HomeMy WebLinkAboutSP003.0 _ Specification Sheet (2)RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
8. ➢LE NOiES
1. Work Includetl: Provltle all labor, matenal antl equlpment to aimple�e
the tile InstallaGon as shown on �he dmwings and specified on dmwings.
2 Pmduds: Refer to �latenal Fnish Legend for pmduct specificotion.
a. Porcelain Tlle.
b. Cemmic Tlle
3. Wall tile Installo6on to comply �o TCA Method F142-93, o�ganlc adhesive,
and Ooor file to comply to TCA I�ethod F142-93 and TCA Method for
mudset instalblion.
4- Contmctor to verdy grout cobrs wlth Arch7tecL Submlt samples.
5. ihls Cont�ac�or Is responslble for prepann9 0ll surfaces to amept tlle
finish See waterymofing membmne lowhons on Floor Fnish Plan, A501.
Install aocking Isolalion sheet by 'LaEcrete' model 'Blue 97 over
contml joints applied w� manufacturer's recommended adhesive
per manu(acWrers 'mstmc6oa An equlvalent product may be subsCituted,
contingent upon review ontl approval by the Architect.
6. Do not apply atlhesives or mortor setting beds unfil necessary gmunds,
hangers, anchors, and olher dems lo receive plumbing hove been pmpedy
Installed. Coordlnate work with other tmdes.
7. Lle lo be appfied plumb and Uue, all grout )olnts are to be o! equal
thlckness.
8. Layoul tile in each areo in such o monner as ta minimize ihe alting
of tile.
9. Gmut�. Woll file - Veniy with Architect.
10- Upon wmplefion of Ne work, dean finish sudace thoroughly_ Do mt
use acid seWtlon on glazed tllework.
11. Seal tile and grout sudaces where rerommended by manufadurer for
matenals and appllcofions involved; comply with manu(acWrer's
recommendali0ns
12 Lobor shall be performed mpitlly, consislwl wllh the prqect schedule,
and In workmonship manner, to Ihe saHs(ocfion o( the Arch➢ect and
Owner.
13. Contmdor Is to guamntee oll work and matenal for one year after
comple6on against oll defeds of moteriols, and workmonship.
14. ihis Gontmdm is responslble for dean up ot any le(t over materlal
or mbbish wused by Installafion of �his woM. Or as requested by
the Ownec
15- Make all Flmr �mnsl6ons level and hue. Provlde leveling lotee wmpound
as necesrvry on uneven llooring. Provide conaete for deeper potches.
i6. Provide somples of all 61es, slones, quarry, reramics, pattems, antl grouls
to archltect for appmval.
C- FIBERGlASS REWFORGED PIASiIG WALL PANEIJNG
L(FRP) to be Kalfle pebble wFite or white Kemfle -09" thLk by Kemllte Cory, U-N-O-
ln rolors noted on drawings.
2- Provide oll necessary atlhesives, lasteners, vinyl molding and trim,
and rivets.
a. CoWk FRP at base, ceiling, and doo� intersecfions.
3. Install pe� Monufacturer's diredions.
D. PAINTWG�SiAINING NOTES
I. Work'mcludea: Labor, matenal and equipment �o complete all painting
and staining as shown, specified, herein or implied from Uese drowings
antl notes, Indudng but not neressarily Iimlted to Ihe following:
A. Items:
1. Intenor and e#enor painting ot locations as indlcated on dmwings,
refer to I�atenal Finish Leqend-
2 Gypsum wollboa�tl and celing, sotfls as speb�ed on tlrowings
3. Recessed Ilght fixWre tnms & mechonlcal dlt(urer � aroess panels
4. Guartlmils & Hantlroils
5. Mlsrelloneous Metals.
6. Miscelloneous Mllwork & Running inm-
7. Wood doors & fmmes
8- D:sploy Millwork
9- Floors
iQ Exposetl rellings ond simcture, os spedfed on tlrawings.
B. Matenals'
1. Colors as speciPied In �latenal Fnish Legend.
a. Aceeptable paint manufadurers�.
As specife .
b- Benjamin Moore paint seledions as spuified-
17. Examination
a. Sle Condi6ons: Venfy Ihe mndl6ons fo� rompllanre with Ihe requirements inclutling
environmental condllions, installotion tolemnces, and other rondlPions affecting �he
InsWllation ond pertormance of vinyl plonk Floonng pads. Any unwtisfactory condiPions
shall be corrected pnor to installoUon of vinyl plank flwring-
b- Feld Dimwsions- Fleld dimensions shall be verifed Qnduding �hcse not shown m the
drowings) prio� to installofion_ Any dlscreponbes mted sholl be brought to the atten6on
of the Archltect with resolulions to the dlscrepancles to be mulually ogreetl upon by
all Padles involved.
I8. Installa�ion
a. Before installing vinyl plank Ooonng, plan out the layout such that tile joints foll ot least
(6) 'mches away fmm undedayment joinLs. Do not Install over �pansion joinLs. Stagger
entl joinls a minimum of (6) 'mches apod.
b It Is the Installer's responsiblllty to veniy the scope of the installation and to ortler
Ue wrrut quordiPies of parts ('mduding a waste allowance).
c. Flmr inslallaL'on procedure
L Chalk-Ilne guide pattem beginning In �he comer of the mom tudhest fmm �he dcorwoy.
2 Apply epoxy adhesive 'm 2-ft. or 3-ft. bantls, being careful not to mver cholk I'mes. Do
not apply more adhesrve Man rnn be rovued wdh'm (20) minutes. DO NOT allow Me
adhesfre to dry rompletely dunng 'mstolloUon.
3. Install CJes olong the chalk Ilnes by setting PJes In adhesive bed.
4- Immed'mtely remove any ezcess adhesive fmm the surfore of the Floonng using o dean,
white tlo�h dampened with a neutml tletergent an� water
5. Roll the PJes In both dlrections withln (30) minutes aker Installation using a 100-Ib. mller.
6- Do not work on newly 'mstalled fJe except to roll CJes. If unmoidable, use a kneeling boord.
Z Repeat the above steps until InstallaPion has been completed.
8. Do not allow WRm (or (24) hours aker installaGoa Newly installed Oooring shall not be
expoead � mlling load hafflc �or ot leaat (72) hours aku Installation �n allow for pmpu
setling and drying of the adheslve-
d. Wall mstallafion mcedure
�
L Apply acrylic mastic using a 1�16" V-notch bowel. Apply skim roat o( mas6c u4ng
(lat side of tmweL Apply a4dlPional odhesive wflh notch side of tmwel held at a 45'
ongle to the wall sudace, combing In one dlredlon. �o not apply moa maslic �han
wn be wvered witFm (3�) miwles- �0 NOi ollow mas6c to dry completeh- I( maslic
begins to skin over (not sikky), retrowel betore setting lile. DO NOi appy more
masL'c than is required to ochfeve a suf�icient bond.
2 Press tiles flrtnly Into place In a peryendicular moPion across mas�c ndges Venfy that
CJes ore level and sqmry Make any requlred adjustrnen�s Immed'mtely-
3- Pound CJes 'mto mastic bed with mbber mallet or beaPing block immediately aiter setting
fJes and checking level�sqmre.
4. ImmPdiately remove any excess adhesive irom the sudoce of the Floonng using a dean,
whlte do�h dampened wdh woter.
5. Tape all ou�side Pile comers to ensure pmper Pile adhesion unUl mastic has set and dned.
6- Repeat the above steps wPJ Installation has been rompletPA-
7. Allow up to (72) hours !or wmplele drying- Drying fime will be eztended if appfiwfion ls In
�m hlgh humidlty envlronment or If Me omblent �empemture Is below 60'F Q6'C� Malntain
wnsislenl lempemWre throughout the drying period-
E.
2&tenor Work�. Pmdde the following paint rystems.
a EIFS: flat sheea
1. lst ontl 2nd CoaC Exlerlor ocryGc lolex emulslon
compatible wi�h stucro.
b- E#enor Sleel
L 2 wats mst'mhibltor / pnmu-
2 roats seml-gloss top coots
S Interior Work: Pmvide the following paln! eystems.
b. H.M. Doors & Fmmes:
I wat'mtenor pnmer
2 wals topcoots. (semi-gloss)
c. Woodwo�k bockpnming
ist cmC Wood Untlercoater
2ntl coaL Spread Ultm Semigloss Enomel
tl. Gypsum Wollboard
Eggshell (Safin) at ceifings antl walls, Flat at loilet mom ceilings,
Sa�n at Mtchen Gyp. Board ceilings & sofflLs.
ist cmL Pnmer Sealer
2nd coaC. refer to finish legend on dmwings
3rd coat: same as second coat
i. Sloiris: Paneling, Doors, Trims - SoUn Rubbed Fnish, U.N 0.
1) 2- 3 mats staln b�ush applled antl wipetl immetliotey
with sott wtton mgs or as necessary to ochleve, seoler
sheen color per Coryomte.
2) All sealers shall be bmsh opplled with wtin finish, U.N.O.
Wait 24 hours atter final stalning. 3 mat process,
oll based polyure�hane per mowfacWre's rec.
a First coat shall be sanding sealer.
b. Fill all pores, gmins smooth.
c. Three roals at msework.
d Fre retardant treatment If Indimted. Class I mGng.
J. NaWml fioish intenor - wood Mm, wood doors ond fmmes,
paneling- Closs I flome spread; more requirements on
Code Analysis Plan, A101.
k. Sheen
poneling. Class I Oame spreod; more requlremenLs on
Cotle Analysis Ploq A101.
2 Stain mting at finish interior - wood tnm, wood doors and fmmes,
ponefinq_ G-0_ to provide Archited with documwtatian that Flamespread
mting meels the required mtings shown on the code analysis- Wood -
flre relardant treatment -all exposed wood paneling, planking and
pywood-
3- Do not begin work on surfaces that are ur�suitable for pmper finish
of work, nolify Archlted and Geneml Gontrador of unsuitable surfaces
and roreed work onl whem m�ditions are correded.
P Y
4. Fill voids between wall suAaces and wood or metal trim or scribed
edges with, putt, wWking material, or spackle, as mquired by the
swface, to assure a smooth �inlsh.
5. Cleaq hontl-sandpaper, and tlus( of( all woodwork. Potty nall
holes, cmcks, and defects In woodwork ofter first wat. Sandpaper
woodwmk smmth ofter each every coal exrzpt the last wat
Insure that surfaces ore �ree of dust, dlrt, and other impedecfions
before pmceeding wilh addlUonol coats.
6- No eztenor stalning or pain6ng 'm miny, damp, high humidity
weother or untll swface is tlry.
7. Apply moleriols accortling !o monufacturer's inslmctlon ond hee
fmm mns antl sags. Apply no point, vomish, or enamel unCJ
preceding cmt Is dry and haN-
8- Conlroctor ls to guarontee all work ontl moterlol !or one year ofler
mmplefion agoinst all defects o� material, and woMmonship.
9- ihis contmdor is responsible for dean up of any left over material
or mbblsh cauxd by Instolla6on of Ihis work. All such matedal
shall be removed fmm the job sde doiN or as requested by the
Owner.
10- All sur(aces to be deanetl, dry and dear o( blemishes, dirt etc
1L Provide paint ond stoin somples o! all materials to archited for
approval. Pnor to any painting�stalning.
ACOUSiICAL TREAiMENT�CEILWG SISTEM
1. Install suspended ceiling system as shown intluding all nemssnry
hangers, imming, penmeter mntml joints and stmctuml reinforcement
a- Matenal as intlicatetl on Motenol Flnish Legend.
2 Manufacturer - see IAatenal Flnish Legend for PJe. &isPmg gnd to remaia
3. Coordinate �he spacing oi all hangers, carrying channels, mnner ond
molding with lhe loca6on of eledrical fixWres and other items occurring
In or on �he relling.
4. iiles to be installed m gmin Ilnes of file are running in same directlon
on all ceil'mgs.
5. following complePion of awustical ceiling instolloUon, all joinLs shall be
stralght, hue to line, with exposetl sudace Ilush ond level.
6. II celling tlRfusers, nght fnWres or olher elemenis on or obove ceifng
cannot be located as shown on the dmwings, such 'mtederence shall
be repoded immediately to the Architect for reloca6oa
7. G_C_ to provlde Architect with documenta6on lhat
ilomespread roting meets the required rotings shown on
the code anolysis-
NOTP. Refer to room fnlsh xhedule antl reflected celling plan on
dmwings Por fudher specifiwPions
DIVISION 10- i01LEi ACCESSORIES
A_ i01LEi ACCESSORIES
L WORK WGWDED
o. Pmvltle tollef accessones, wdh accessanes, attachment hartlware and
rough-in fromes as requlred for complete, opero6onol instalb6on.
2. MANUFACTURERS
As specified on Tollet Accessory Schedule, or appmved equal.
3. MATERIALS
a. Keys: Provide univerrvl keys for occess to toilet accessory
um(s requlnng Intemal access for servicing and resupply;
pmvide minimum six keys to Owner �epresentative.
b. &pased Finishes: Stainless steel, number 4, safin Pinish�, sa8n
chmme finish occeptable where stainless steel not wailable for
accessory dem listetl or scheduled.
4. INSiALLAT10N
a- Install accessories in accoNance with manufacWrer's pnnted
inslmctions using fwteners appmpriate lo subshole-
DIVISION IL SPECYALTIES
1. M& aAlfacts shall be pmNded by the Owner
2 Fre ez6nguishers and signage per fire �epadment requirements by G-C.
4- Stoinless steel corne� guards-
a- To be 18 gauge type 430 �4 satin Anlsh and 3 1�7'z3 1/2"x48"
or as noted on drowings-) Provided ond lnstalled h FSEC
b.
5. Awnings & Signage: by Ownels Contractor
Awning monutacWrer must mee� all wlnd, dead & Ilve lood
requirements for the bwl muNGpality-
6. Provlde item cuts, shops on all specialty items for approval.
DIVISION I2�. P.O.S. / SOUND SYSiEM / SECURIIY
1. G.G and subcontmctors to cmrdinate and supply all necessary Items (indutling winng) w�
P-05.� Sound Syslem wntmctors seluted by ownec ElecMcal Items induded in dmwings
ore for 'mPortnaPional & pncing purposes only. Fnal selected vendors may dlffer on
requirements to tha� shown on dmwings.
DNISION 13: FOOD EQUIPMENi
1. Prior to rouqh-in !or kitchen equipment, venly oll rough-in bcatlons ontl
obtain exoct dlmensions fmm kitchen equipment supplfer.
2 InstallaPion of piping shall wmply with all health depadment and local code
aulhonty mquirements
3- LowUons of all plumbing connutions on plan are for referwce only_ Exoct
IocaL'ons shall be mo�dinated with ki(chen equipmen� supplier and exisL'ng
Pield conditions.
DIVISION 14: WNVEI'ING EQUIPMENi
DIVISION 75� MECHANICAL - SEE MECHANICAL & PWMBING DRAWINGS FOR SPECIFlCATIONS (BY OTHERS�
DIVISION 16 ELECTRICAL - SEE ELECTRICAL DRAWINGS PoR SPECIFlCATIONS BY OiHERS).
� aa
� � �
� a 8
� � �
� - � � �
� � � e
& � � � �
+
Q z ^
�
� `'' � ¢
IH
� w �
o � W
aM + r N
N
�--i w
� w m � o�
� ~ LL
\o C/� � .�.
� w i -
d�--� c o
(� "' � a m
- 6 Z °j s
aNJ J ^"'
_ Q
� � E
_ �
Q � O
J
� r
� �
� �
� a
+
:--) '"
� � �
� � � N
� N a
� N �
z �y � i
:
�s¢
co c
�
¢
� ms
� Ms
N Q
<
� N
�
'o
�
� a `�s T^
: � `� `d
� c � o � � &
PROFESSIONAL SEAL:
` d� STE��F'':o
�`��4i� �C`�':�s
_ :Q� Nn. 0.,: "
19300071:;�._
��,o� '
SHEET NUMBER:
SP3oF3
� 201➢, &4RKER NFSfOR, WC.
ALL RICHiS RESERVEO
oarE: 06/11 /20