Loading...
HomeMy WebLinkAboutM0-00-MECHANICAL-COVERSHEET-Rev.0� d RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel y" �n„� ��.�a,�,a' � onrE: 06/11 /20 VIEW KEY �NAME � LEVEL NAME �� INDICATES NOTE USED TO �ESCRIBE 10'-0"�HEIGHTABOVE ADOITIONALINFORMATIONABOUT PROJECTO'-0" WORKREQUIRED,SPEQFICTOTHE SHEET ANDIOR DETAIL INDICATES DIRECTION OF TRUE NORTH PLAN OR DETAIL NUMBER � PLAN OR �ETAIL NAME ' � VIEW NAME_ `� PLAN OR �ETAIL SCALE 'I'pRS�* INDICATES SIMILAR DETAIL SI�REFERENCED IN MULTIPLE LOCATIONS —DETAIL REFERRED TO BY SECTION CUT 1 M101 SHEETDETAILISLOCATE�ON INDICATES SIMILAR DETAIL REFERENCED IN MULTIPLE LOCATIONS SI �DETAIL REFERRED TO BV ELEVATION 4 3 T101� SHEET DETAIL IS LOCATED ON LINE TVPE KEV: NEW WORKBYTHISCONTRACTOR (DARK SOLID LME) — — — —NEW WORKl1NDERFLOORORUNDERGROUN�BVTHISCONTRACTOR (DARK LONG DASHED LINE) NEW W ORK BY OTHERS AND/OR EXISTING TO REMAIN (LIGHT SOLID LINE) ------- EXISTING TO BE REMOVEO BV THIS CONTRACTOR (�ARK SHORT DASHED LINE) APPLICABLE CODES CONTRACTOR SHALL COMPLV W ITH APPLICABLE CODES AND LOCAL AMENDMENTS. BWLDINGCODE: INDIANABWLDINGCODE WITHAMENDMENTS 2014 EDITION FIRECODE: INDIANAFIRECODE WITHAMENDMENTS 2072 EDITION LIFESAFETVCODE: NFPA1012012EDITION WITHAMENDMENTS MECHANICAL CODE: ELECTRICAL CODE: PWMBING CODE: FIRE CODE: ACCE55181LITV CODE' ELEVATORCO�E: ENERGVCO�E: OTHER APPLICABLE CODE: ABBR: n.v.o. GC. C.M. EC. RP.C. RS.C. G.C. H.C. M.C. N.QC. P.C. S.C. T.C. T.GC. V.C. INDIANAMECHANICALCODE WITHAMENDMENTS 2014 EDITION IEC2009EDITION WITHAMENDMENTS (NFPA ]0-2008) INDIANAPWMBINGCODE WITHAMENDMENTS 2072 EDITION INDIANAFIRECODE WITHAMENDMENTS 2074 EDITION INDIANA BWLDING CODE CHAPTER-11 WITH AMENDMENTS 2074 EDITION ASME1].3-2005,ASMEQEI-1-200] WITHAMENDMENTS ANSVASCE/T & Di 21-OB INDIANAENERGVCONSERVATION WITHAMENDMENTS CODE 2010 FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND HEALTHCARE FAQLITIES 2018 EDITION DESCRIPTION: AUDIONISUAL CONTRACTOR CIVIL CONTRACTOR CONSTRUCTION MANAGER ELECTRICALCONTRACTOR FlRE PROTECTION CONTRACTOR FOOD SERVICE CONTRACTOR GENERALCONTRACTOR HEATING CONTRACTOR MECHANICALCONTRACTOR NURSECALLCONTRACTOR PLUMBING CONTRACTOR SECURITV CONTRACTOR TECHNOLOGVCONTRACTOR TEMPERATURECONTROLSCONTRACTOR VENTILATION CONTRACTOR MECHANICAL SYMBOL LIST NOT ALL SYMBOLS MAV APPLY. SYMBOL: DESCRIPTION: —BD— BOILER BLOW DOWN —BF— BOILER FEED WATER —CA— COMPRESSEDAIR —CR— CONDENSERWATERRETURN —CS— CONDENSERWATERSUPPLV —CS15— QEAN STEAM - NUMBER INDICATES PRESSURE IN PSIG. —CWR— CHILLEDWATERRETURN —CWS— CHILLEDWATERSUPPLV —�PP— DR41N —G— NATURALGAS —GV— GASREGULATORVENT —GWR— GLYCOLWATERRETURN —GWS— GLYCOLWATERSUPPLY —HCR— HEATWGICHILLEDWATERRETURN —HCS— HEATWG/CHILLEDWATERSUPPLV —HC REFRIGERANTHOTGAS —HPC— HIGH PRESSURE CONDENSATE —HPS— HIGH PRESSURE STEAM —HWR— HEATWGWATERRETURN —HWS— HEATINGWATERSUPPLV —LCS— LOW PRESSURE CLEAN STEAM —LIQ— REFRIGERANTLIQUID —LPC— LOW PRESSURECONDENSATE —LPS— LOW PRESSURESTEAM —LWR— LOOPWATERRETURN —LWS— LOOPWATERSUPPLV —MV— MEDICAL VACUUM —OR— OIL RETURN —OS— OILSUPPLV —PC— PUMPEDCONDENSATE —PD— PUMPEDDISCHARGE —RWR— REHEATWATERRETURN —RWS— REHEATWATERSUPPLV —SUC— REFRIGERANTSUCTION —SV— SAFETYRELIEFVENT —VAC— LABVACUUM � PIPECAP J PIPEDOWN PIPE UP OR 11P/DOWN �� PITCH PIPE IN DIRECTION � DIRECTION OF FLOW IN PIPE �� NEW CONNECTION �i� DIELECTRICCONNECTION �I� UNION/FLANGE �� SHUTOFF VALVE NORMALLY OPEN �� SHUTOFFVALVENORMALLVCLOSED �� THROTTLWGVALVE � BALANqNGVALVE(NUMBERINDICATESGPM) � AUTOMATIC BALANGNG VALVE � MIXWG VALVE �(1-- CONTROLVALVE(THREEWAV) T p�j CONTROL VALVE (TNO-WAV) � SOLENOI� VALVE �y� CHECKVALVE � SAFETV/RELIEFVALVE PRESSUREREDUqNGVALVE LIQUID/GAS 8 ( ) � PRESSURE REDUCING VALVE (STEAM) � TRIPLE DUTV VALVE (ANGLE TVPE) C3 TRIPLEDUTVVALVE(IN-LINETYPE) � PUMP Y VACUUM BREAKER �� "WYE"-STRAWER �c-� "WYE"-STRAWERWISHUTOFFVALVEANDHOSECONNECTIONWITHCAP � � BASKETSTRAINER � REXIBLE CONNECTION � PRESSURE/TEMPERATURETESTPLUG p REDUCER-REFERENCESPECIFICATION FOR CONCENTRICIECCENTRIC AND FOTIFOB � SUCTION DIFFUSER WITH SUPPORT FOOT � AUTOMATIC AIR VENT + MANUALAIRVENT rs i DRAIN VALVE W ITH HOSE CONNECTION AND CAP L ��P PRESSURE SENSOR (FURNISHE� WITH BALL VALVE) �OP PRESSUREGAUGE(Fl1RNI5HEDWITHBALLVALVE) �� DIFFERENTIALPRESSURESENSOR �--� r 1 L gp STATICSWITCH FLOW METER °� FLOW SWITCH FS FLOW SENSOR T� STEAM TRAP (REFER TO SCHEDULE) F&T STEAM TRAP (REFER TO SCHEDULE) DT• y T. INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE) - ALIGNMENTGUIDE -x— PIPEANCHOR � EXPANSION JOINT (M� METER MECHANICAL SYMBOL LIST NOT ALL SYMBOLS MAV APPLY. SYMBOL: DESCRIPTION: � DIRECTION OF AIR FLOW � I I I I I L� FLEXIBLE DUCT � MANUALVOLUMEDAMPER RISE IN DIRECTION OF AIR FLOW DROP IN DIRECTION OF AIR FLOW DUCTCAP DUCT DOWN DUCT UP � SUPPLVIOUTSIDEAIRDUCTSECTION � RETURN AIR DUCT SECTION � E%HAUSTIRELIEF AIR DUCT SECTION � 4-WAV DIFFUSER W ITH BLANKOFF IN ONE DIRECTION 6�1��5 AIRTERMINALPROPERTIESNECKOSZEICFM 4' I n TERMINALAIRBOX(REFERTOSCHE�ULE) 4 � q n TERMINALAIRBOXw/REHEATCOIL(REFERTOSCHEDULE) � SERIESFANPOWEREDTERMINALAIRBO%w/REHEATCOIL (REFER TO SCHEDULE) � PARALLELFANPOWEREDTERMINALAIRBOXwIREHEAT COIL (REFER TO SCHEDULE) _ `� `� `� HUMIDIFIER � OPPOSEDBLADEDAMPER(REFERTOSCHEDULE) � PARALLELBLAOEDAMPER(REFERTOSCHEDULE) �� DIFFERENTIALPRESSURESENSOR OH HUMIDISTATSENSOR �H HUMIDISTAT/SENSOR OC CARBONMONOXI�ESENSOR O CARBON DIOXIDE SENSOR 2 OO OCCUPANCVSENSOR (P) PRESSURE SENSORIMONITOR �P PRESSURESENSOR(DUCTMOUNTED) (T7 THERMOSTATISENSOR �T TEMPERATURESENSOR �T THERMOSTAT/SENSOR WITH HEAVV DUTY ENCLOSURE TEMPERATURE SENSOR W ITH W ELL THERMOMETER WITH WELL (DIAL TYPE) THERMOMETER W ITH W ELL (RLLED TVPE) � XX-V AIRFLOW MEASUREMENT SVMBOL XX-AHUSYMBOL V - SEQUENTIAL NUMBER ABBR: AO AFF C �o CFSD DPO (o-2") OPS EA FD FOB FOT FSD MA MV NC N.C. NIC N.O. oa PS RA SA SD TAB TD TVP �o-, UNO MECHANICAL ABBREVIATION KEY DESCRIPTION: ACCESSDOOR ABOVE FINISHED FLOOR COMMON CLEANOUT CONTROL/FlRE/SMOKE �AMPER DIFFERENTIAL PRESSURE GAUGE (RANGE) DIFFERENTIAL PRESSURE SWITCH EXHAUSTIRELIEF AIR FIRE DAMPER FLAT ON BOTTOM FLAT ON TOP FIREISMOKE DAMPER MIXED AIR MIXING VALVE NEW CONNECTION NORMALLVCLOSED NOT IN CONTRACT NORMALLV OPEN OUTSIDE AIR PRESSURE SW ITCH RETURN AIR SUPPLV AIR SMOKEDAMPER TERMINAL AIR BOX TRANSFERDUCT TVPICAL DOOR UNDERCUT BV OTHERS (1" TVPICAL) UNLESS NOTED OTHERWISE MECHANICAL GENERAL NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AN� TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PW MBWG, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. DRAWINGSSHOWINGLOCATIONSOFWUIPMENT,DUCTWORK,PIPING,ETQARE DIAGRAMMATIC AND MAV NOT ALWAVS REFLECT EXACT INSTALLATION CONDITIONS. DRAW INGS SHOW THE GENERAL ARRANGEMENT OF DUCTW ORK, PIPING. E�UIPMENT, ETC., AND MAV NOT INCLUDE ALL OFFSETS AND FlTTINGS REQUIFED FOR COMPLETE INSTALLATION. THEDRAWINGSSHALLBEFOLLOWEDASCLOSELVASACTUALBUILDING CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. 2. DONOTSCALEDRAWINGS. VERIFYALLDIMENSIONSANDCLEARANCESFROM ARCHITECTURAL, STRl1CTl1RAL, SUBMITTALS, AND OTHER APPROPRIATE ORAWINGS OR PHVSICALLV AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. 3. COORDINATE ALL WORK W ITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVI�E CLEARANCESREQUIREDFOROPERATION MAINTENANCE CODECOMPLIANCE ANDTO VEPoFV NON-INTERFERENCE W ITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY QEARANCES FOR ALL TRADES. BRING ANV IMERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEOING W ITH FABRICATION OR EQUIPMENT ORDERS. 4. ftEVIEWSPACERE�UIREMENTSOFEQUIPMENTSPECIREDORSUBSTITUTEDANDMAKE REASONABLE ACCOMMODATIONS W LAVOIIT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANV CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL WST OR EXPENSETO OTHERS. fl EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATE� WITH ELECTRICAL CHANGES REQUIRED FOR Epl11PMENT PROPOSE� THAT �IFFERS FROM THE BASIS OF DESIGN. ]. REFER TO ARCHITECTURAL RERECTED CEILMG PLAN, ELECTRICAL, TECHNOLOGV AUDIONISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN SPRINKLERS. 8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BV THEIft ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES �AMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND F�N�sH. 9. IN AREAS W ITH ORVWALL CEILINGS COORDINATE LOCATIONS OF ACCE55 PANELS W ITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES. DAMPERS, ETG COORDINATE PANEL TVPE AND COLOR W ITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIOOING. 10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT W HERE CONDUITS, PIPING, AND DUCTS PENETRATE PENETRATIONS THROUGH EMERIOR WALLS AND ROOF SHALL BE SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE. 11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HBGHT NON-FlRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRE� NC LEVELS W ITHIN ROOMS. 12 WHERE PIPES AND DUCTS ARE SHOW N TO PENETRATE FLOORS, PROVIDE SLEEVED OPENINGS W ITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCOR�ANCE W ITH ALL RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. 13. EQUIPMENTSIZESANDSERVICECLEARANCEREQUIREMENTSVARVAMONGDIFFERENT MANUFACTURERS. CONSULT APPROVED SHOP DRAW INGS FOR EQUIPMENT SIZES AND REQUIRE� SERVICE CLEARANCES. COORDINATE W ITH LAVOUT OF E�UIPMENT PADS, PIPING, DUCTWORK, ETC. 14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. iS MAINTAIN MINIMUM 3'-6" CLEARANCE W FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SWITCHES, AND DISCONNECTS. i6. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6" BEVOND ALL SIDES OF EQUIPMENT. 1]. �O NOT SUPPORT EQl11PMENT, PIPING, OR �UCTWORK FROM METAL DECKING OR OTHER NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN ACCORDANCE W ITH SPEGFlCATIONS. PIPING GENERAL NOTES: 1. THE SRE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4" UNLESS NOTED OTHERWISE. 2. PIPE DRAIN LMES FROM EQUIPMENT TO NEAREST FLOOR DRAIN. 3. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT MANUFACTURERRECOMMENDATIONS. VENTILATION GENERAL NOTES: 1. THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX (TAB) SHALL MATCH THE TAB'S INLET SRE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN LENGTH, IN WHICH CASE THE BRANCH SHOULD BE INCREASED ONE DUCT SIZE, OR NOTED OTHERWISE. 2 ALIGNTEMPERATURESENSORSWITHLIGHTSWITCHESANDWHENINCLOSEPROXIMITYTO EACHOTHER. 3. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT. 4. PROVIDE DUCT ACCESS DOORS IN ALL HORIZONTAL RETURN DUCTWORK AT 20 FOOT INTERVALS PER NFPA 90A. TAB POST-CONSTRUCTION NOTES: 1. AFTER CONSTRUCTION ACTNITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) ANO BALANCING CONTR4CTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION DRAWINGS. 2. AREASSERVEDBVTHISEQUIPMENTWHICHWERENOTRENOVATEDSHALLBERE BALANCED TO THE AIRROW RATES MEASURED BEFORE THE RENOVATION OCCURRED (REFER TO THE FINAL PRE- DEMOLITION REPORT). 3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES ANDIOR GRILLE READINGS AS REQUIRE� TO DETERMME THE FLOW RATE IN THE EVENT TRAVERSES ARE TAKEN AT AN ALTERNATE LOCATION(S�, TAB CONTRACTOR SHALL INCLUDE A DRAW ING THAT SHOW 5 THE LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN. 4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT TRAVERSE READING IS TAKEN AND SHALL BE INCLU�ED IN THE FINAL POST-CONSTRUCTION TABREPORT. 5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST- CONSTRUCTION TAB REPORT AS REpUIRED BY SECTION 23 �5 93. 6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRE� IN THE SPECIFICATIONS. MECHANICAL SHEET INDEX MO-00 MECHANICALCOVERSHEET M3-1G FIRSTFLOORPLAN-MECHANICAL M3-2G SECONDFLOORPLAN-MECHANICAL M3-3G THIRD FLOOR PLAN - MECHANICAL M3-0G FOURTHROORPLAN-MECHANCIAL M3-0S SKVBRIDGEROORANDROOFPLANS- MECHANICAL M8-00 MECHANICALDETAILS M9-00 MECHANICALSCHEDULES INSTALL ABOVE COUNTER INSTALL ABOVE COUMER INSTALL DEVICE AT 18" OEVICEAT44"ABOVE OEVICEAT40"ABOVE ABOVEFINISHEDFLOOR. FINISHED FLOOR. FINISHED FLOOR. ADA GUIDELINES - FRONT ACCESS 10" MA%. 10"-24" MAX. INSTALL DEVICE AT 44" INSTALL DEVICE AT 42" ABOVE FINISHED FLOOR. ABOVE FINISHED FLOOR. ADA GUIDELINES - SIDE ACCESS ADA STANDARDS FOR ACCESSIBLE DESIGN MSKTD & Associates ArchitecNre I Engineering I Interior Design 1�15 Magnavox Way I 930 Nohh Mentlian Fort Wayne, IN 46804 Intlianapolis, IN 46204 260.432.9337 31].917.1190 wwwmskitlmm <:IMEG 8900 KEVSTONE XING SUITE 210 INDIANAPOLIS, IN 46240 31�.848.5045 FAX:31�.8442201 www.imegcorp.com :/12/19 U • �/� U it� � O � � � � L W �� � U � O � •� � \ � w � � A 1 _ U �oca � L /�//J� t � � O • � i� U V � � � � � N � � � � .o � � � � L a I� U � � PROJECTNO. DATE 18004130.00 12-12-19 REV. DATE SET DESCRIPTION BP #4.1 - Arch/MEPT/ Garage Documents SHEET TITLE MECHANICAL COVERSHEET SHEETNUMBER MO-00