HomeMy WebLinkAboutA12-7-Skybridge-Parking-Garage-Vert-Circ-Plans-and-Sections-Rev.1�
----�
� III
TO STRUCTURAL DWGS
�R SKVBRIDGE FRAMING
PE
� O
�e SouN Level4
13h' 1"
�
@Xli
— ALUMINUMCURTAINWALL:
�e Sou�h Lavel3
122' 9"
�
E%III
CLIP CURTAINN
STRUCTURE AT EACH BEAI
_ Garege Sou�h Level2
_ tn b•
�
INSULATED METAL PANELS
CONTINUE ABOVE COLUMN COVERS
C
� 4'-5" 3'-6"
PREFlNISHE� ALUM.
W W MN COVER
2"INSULATED METALPANEL
SOFFITAND FRAMING
-REFERTO REFLECTE�
CEILING PLANS FOR MORE
WPoRMATION
a
w C.LP.COLUMNSEE
LL STRl1QURAL
0
z
� o BRACESTUDSASREp'�
— a— — — —
0
�
METALSTUD FRAMWGAS
REpUIRE� (COOR�INATE
STUD GAUGE AND SPECIFIC
STU� FRAMWG LOCATIONS W/
W LUMN COVER SUPPLIER)
PREFlNISHED ALUM. COLUMN
COVER-SEESPECS
REFER TO CIVIL DWGS FOR
C WALKWAYWFORMATION
I -! 2, ,'Y;;.-� I I=I
}I III-
I I� e•, I.. I I II I
PA
FULLVADHERED ROOF
MEMBRANEOVERTAPERED
INSULATION I 1l4" IFT MW SLOPE
(NO MINIMUM INSULATION
REQUIRED�.
METAL COPING CAP. SEE
DETAILS.
- �-���-���-���-���-�
I I SEE PARKING GARAGE �RAWINGS
FOR GARAGE FOUNDATIONS
Wall Section - Skybridge Elevator
RELEA5E0 FOR CONSTRUCTION
Suhjec��ocompliancewithallregula�ions �of Plan
04 S�a�e antl Local Codes
�._�..
City of Carmel
y" �n„� ��.�a,�,a'
�
onrE: 06/11 /20
) 2
�
�\
'A.3
��
�
SouN Leveli
mo-i•
4th Floor Enla
114•• = 1•_0••
3
12-00
P4.4
Y
P4 8
Y
P5
Wall Section - Skybridge Elevator
r .
�A 2
�
OPEN TO ABOVE. NO
CEILWG IN THIS STAIR.
�\
�A.3
�/
Stair Plan �
r .
�A.2
�
/1
�A.3
�/
iBEAM
TO STRUCTURAL,
2DINATE EXACT
SION WITH ELEVATOR
JFACTURER
L THE FRONT WALLS AT THE RRST AND
iTH FLOOR AFTER CAB INSTALLATION IS
'LETE. COOROINATE SrzE OF MRLL
11RED FOR ELEVATOR W STALLATION.
_ WITH 10" CMU WALL W/ #4 @ 8" OC.
JT CORES SOLID @ RBNF. REF.
ICTURAL DRAW INGS.
ARKING GARAGE �RAW INGS
'�ARAGESTRUCTURE
2DINATE WALL THICKNESS
11RE�FOR RECESSEDCONTROL
iL WITH ELEVATOR
IFACTURER
Garege5outhLevel4 �
134'-i"
� \
\
SEE PARKING GARAGE �RAW INGS
FOR GARAGESTRUCTURE
GeageSoWhLevel3 _ _ _
�22_9• �
GarageSOWhLevel2 �
111 5'
INFILL THE FRONT W ALLS AT THE FIRST AND
FOURTH FLOOR AFTER CAB INSTALLATION IS
COMPLETE. COORDINATE SIZE OF WFILL
REOUIRED FOR ELEVATOR INSTALLATION.
INFILL W ITH 10" CMU WALLWI N4 @ 8" OC.
GROUTCORESSOLID@REWE REF.
STRUCTURALDRAWINGS.
SEE PARKING GARAGE �RAWINGS FOR GARAGE STRUCTURE
�
I 6
� I �
_I__
a a•
GLEAR OPENING
. ..........�
< �•
CLEAR OPENING
0
3� 5• V• �• 5• 2• 4� 0•
CLEAR OPENING CLEAR OPE
0
PD
�I
WFlLL THE FRONT WALLS AT THE FlRST AND
FOURTH FLOOR AFfER CAB INSTALLATION IS
COMPLETE. COOR�INATESIZEOFINFlLL
REQUIRED PoR ELEVATORINSTALLATION.
WRLL W ITH 1�" CMU WALL W/ #4 @ 8" OC.
GROUTCORESSOLID@REINF. REF.
STRUCTURAL �RAWWGS.
3 LAVERS OF il2" TVPE'X' GYPSUM
BOARD AS RE�UIRED TO MAINTAIN 2
HOUR RATING OF SHAFT- FLUSH wl
EXTERIOR FACE SHAFT. COOR�INATE
SIZE AND LOCATION w/ MANUFACTURE
RECESSEDCONTROLPANEL
I COORDINATEWALLTHICKNESS
REQl11RE0 FOR RECESSED CONTROL
PANEL W ITH ELEVATOR
MANUFACTURER
I SEEPARKINGGARAGEDRAWINGS
FOR GARAGE STRUCTIIRE
INFlLL THE FRONT WALLS AT THE FIRST AN�
FOURTH FLOOR AFTER CAB INSTALLATION IS
COMPLETE COOR�INATE S2E OF WFlLL
REpUIRE� FOR ELEVATORINSTALLATION.
I INFILL WITH 10" CMU WALLW/ pA� 8' OC.
GROUTCORESSOLID@REWF REF.
STRUCTURAL�RAWINGS.
PN016" WI�E STEEL LAD�ERS.
I COORDINATE LOCATION WITH ELEVATOR
MANUFACTURER
�I��� � ��2��
..�I�� �� ����
Garege SOWh Level 1
mo -i°
3rd Floor Enlarged Stair Plan �
1/4. _ �._Q�.
PE
P7 8 P8
I � 2
12-11 I
PA - - - PA
�A 2
�
�\
�A.3
�/
2nd Floor Enlarged Stair Plan �
1/4.._ �. p..
4_0.
CLEAR OPENING
IL
I________ �----= P1
F____---__-
________ �___________
r
iF__________
________ �__________ ��
— — - �A.2
�
i
` RETORNHANDRAILTO I
` NEAREST POST (TVP�.
\ STAIR
�5T2.,
�\
-�r - - --�- �A.3
��
1/4• - ��-0•
"' SEE PARKING GARAGE STRUCTURAL DRAWINGS FOR
DOCUMENTATION OF STAIRS (OTHER THAN RAILINGS)'"'
P4
P5 2
Y
-I I II II I�'.�I .�, o I�I II II—I I
.—� 1 � —
SEE PARKING GARAGE �RAW INGS FOR GARAGE PoUNDATIONS
� Wall Section - Skybridge Elevator
MSKTD
& Associates
ArchitecNre I Engineering I Interior Design
1115 Magnavox Way I 930 Nohh Meritlian
Fort Wayne, IN 46804 Indianapolis, IN 46204
260.432.9337 31].917.1190
www.msk�dcom
U
•�
�^ U
1�L �
O � W^'
� � i
� � }I
� U,vI �'
O ^ •O
� w �
ti
U Oo`�
�
i � � �
O .�
U V � � �
�-
a� � � � �
.o � ���
L
a I� U � �
PROJECT NO. DATE
7382 12-12-19
REV. DATE
1 ASI #23-BP4.1 0430-20
SET DESCRIPTION
BP #4.1 - Parking Garage
& Skybridge Arch / MEPT
/ Interiors Package
SHEET TITLE
Skybridge/Parking Garage
Vertical Circulation Plans
and Sections
SHEETNUMBER
Al2-7
P7 8 P8
��
�\ �\
P7 8 P8
�/
P7 8 P8
��