HomeMy WebLinkAboutGN001 - 218VWCSEE ELEV.
FOR SIZE
VENTED SOFFIT
SEE ELEV. FOR SIZE
R-38 INSULATION
BOTTOM TRUSS CHORD
SIDING
7/16" ROOF DECKING
ROOF SHINGLES
PROVIDE 2" CLEARANCE
FOR INSULATION
SEE ROOF PLAN
12"
1/2" DRYWALL
2x4 STUD WALL
AT 16" O.C.
BRICK VENEER
7/16" ZIP SHEATHING
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
3/4" DECKING
SEE FLOOR FRAMING
PLAN FOR JOIST LAYOUT
3/4" DECKING
2x4 SILL PLATE
1/2" DRYWALL
R-15 INSULATION SEE ELEVATION FOR WALL HEIGHTSEE ELEVATION FOR WALL HEIGHT METAL TIE
THROUGH WALL FLASHING
R-10 VINYL FACED BATT INSULATION
DOWN 4'-0" FROM TOP OF FNDN. WALLNOTE: OFFSET FACE OF STUD 1/2"
FROM FACE OF FOUND. WALL
WATERPROOFING
TYPICAL FOUNDATION WALL:
* 8" POURED CONCRETE WALL
* SILL ANCHOR BOLTS @ 6'-0" O.C.
* 16"X8" CONCRETE FOOTING
* #3 STEEL WALL REINFORCING
2" FROM FACE OF WALL
* LOOP WIRE REINFORCING
4" CONC. SLAB ON GRADE
W/ 6 MIL. VAPOR BARRIER
4" MIN. GRANULAR FILL
GRANULAR FILL TO
12" ABOVE TOP OF
CONCRETE FOOTING
4" DRAIN TILE
4" DRAIN TILE
1'-4"8"1'SEE ELEVATION FOR WALL HEIGHTSLOPED BRICK ROWLOCK SILL
OVERDIG
GRADE
CONCRETE FOOTER
IN UNFINISHED BASEMENT AREAS
R-13 BATT INSULATIONBETWEEN JOISTS TYP.
W/FIRESTONE RUBBER FLASHING
DRIP EDGE FLASHING TYP.1x6 BAND BOARD w/METAL
(R-13 IN BASEMENT FINISHED WALLS)
FIN. MAIN LEVEL
FIN. UPPER LEVEL
FIN. LOWER LEVEL (9' WALLS)
T.O. PLATE (MAIN)
T.O. FOUNDATION
T.O. PLATE (UPPER)6' - 8"BEAM SUPPORTING LANDING
FLUSH BEAM SUPPORTING FLOOR
LINE OF 6’-8” HEAD HEIGHT
CLOSED TREADS
FURR OUT WALL TO UNDERSIDE OF LANDING
ALIGN
CLOSED TREADS
OPEN TREADS PER SPECS
FRAME BULKHEAD BETWEEN BEAMS
FIN. MAIN LEVEL
FIN. UPPER LEVEL
FIN. LOWER LEVEL (9' WALLS)
T.O. PLATE (MAIN)
T.O. FOUNDATION
T.O. PLATE (UPPER)6' - 8"OPEN TREADS PER SPECS
CLOSED TREADS PER SPECS
FURR WALL TO BOTTOM SIDE OF LANDING
ALIGN
LINE OF 6’-8”H HEAD HT
FLUSH WOOD BEAM
FIN. MAIN LEVEL
FIN. UPPER LEVEL
T.O. PLATE (MAIN)
T.O. PLATE (UPPER)
PLATFORM
MEZZO 60 ” FIREPLACE
TILE- WRAPS ALL SIDES8' - 0"BULKHEAD BEYOND
1X4 TRIM @ TOP OF TILE ON ALL SIDES W/ WOOD CAP
8' - 0" 2' - 1 1/8" GYP BD BULKHEAD W/ VENTING FOR FIREPLACE
8" MIN.3"D METAL DEFLECTOR IN TILE JOINT
TV
1' - 6" FIN. MAIN LEVEL
T.O. PLATE (MAIN)
T.O. GARAGE WALL
LINE OF PLATFORM
COSMO 42” FIREPLACE
STONE PER SPECS
FIN. MAIN LEVEL
T.O. PLATE (MAIN)
CROWN, TYP.
TRIM HEADER, TYP.
1X6 TRIM JAMB RIPPED TO FIT, TYP.
BASE TRIM, TYP.
INTERIOR PILASTERS. SEE PLAN FOR DIMS.
FIN. MAIN LEVEL
FIN. LOWER LEVEL (9' WALLS)
T.O. FOUNDATION
WOOD STUD BEARING WALL
FROM CRAWL FOUNDATION
WALL UP TO BOTTOM OF
FLOOR JOIST
4" CONC. SLAB OVER
6 MIL VAPOR BARRIER OVER
4" MIN. GRANULAR FILL
FOUNDATION WALL OVERDIG
4" DRAIN TILE
TYPICAL FOUNDATION WALL:
* 8" POURED CONCRETE WALL
* SILL ANCHOR BOLTS @6'-0" O.C.
* 16" X 8" CONCRETE FOOTING
* #3 STEEL WALL REINFORCING 2" FROM FACE OF WALL
* LOOP WIRE REINFORCING
11 7/8" I-JOIST
APPROXIMATE CRAWL FLOOR
6 MIL VAPOR BARRIER OVER
4" MIN. GRANULAR FILL
PROVIDE A WOOD LVL
HEADER AT CRAWL
SPACE ACCESS OPENING
R-10 VINYL FACED BATT INSULATION
ON EXTERIOR WALLS IN CRAWL 8' - 9 1/2"HEIGHT DETERMINED BY GRADECUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.630032 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2015 Wedgewood Building Co. LLC. 5/5/2020
5:31:44 PM
ID1AHMAD SULTAN RESIDENCE218 NORTH LAKE @ THE VILLAGE OF WEST CLAYINTERIOR ELEVATIONS AND DETAILS BJDS
3/4" = 1'-0"1 TYPICAL WALL SECTION
GENERAL NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.Rev.No. Date Description1/4" = 1'-0"2 STAIR SECTION 1
1/4" = 1'-0"3 STAIR SECTION 2
1/4" = 1'-0"4 GREAT ROOM FIREPLACE ELEVATION
1/4" = 1'-0"5 FOUR SEASON ROOM FIREPLACE ELEVATION
1/4" = 1'-0"6 FOUR SEASON ROOM ELEVATION
1/2" = 1'-0"7 CRAWL WALL SECTION