Loading...
HomeMy WebLinkAboutA001 Abbreviations & General Notes: tN'r x�`/i �- RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel `�y,:a���'.�`� �,�:;vaYa/„1��. DATE: 06�� $�2O ABBREVIATION LEGEND A: Area, Acre; Alcove; Compressed Air Line AB: Anchor Bolt ABV: Above AC: Air Conditioning, Altematinq Current ACC: Access ACF: Architectural Concrele Finish ACR: Acrylic ACST: Acoustic ACT: Actual AD�. Access Door, Area Drain ADA: Americans with Disabilities Act of 1992 ADD: Addendum; Addition ADDL: Additional ADH: Adhesive ADJ: Adjust, Adjustable, Adjacent AF: Above the Floor AFF: Above Finished Floor AIA: American Institute of Architects ALM: Alarm ALT: Alternate, Alteration; Altitude ALUM: Aluminum AMB: Ambient AMT: Amount ANCH: Anchor, Anchorage ANOD: Anodized AP: Access Panel APPROX: Approximate APRVD: Approved APT:Apartment ARCH: Architect, Architectural AS: Acoustic Sealant ASC: Above Suspended Ceiling ASPH: Asphalt ASSEM: Assemble ASSY: Assembly ASTM: American Society for Testing and Materials ATC: Acoustical Tile Ceiling ATTEN: Attenuation.Attention ATM: Automatic Teller Machine; Atmospheric AUTH: Authorized AUTO: Automatic AVG:Average B: Bathroom B TO B: Back to Back B& B: Balled and Burlapped Bl: Bottom (of) BAL: Balance, Ballast BC: Broom Closet BDY:Boundary BEL: Below BETW: Between BEV: Bevel BHD: Bulkhead BIT: Bituminous BJF: Bituminous Joint Filler BL: Building Line BLDG: Building BLK: Block BLKG: Blocking BLT-IN: Built-In BM: Beam, Bench Mark BN: Bullnose BNT: Bent BOT: Botlom BP: Base Plate BPL: Bearing Plate BR: Bedroom BRDG: Bridging BRG: Bearing BRK Brick BRKT: Bracket BRS: Brass BRZ: Bronze BS: Both Sides BSMT: Basement BT: Bathtub, Bolt BUR: Built-up Roof BW: Both Ways C: Curb, Clock Outlet C/C: Center to Center CAB: Cabinet CAP: Capacity CAR: Carpet CAV: Cavity CCW: Counter Clockwise CCTV: Closed Circuit TV CEM: Cement CER: Ceramic CF: Cubic Feet CFL Counterflashing CFS: Cold Formed Steel CG Comer Guard CH: Coat Hook CHR: Chilled Water Return CHAM: Chamfer CHAN:Channel CHS: Chilled Water Supply CI: Cast Iron CIP: Cast-in-Place CIR: Circle, Circular CIRC: Circumference CITG: Clear Insulating Tempered Glass CJ: Control Joint CK: CaWking CL Centerline, Clearance, Closure, Class CLG Ceiling CLL Contract Limit Line CLO: Closet CLR: Clear CLR OPG Clear Opening CMP: Corrugated Metal Pipe CMU: Concrete Masonry Unit CND: Conduit CNTR: Counter COAX: Coaxial C.O.: Cased Opening CO: Company, Cleanout, Cased Opening, Cut Out COD: Cleanout Door COL: Column COM: Common CON: Construclion CONC: Concrete CONN: Connection CONT: Continuous, Continue, Control COP:Copper COR: Corner CORR: Corridor, Corrugate CR: Curtain Rod CRPT: Carpet CRS: Course, Cold Rolled Steel CS: Cast Stone CSG: Casing CSK: Countersink CSMT: Casement CT: Ceramic Tile CTD: Coated CTR: Cenler CW: Clockwise, Cold Water CWR: Condensate Waste Return CWS: Condensate Waste Supply CY: Cubic Yard CYL Cylinder CYL L Cylinder Lock DA: Double Acting DB: Decibel DBL: Double DC: Direct Current DD: Driveway Drain, Deck Drain DEG: Degree DEGF: Degree Farenheit DEMO: Demolition DEPT� Depariment DR Drinking Fountain DH: Double Hung DIAG: Diagonal DIA: Diameter DIFF: Diffuser DIM: Dimension DISL Disposal DIV: Division DL: Dead Load DMT: Demountable DN: Down DO: Door O enin p 9 DP: Dampproofng DPR:Damper DR: Door, Dining Room DS: Downspout DSP: Dry Standpipe DT: Drain Tile DTL Detail DVTL: Dovetail DWG: Drawing DWGS: Drawings DWR: Drawer E: East E TO E: End to End EA: Each EB: Expansion Bolt EC: Exposed Construction ECP: Exposed Constmction Painted EE: Each End EF: Each Face EG: Edqe Grain EIFS: Exterior Insulation and Finish System EJ: Expansion Joint ELEC: Electrical ELEV: Elevator, Elevation EMER: Emergency ENAM:Enamel ENCL Enclosure ENG: Engineer ENT: Entrance EPDM: Eth lene Pro lene Diene Monomer Y PY EQ: Equal EQUIP: Equipment ERP: Emergency Receptade Panel EST: Estimate EW: Each Way EX: Exit EXC: Excavate EXEC: Executive EXH: Exhaust EXH AIR: ExhaustAir EXIST: Existing EXP: Expansion, Exposed EXT: Exterior F: Degrees Fahrenheit F TO F: Face to Face FA: Fire Alarm, Fresh Air FAB: Fabricate FACP: Fire Alarm Control Panel FAG: Fire Alarm Gong FAST: Fastener, Fasten FBD: Fiberboard FBRK: Fire Brick FD: Floordrain FDC: Fire Department Connection FDN: Foundation FE: Fire Extinguisher FEQ Fire Extinguisher Cabinet FF: Finished Floor, Factory Finish FFE: Finished Floor Elevation FF&E: Fixtures, Furnishings & Equipment FFL: Finished Floor Line FGL Fiberglass FGR: Fiberglass reinforced FH: Fire Hose FHC: Fire Hose Cabinet FHWS: Flat Head Wood Screw FHY: Fire Hydrant FIN: Finish, finished FIX: Fixture FLG: Flashing FLR: Floor FLUOR: Fluorescent FLX: Flexible FND: Feminine Napkin Dispenser FO: Finished Opening FOC: Face of Concrete FOF: Face of Finish FOS: Face of Studs FP: Fireproof FPL: Fireplace FR: Front, Fire Riser FRM: Frame FRT: Fire Retardant FS: FloorSink FT: Foot, Feet, Fully Tempered FTG Footing, Fitting FURN: Furnish, Fumiture FURR: Furring FUT: Future G: Gas GA: Gauge GAL: Gallon GALV: Galvanized GC: General Contractor GEN: General GFCI: Ground Fault Circuit Intermpted GFI: Ground Fault Interrupted GFRQ Glass Fiber Reinforced Concrete GI: Galvanized Iron GKT: Gasket GL: Glass GLZ: Glaze GMU: Glazed Masonry Unit GND: Ground GOVT: Government GP: Galvanized Pipe GR: Grade GRAN: Granite GRTG Grating GT: Grout GV: Galvanized GVL: Gravel GYP:Gypsum GYP BD:Gypsum Board HB: Hose Bib HBD: Hardboard HC: Hollow Core HD: Heavy Duty HDR: Header HDPE: High Density Polyethylene HDW: Hardware HDWD: Hardwood HGR: Hanger HGT: Height HK: Hook or Hooks HM: Hollow Metal HMP: Hollow Metal, Painted HOR: Horizontal HR: Hour HRS: Hot Rolled Steel, Hours HT: Height HTR: Heater HV: High Voltage HVAC: Heating, Ventilating & Air Conditioning HW: Hot Water HWR: Hot Water Recirculating Return HWS: Hot Water Supply HYD: Hydraulic I: Iron ID: Inside Diameter IN: Inch INC: Incandescent INCL: Incline, Include WCR: Increase INFO: Information INSP: Inspect INSTL: Install INSUL: Insulation INT: Interior INV: Invert IP: Iron Pipe J: Joist JB: Junction Box JC: Janitor's Closet JF: Joint Filler K: Kickplate KIT: Kitchen KS: Kitchen Sink KW: Kilowatt L: Lek, Length LAD: Ladder LAM: Laminate, Laminated LB: Pound (weight), Lag Bolt LBL: Label LBR: Lumber LCD: Liquid Crystal Diode LCL Linen Closet LCM: Lead Coated Metal LD: Leader Drain LH: Left Hand LIB: Library LINO: Linoleum LIQ: Liquid LKR: Locker LL: Live Load LMS: Limestone W: Length LNDG: Landing LOC: Locate LOCS: Locations LR: Living Room LS: Loud Speaker LT: Light LTG Lighting LTL: Lintel W: Low Voltage LVR:Louver LW: Light Weight LWC: Light Weight Concrete MACH: Machine MAINT: Maintenance MARB: Marble MAS: Masonry MATL: Material MAX:Maximum MB: Mail Box MC: Medicine Cabinet MECH: Mechanical MED: Medium MEMB: Membrane MET: Metal MEZZ: Mezzanine MFD: Manufactured, Metal Floor Deck MFG: Manufacturer, Manufacturing MH: Manhole MIKE: Microphone MIN: Minimum MIR: Mirror MISC: Miscellaneous MLDG: Molding MO: Masonry Opening MOD: Module MONO: Monolithic MOV: Movable MRD: Metal Roof Deck MT: Mount, Mounted MTL: Material, Metal MTR: Motor MULL: Mullion MWK: Millwork N. North NATL: Natural NEC: National Electrical Code NEUT: Neutral NI: Nickel NIC: Not In Contract NO: Number NOM: Nominal NR: Noise Reduction NRC: Noise Reduction Coefficient NS: NearSide NTS: Not To Scale O TO O: Out to Out HOLLAND BUILDING, BUILDING G, CONSTRUCTION DOCUMENTS, A001, BIM Server: PDGBIM - BIM Server 19BLDG G/Building G, 8/20/16, 633 PM OA: Outside Air, Overall OC: On Center OD: Outside Diameter OF: Outside Face OFF: Offce OH: Overhead OHD: Overhead Door OI: Ornamental Iron OPNG: Opening OPP: Opposite OPP H: Opposite Hand ORN: Ornamental OUT: Outlet OVFL: Overflow OZ: Ounce P: Paint P. LAM: Plastic Laminate P SL: Pipe Sleeve PAR: Parallel PARTN: Partition PB: Panic Bar PBD: Particle Board PC: Precast Concrete PCF: Pounds per cubic foot PD: Pump Discharge, Plaza Drain PE: Professional Engineer PED: Pedestal, Pedestrian PERF: Pertorate PERIM: Perimeter PERP: Perpendicular PFN: Prefinished PH: Phase, Phone PKG: Parking PKWY: Parkway PL Property Line PLAS: Plastic PLAS LAM: Plastic Laminate PLF: Pounds Per Lineal Foot PLMBG: Plumbing PLTF: Platform PLWD: Plywood PNL: Panel PNT: Paint POL: Polish, Polished PORC: Porcelain PORT: Portable POT W: Potable Water PP: Precast Panel PR: Pair PRC:Precast PREFAB: Prefabricated PRES: Pressure PRFMD: Preformed PRI: Primary PRMLD: Premolded PROT: Protection, Protective PRSTR: Prestressed PRTN: Partition PS: Plumbing Stack PSC: Prestressed Concrete PSF: Pounds per square foot PSI: Pounds per square inch PT: Point PTC: Past-Tensioned Concrete PTD: Paper Towel Dispenser PTDIR: Combination Paper Towel D is penser/Receptacle PV: Paving PVG: Paving PVMT: Pavement PVT: Private PWR: Power QUAL: Quality QT: Quarry Tile, Quart QTR: Quarter QTY: Quantity R: Radius R& S: Rod and Sealant RA: Return Air, Registered Architect RAD: Radiator RB: Rubber RBT:Rabbet RCP: Reflected Ceiling Plan RD: Roof Drain, Round REBAR: Reinforcing Bar RECP: Receptacle REF: Refer, Reference, Refrigerator REFL: Reflected, Reflector REG: Regular REINF: Reinforcement, or Reinforce REQ: Require, Required RESIL: Resilient RET: Return, Retaining REV: Reverse, Revise, Revision RF: Roof RFG: Roofing RGTR: Register RGH: Rough RH: Right Hand RHR: Right Hand Reverse RM: Room RMV: Remove, Removable RO: Rough Opening ROW: Rightof Way RPM: Revolutions Per Minute RT: Rubber Tile, Right RTR/RR Rubber TreadlRubber Riser RVS: Reverse Side RVT: Rivet RWC: Rain Water Conductor RWL Rain Water Leader S: South, Sealant, Supply S&S: Stained & Sealed S&V: Stain & Vamish SACT: Suspended Acoustical Tile SALV: Salvage SAN: Sanitary SC: Solid Core SCD: Seat Cover Dispenser SCH: Schedule SCR: Screen SCUP: Scupper SCWD: Solid Core Wood SD: Soap Dispenser SE: Structural Engineer SEC: Second, Secondary, Security System SECT: Section SEL Select SERV: Service SF: Square Foot SFGL: Safety Glass SGS: Silicone Glazing Sealant SH: Shelf SHT: Sheet SHTHG Sheathing SHWR: Shower SIG Signal SIM: Similar SJS: Silicone Joint Sealant SK: Sink SKL Skylight SLV:Sleeve SND: Sanitary Napkin Dispenser SP: Standpipe, Soundproof SPC: Spacer S PE C S: 5 pecificatio n s SPK:Speaker SPL: Special SPLR: Sprinkler SPM: Sprinkler Main SPP: Skim Coat Plaster Painted SQ: Square S5: Stainless Steel, Soil Stack SSGS: Silicone Structural Glazing Sealant SSK: Service Sink ST: Storm Water STA: Station STC: Sound Transmission Class STD: Standard STG Storage, Seating STK: Stack STL: Steel STOR: Storage STRUC: Structural STWY: Stairway SUPP: Supplementary, Supplement SUPT: Superintendent SUR: Surface SUSP: Suspended, Suspend SV: Safety Relief Valve SW: Switch SWBD: Switchboard SWGR: Switchgear SY: Square Yard SYM: Symmetrical SYN: Synthetic SYS: System T: Tread T/: Top of TBB: Top and Boltom T&G: Tongue & Groove TAN: Tangent TB: Towel Bar TC: Top of Curb, Terracotta TD: Trench Drain TEL: Telephone TEMP: Temporary, Tempered, Temperature TEN:Tenant TERM: Terminal TH: Thermostat THK: Thick, Thickness THR: Threshold THRM:Thermal THRU: Through TLT: Toilet TOL: Tolerance TP: Top of Pavement TPD: Toilet paper Dispenser TPH: Toilet Paper Holder TPTN: Toilet Partition TRANS: Transformer, Translucent TRAV: Travertine TRD: Tread TSL: Top of Slab TST: Top of Steel TT: Traffic Topping TTC: Telephone Terminal Closet TW: Top of Wall TYP: Typical TZ: Terrazzo UH: Unit Heater UL Underwriters' Laboretories UNEXC: Unexcavated UNFIN: Unfinished UNO: Unless Noted Otherwise UR: Urinal USG: United States Gypsum Company UT: Utility V: Volt VAR: Varies VB: Vapor Barrier VCT: Vinyl Composition Tile VENT: Ventilate, Ventilator VERT: Vertical VEST: Vestibule VF: Vinyl Fabric VIF: VeriTy In the Field VIN: Vinyl VNR: Veneer VOL: Volume VP: Vapor Proof, Vent Pipe VR� Vapor Retarder VS: Vent Stack VT: Vinyl Tile VTR: VentThrough Roof VWC: Vinyl Wall Covering W: West, Width, Wide, Watt, Waste, Water, Water W/: With W/O: Without WAINS: Wainscot WB: Wood Base WC: Watercloset WD: Wood WDP: Wood, Painted WDSS: Wood, Stained & Sealed WF: Wide Flange (structural steel) WGL: Wire-Glass WH: Water Heater, Wall Hung, Wall Hydrant WI: Wroughtlron WIN: Window WM: Wire Mesh, Water Meter WP: Waterproof, Weatherproof WPR: Waterproofing WPT: Working Point WR: Water Resistant, Water Repellant WS: Weatherstripping, Water Stop WT: Weight, WaterTable, Watertight WVNR: Wood Veneer WWF: Welded Wire Fabric X HVY: Extra Heavy X STR: Extra Strong YD: Yard YR: Year GENERAL NOTES: 1. Nothing setforih in these tlrawings shallrelease any conVactorfrom his responsibility to provide appropriate quantities, fieltl measuremenls, dimensional sta�ility, installation, anchorage, and coordination with other Uades; or release him (rom his responsibility to identify and resolve deviations from ihe requiremenis of ihe conhact documents, or free him of his responsibility ro alert designer lo errors or omission. 2. Con�rac�or shall utilize these drawings in conjunction wAh �he speci�iw�ions �o de�ermine �he full scope, inten� antl requiremen�s of �he project Specifications antl drawings are intentled �o be complemen�ary, not mutualty exclusive. Work shown on �he drawings bu� not lis�etl in the specrfica�ions, be in�erpretetl as �hough work were (uly tlescribetl in bo�h places. The higher quantiry, higher quality, more labor in[ensive antl overall more 3. Each contrac�or shall verrfy in the field all exis�ing applicable contli�ions antl tlimensions shown on the tlrawings antl as pertinen� �o �he in�en� of �hese tlrawings. Any discrepancy tliscovered shall be bmugh� �o �he a��en�ion o( [he tlesigner prior �o �he commencemen� of any work a(fec�etl by, or rela�ed �o, such tliscrepancy. Each conhacror shall be responsible for all costs associatetl with, or wusetl by his failure to comply wi[h ihis requirement. 4 Each contractor shau review all por�ions of his work, before s�atling the work, �o verrfy that Ihe work wlll not prohibit comple�ion of tM1e pmjed as In�entletl in these wns�mc�ion tlocuments. All quas�ians shell be raferred �o iha designer for resoW�ion. 5. EacM1 conhactor shall tleltl verdy all existing applicable contlifions and dimensions shown on the dawings_ As pertalns to the Intent o( these drawings, conVactor shall bdnq ip Ihe attention of tM1e architect ana tlesigner any tliscrepancies dscoveretl prior to ihe ent of any work aftectetl by o relatetl to suGh di5crepdncy. Edch WOtfdctof snall ben esponsible for au wsis associatetl wim or caused by �ha� corRreator's faiWre to comply wiM iM1is raquiramen�. 6. All tllmsensions to ex[erior walls are to ou�side face of sheathing. S�mcWral tlrawings are �o outsitle face of smtl. Z All dimensions �o Interior partition walls are �o face of framing. 8. Top of firet floor = 0'-0" = 83450' unless noted otherwise (not induding floor finish ihickness) 9. All work shown in �hese drawings antl in �he specrfica�ions shall be base bitl unless notetl to be by al�ema�e bitl. 10. Refer to shee� A002 for wall types. 11. All new doors �o be installed wAh hinges side 4" minimum fmm wall, in framed wall condi�ion. See plan �or CJP. antl C.M.U. walls. 12. A minimum clear area of iB" is required �o �he side of each tloor s�rike jamb on the pull side fortloors on an accessible mute. 13. Caulk interior and exterior perimeters of all hollow metal and aluminum door and window frames. 14. Maximum spacing be�ween gypsum board con�rol joints (CJ) shall be 30'-0". The maximum tlis�ance fmm a corner �o a joint shall be 24'-0". Provitle conVol join�s between all in�erior load bearing walls antl non-loatl bearing walls, a� all abrup� changes in wall height, at all changes of wall �hickness, a� pilas�ers antl columns. Verrfy final join� localions with NE before conshuction. 15. Paint all hollow metal doors and fremes exposed s[eel handreils and guardrails. 16. All framed walls shall extend to deck above and be provided with fire stop sealant unless no�ed olherwise. 1]. Oo not scale drewings, contac[ archi�ect if specific tlimension is neetled. 18. Pmvide conwaled fire ra�etl wood blocking or metal framing suppotls as requiretl for all surface mounted i�ems. �9. Exterior piywood sheaMing in iieu of exterior qypsum sheathing to be used in all exterior sections delineated as signage zones. See ex�erior eleva�ions for loca�ions. 20. Apply sealant at all plumbing tixWres, at juncture with wall, and at all countertops and backsplashjuncNres. 21. Coortlina[e clearance antl access for mechanical unils wilh mechaniwl plans. Con�acl archi�ec� m coortlinate issues. 22 All Coniractors are required to coordinate iheir work with all disciplines to avoid conflicts. See Mechanical, ElecUical and Plumbing drawings for additional information regarding size antl quan�i�y of openings, slab requiremen�s and lintels. 23. A�y and all peneUations shall receive caNking to seal any type o( energy loss. 24. The Con�ractor to verify antl coortlina�e all applicable tlimensions of fuWres and equipmen� supplietl antl lor inslalled by o�hers. 2S The use of �he wortls "Pmvitle" or'Pmvitled' in connec�ion wi�h any item specified is intentletl �o mean, unless o�herwise wteQ �ha� such shall be �umisheQ ins�all and connedetl where so requiretl. 26. Upon completion of prqect, obtain all final inspections as required by local jurisdictions and fumish owner wim eviaence of ail such inspections and Certificates Of Occupancy. 2]. These Cons�ruc�ion No�es andl or Drawings are supplietl �o illustrate the tlesign antl general type of cow�mc�ion desiretl antl are intentletl �o impty �he fines� quality of constmction ma�erial antl workmanship throughoN. 28. All means of Egress antl Fire Protection shall be maintainetl a� all times. Any shut tlown of Li(e Safety or Builtling Sys�ems shall be approvetl and coordina�ed in advance with �he Owner antl Local Building Depar�men�. 29. The General Contractor is responsible for pmvitling temporary bracing antl/or shoring until the permanen� bracing is in place. 30. All new fire extinguisner cabinets to be (inisned to match adjacent wall finish ana installed acwrding �o cotle. Lrfe Safety Contractor to verrfy placemen� and quan�ity of fire extinguishers throughoW the space. I( addi�ional �ire extinguisher locations are needeQ a plan must be submdted �o �he tlesigner (or review of aesthetic purposes ony. 31. These drawings are no� �o be separa�ed. 32. Roofing con�rac�oris responsible forfurnishing antl ins[alling all expansionjoin�assemblies be�ween mof antl existing parking garage, inclutling mof sitle of parape� walls antl wall copings. PEDCOR DESIGN GROUP LLC ArchitecWre / Prqect ManagemeN�. 355 Gi�y CenterDrive Garmel, Intliana 46032 3177057979 (phone) 3177057980 ((ax) Amhitect 00033126 \ Sr4i[ OF i � � � � � KEY PLAN � HAMILTON WEST scn�e�. urs � � �/ vuurvoem Developec P E D C O R �:� �e� DEVELOPMENT CO. Project: }'^+ 0 v, J N � � 0 � z � w � wN � � n � O �7 � �� ` � �z �C% O L Ca � U 2 � � � Construction Documents Setlssue Date Sheellssue Dale Drawn By Checketl By ast � ewsion ate�eu,� 0100% Cons�mc[lon Documen�s 12118/19 Projec� Number sneet TiHe: Abbreviations & General Notes sneec N�mber: ���/ l/ �