Loading...
HomeMy WebLinkAboutS-001-GENERAL-NOTES---STRUCTURAL-Rev.1� a DIVISION 01 - GENERAL REQUIREMENTS 14 ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEOERAL, STATE, AND LOCAL BUILDING COOESIORDINANCES AND FIRE CODES, MCLUDINCa THE FOLLOWINCa: A. CITV OF CARMEL CODE OF ORDINANCES, ADOPTED SEPTEMBER 1I, 2018 B. INDIANA BUILDING CODE, 2014 EDITION (BC 2012 W ITH INDIANA AMENDMENTS) 7.2 SPECIAL INSPECTIONS A. THE CONTRACTOR W ILL ENGAGE ONE OR MORE SPECIAL INSPECTORS W HO SHALL PROVIDE WSPECTIONS AND MATERIALS TESTING �URING CONSTRUCTION. ALL SPECIAL INSPECTIONS AND TESTING SHALL CONFORM TO THE REQUIREMENTS OF SPEC 014100 AND THE CODES LISTE� IN SECTION 1.1. B. SPECIAL WSPECTIONS ARE IN ADDITION TO THE INSPECTIONS CONOUCTED BV THE LOCAL BUILDING OFFICIAL. SPECIAL INSPECTIONS SHALL NOT RELIEVE THE OWNER AND CONTRACTOR FROM REQUESTING THE BUILDING OFRCIACS INSPECTIONS REQUIRED BV BC SECTION 110. G SPECIAL INSPECTORS SHALL BE GNEN PROPER NOTICE AND ACCESS TO THE SITE TO PERFORM TESTING AND INSPECTION AS NECESSARY. D. REQUIREDCATEGORIESOFSPECIALINSPECTIONS: 1. STEELCONSTRUCTIONQBCSECTION17052) 2. CONCRETE CONSTRUCTION QBC SECTION 1105.3) 3. MASONRV CONSTRUCTION (IBC SECTION 1]054) 4. SOILS (IBC SECTION 1705.6) 5. INSPECTION OF FABRICATORS IS NOT REQUIRED WHERE THE FABRICATOR IS APPROVED IN ACCOR�ANCE W ITH IBC. E DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: 1. THESPECIALMSPECTORSHALLOBSERVETHEWORKASSIGNEDTOVERIFVTHATITCONFORMSTOTHE CONTRACTDOCUMENTS. 2. THE SPECIAL INSPECTOR SHALL NOT AUTHORIZE OR APPROVE DEVIATIONS FROM THE CONTRACT DOCUMENTS. ALL �EVIATIONS FROM THE CONTRACT �OCUMENTS MUST BE INITIATED BY THE CONTRACTOR VIA A W RITTEN RE�UEST FOR INFORMATION (RFI) AND APPROVE� BV THE ENGINEER OF RECORD PRIOR TO PROCEEDING W ITH THE WORK. 3. THE SPECIAL MSPECTOR SHALL FURNISH WRITTEN INSPECTION REPORTS TO THE ENGWEER OF RECOR�. ALL �ISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. IF CORRECTIONS ARE NOT MADE, THE BUILD W G OFFlCIAL AND ENGMEER AND/OR ARCHITECT SHALL BE NOTIFIE�. 1.3 OEFERREO SlI6MITTALS A. IN ACCORDANCE W ITH IBC 10] 34.1 AND LOCAL BWLDING DEPARTMENT REQUIREMENTS, DEFERREO SUeMITTALS ARE DERNED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE APPLICATION FOR PERMIT ANO W HICH ARE TO BE SUBMITTED TO THE BUILDING OFFIQAL W ITHIN A SPECIFIED PERIOD. B. DEFERRAL OF ANV SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF THE BUILDING OFFlCIAL THE ARCHITECT OR ENGWEER OF RECORD SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCl1MENT5 AND THE CONTRACTOR SHALL SUBMIT THE DEFERRED SUBMITTAL DOWMENTS FOR REVIEW BV THE aUILDMG OFFlCIAL. C. ALL DEFERRED SUBMITTAL ITEMS SHALL BE SIGNED AND SEALED BV A DESIGN PROFESSIONAL LICENSED IN THE STATE W HERE THE PROJECT IS LOCATED. o. oOCUMENTSFORDEFERREDSUBMITTALSHALLBESUBMITTEDTOTHEARCHITECTORENGINEEROFRECORDA MINIMUMOF30DAVSPRIORTOFABRICATION. DEFERRE�SUBMITTALDOCUMENTSWILLBEREVIEWEDBVTHE ARCHITECT OR ENGINEER OF RECORD FOR GENERAL CONFORMANCE W ITH CONTRACT DOCUMENTS. A COPV OF THE �EFERRED SUBMITTAL DOCUMENTS SHALL BE SUBMITTED TO THE BUILDING OFFlCIAL W ITH A NOTATION INDICATING THAT THE DEFERRE� SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL �OCUMENTS HAVE BEEN APPROVED BV THE BUILDING OFFICIAL. E. THE EOR IS DELEGATING THE DESIGN OF THE FOLLOW ING ITEMS, ALL OF WHICH WILL BE DEFERRED SUBMITTALS: 1. GLAZINGSVSTEMSANDTHEIRCONNECTIONS 2. PRECASTCONCRETEINCWDINGCAST-INFABRICATEDHARDWARE 3. GUARDRAILS AND HANDRAILS 4. STRUCTURALSTEELCONNECTIONS 5. TEMPORARV BRAQNG AND SHORING SVSTEMS FOR SLABS, BEAMS, AND WALLS 1.4 BUILDING CLASSIFICATION PARKING GARAGE A. IBC USE AN� OCCUPANCV CLASSIFICATION�. LOW-HAZAR� STORAGE, GROUP S-2 OPEN PARKING GARAGE B. TVPE OF CONSTRUCTION IB C. UNPROTECTED,WITHOUTSPRMKLERS' ' SOUTH TOWER TO BE SPRMKLERED AT PEDESTRIAN BRIDGE D. AREA PER TIER 54000 54. FT. E RAMPACCESSIBLETIERS 4 PEDESTRIAN BRIDGE A. IBC USE AN� OCCUPANCV CLASSIFICATION�. PE�ESTRIAN WALKWAY (SECTION 3104) B. TVPEOFCONSTRUCTION NONCOMBUSTBLE C. UNPROTECTED,WITHOUTSPRINKLERS 1.5 FIRE RESISTANCE A. FIRERESISTANCERATINGREQUIREMENTSFORBUILDINGELEMENTS�1BCTABLE601) 1. PRIMARV STRUCTURAL FRAME 2 HRS 2. BEARING WALLS: i. EXTERIOR 2 HRS ii. INTERIOR 2 HRS 3. NONBEARING WALLSAND PARTITIONS: i. EXTERIOR REFERTOARCH ii. INTERIOR 0 HRS 7.6 LOADING AND DESIGN PARAMETERS - ASCE7-70 OR AS SPECIFIED HEREIN A. RISKCATEGORV II B. SUPERIMPOSED DEAD LOADING: 1. SUPPORTE� PARKING AND DRIVE AREAS: i. MECHANICAL, ELECTRICAL, PLUMBING, MISG 5 PSF ii. CAST-IN-PLACECONCRETETOPPING 38PSF 2 ROOF NON-PARKING- ( ) i. BUILT-UP ROOFING, WSULATION, WATERPROOFWG 20 PSF 3. STAIRSANDEXITS: i. MECHANICAL, ELECTRICAL, PWMBING, MISC. 5 PSF G LNE LOADING: 1. SUPPORTE� PARKING AND DRIVE AREAS: i. UNIFORM LOAD 40 PSF ii. CONCENTRATED LOAD ACTING ON 20 SQ IN. AREA 3000 LBS 2. ROOF(NON-PARKING): i. UNIFORM LOAD 20 PSF ii. CONCENTRATED LOAD ACTING ON 20 SQ IN. AREA 300 LBS 3. SLAB ON GRADE: i. UNIFORM LOAD 100 PSF ii. CONCENTRATED LOAD ACTING ON 20 SQ IN. AREA 3000 LBS 4. STAIRS AND EXITS AND PEDESTRIAN BRIDGB i. UNIFORM LOAD 100 PSF ii. CONCENTRATED LOAD ACTING ON 4 SQ. IN. AREA 300 LBS 5. HANDRAILSANDGUARDS: i. UNIFORM LOAD 50 PLF ii. CONCENTRATEDLOAD 200 LBS 6. INTERMEDIATE RAILS, BAWSTERS, AND PANEL FILLERS: i. CONCENTRATED LOAD ACTING ON 1 SQ. FT. AREA MA%IMUM 50 LBS 7. VEHICLEBARRIERSVSTEMS: i. CONCENTRATED LOAD ACTING ON 1 SQ. FT. AREA MAXIMUM ACTINGBETWEENI8AND2IINCHESABOVEFINISHEDFLOOR 60W LBS 8. LIVELOADREDUCTION: i. MAXIMUM GARAGE UNIFORM LOA� REDUCTION FORMEMBERSSUPPORTINGTWOORMORELEVELS 20 % 9. CONSTRUCTION LNE LOAD: i. UNIFORM LOAD 20 PSF ii. CONCENTRATED LOAD ACTING ON 20 5�. IN. AREA 20W LBS D. SNOW LOADING: L EXPOSUREFACTOR(Ce) 10 2 THERMALFACTOR(CQ 12 3- IMPORTANCE FACTOR Qs) 1 0 4. Gf20UNDSNOWLOAD(Pg) 20.OPSF 5. FLAT ROOF SNOW LOAD (Pf) 1I.0 PSF 6. MINIMUM LOWSLOPE ROOF SNOW LOA� (Pm) 20.0 PSF ]. ROOF SLOPE FACTOR (Cs) 1.0 8- SLOPE� ROOF (BALANCED) SNOW LOA� (Ps) iZ0 PSF 9. RAIN-ON-SNOW SURCHARGE LOAD 50 PSF 10. MAXDRIFTSURCHARGE(Ptl) 64.OPSF 11. WIDTHOFMAXSNOWDRIFT(w) 16.0FT E. WINDLOADING: 1. ULTIMATE DESIGN WIND SPEE� (VWt) 115 MPH 2 NOMINAL DESIGN WIND SPEED (Vasd) 89 MPH 3. EMPOSURECATEGORV B 4. INTERNAL PRESSURE COEFFIQENT (GCpi) +l- 0.18 5. COMPONENTS AN� CLA�DING DESIGN PRESSURES (PSF) ROOF ROOF ROOF WALL WALL ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 <_ 10 SF 102 24.9 102 41.8 102 62.9 24.9 2].1 24.9 334 =� 20 SF 9.5 24.3 9.5 31.4 9.5 522 23.9 26.� 23.9 31.3 U Q 50 SF 8B 23.5 8.6 31.5 8.6 3�.8 22.3 246 223 28.1 w o 100 SF 8.1 22.8 8.1 27.1 8.1 27.1 21.3 23.4 21.3 26.0 LL z 200 SF 8.1 22.8 8.1 21.1 8.1 2�.1 202 22.3 2� 2 23.9 w� 2 500 SF 8.1 228 8.1 2].1 8.1 2].1 18B 20] 18.6 20 � RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel y' un��V l�rc�fJ�lo/s�. onrE: 06/11 /20 F. SEISMIC LOADMG 1. RISK CATEGORV II 2 IMPORTANCE FACTOR Qa) LO 3. SPECTRALRESPONSEACCELERATIONS I. SHORT PERIODS (SS) 0.149 %g IC 1 6EC PERIOD (61) 0_082 %g 4. SITE CLASS C 5. DESIGN SPECTRAL RESPONSE ACCELERATIONS L SHORT PERIODS (SDS) 0-119 %g ii. 1 SEC PERIO� (SDi) 0.093 % g 6. DESIGN CATEGORV 6 7. SEISMICBEHAVIOR: PARKING GARAGE i. NORTH/SOUTH DIRECTION: ANALVSIS PROCEDURE: EQUNALENTLATERALPoRCE SEISMIC FORCE RESISTING SVSTEM: ORDINARV PRECASTSHEAR WALLS (B.9 - BUIL�ING FRAME SYSTEMS) BASE SHEAR (V) 603 KIPS RESPONSE COEFFICIENT (Cs) 0-030 RESPONSE MODIFlCATION FACTOR (R) 4 ii. EASTNVESTDIRECTION: ANALVSIS PROCEDURE: EQUNALENTLATERALPoRCE SEISMIC FORCE RESISTING SVSTEM: ORDINARV PRECAST SHEAR WALLS (B.9 - BUIL�ING FRAME SYSTEMS) BASE SHEAR (V) 603 KIPS RESPONSE COEFFICIENT (Cs) 0-030 RESPONSE MODIFlCATION FACTOR (R) 4 SOUTH TOWER i. NORTH/SOUTH DIRECTION: ANALVSIS PROCEDURE: EpUNALENTLATER4LFORCE SEISMIC FORCE RESISTING SVSTEM: ORDINARV PRECAST SHEAR WALLS (A.6 - BEARING WALL SVSTEMS) BASE SHEAR (V) 84 KIPS RESPONSE COEFRCIENT (Cs) 0.040 RESPONSE MODIFICATION FACTOR (R) 3 ii. EAST/WESTDIRECTION: ANALVSIS PROCEDURE: EpUNALENTLATER4LFORCE SEISMIC FORCE RESISTING SVSTEM: ORDINARV PRECAST SHEAR WALLS (A.6 - BEARING WALL SVSTEMS) BASE SHEAR (V) 84 KIPS RESPONSE COEFRCIENT (Cs) 0.040 RESPONSE MODIFICATION FACTOR (R) 3 PEDESTRIAN BRIDGE SUPPORT FRAME i. NORTH/SOUTH DIRECTION: NON-PARTICIPATING ii. EAST/WESTDIRECTION: ANALVSIS PROCEDURE: EpUNALENTLATER4LFORCE SEISMIC FORCE RESISTING SVSTEM: ORDINARV REMF CONC MOMENT FRAME (C � - MOMENT-RESISTING FRAME SVSTEMS) BASE SHEAR (V) 12 KIPS RESPONSE COEFRCIENT (Cs) 0.040 RESPONSE MODIFICATION FACTOR (R) 3 G. VOLUMETRICCHANGELOADING-PqMNL42040(CHAPTER4) 1. MAXIMUM SEASONAL CLIMATIC TEMPERATURE CHANGE 65 °F 2 ANNUALAVERAGEAMBIENTRELATNEHUMIDITV ]0 % 1.] FUTURE E%PANSION A NONE. 1.8 MINIMUM HEADROOM GLEARANGE A. SIGNED CLEARANCE 1. ALL LEVELS 8'-2" B. MINIMUM CONSTRUCTION CLEARANCE: 1. ALLLEVELS(STRUCTURAL,ARCHITECTURALANDMEPITEMS) 8'-4" 1.9 ORAINAGE A. PROVIDE AS INDICATED BV PLAN ELEVATIONS WITH 1 1/2 % MINIMUM SLOPE ON PARKING SURFACES WHERE ELEVATIONS NOT INDICATED 1.10 OATUM A. 100'-0" = 838]9' MSL 141 CORROSION PROTECTION SYSTEM A. CORROSION PROTECTION SVSTEM IS BASED ON CRITERIA PRESENTED IN ACI 362.1R "GUIDE FOR THE DESIGN AND CONSTRUCTION OF DURABLE CONCRETE PARKING STRUCTURES" FOR ZONE III EXPOSURE 1. PRECAST STRUCTIIRE WITH HEAVV Dl1TV �ECK COATING, CONCRETE SEALER, CONCRETE TOPPING W ITH CORROSION INHIBITOR, LOW PERMEABILITV PRECAST CONCRETE, AND SPECIAL PRECAST CONCRETE COVER REQUIREMENTS, ALL AS SPECIFlED HEREIN 2. CONCRETE ACCESSORIES TO BE HOT-DIP GALVANIZED), ANDIOR STAINLE55 STEEL ALL AS SPEGFIED HEREIN 1.12 CONSTRUCTION AND COORDINATION NOTES A. THE CONTRACTOR SHALL COORDINATE AND CHECK ALL OIMENSIONS RELATING TO ARCHITECTURAL RNISHES, MECHANICAL EQUIPMENT AND OPENINGS, ELEVATOR SHAFTS AND OVERRIDES, ETG AND NOTIFV THE ARCHITECT/ENG W EER OF ANY �ISCREPANCIES BEFORE PROCEEDING W ITH ANV W ORK. B. METHODS, PROCEDURES. AND SE�UENCES OF CONSTRUCTION ARE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE WTEGRITY OF THE STRIICTl1RE AT ALL STAGES OF CONSTRUCTION. Q CONSTRUCTION MEANS, METHODS, PROCEDURES, BRACING, AND SAFETV ARE THE SOLE RESPONSIBILITVOFTHEGENERALCONTRACTORORSUBCONTRACTOR. THESTRUCTURALDRAWINGS REPRESENTTHE COMPLETE STRUCTURAL SVSTEM IN ITS FINISHED STATE. �. THE STRUCTURE HAS BEEN DESIGNED FOR THE INSERVICE LOADS ONLV. THE METHODS, PROCEDURES. AN� SEQUENCES OF CONSTRUCTION ARE THE RESPONSIBILITV OF THE CONTRACTOR. FORMWORK FOR CONSTRUCTION SHALL NOT BE REMOVED BEFORE THE CONCRETE HAS GAMED SUFFICIENT STRENGTH AN� THE STRUCTURE HAS TO SAFELV SUPPORT THE DEAD AND SUPERIMPOSED LOADS WHICH SUBSEpUENTLV WOULD BE APPLIED. REFER TO SPEC SECTION 0311 00 CONCRETE FORMWORK FOR ADDL WFORMATION. E. ALL OMISSIONS OR CONFLICTS AMONG VARIOUS ELEMENTS OF DRAW INGS ANO/OR SPECIFICATIONS SHALL BE REPORTED TO ENGINEER BEFORE PROCEEDING W ITH ANV WORK. F. NO STRUCTUR4L MEMBERS SHALL BE PENETR4TED OR CUT FOR PIPES, OlICTS, ETC., UNLESS SPEGFICALLV DETAILED OR APPROVED IN WRITING BV ENGMEER. ALL PENETRATIONS SHALL BE SUBMITTED TO ENG WEER OF RECORD FOR REVIEW AND APPROVAL. G. VERIFV AND COORDINATE LOCATION AND SIZE OF ALL OPENINGS AND SLEEVES THROl1GH FLOORS, WALLS, AND ROOFS W ITH RESPECTNE SUBCONTRACTOR (MECHANICAL, ELECTRICAL, HVAQ ETC.) H. THESTRUCTURALORAWINGSSHALLBElISEDINCONJUNCTIONWITHTHEDRAWINGSAND SPEGFlCATIONS OF ALL OTHER DISCIPLWES AND COORDINATED W RH THE W ORK OF ALL TR4DES. I. VERIFVSTRUCTUR4LELEVATIONSANDDIMENSIONSWITHRESPECTNEOTHERTRAOESANDDRAWINGS. J. VERIFV LOCATION OF SLAB DEPRESSIONS, FLOOR DRAINS, INSERTS, AND OTHER RELATED ITEMS. K. SCALES NOTED ON THE DRAW INGS ARE FOR GENERAL REFERENCE ONLV. NO DIMENSIONAL INFORMATION SHALL BE OBTAMED BY DIRECT SCALING OF THE DRAW INGS. L FLOOR SLAB ELEVATIONS INDICATED ON DRAW INGS ARE ESTABLISHED TO PROVIDE POSITIVE DRAINAGE ANO PROVIDE REOUIRED HEADROOM QEARANCE, REFER TO SECTIONS 1.8 AND 1.9. NOTIFY ENGMEER OF GRADES INOICATEO WHICH DO NOT ALLOW FOR MINIMUM HEA�ROOM CLEARANCE. M. IF DRAW INGS AN� SPEQFICATIONS ARE IN CONFLICT, THE MOST STRINGENT RESTRICTIONS AN� REQUIREMENTS SHALL GOVERN. N. DO NOT INSTALL CONDUIT W SUPPORTED SLABS, SLABS-ON-GRAOE, COWMNS OR WALLS UNLESS EMPLICITLV SHOWN OR NOTED ON STRUCTURAL DRAWINGS OR APPROVED BV ENGINEER OR RECORD. O. VISITS TO JOB SITE BV ENGMEER TO OBSERVE CONSTRUCTION DO NOT IN ANY WAY MEAN GUARANTEE OF CONTRACTOR'S W ORK, NOR RESPONSIBILITY FOR COORDINATION, SUPERVISION, NOR SAFETY AT JOB SITE. 1d3 GONSTRUGTION PHASING A. CONTRACTOR SHALL BE RESPONSBLE FOR COORDINATION OF ALL CONSTRUCTION ACTIVITV AN� SHALL COOPERATE FULLV WITH OWNER FOR ALL CONSTRUCTION PHASING. 1.iG FORMWORKANDSHORING A. DRAWINGSDONOTMCWDENECESSARYCOMPONENTSFORSAFETYOFBUILDINGOREOUIPMENT DURING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ALL WORK RELATING TO CONSTRUCTION, ERECTION METHODS, BRAqNG, SHORWG, RIGGING, GUVS, SCAFFOLDWG. FORMWORK, AND OTHER WORK AIDS REQUIRE� TO SAFELY PERFORM WORK INDICATED. B. CONTRACTOR IS RESPONSIBLE FOR PROVIDING APPROPRIATE SHORING. REFER TO SECTION 031100, "CONCRETEFORMWORK" OIVISION 02 � E%ISTING CONDITIONS 2.7 EXISTINGSTRUCTURES 1. WHEREDIMENSIONSAREIN�ICATE�FORE%ISTWGSTRUCTURESORUTILITIES,THEYARE APPROXIMATEANDFORREFERENCEONLV. CONTRACTORSHALLVERIFVMFIELD(VIF)ALL OIMENSIONSANDELEVATIONSPRIORTOCONSTRl1CTION. ANYVARIATIONSBETWEENEXISTING �IMENSIONS AND/OR ELEVATIONS ON DRAWINGS SHALL 8E REPORTE� TO ENGINEER. DIVISION 03 - CAST-IN-PLACE CONCRETE 3.1 ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWINCa: A. ACI318-11 B. AC13621R42 C. REFER TO SPECIFICATION SECTION 033020 CAST-IN-PLACE CONCRETE FOR INFORMATION NOT LISTED HEREIN 3.2 CONCRETE MAXIMUM MAXW/C AVGAIR DESCRIPTION F'C fPSll CHLORIDE ION RATIO ENTRAMED FOOTINGS 8 MAT FDNS 4000 STD 0.30 0.50 N/A WALLS 5000 CNA/SPA 0.15 0.40 6-1/2% COLUMNS SOOOCNNSPA 0.15 0.40 6-i12% BEAMS SOOOCNNSPA 0.06 040 6412% TOPPWGSLAB SOOOCNA/SPA 0.06 0.40 6-1/2% SLAB-ON-GRADE 4500STD5F 0.15 0.40 6-i12% ISLANDS&HKPA�S 4000STD/F 0.15 040 6412% COMPOSITEMETALDECK 4000STD 0.30 0.40 6-1/2% ALLOTHERS 4000STD 0.30 0.40 6-i12% NOTES: (i) STD'. DESIGNATES A CONCRETE MIX DESIGN IN ACCORDANCE WITH SPECIFlCATION SECTION 033W0 WHICH �OES NOT REQUIRE SILICA FUME, GGBSIFLV ASH, OR CALCIUM NITRITE ADMIXTURE (2) CNA: DESIGNATES A CONCRETE MIX DESIGN IN ACCORDANCE WITH SPECIFlCATION SECTION 033020 WHICH CONTAINS 25 GALICV OF CALCIUM NITRITE CORROSION-INHIBITOR ADMIXTURE (3) SPA: DESIGNATES A CONCRETE MIX DESIGN IN ACCORDANCE WITH SPECIFlCATION SECTION 033020 WHICH CONTAINS 15% MINIMUM OF GGBS BV WEIGHT OF CEMENT (4) SF DESIGNATES A WNCRETE MIX DESIGN IN ACCORDANCE W ITH SPECIFlCATION SECTION 033020 W HICH CONTAINS 4-012 LBS/CV OF STRUCTURAL MACRO FIBERS (5) F: DESIGNATES A CONCRETE MIX DESIGN IN ACCORDANCE WITH SPECIFICATION SECTION 033020 WHICH CONTAINS 1-1/2 L6S/CY OF FlBRILLATED FlBER REWFORCEMENT OR 1 LBS/CY MICROFlLAMENT REWFORCEMENT (6) AVERAGE AIR-ENTR4INED VAW ES ARE FOR IN-PLACE CONCRETE. WLERANCE ON TOTAL AIR CONTENT IS 1-V2% PER ACI318. (]) ALL NORMALWEIGHT CONCRETE SHALL HAVE A DENSITV OF APPROXIMATELV 145 PCF UNLESS NOTE� OTHERW ISE THE W EIGHT OF RV ASH AND GGBS ADMIXTURE(S) MAV BE MCLUDED W ITH THE W EIGHT OF CEMENT. (8) FORSITEWORKCONCRETEREFERTOCIVILORAWINGS 3.3 CEMENT A. ASTM C 150 TVPE I OR III B. ASTMC595TVPE1(PM}AORTVPEI(SM�A 3.4 AGGREGATES A ASTM C 33 3.5 MILD REINFORCEMENT A. MILDREWFORCEMENT,ASTMA615GRADE60 B. MILD REINFORCEMENT (LOW ALLOY WELDABLE), ASTM A]O6 GRADE 60 C. MECHANICALTENSIONANDCOMPRESSIONSPLICESASIN�ICATE�ONDRAWINGS D. MECHANICALTERMINATIONSIZESASINDICATEDONDRAWINGS E. EPDXY COATING FOR PLAIN AND DEFORMEO MILD REINFORCEMENT, ASTM A]]5 F. WELDED DEFORMED W IRE FABRIC SHEETS, ASTM A 49], GRADE 65 G. EPDXV COATWG FOR PLAIN W ELDED W IRE FABRIQ ASTM A 884 H. EPDXY COATING FOR DOWEL BARS SHALL BE THE SAME AS SPEQFIED FOR REINFORCEMENT TO BE SPLICEO I. WELDINGFORREMFORCINGSTEEL,AWSD1.4 J. CONCRETEPROTECTIONSHALLBEPERACI362.iR,EXCEPTASNOTE00NDRAWINGSANOSPEQFIEDHEREIN. SPECIFIC DRAW INGS AND DETAILS MAV OR MAV NOT INDICATE EPO%V COATING OR UNCOATED REINFORCING. IN AREAS OF DISPUTE, THIS SCHEDULE SHALL GOVERN IN ALL CASES. DESCRIPTION COVER PROTECTION FOOTINGS 3" UNCOATED WALLS 2' UNCOATED COLUMNS & PILASTERS TIES 2" ALL SIOES EPDXY COATED VERTICAL REINFORCING 2 V2' UNCOATED BEAMS(ELEVATED) STIRRUPS 21/2" TOP EPDXY COATED 1 1l2" SIDE & BOTTOM TOP REMFORCING - UNCOATED SIDEREINFORCING - UNCOATED BOTTOM REINFORCING - UNCOATED TOPPWGSLAB 11/2" EPDXVCOATED SLAB-ON-GRADE 2"FROMTOP UNCOATED ISLANDS, HK PADS, CURBS, MISC. 1412" EPDXV COATED COMPOSITE METAL DECK 1" TOP UNCOATED 3.6 POSTdNSTALLED MILD REINFORCEMENT A. POST-WSTALLED REINFORCING BAR CONNECTIONS SHALL BE OESIGNED PER THE ACI 318 BUILDING CO�E REQUIREMENTS FOR STRUCTURAL WNCRETE. POST-INSTALLED REINFORCING BAR CONNECTIONS SHALL CONSIST OF THE FOLLOW ING ADHESNE SVSTEMS AS PFOVIDED BV HILTI, MG OR APPROVED EQUAL CONTACT HILTI AT (800) 8]9-8000 FOR PRODUCT RELATED QUESTIONS. 6. POST-WSTALLED REINFORCING BAR CONNECTIONS IN CONCRETE 1. EPDXVSVSTEMSWITHSAFESETTECHNOLOGV: i. HILTI HIT-RE SOO V3 SAFESET SVSTEM WITH HILTI HOLLOW DRILL BIT (TECD OR TEVD), AN� HILTI VC 20/40 VACUUM VC 20-U OR VC 40-U W ITH POST-INSTALLED STEEL REINFORCING BARS ( ) INSTALLED PER ICC ESR3814 ii. HILTI HIT-HV 200 SAFESET SVSTEM W ITH HILTI HOLLOW DRILL BIT (TECD OR TE-VD), AND HILTI VC 20/40 VACUUM (VC 20-U OR VC 60-U)WITH POST-INSTALLED STEEL REINFORCING BARS INSTALLED PER ICC ESR-381] G THE DESIGN OF STRAIGHT POST-INSTALLED REMFORCING BARS SHALL BE PERPoRMED PER THE �EVELOPMENT AND SPLICE LENGTH REpUIREMENTS OF THE ACI 318 BUILD W G CODE REQUIREMENTS FOR STRUCTURAL CONCRETE THE POST-INSTALLED REMFORqNG BAR SVSTEM IS AN ALTERNATNE TO CAST-IN- PLACE REINFORQNG BARS GOVERENED BV ACI318AND IBC CHAPTER 19. D. THE EPDXV SVSTEM SHALL BE TESTE� IN ACCORDANCE W ITH THE ICC-ES ACCEPTANCE CRITERIA FOR POST- INSTALLED EPDXV ANCHORS M CONCRETE ELEMENTS (AC308), TABLE 3.8. TECHNICAL �ATA SHALL BE Pl16LI5HED IN AN ICGES EVAWATION SERVICE REPORT SHOWING COMPLIANCE W ITH IBC. 1. ICGES ESR-3814 FOR HILTI HIT-RE 500 V3 EPDXV ANCHORS AND POST-INSTALLED REMFORQNG BAR CONNECTIONS IN CRACKE� AND UNCRACKED CONCRETE. 2. ICC-ES ESR3187 FOR HILTI HIT-HV 200 EPDXV ANCHORS ANo POST-INSTALLED REWFORCING BAR CONNECTIONS IN CRACKE� AND UNCRACKED CONCRETE. E. POST-WSTALLED REINFORCING BAR INSTALLATION SHALL BE PERFORMED BV PERSONNEL TRAINED TO INSTALL THE SVSTEM PER THE MANUFACTURER'S PRIMED INSTALLATION INSTRUCTIONS (MPII), AS INCLUDED IN THE ANCHORPACKAGING. THECONTRACTORSHALLARRANGEFORAMANUFACTURER'SREPRESENTATNETO PROVIDE ONSITE INSTALLATION TRAINING FOR POST-MSTALLE� REMFORCING BARS. THE STRUCTURAL ENGWEER OF RECORD MUST RECENE DOCUMENTED CONRRMATION PRIOR TO THE COMMENCEMENT OF INSTALLING THE BARS THAT ALL OF THE CONTRACTOR'S PERSONNEL W HO W ILL INSTALL POST-INSTALLED REINFORCING BARS HAVE BEEN TRAINED TO INSTALLTHE SVSTEM PER THE MANUFACTURER'S PRINTED WSTALLATION INSTRUCTIONS (MPII). F. THE POSITION OF EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE SHALL BE LOCATED PRIOR TO POST-INSTALLMG BARS EXISTING BARS SHALL BE LOCATED USING HILTI FERROSCAN, GPR, X-RAV, CHIPPING, OR OTHER MEANS. «I A. MISCELLANEOUS STEEL SHAPES, PLATES, ANO BARS, ASTM A 36, HOT-DIP GALVANIZE� AFTER ASSEMBLV. STAINLESS STEEL ASTM A 6660R ASTM A 276, TVPE 304L AS NOTED ON DRAWINGS. B. ANCHOR BOLTS. ASTM F 1554 GRADE 36 UNO, HOT-DIP GALVANIZED C. HEADED STUD ANCHORS, ASTM A 108, REFER TO SECTION SA.4.A.1 FOR ADDL WFO. D. POST-INSTALLED ANCHORS SHALL BE STAINLESS STEEL: L EXCEPT W HERE IN�ICATED ON THE �RAW INGS, POST-INSTALLED ANCHORS SHALL CONSIST OF THE FOLLOWING ANCHOR TVPES AS PROVIDED BV MLTI, INC. OR APPROVED EpUAL CONTACT MLTI AT (800) 8I9-8000 FOR PRODUCT RELATED QUESTIONS. 2. ANCHORAGETOCONCRETE: i. AOHESIVEANCHORSFORCRACKEDANDUNCRACKEOCONCRETElISE: a. HILTI HIT-HV 200 SAFESET SVSTEM W ITH HILTI HIT-Z ROD PER ICC ESR-3187 b. HILTI HIT-HV 200 SAFESET SVSTEM W ITH HILTI HOLLOW DRILL BIT (TECD OR TEVD) AND VC 20/40 VACUUM (VC 20-U OR VC 40-U) SVSTEM WITH HAS-E THREA�ED ROD PER ICC ESR318] c. HILTI HIT-RE SOO V3 SAFESET SVSTEM WITH HILTI HOLLOW DRILL BIT (TECD OR TEV�) AND VC 20I40 VACUUM (VC 20-U OR VC 40-U) SVSTEM W ITH HAS-E THREADEO ROD PER ICC ESR3184 tl. HILTI HIT-RE SOO V3 SAFESET SVSTEM WITH HILTI ROUGHENING TOOL (TEYRT) WITH HAS-E THREADE� ROD PER ICC ESR3184 FOR DIAMOND CORED HOLES ii. MEDIUM DUTV MECHANICAL ANCHORS FOR CRACKED AND UNCRACKE� CONCRETE USE: a. HILTI KW IK HUS EZ ANO KWIK HUS EZ-I SCREW ANCHORS PER ICC ESR-302] b. HILTI KW IK BOLT-TZ E%PANSION ANCHORS PER ICC ESR-191] c. HILTI KW IK BOLT 3 EXPANSION ANCHORS (UNCRACKED CONCRETE ONLY) PER ICC ESR-2302 iii. HEAVV DUTV MECHANICALANCHORS FOR CRACKED AND UNCRACKED CONCRETE USE: a. HILTI HDA UNDERCUT ANCHORS PER ICC ESR-1546 b. HILTI HSL3 E%PANSION ANCHORS PER ICC ESR-1545 3. REBAR DOWELING INTO CONCRETE: i. REFERTOSECTION3.6POST-INSTALLE�MILDREINFORCEMENT 6. ANCHORAGE TO SOLID GROUTED MASONRV: i. ADHESIVEANCHORSUSE: a. HILTI HIT-HV 2]0 MASONRV ADHESNE ANCHORING SVSTEM PER ICC ESR-2682 b. HILTI HIT-HV 200 SAFESET SVSTEM W ITH MLTI HIT-Z ROD PER ICC ESR-3963 c. HILTIHIT-HV200SAFESETSVSTEMWITHHILTIHOLLOWDRILLBIT(TECDORTEYD)ANDVC 20I40 VACUUM (VC 20-U OR VC 40-U) SVSTEM WITH HAS-E THREAOED ROD PER ICC ESR-39G3 tl. STEEL ANCHOR ELEMENT SHALL BE HILTI HA&E CONTINUOUSLV THREADED ROD OR CONTINUOUSLV OEFORMED STEEL REBAR ii. MECHANICALANCHORSUSE: a. HILTI KW IK BOLT 3 EXPANSION ANCHORS PER ICC ESR-0385 b. HILTI KW IK BOLT-TZ EXPANSION ANCHORS PER ICC ESR3]85 5. ANCHORAGETOHOLLOW/MULTI-WVTHEMASONRV: i. ADHESIVEANCHORSUSE: a. HILTI HIT-HV 2]0 MASONRV ADHESNE ANCHORING SVSTEM PER ICC ESR3342 b. STEEL ANCHOR ELEMENT SHALL BE HILTI HAS-E CONTINUOUSLV THREADE� ROD OR CONTINUOUSLY DEFORMED STEEL REBAR c. THE APPROPRIATE SIZE SCREEN TUBE SHALL BE USED PER A�HESIVE MAUNFACTURER'S RECOMMENDATION 6. ANCHOR CAPAqTY USED IN DESIGN SHALL BE BASED ON THE TECHNICAL DATA PUBLISHED BV HILTI OR SUCH OTHER METHOD AS APPROVEO BV THE STRUCTURAL ENGINEER OF RECORO. SUBSTITUTION REpUESTS FOR ALTERNATE PRO�UCTS MUST BE APPROVE� IN WRITING BV THE STRUCTURAL ENGINEER OF RECORD PRIOR TO USE CONTRACTOR SHALL PROVIDE CALCULATIONS DEMONSTRATING THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF ACHIEVING THE PERFORMANCE VAW ES OF THE SPEQFIED PRODUCT. SUeSTITUTIONS WILL BE EVALUATE� BVTHEIR HAVING AN ICC ESR SHOWING COMPLIANCE W ITH THE RELEVANT BUILDMG CODE FOR SBSMIC USES, LOA� RESISTANCE, INSTALLATION CATEGORY, ANO AVAILABILITV OF COMPREHENSIVE INSTALLATION WSTRUCTIONS. ADHESIVE ANCHOR EVAWATION W ILL ALSO CONSIDER CREEP, IN-SERVICE TEMPERATURE, AND INSTALLATION TEMPERATURE. ]. INSTALL ANCHORS PER THE MANUFACTURER INSTRUCTIONS, AS INC W DED IN THE ANCHOR PACKAGING. 8. OVERHEAD A�HESIVE ANCHORS MUST BE INSTALLED USING THE HILTI PROFI SYSTEM. 9. THECONTRACTORSHALLARRANGEANANCHORMANUFACTURER'SREPRESENTATIVETOPROVIDE ONSITEINSTALLATIONTRAINWGFORALLOFTHEIRANCHORINGPRODUCTSSPECIRED. THE STRUCTURAL ENGINEER OF RECORD MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR'S PERSONNEL W HO INSTALL ANCHORS ARE TRAINED PRIOR TO THE COMMENCEMENT OF INSTALLING ANCHORS. 10. ANCHOR CAPACITV IS DEPEN�ANT UPON SPACING BETVJEEN ADJACENT ANCHORS AND PROXIMITV OF ANCHORS TO EDGE OF CONCRETE. INSTALL ANCHORS IN ACCORDANCE W ITH SPACING AND EDGE CLEARANCES INDICATED ON THE DRAWINGS. 11. EXISTING REINFORQNG BARS IN THE CONCRETE STRUCTURE MAV CONFLICT WITH THE SPECIFIC ANCHOR LOCATIONS. UNLESS NOTED ON THE DRAWINGS THAT THE BARS CAN BE CUT, THE CONTRACTOR SHALL REVIEW THE EXISTING STRUCTURAL DRAW INGS AND SHALL UNDERTAKE TO LOCATE THE POSITION OF THE REINFORCING BARS AT THE LOCATIONS OF THE CONCRETE ANCHORS, BV HILTI FERROSCAN, GPR, X-RAV, CHIPPING, OR OTHER MEANS. E. ASPHALTIC JOINT FILLER SHALL BE 1/2" THICK OR AS NOTED ON DRAW INGS. F. COMPRESSIBLE JOINT FlLLER SHALL 8E 1"THICK OR AS NOTED ON DRAW WGS. G. EARTH DAMS 1/e" CONTINUOUS PREMOLDED MEMBRANES. H. SLIOE BEARING SYSTEMS SHALL BE AS INDICATED ON DRAWINGS. I. CONCRETE DAMS SHALL BE FORMED OR BACKER RODS AS NOTED ON DRAW INGS. 3.8 GROUT A. PREMIXED. PACKAGED, NON-SHRINK, CHLORIDEFREE, NON-STAINING, FC = 6000 PSI MINIMUM, ASTM C 1101. 3.9 GENERAL CAST-IN-PLACE CONCRETE A. REINFORCEMENT 1. PROVIDE EXTRA REWFORCING AROUND ALL OPENWGS, TWO #5 BARS ON ALL FOUR SIDES OF EACH OPENING. EXTENDTWOFEETBEVONDCORNERSOFOPENING. 2 PROVI�E STANDARD 90 DEGREE BAR HOOKS UNLESS NOTED OTHERW ISE ON DRAW INGS. 3. MINIMUM LENGTH OF LAP SPLICES SHALL BE BASED ON ACI 318 CLASS B, UNLESS NOTED OTHERWISE ON DRAWINGS. 6. APPROVED REBAR COUPLERS MAV BE USED AT CONTRACTOR'S OPTION TO AID PLACEMENT OF DOWELS THROUGHFORMS. 5. REINFORQNG STEEL SHALL NOT BE BENT OR STRAIGHTENED UNLE55 APPROVED BV ENGINEER OR AS INDICATED ON DRAWINGS. 6. RELD CUTTING OF REMFORCEMENT IS PROHIBRED UNLESS APPROVED BY ENGMEER. ]. WELDINGOFREINFORCEMENTISPROHIBITEDUNLESSSPECIFICALLVCALLE�FORONDRAWINGSOR APPROVED BV ENGINEER. DO NOT WELD EPO%V COATED REMFORCEMENT. B. ACCESSORIES 1. ALLWELDASSEMBLIESSHALLUSEEIOXXLOWHVDROGENELECTRODES.MINIMUMWELDSIZEISI/4 INCH. STAINLESS STEEL ELECTRODES SHALL BE TYPE 308L OR 34]. 2. FORFIELDWELDINGGALVANIZEDCONNECTIONHARDWARE REMOVESLAG WIREBRUSH ANDAPPLY THREE COATS OF Z.R.G COLD GALVANIZING. 3. INSTALL INSERTS AND ANCHORS IN CONCRETE FOR SUSPENDING MECHANICAL AND ARCHITECTURAL ITEMS WHERE FEA518LE. IFADOITIONAL FASTENERS ARE NEEDED M CONVENTIONALLY REINFORCED CONCRETE, USE �RILLED-IN TVPE ANCHORS LOCATE� TO AVOID CONFLICT WITH REINFORCEMENT. DO NOT USE DRILLED-IN ANCHORS OR POWER DRNEN FASTENERS IN PRECAST CONCRETE UNLESS APPROVED BY ENGMEER. 4. NOALUMINUMCONDUITORPRODUCTSCONTAININGALUMINUMORANVOTHERMATERIALINJURIOUSTO THE CONCRETE SHALL BE EMBEDDED M CONCRETE. C JOINTS 1. PROVIDEA3/41NCHCHAMFERONEXPOSEDCORNERSOFCONCRETEUNLESSOTHERWISEINDICATEDON DRAW INGS. TOP EDGES OF WALLS MAY BE TOOLED. 2 TOOL SLAB JOINTS AT THE TIME OF FINISHING SAW WTTING IS NOT ALLOW E� UNLESS SPEqFICALLV CALLED FOR ON DRAW INGS OR APPROVED BV ENG W EER. 3. CAST WALLS WITH CONSTRUCTION AND CONTROL JOINTS AT 12 FEET ON CENTER MAXIMUM UNLE55 NOTED ON DRAW INGS. 4. CAST SLAB ON GRADE WITH CONSTRUCTION AND CONTROL JOINTS IN STRIPS 75 FEET BV 100 FEET MAXIMUM UNLE55 NOTEO OTHERW ISE ON DRAW INGS. 6. CONSTRUCTION JOINTS SHALL BE PREPARED BV ROUGHENMG THE CONTACT SURFACE TO A FULL AMPLITUDE OF 1/4" AND LEAV WG THE CONTACT SURFACE CLEAN AND FREE OF LAITANCE. ]. PROVI�E WATERSTOPS IN CONSTRUCTION JOINTS IN CAST-IN-PLACE CONCRETE ELEMENTS THAT HAVE ONE SIDE EXPOSED TO THE W EATHER OR SOIL AND OTHE OTHER SIDE ADJACENT TO ENCLOSED SPACE. REFER TO ORAW INGS FOR OTHER W ATERPROOFING AND DAMPPROOFING DETAILS. D. GENERAL 1. THE USE OF CHLORI�ES SUCH AS DEICING SALTS ARE PROHIBITE� FOR USE OF MELTING ICE PRIOR TO PLACEMENTOFCONCRETE. MSKTD & Associates ArchitecNre I Engineering I Interior Design 1115 Magnavox Way 930 Nohh Meritlian Fort Wayne, IN 46804 I Intlianapolis, IN 46204 260.432.9337 31].917.1190 www mskltl com � WGIo 8910 Purdue Rd, Suite 400 Indianapolis, IN 46268 Phone No. 317.735.3349 www.wginacom � ' Na. PE103000 STATEOF U •� �/\ U it� � W Q � � � � �^` � � W v V � O N X LL ^ � l W `^ i vl rn � � V U O Z �/A' Y / � Y •� � U � a^ +� I..L � ^` i � � � � Z� U � � � �r L W � U PROJECTNO. DATE 7382 10/11 /2019 REV. DATE SET DESCRIPTION BP #4 - Garage / Bridge Structural Package SHEET TITLE GENERALNOTES- STRUCTURAL SHEETNUMBER S-001