HomeMy WebLinkAboutA001 Abbreviations & General Notes: tN'r x�`/i �-
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;vaYa/„1��.
DATE: 06�� $�2O
ABBREVIATION LEGEND
A: Area, Acre; Alcove; Compressed Air Line
AB: Anchor Bolt
ABV: Above
AC: Air Conditioning, Altematinq Current
ACC: Access
ACF: Architectural Concrele Finish
ACR: Acrylic
ACST: Acoustic
ACT: Actual
AD�. Access Door, Area Drain
ADA: Americans with Disabilities Act of 1992
ADD: Addendum; Addition
ADDL: Additional
ADH: Adhesive
ADJ: Adjust, Adjustable, Adjacent
AF: Above the Floor
AFF: Above Finished Floor
AIA: American Institute of Architects
ALM: Alarm
ALT: Alternate, Alteration; Altitude
ALUM: Aluminum
AMB: Ambient
AMT: Amount
ANCH: Anchor, Anchorage
ANOD: Anodized
AP: Access Panel
APPROX: Approximate
APRVD: Approved
APT:Apartment
ARCH: Architect, Architectural
AS: Acoustic Sealant
ASC: Above Suspended Ceiling
ASPH: Asphalt
ASSEM: Assemble
ASSY: Assembly
ASTM: American Society for Testing and Materials
ATC: Acoustical Tile Ceiling
ATTEN: Attenuation.Attention
ATM: Automatic Teller Machine; Atmospheric
AUTH: Authorized
AUTO: Automatic
AVG:Average
B: Bathroom
B TO B: Back to Back
B& B: Balled and Burlapped
Bl: Bottom (of)
BAL: Balance, Ballast
BC: Broom Closet
BDY:Boundary
BEL: Below
BETW: Between
BEV: Bevel
BHD: Bulkhead
BIT: Bituminous
BJF: Bituminous Joint Filler
BL: Building Line
BLDG: Building
BLK: Block
BLKG: Blocking
BLT-IN: Built-In
BM: Beam, Bench Mark
BN: Bullnose
BNT: Bent
BOT: Botlom
BP: Base Plate
BPL: Bearing Plate
BR: Bedroom
BRDG: Bridging
BRG: Bearing
BRK Brick
BRKT: Bracket
BRS: Brass
BRZ: Bronze
BS: Both Sides
BSMT: Basement
BT: Bathtub, Bolt
BUR: Built-up Roof
BW: Both Ways
C: Curb, Clock Outlet
C/C: Center to Center
CAB: Cabinet
CAP: Capacity
CAR: Carpet
CAV: Cavity
CCW: Counter Clockwise
CCTV: Closed Circuit TV
CEM: Cement
CER: Ceramic
CF: Cubic Feet
CFL Counterflashing
CFS: Cold Formed Steel
CG Comer Guard
CH: Coat Hook
CHR: Chilled Water Return
CHAM: Chamfer
CHAN:Channel
CHS: Chilled Water Supply
CI: Cast Iron
CIP: Cast-in-Place
CIR: Circle, Circular
CIRC: Circumference
CITG: Clear Insulating Tempered Glass
CJ: Control Joint
CK: CaWking
CL Centerline, Clearance, Closure, Class
CLG Ceiling
CLL Contract Limit Line
CLO: Closet
CLR: Clear
CLR OPG Clear Opening
CMP: Corrugated Metal Pipe
CMU: Concrete Masonry Unit
CND: Conduit
CNTR: Counter
COAX: Coaxial
C.O.: Cased Opening
CO: Company, Cleanout, Cased Opening, Cut Out
COD: Cleanout Door
COL: Column
COM: Common
CON: Construclion
CONC: Concrete
CONN: Connection
CONT: Continuous, Continue, Control
COP:Copper
COR: Corner
CORR: Corridor, Corrugate
CR: Curtain Rod
CRPT: Carpet
CRS: Course, Cold Rolled Steel
CS: Cast Stone
CSG: Casing
CSK: Countersink
CSMT: Casement
CT: Ceramic Tile
CTD: Coated
CTR: Cenler
CW: Clockwise, Cold Water
CWR: Condensate Waste Return
CWS: Condensate Waste Supply
CY: Cubic Yard
CYL Cylinder
CYL L Cylinder Lock
DA: Double Acting
DB: Decibel DBL: Double
DC: Direct Current
DD: Driveway Drain, Deck Drain
DEG: Degree
DEGF: Degree Farenheit
DEMO: Demolition
DEPT� Depariment
DR Drinking Fountain
DH: Double Hung
DIAG: Diagonal
DIA: Diameter
DIFF: Diffuser
DIM: Dimension
DISL Disposal
DIV: Division
DL: Dead Load
DMT: Demountable
DN: Down
DO: Door O enin
p 9
DP: Dampproofng
DPR:Damper
DR: Door, Dining Room
DS: Downspout
DSP: Dry Standpipe
DT: Drain Tile
DTL Detail
DVTL: Dovetail
DWG: Drawing
DWGS: Drawings
DWR: Drawer
E: East
E TO E: End to End
EA: Each
EB: Expansion Bolt
EC: Exposed Construction
ECP: Exposed Constmction Painted
EE: Each End
EF: Each Face
EG: Edqe Grain
EIFS: Exterior Insulation and Finish System
EJ: Expansion Joint
ELEC: Electrical
ELEV: Elevator, Elevation
EMER: Emergency
ENAM:Enamel
ENCL Enclosure
ENG: Engineer
ENT: Entrance
EPDM: Eth lene Pro lene Diene Monomer
Y PY
EQ: Equal
EQUIP: Equipment
ERP: Emergency Receptade Panel
EST: Estimate
EW: Each Way
EX: Exit
EXC: Excavate
EXEC: Executive
EXH: Exhaust
EXH AIR: ExhaustAir
EXIST: Existing
EXP: Expansion, Exposed
EXT: Exterior
F: Degrees Fahrenheit
F TO F: Face to Face
FA: Fire Alarm, Fresh Air
FAB: Fabricate
FACP: Fire Alarm Control Panel
FAG: Fire Alarm Gong
FAST: Fastener, Fasten
FBD: Fiberboard
FBRK: Fire Brick
FD: Floordrain
FDC: Fire Department Connection
FDN: Foundation
FE: Fire Extinguisher
FEQ Fire Extinguisher Cabinet
FF: Finished Floor, Factory Finish
FFE: Finished Floor Elevation
FF&E: Fixtures, Furnishings & Equipment
FFL: Finished Floor Line
FGL Fiberglass
FGR: Fiberglass reinforced
FH: Fire Hose
FHC: Fire Hose Cabinet
FHWS: Flat Head Wood Screw
FHY: Fire Hydrant
FIN: Finish, finished
FIX: Fixture
FLG: Flashing
FLR: Floor
FLUOR: Fluorescent
FLX: Flexible
FND: Feminine Napkin Dispenser
FO: Finished Opening
FOC: Face of Concrete
FOF: Face of Finish
FOS: Face of Studs
FP: Fireproof
FPL: Fireplace
FR: Front, Fire Riser
FRM: Frame
FRT: Fire Retardant
FS: FloorSink
FT: Foot, Feet, Fully Tempered
FTG Footing, Fitting
FURN: Furnish, Fumiture
FURR: Furring
FUT: Future
G: Gas
GA: Gauge
GAL: Gallon
GALV: Galvanized
GC: General Contractor
GEN: General
GFCI: Ground Fault Circuit Intermpted
GFI: Ground Fault Interrupted
GFRQ Glass Fiber Reinforced Concrete
GI: Galvanized Iron
GKT: Gasket
GL: Glass
GLZ: Glaze
GMU: Glazed Masonry Unit
GND: Ground
GOVT: Government
GP: Galvanized Pipe
GR: Grade
GRAN: Granite
GRTG Grating
GT: Grout
GV: Galvanized
GVL: Gravel
GYP:Gypsum
GYP BD:Gypsum Board
HB: Hose Bib
HBD: Hardboard
HC: Hollow Core
HD: Heavy Duty
HDR: Header
HDPE: High Density Polyethylene
HDW: Hardware
HDWD: Hardwood
HGR: Hanger
HGT: Height
HK: Hook or Hooks
HM: Hollow Metal
HMP: Hollow Metal, Painted
HOR: Horizontal
HR: Hour
HRS: Hot Rolled Steel, Hours
HT: Height
HTR: Heater
HV: High Voltage
HVAC: Heating, Ventilating & Air Conditioning
HW: Hot Water
HWR: Hot Water Recirculating Return
HWS: Hot Water Supply
HYD: Hydraulic
I: Iron
ID: Inside Diameter
IN: Inch
INC: Incandescent
INCL: Incline, Include
WCR: Increase
INFO: Information
INSP: Inspect
INSTL: Install
INSUL: Insulation
INT: Interior
INV: Invert
IP: Iron Pipe
J: Joist
JB: Junction Box
JC: Janitor's Closet
JF: Joint Filler
K: Kickplate
KIT: Kitchen
KS: Kitchen Sink
KW: Kilowatt
L: Lek, Length
LAD: Ladder
LAM: Laminate, Laminated
LB: Pound (weight), Lag Bolt
LBL: Label
LBR: Lumber
LCD: Liquid Crystal Diode
LCL Linen Closet
LCM: Lead Coated Metal
LD: Leader Drain
LH: Left Hand
LIB: Library
LINO: Linoleum
LIQ: Liquid
LKR: Locker
LL: Live Load
LMS: Limestone
W: Length
LNDG: Landing
LOC: Locate
LOCS: Locations
LR: Living Room
LS: Loud Speaker
LT: Light
LTG Lighting
LTL: Lintel
W: Low Voltage
LVR:Louver
LW: Light Weight
LWC: Light Weight Concrete
MACH: Machine
MAINT: Maintenance
MARB: Marble
MAS: Masonry
MATL: Material
MAX:Maximum
MB: Mail Box
MC: Medicine Cabinet
MECH: Mechanical
MED: Medium
MEMB: Membrane
MET: Metal
MEZZ: Mezzanine
MFD: Manufactured, Metal Floor Deck
MFG: Manufacturer, Manufacturing
MH: Manhole
MIKE: Microphone
MIN: Minimum
MIR: Mirror
MISC: Miscellaneous
MLDG: Molding
MO: Masonry Opening
MOD: Module
MONO: Monolithic
MOV: Movable
MRD: Metal Roof Deck
MT: Mount, Mounted
MTL: Material, Metal
MTR: Motor
MULL: Mullion
MWK: Millwork
N. North
NATL: Natural
NEC: National Electrical Code
NEUT: Neutral
NI: Nickel
NIC: Not In Contract
NO: Number
NOM: Nominal
NR: Noise Reduction
NRC: Noise Reduction Coefficient
NS: NearSide
NTS: Not To Scale
O TO O: Out to Out
HOLLAND BUILDING, BUILDING G, CONSTRUCTION DOCUMENTS, A001, BIM Server: PDGBIM - BIM Server 19BLDG G/Building G, 8/20/16, 633 PM
OA: Outside Air, Overall
OC: On Center
OD: Outside Diameter
OF: Outside Face
OFF: Offce
OH: Overhead
OHD: Overhead Door
OI: Ornamental Iron
OPNG: Opening
OPP: Opposite
OPP H: Opposite Hand
ORN: Ornamental
OUT: Outlet
OVFL: Overflow
OZ: Ounce
P: Paint
P. LAM: Plastic Laminate
P SL: Pipe Sleeve
PAR: Parallel
PARTN: Partition
PB: Panic Bar
PBD: Particle Board
PC: Precast Concrete
PCF: Pounds per cubic foot
PD: Pump Discharge, Plaza Drain
PE: Professional Engineer
PED: Pedestal, Pedestrian
PERF: Pertorate
PERIM: Perimeter
PERP: Perpendicular
PFN: Prefinished
PH: Phase, Phone
PKG: Parking
PKWY: Parkway
PL Property Line
PLAS: Plastic
PLAS LAM: Plastic Laminate
PLF: Pounds Per Lineal Foot
PLMBG: Plumbing
PLTF: Platform
PLWD: Plywood
PNL: Panel
PNT: Paint
POL: Polish, Polished
PORC: Porcelain
PORT: Portable
POT W: Potable Water
PP: Precast Panel
PR: Pair
PRC:Precast
PREFAB: Prefabricated
PRES: Pressure
PRFMD: Preformed
PRI: Primary
PRMLD: Premolded
PROT: Protection, Protective
PRSTR: Prestressed
PRTN: Partition
PS: Plumbing Stack
PSC: Prestressed Concrete
PSF: Pounds per square foot
PSI: Pounds per square inch
PT: Point
PTC: Past-Tensioned Concrete
PTD: Paper Towel Dispenser
PTDIR: Combination Paper Towel
D is penser/Receptacle
PV: Paving
PVG: Paving
PVMT: Pavement
PVT: Private
PWR: Power
QUAL: Quality
QT: Quarry Tile, Quart
QTR: Quarter
QTY: Quantity
R: Radius
R& S: Rod and Sealant
RA: Return Air, Registered Architect
RAD: Radiator
RB: Rubber
RBT:Rabbet
RCP: Reflected Ceiling Plan
RD: Roof Drain, Round
REBAR: Reinforcing Bar
RECP: Receptacle
REF: Refer, Reference, Refrigerator
REFL: Reflected, Reflector
REG: Regular
REINF: Reinforcement, or Reinforce
REQ: Require, Required
RESIL: Resilient
RET: Return, Retaining
REV: Reverse, Revise, Revision
RF: Roof
RFG: Roofing
RGTR: Register
RGH: Rough
RH: Right Hand
RHR: Right Hand Reverse
RM: Room
RMV: Remove, Removable
RO: Rough Opening
ROW: Rightof Way
RPM: Revolutions Per Minute
RT: Rubber Tile, Right
RTR/RR Rubber TreadlRubber Riser
RVS: Reverse Side
RVT: Rivet
RWC: Rain Water Conductor
RWL Rain Water Leader
S: South, Sealant, Supply
S&S: Stained & Sealed
S&V: Stain & Vamish
SACT: Suspended Acoustical Tile
SALV: Salvage
SAN: Sanitary
SC: Solid Core
SCD: Seat Cover Dispenser
SCH: Schedule
SCR: Screen
SCUP: Scupper
SCWD: Solid Core Wood
SD: Soap Dispenser
SE: Structural Engineer
SEC: Second, Secondary, Security System
SECT: Section
SEL Select
SERV: Service
SF: Square Foot
SFGL: Safety Glass
SGS: Silicone Glazing Sealant
SH: Shelf
SHT: Sheet
SHTHG Sheathing
SHWR: Shower
SIG Signal
SIM: Similar
SJS: Silicone Joint Sealant
SK: Sink
SKL Skylight
SLV:Sleeve
SND: Sanitary Napkin Dispenser
SP: Standpipe, Soundproof
SPC: Spacer
S PE C S: 5 pecificatio n s
SPK:Speaker
SPL: Special
SPLR: Sprinkler
SPM: Sprinkler Main
SPP: Skim Coat Plaster Painted
SQ: Square
S5: Stainless Steel, Soil Stack
SSGS: Silicone Structural Glazing Sealant
SSK: Service Sink
ST: Storm Water
STA: Station
STC: Sound Transmission Class
STD: Standard
STG Storage, Seating
STK: Stack
STL: Steel
STOR: Storage
STRUC: Structural
STWY: Stairway
SUPP: Supplementary, Supplement
SUPT: Superintendent
SUR: Surface
SUSP: Suspended, Suspend
SV: Safety Relief Valve
SW: Switch
SWBD: Switchboard
SWGR: Switchgear
SY: Square Yard
SYM: Symmetrical
SYN: Synthetic
SYS: System
T: Tread
T/: Top of
TBB: Top and Boltom
T&G: Tongue & Groove
TAN: Tangent
TB: Towel Bar
TC: Top of Curb, Terracotta
TD: Trench Drain
TEL: Telephone
TEMP: Temporary, Tempered, Temperature
TEN:Tenant
TERM: Terminal
TH: Thermostat
THK: Thick, Thickness
THR: Threshold
THRM:Thermal
THRU: Through
TLT: Toilet
TOL: Tolerance
TP: Top of Pavement
TPD: Toilet paper Dispenser
TPH: Toilet Paper Holder
TPTN: Toilet Partition
TRANS: Transformer, Translucent
TRAV: Travertine
TRD: Tread
TSL: Top of Slab
TST: Top of Steel
TT: Traffic Topping
TTC: Telephone Terminal Closet
TW: Top of Wall
TYP: Typical
TZ: Terrazzo
UH: Unit Heater
UL Underwriters' Laboretories
UNEXC: Unexcavated
UNFIN: Unfinished
UNO: Unless Noted Otherwise
UR: Urinal
USG: United States Gypsum Company
UT: Utility
V: Volt
VAR: Varies
VB: Vapor Barrier
VCT: Vinyl Composition Tile
VENT: Ventilate, Ventilator
VERT: Vertical
VEST: Vestibule
VF: Vinyl Fabric
VIF: VeriTy In the Field
VIN: Vinyl
VNR: Veneer
VOL: Volume
VP: Vapor Proof, Vent Pipe
VR� Vapor Retarder
VS: Vent Stack
VT: Vinyl Tile
VTR: VentThrough Roof
VWC: Vinyl Wall Covering
W: West, Width, Wide, Watt, Waste, Water, Water
W/: With
W/O: Without
WAINS: Wainscot
WB: Wood Base
WC: Watercloset
WD: Wood
WDP: Wood, Painted
WDSS: Wood, Stained & Sealed
WF: Wide Flange (structural steel)
WGL: Wire-Glass
WH: Water Heater, Wall Hung, Wall Hydrant
WI: Wroughtlron
WIN: Window
WM: Wire Mesh, Water Meter
WP: Waterproof, Weatherproof
WPR: Waterproofing
WPT: Working Point
WR: Water Resistant, Water Repellant
WS: Weatherstripping, Water Stop
WT: Weight, WaterTable, Watertight
WVNR: Wood Veneer
WWF: Welded Wire Fabric
X HVY: Extra Heavy
X STR: Extra Strong
YD: Yard
YR: Year
GENERAL NOTES:
1. Nothing setforih in these tlrawings shallrelease any conVactorfrom his responsibility to
provide appropriate quantities, fieltl measuremenls, dimensional sta�ility, installation,
anchorage, and coordination with other Uades; or release him (rom his responsibility to
identify and resolve deviations from ihe requiremenis of ihe conhact documents, or free
him of his responsibility ro alert designer lo errors or omission.
2. Con�rac�or shall utilize these drawings in conjunction wAh �he speci�iw�ions �o de�ermine
�he full scope, inten� antl requiremen�s of �he project Specifications antl drawings are
intentled �o be complemen�ary, not mutualty exclusive. Work shown on �he drawings bu� not
lis�etl in the specrfica�ions, be in�erpretetl as �hough work were (uly tlescribetl in bo�h
places. The higher quantiry, higher quality, more labor in[ensive antl overall more
3. Each contrac�or shall verrfy in the field all exis�ing applicable contli�ions antl tlimensions
shown on the tlrawings antl as pertinen� �o �he in�en� of �hese tlrawings. Any discrepancy
tliscovered shall be bmugh� �o �he a��en�ion o( [he tlesigner prior �o �he commencemen� of
any work a(fec�etl by, or rela�ed �o, such tliscrepancy. Each conhacror shall be responsible
for all costs associatetl with, or wusetl by his failure to comply wi[h ihis requirement.
4 Each contractor shau review all por�ions of his work, before s�atling the work, �o verrfy that
Ihe work wlll not prohibit comple�ion of tM1e pmjed as In�entletl in these wns�mc�ion
tlocuments. All quas�ians shell be raferred �o iha designer for resoW�ion.
5. EacM1 conhactor shall tleltl verdy all existing applicable contlifions and dimensions shown
on the dawings_ As pertalns to the Intent o( these drawings, conVactor shall bdnq ip Ihe
attention of tM1e architect ana tlesigner any tliscrepancies dscoveretl prior to ihe
ent of any work aftectetl by o relatetl to suGh di5crepdncy. Edch WOtfdctof
snall ben esponsible for au wsis associatetl wim or caused by �ha� corRreator's faiWre to
comply wiM iM1is raquiramen�.
6. All tllmsensions to ex[erior walls are to ou�side face of sheathing. S�mcWral tlrawings are �o
outsitle face of smtl.
Z All dimensions �o Interior partition walls are �o face of framing.
8. Top of firet floor = 0'-0" = 83450' unless noted otherwise (not induding floor finish ihickness)
9. All work shown in �hese drawings antl in �he specrfica�ions shall be base bitl unless notetl to
be by al�ema�e bitl.
10. Refer to shee� A002 for wall types.
11. All new doors �o be installed wAh hinges side 4" minimum fmm wall, in framed wall
condi�ion. See plan �or CJP. antl C.M.U. walls.
12. A minimum clear area of iB" is required �o �he side of each tloor s�rike jamb on the pull side
fortloors on an accessible mute.
13. Caulk interior and exterior perimeters of all hollow metal and aluminum door and window
frames.
14. Maximum spacing be�ween gypsum board con�rol joints (CJ) shall be 30'-0". The maximum
tlis�ance fmm a corner �o a joint shall be 24'-0". Provitle conVol join�s between all in�erior
load bearing walls antl non-loatl bearing walls, a� all abrup� changes in wall height, at all
changes of wall �hickness, a� pilas�ers antl columns. Verrfy final join� localions with NE
before conshuction.
15. Paint all hollow metal doors and fremes exposed s[eel handreils and guardrails.
16. All framed walls shall extend to deck above and be provided with fire stop sealant unless
no�ed olherwise.
1]. Oo not scale drewings, contac[ archi�ect if specific tlimension is neetled.
18. Pmvide conwaled fire ra�etl wood blocking or metal framing suppotls as requiretl for all
surface mounted i�ems.
�9. Exterior piywood sheaMing in iieu of exterior qypsum sheathing to be used in all exterior
sections delineated as signage zones. See ex�erior eleva�ions for loca�ions.
20. Apply sealant at all plumbing tixWres, at juncture with wall, and at all countertops and
backsplashjuncNres.
21. Coortlina[e clearance antl access for mechanical unils wilh mechaniwl plans. Con�acl
archi�ec� m coortlinate issues.
22 All Coniractors are required to coordinate iheir work with all disciplines to avoid conflicts.
See Mechanical, ElecUical and Plumbing drawings for additional information regarding size
antl quan�i�y of openings, slab requiremen�s and lintels.
23. A�y and all peneUations shall receive caNking to seal any type o( energy loss.
24. The Con�ractor to verify antl coortlina�e all applicable tlimensions of fuWres and equipmen�
supplietl antl lor inslalled by o�hers.
2S The use of �he wortls "Pmvitle" or'Pmvitled' in connec�ion wi�h any item specified is
intentletl �o mean, unless o�herwise wteQ �ha� such shall be �umisheQ ins�all and
connedetl where so requiretl.
26. Upon completion of prqect, obtain all final inspections as required by local jurisdictions and
fumish owner wim eviaence of ail such inspections and Certificates Of Occupancy.
2]. These Cons�ruc�ion No�es andl or Drawings are supplietl �o illustrate the tlesign antl general
type of cow�mc�ion desiretl antl are intentletl �o impty �he fines� quality of constmction
ma�erial antl workmanship throughoN.
28. All means of Egress antl Fire Protection shall be maintainetl a� all times. Any shut tlown of
Li(e Safety or Builtling Sys�ems shall be approvetl and coordina�ed in advance with �he
Owner antl Local Building Depar�men�.
29. The General Contractor is responsible for pmvitling temporary bracing antl/or shoring until
the permanen� bracing is in place.
30. All new fire extinguisner cabinets to be (inisned to match adjacent wall finish ana installed
acwrding �o cotle. Lrfe Safety Contractor to verrfy placemen� and quan�ity of fire
extinguishers throughoW the space. I( addi�ional �ire extinguisher locations are needeQ a
plan must be submdted �o �he tlesigner (or review of aesthetic purposes ony.
31. These drawings are no� �o be separa�ed.
32. Roofing con�rac�oris responsible forfurnishing antl ins[alling all expansionjoin�assemblies
be�ween mof antl existing parking garage, inclutling mof sitle of parape� walls antl wall
copings.
PEDCOR DESIGN GROUP LLC
ArchitecWre / Prqect ManagemeN�.
355 Gi�y CenterDrive
Garmel, Intliana 46032
3177057979 (phone)
3177057980 ((ax)
Amhitect
00033126
\ Sr4i[ OF i
� �
�
�
�
KEY PLAN �
HAMILTON WEST
scn�e�. urs
�
�
�/
vuurvoem
Developec
P E D C O R
�:� �e�
DEVELOPMENT CO.
Project:
}'^+ 0
v, J N
� � 0
� z �
w �
wN �
� n �
O �7 �
�� ` �
�z �C%
O L
Ca � U
2 �
�
�
Construction Documents
Setlssue Date Sheellssue Dale
Drawn By Checketl By
ast � ewsion ate�eu,�
0100% Cons�mc[lon Documen�s 12118/19
Projec� Number
sneet TiHe:
Abbreviations &
General Notes
sneec N�mber:
���/ l/ �