HomeMy WebLinkAboutSWPP Plan - C900 KinderCare Carmel15' SETBACK20' SETBACK30' SETBACK
KIDERCARE LEARNING CENTER
SINGLE STORY BUILDING
6)
F.F. 902.00'
SOUTH SUB-PARCEL
(58110 SF OR 1.33 AC)
NORTH SUB-PARCEL
(49960 SF OR 1.15 AC)
20' SE
T
B
A
C
K
0' 5' 10' 15' 20' 25' 50'20' SETBACK30' SETBACK ANDGREENBELTEX.ST EX.ST EX.ST EX.ST EX.ST EX.ST EX.ST EX.STEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.GASEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SANEX.SAN CWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCWCW20'-0"
SAN. EASEMENT
20'-0"
WATER E
A
S
E
M
E
N
T
NO PLAN
T
I
N
G
SUB-PARCEL LINE
SAN SAN
20'-0"
SAN. EASEMENT
10'-0"
GAS EASEMENT
WTR
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GASGASGASGASSTSTSTSTSTSTSTSTSTSTSTSTSTST STSTSTSTSTST
STSTSTSTST
10'-0"
GAS EASEMENT
DISTURBANCE LIMIT
CWOCWOCWOCWO
TMSTMSTMSTMSTMSTMSTMSTMSTMSTMSTMS TMS TMS TMS TMS TMS
TTSTTSTTSTTSTTSTTSTTSTTSTTSTTSTTS TTS TTS TTS TTS TTS
IP
(ROW)IP
IP
DISTURBANCE AREA = 1.729 AC
ST ST ST ST ST ST ST ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
STSTSTSTSTSTSTSTST901.5'901.5'900.0'
898.0'
897.0'
900.0'
901.0'901.5'898.0'
IP
IP
DISTURBANCE LIM
I
T
DISTURBANCE LIM
I
T DISTURBANCE LIMITDISTURBANCE LIMIT
DISTURBANCE LIMITFLOWF
LOW
FLOW
FLOW
FLOW
FL
O
W
FL
O
W
FLOW FLOWFLOWFLO
W
FL
O
W
FLOW
TEMPORARY ENTRANCE
PLACE SWPPP INFORMATION
SIGN AT THIS LOCATION
TEMPORARY CONCRETE WASH-OUT
TEMP. MATERIAL
STORAGE AREA
TEMP. TRASH
STORAGE AREA
RE-ESTABLISH GRASS BY SEEDING
IF NO DISTURBANCE OCCURS IN 7 DAYS
RE-ESTABLISH GRASS BY SEEDING
IF NO DISTURBANCE OCCURS IN 7 DAYS
RE-ESTABLISH GRASS BY SEEDING
IF NO DISTURBANCE OCCURS IN 7 DAYS
A
A
A
A
B
B
B
B
B
B
BBB
B
B
C
DE
F
F F
F
F
F
F
F
F
SAN SAN SAN SAN SAN
ST901.0'900.5'9
0
0
.
5
'900.0'900.0'
900.0'
899.0'
899.0'
899.0'
898.0'
897.0'901.0'897.0'
IP
IP
IP
898.0'898.0'902.0'
902.0'
901.0'
900.0';
899.0'
901.0'
900.0'
899.0'
901.0'
900.0'
ST
ST
ST
ST
ST
ST
ST
ST
ST
WTR WTR
150'-0"
IP
KEYED NOTES:
TEMPORARY ROCK CHECK DAM
GRASS SHALL BE RE-ESTABLISHED IN THIS AREA BY SEEDING. A HEALTHY
STAND OF GRASS SHALL BE ESTABLISHED IN ALL DISTURBED AREAS UPON
COMPLETION OF LAND DISTURBING ACTIVITIES. TEMPORARY MULCH
STABILIZATION AND SEEDING SHALL BE APPLIED IN DISTURBED AREA WHERE
NO ADDITIONAL DISTURBANCE OCCURS IN 7 DAYS, AS NOTED BELOW.
24' WIDE CONSTRUCTION ENTRANCE/ WHEEL CLEANING AREA
TEMPORARY TRASH AREA/ TEMPORARY TOPSOIL STOCKPILE AREA, IF
REQUIRED. (SEE EROSION CONTROL DETAIL)
TEMPORARY MATERIAL STORAGE AREA
INSTALL EROSION CONTROL BLANKET ON SLOPE
ROCK CHUTE/ RIPRAP AT PIPE OUTLET (NOT USED)
TEMPORARY SEDIMENT BASIN OUTLET TRAP, 12' LONG AND 6' WIDE FROM
OUTLET
(NOT USED)
= AREA SUBJECT TO TEMPORARY SEEDING DURING CONSTRUCTION
& PERMANENT SEEDING AND/OR SOD PLACEMENT AS SOON AS
LAND DISTURBING ACTIVITIES ARE COMPLETE.
= CONCRETE TRUCK WASHOUT AREA (10'X10')
= FILTER SOCK DROP INLET PROTECTION
= TEMPORARY MATERIALS STORAGE AREA
= CONSTRUCTION/ DISTURBANCE LIMITS
= SILT FENCE
= RIPRAP SCOUR PROTECTION OVER FILTER FABRIC
= GRAVEL CONSTRUCTION ENTRANCE. MIN. L= 50FT, W=24FT
= EROSION CONTROL BLANKET (WESTERN EXCELSIOR EXCEL SR-1 OR
APPROVED EQUAL)
= DIRECTION OF SURFACE FLOW
= TEMPORARY RACK CHECK DAM
SF
= TEMPORARY TRASH STORAGE AREA/ STOCKPILE AREA
TMS TMSTMSTMS
TTS TTS TTSTTSSIP SIP SIPSIPCWO CWOCWOCWOEROSION CONTROL & SWPP LEGEND
= INLET PROTECTION
A
B
C
D
E
F
G
H
GENERAL NOTES:
1.THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS, WASTEWATER, AND OTHER SUBSTANCES ON
THE SITE IN SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY THE ACTION OF
WINDS. STORM WATER RUNOFF, OR OTHER FORCES. PROPER DISPOSAL OR MANAGEMENT OF ALL WASTES
AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE OF THE WASTE OR MATERIAL, IS
REQUIRED.
2.PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF ACCUMULATED SEDIMENT. BULK CLEARING
OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING THE AREA WITH WATER. CLEARED
SEDIMENT SHALL BE RETURNED TO THE POINT OF LIKELY ORIGIN OR OTHER SUITABLE LOCATION.
3.THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE
CONSTRUCTION SITE. ALL MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE INSTALLED
UNDER THE GUIDANCE OF QUALIFIED PERSONNEL EXPERIENCED IN EROSION CONTROL, AND FOLLOWING
THE PLANS AND SPECIFICATIONS INCLUDED HEREIN.
4.ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE INDIANA STORM WATER QUALITY
MANUAL AVAILABLE FROM IDEM.
5.ADDITIONAL EROSION CONTROL MEASURE MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR.
1 2 3 4 5 6
1 2 3 4 5 6
D
C
B
A 236 EAST MAIN STREETENGINEERING THAT WORKSENGINEERING WITH STYLEGAS CITY, IN 46933SCALE(36x24):
SITE STORMWATER POLLUTION PREVENTION PLAN
C900
1
1" = 20' - 0"
SWPP PLAN
C900
N