Loading...
HomeMy WebLinkAboutCS001.0_Responsability MatrixSAMPLES/PRODUCT SPEC. SHEETS PROJECT SUBMITTALS , �oNnR��r�oN s��Eo�� THE PROJECT OR NECESSARY DRAWING CHANGES °�`°�""°A`�"°��E� eE�"'�°°�`�M= SUBMITTALS REQUIRED cwcau coxmncraR mre R�ea µo n�vrewe4 ww sxr ra TME aecn�n �aR a�cw u�o caMUEM. TENANT I G.C. IARCHITECTI REMARKS I SHOP DRAWINGS i i • ATTIC STOCK 1. 10R LIGHT FlXNRE BULBS FOR G.C. SUPPLIED LIGHT FIXTURES. 2. 1 BOX OF EACH WALL h FLOOR TILES. 3. 1 BOX OF EACH CEILING TILE. 4. 1 QUART OF EACH PAINT. TENANT I G.C. IARCHITECTI REMARKS � � � PROJECT CLOSEOUT 1. TEST & BAIANCE REPORT FOR ENTIRE HVAC SYSTEM PROVIDED BY INDEPENDENT MECHANICAL CONTRACTOR HIRED BY THE OWNER WITHW Q4) DAYS OF TURNOVER. 2. (2) PUNCH LIST WALK-THRU'S REQUIRED - (1) DAttIME & (1) NIGHTfIME. �:z��r�x���r:�►u�:�:����►u���� THE COMRACT DOWMEMS ARE INTENDED TO INCWDE OR IMPLY ALL REMS REQUIRED PoR THE PROPER E%ECUTION, FULL PERFORMANCE AND COMPLETION OF THE WORK FOR A FULLY FINISHED AND FUNCTIONING PROJECT. ANY ITEM OF WORK AIENTIONED IN THE SPECIFlCATIONS AND NOT SHOWN IN THE DRAWWGS, OR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE SPEQFlCATIONS, SHALL BE PROVIDE� BY COMRACTOR AS IF SHOWN OR MENTIONED IN BOTH. THE DRAWINGS AND SPEGFICATIONS ARE INTENTIONALLY NON-EXHAUSTNE AN� PAR7IALLY COMPLEfE DOWMEMS WHICH INDICATE THE GENERAL SCOPE OF 7HE PROJECT IN TERMS OF THE ARCHITECTURAL �ESIGN CONCEPT, pUALIiY LEVEL OF THE PROJECT IN GENE2AL, 7HE GENERAL DIMENSIONS OF THE WORK, THE IYPE OF SiRUCiURAL, MECHANICAL, ELECTRICAL AND PLUA�BING SlSTEMS AND THE DESIGN INTEM OF THE MfWOR ARCHITECTUNAL AN� INTERIOR DESIGN ELEMENTS OF CONSTRUCTION. AS PARTIALLY COMPLEfE DOCUMENTS, THE DRAWINGS AND SPEQFICATIONS DO NOT NECESSARILY INDICAiE OR DESCRIBE ALL WORK OR THE IMERMESHWG AND COORDINATION REQUIRED FOR THE FULL PERFORMANCE AND COMPLEfION OF THE WORK. 7HI5 CONS�RUCTION CON7RACT AN� CONTRACTOR'S SUBWNTRACTS AN� MATERIAL PURCHASE OR�ERS WILL BE AWARDED ON THE BASIS OF SUCH DOCUMENTS WI7H THE UN�ERSTANDING THAT CONTRACTOR, SUBCONTRACTORS AND MATERIALMEN ARE TO FURNISH ITEMS REQUIRE� FOR PROPER COMPLETION OF WORK WITHOUT ADJUSTMENT TO THE COMRACT SUM OR SCHE�ULE. IT IS INiEN�E� THAT THE WORK BE OF SOUN� AN� QUALIIY CONSTRUCTION AND THAT THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MCLUSION OF ADEDUATE Sl1MS OF AIONIES AND TIME AND TO WVER INSTALLATION, IMERMESHING AND COORDINATION OF ALL ITEMS INDICATED, DESCRIBE� OR IMPLIED IN THE POR710N OF THE WORK TO BE PERFORME� AN� COMPLEfE� BY THEM. SUBSEQUENT DRAWINGS AND SPECIFlCATIONS WILL BE ISSUED WHICH WILL MORE COAIPLETELY DETAIL THE WORK BUT WILL NOT CHANGE 7HE WERALL SCOPE, DESIGN MiENT, OR GIVE CAUSE FOR CHANGE ORDERS TO CONSTRUCTION CONTRACT. GENERALLY, THE SPECIFICATIONS DESCRIBE WORK WHICH CANNOT BE READILY INDICATED ON THE DRAWINGS AND INDICAIE ttPES, QUAllPES AND METHODS OF INSTALlATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRE� FOR THE WORK. R IS NOT INTEN�E� TO MENTION EVERY REM OF WORK IN THE SPECIFlCATIONS WHICH CAN BE ADEQl1ATELY SHOWN ON THE DRAWWGS, NOR TO SHOW ON THE DRAWINGS ALL IiEMS OF WORK DESCRIBED OR REQUIRE� BY THE SPECIfICATI0N5 EVEN IF THEY ARE OF SUCH A NATURE THAT THEY COI1L� HAVE BEEN SHOWN 7HEREON. ALL MATERIALS OR IABOR PoR WORK WHICH IS SHOWN ON THE DRAWWGS AND SPECIFICATIONS OR WHICH IS REASONABLY INFERABLE THEREFROM AS BEING NECESSARY TO PRODUCE A FINISHE� JOB SHALL BE PROVIDED BY THE CONTRACTOR WHEfHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE DRAWINGS AND SPEQFICATIONS. PROJECT RESPONSIBILITY MATRIX � ���P� ITEM Fixruaes, FueNisHiNcs & EQUIPMENT STRUCTURAL COMMENTS ALL OTHER WORK NOT LISTED ABOVE & SHOWN ELSEWHERE HERBN • • NOTB OTHER ITEMS NOT INCWDED IN MATRIX ARE G.C.'S RESPONSIBILIiY (UNLESS NOTED OTHERWISE ON DRAWINGS). G.C. TO PROVIDE ARCHIiECT OR TENANi WITH RELIABLE iAKE-OFFS AND FlELD DIMENSIONS UPON DEMAND FOR ARCHITECi OR iENANT PROVIDED ITEMS. * G.C. IS RESPONSIBLE FOR UN-CARTING, 0.SSEMBLING, & INSTAWNG OF OWNER SUPPIJED IiEMS INCWDING BUi NOi IJMIiED T0: WUIPMENT & FURNITURE. "* G.C. IS RESPONSIBLE FOR THE REMOVAL OF TRASH AND ASSOCIATED BOXES, HG FROM OWNER SUPPIJED ITEMS FROM THE CONSTRUCTION SITE. � � � � � � � � � e � B � � � � � � e & � � � � + Q z � � � `' � Q i--i � w � o ,� W aM + r N N �--i �, � W m � o� � ~ LL \o tn � .�. � ", i - d�--� c o Q w�sz - 6 Z °j s aNJ J ^' : _ Q � � i _ � Q � O J � r � � � � � a + � < s �i s< co c �n s <s ¢ � � a `�s T^ : � W `� `d m � e = o B � � � x b _ ° �d\ S7F���F'':o ;��F�4i� �F`��:'9 ; ' :Q� Nn. O�. ; 19300071.j;�.= ��,o� ' RELEA5E0 FOR CONSTRIlCTION Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��. oarE: 06/11 /20 CS1oF3 uL