Loading...
HomeMy WebLinkAboutRoof PlanSOFFIT LIGHTING (TYP) LOCATE ALL PLUMBING STACKS NEAR ROOF PLANE. VERIFY THAT NO VENTS ARE VISIBLE FROM THE STREET. PROVIDE PREFINISHED METAL DRIP EDGE AT ALL ROOF EAVES AND RAKES. PROVIDE PREFINISHED 5" METAL GUTTERS AND DOWNSPOUTS -COORDINATE DOWNSPOUT LOCATIONS WITH OWNER & CIVIL ENGINEER IN FIELD. PROVIDE SELF-ADHERED ROOFING UNDERLAYMENT (GRACE ICE & WATER SHIELD OR APPROVED EQUAL) AT ALL EAVES AND VALLEYS 36" PAST THE INTERIOR OF THE EXTERIOR WALL AND UP EACH VALLEY SIDE 18" MINIMUM. PROVIDE SELF-ADHERED ROOFING UNDERLAYEMNT (GRACE ICE & WATER SHIELD OR APPROVED EQUAL) AT ALL DORMERS, TYPICAL. SADDLE SHALL BE SINGLE PLY 60 MIL EPDM WITH PREFINISHED METAL EDGE FLASHING WITH DRIP EDGE. INSTALL IN STRICT COMPLIANCE WITH MANUFACTURER'S INSTALLATION SPECIFICATION. MINIMUM SLOPE TO BE 1/4" PER FOOT. PAINT ALL ROOF PENETRATIONS TO MATCH ROOF. ROOF PLAN NOTES Project North True North is a member of the IBI Group of companies DATE: ISSUE SHEET TITLE PROJECT SCALE: APPROVED BY:PROJECT MGR: PROJECT NO: SHEET NUMBER CLIENT COPYRIGHT ISSUES This drawing has been prepared solely for the intended use, thus any reproduction or distribution for any purpose other than authorized by IBI Group is forbidden. Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job, and IBI Group shall be informed of any variations from the dimensions and conditions shown on the drawing. Shop drawings shall be submitted to IBI Group for general conformance before proceeding with fabrication. IBI Group Engineering Services (USA) Inc.NOT FOR CONSTRUCTIONCHECKED BY:DRAWN BY:SCALE CHECKSEAL 3221 W Big Beaver, Suite 111 Troy, MI, 48084 10mm1 inCONSULTANTS As indicated C C:\Users\corrinne.greer\Documents\REVIT2018\122885_814KC CrmlIN_arch_v18_corrinne.greer.rvtROOF PLAN 122885 M.STOCK 2020-02-19 AE1-300a KINDERCARE LEARNING CENTER L.SMIGLIANI CARMEL, IN C.GREER E.SHELINE SCALE:1/8" = 1'-0" ROOF PLAN1 No. DESCRIPTION DATE A SITE PLAN REVIEW 2019-11-08 B SITE PLAN REVIEW REV01 2020-02-21 C SITE PLAN REVIEW REV03 2020-05-05