HomeMy WebLinkAboutP3-1G-FIRST-FLOOR-PLAN---PLUMBING-Rev.0P1�
P1.2
Y
�
i P � `,
Y
�
�
I
P4.4
Y
r� P I
I �
��
�
P7.8 P8
\r/
� VC04 G
PA
PA.2
/
PA.3
MSKTD
& Associates
ArchitecNre I Engineering I Interior Design
1115 Magnavox Way I 930 Nohh Mentlian
Fort Wayne, IN 46804 Intlianapolis, IN 46204
260.432.9337 31].917.1190
wwwmskitlmm
<:IMEG
8900 KEVSTONE XING SUITE 210
INDIANAPOLIS, IN 46240
31�.848.5045 FAX:31�.8442201
www.imegcorp.com
�YCO-1G
PB
�/iz/ie
�
�
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
y" �n„� ��.�a,�,a'
�
onrE: 06/11 /20
P4.8
Y
� FIRST FLOOR PLAN -
' ' � 3/32" = 1'-0"
ORS
PC
-.
GENERALNOTES:
A. REFERTOSHEETPO-OOFORPWMBING
SVMBOLS, ABBREVIATIONS AN� WSTALLATION
NOTES.
B. PIPWG SHALL NOT BE ROUTED ABOVE
ELECTRICAL OR TELECOM ROOMS.
C. MAINTAIN 3'-0" CLEARANCE M FRONT OF ALL
TERMINAL AIR BOX CONTROLS ENCLOSURES.
D. DONOTBLOCKDUCTWORKACCESSDOORS
WITH PIPING, CABLE TRAVS, OR OTHER
DUCTWORK.
E. BRANCH PIPING RUNOUTS TO PLl1MBING
FIXTURES SHALL BE 3/4" SIZE, UNLESS
OTHERW ISE NOTED.
F. ALL VALVES SHALL BE INSTALLE� SO THEV
CAN BE ACCESSED FROM LAV-IN CEILINGS.
SKYBRIDGE
BP#4.1 _ _ MOB _ _ _ _ HOSPITAL_
BP#5
g '�, A O
r,�e No,��
�� C
U
.
� U
� �
O � �
� — �
— �
� U �
0 X ��
�W=
ti
U 00`�
�
L /�J/J� t � �
O . � i�
U V � � �
�—
a� � � � �
.o � ���
L
a I� U � �
PROJECTNO. DATE
18004130.00 12-12-19
REV. DATE
SET DESCRIPTION
BP #4.1 - Arch/MEPT/
Garage Documents
SHEET TITLE
FIRST FLOOR PLAN —
PLUMBING
SHEETNUMBER
P3-1 G