Loading...
HomeMy WebLinkAboutReceipt Shestak, Joe From:Conn, Angelina V Sent:Tuesday, June 16, 2020 12:33 PM To:Blanchard, Jim E; Chavez, Nathan; Keesling, Rachel M; 'Hall, Willie'; Haney, Douglas C; Hollibaugh, Mike P; Jesse, Christina; 'John Molitor'; Jordan, Alex; Kashman, Jeremy M; Kass, Joslyn; Keeling, Adrienne M; Krueskamp, Theresa A; Littlejohn, David W; Lopez, Alexia K; Maki, Sue; Martin, Candy; McCoy, David W; Mindham, Daren; Mishler, Nicholas F; Motz, Lisa; Shestak, Joe; Speth, Nichole M; Thomas, John G; Warner, Caleb; Worrell, Jeff Cc:troy@truenorthindy.com; stcaress@yahoo.com Subject:Docket No. Assignment: Replat of Newark Village Lot 77, Secondary Plat (PZ-2020-00091 SP) Follow Up Flag:Follow up Flag Status:Flagged I’ve issued the Plan Commission Docket Number for this item. It is the following: Docket No. PZ-2020-00091 SP: Replat of Newark Village Lot 77. The applicant seeks secondary plat administrative approval create 2 lots on 0.483 acres, to create lots 77A and 77B. The site is located at 815 and 811 Pawnee Rd. It is zoned R2/Residence. Filed by Troy Terew of True North Surveying LLC on behalf of Steve and Grace Caress, owners. Troy Terew, surveyor, can be contacted at Troy@Truenorthindy.com or 317-841-8754. FILING FEES: Replat / Secondary Plat $370.00 Total Due: $370.00 Petitioner, please note the following: 1. This item will not be on an agenda of the Technical Advisory Committee; however, the petitioner should distribute plans and work with each TAC Member individually to get all review comments addressed (please note that not all TAC Members use ProjectDox; the TAC members lists shows the plan receipt preferences). 2. Mailed and Published Public Notice does not need to occur. 3. This item will be reviewed administratively by this Dept. and TAC, but the final plat also needs approval by the BPW (Board of Public Works & Safety). Please work with Caleb Warner in the City Engineering Dept. to get on a BPW meeting agenda, which has a filing deadline. His number is 317-571-2441, and his email address is cwarner@carmel.in.gov. 4. The filing fee is due prior to the Planning Director’s approval (signature on the final plat). Checks can be made out to The City of Carmel. 5. Please refer to the application/checklist for more detail. 6. Review comments from the Planning/Zoning Dept. will be issued soon via ProjectDox, our electronic plan review software. Sincerely, 1 Angie Conn, AICP Carmel Planning & Zoning Dept. rd 1 Civic Sq. 3 Flr., Carmel, IN 46032 P: 317-571-2417 | W: www.carmeldocs.com 2