HomeMy WebLinkAboutE-601 Electrical SchedulesE
fl
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;vaYa/„1��.
oarE: 06/18/20
VOLTAGE' 480/Dl MOl1NTING: SURFACE
PHASE 3 W�RE a PANEL SGH1 NE��,A� ,oa,
MAIN�. MLO MCB AMPS�. NA IG�. NO
BUS AMPS�. 400 PROVIDE SUB-FEED (DOUBLE MAIN LUGS AIC: 14.000
LOAO DESGFIPTION TP LOAO GKT OCP PH OCP GKT LOAD TP LOAD DESGRIPrION
SERVICE GARAGE LIGHTING L 1.5 1 20A A 2 6J H
RETAILSPACELIGHTING L 1.0 3 20A B 30A3P 4 6J H RETAILSPACEHEATER
RETAILSPACELIGHTING L 0.1 5 20A C 6 6] H
SPARE ] 20A A 8 6.� H
SPARE 9 20A B 30A3P 10 6J H RETAILSPACE HEATER
SPARE 11 20A C 12 6J H
H 1.0 13 A 14 10.0 H
WATER ROOM HEATER H 1.0 15 15A3P B 45A3P 16 10.0 H SERVICE GARAGE HEATER
H 1.0 1] C 18 10.0 H
H 25 19 A 20 10.0 H
REfAIL SPACE HEATER H 2.5 21 15A3P B 45A3P 22 1p.0 H SERVICE GARAGE HEATER
H 25 23 C 24 10.0 H
H 1.] 25 A 26 4.2 M
RETAIL SPACE HEATER H �,� 9 15A3P B 30A3P 28 42 M BOOSTER PUMP
H 1.� 29 C 30 42 M
H 1J 31 A 32 3.6 M
FEfAILSPACEHEATER H 1J 33 15A3P B 30A3P 34 3.6 M COMPACTOR
H 1J 35 C 36 3.6 M
SPARE 3] A 38 10.0 O TRANSFORMER T-1
(FUTURE COMPACTOR) 39 30A3P B 50A3P 40 10.0 �
41 C 42 10.0 O
PHASETOTALS A:59.52 B:58.98 C:58.03
LOADNPE(rP) 4gMing peceptacle Motor Largest Heat Kitchen Other
Nonsimultaneous = 0 Mabr
TOTAL SECTION T. 2.6 OD 23.a 0.0 120.5 0.0 30.0
ALL SECTIONS.
DEMAND FACTOR' 1.00 Calculation 1.00 125 1.00 1.00 1.00
DEMAND' 26 0.0 23.4 D.0 120.5 0.0 30.0
DEMAND KVA�.1]6.5 �EMAND AMPS�.212
VOLTAGE'. 208/120 MOl1NTING'. SURFACE
PHASE'.3 WIRE:4 pANEL SGL1 NEUTRAL'.100%
MAIN'. MCB MCB AMPS'. 225 IG'. NO
6US AMPS'. 225 AIC'. 22,000
LOA� DESCRIPTION TP LOAO CKT OCP PH OCP CKT LOAD TP LOAD DESCRIPTION
SPARE 1 20A A 30A 2 0.9 M OVERNEA� DOOR MOTOR
SPARE 3 20A B 30A 4 0.9 M
SPARE 5 20A C 30A 6 0.9 M OVEFHEA� DOOR MOTOR
SPARE � 20A A 25A 8 0.9 M
SPARE 9 20A B 20A 10 0.9 M OVERHEAD DOOR MOTOR
SPAFE 11 20A C 20A 12 0.9 M
SPARE 13 20A A 20A 14 1.9 M EF-6
SPARE 15 20A B 20A 16 0.1 M LV-5
SPARE 1] 20A C 20A 18 0.] R RECEPTACLES
SPARE 19 20A A 20A 20 OJ R REGEPTAGLES
SPARE 21 20A B 22 1.3 O WATEF HEATER
SPARE 23 20A C Z�A zP 24 1.3 �
SPARE 25 20A A 20A 26 SPARE
SPARE 2] 20A B 20A 28 SPARE
SPARE 29 20A C 20A 30 SPARE
SPARE 31 20A A 20A 32 SPARE
SPARE 33 20A B 20A 39 SPARE
SPARE 35 20A C 20A 36 SPARE
SPARE 3] 20A A 20A 38 SPARE
SPARE 39 20A B 20A 40 SPARE
SPARE 41 20A C 20A 42 SPARE
PHASETOTALS A'.4.44 6:3.15 C'.3.]]
LOAOTYPE�TP) Lighting fleceptacle Molor Larges[ Hea� Kitchen O�her
NonsimWtaneous = 0 Mobr
TOTAL SECTION 1'. 0.0 1.4 ].4 0.0 0.0 0.0 2.5
ALL SECTIONS�.
DEMAND FACTOR'. 1.00 Calculation 1.00 125 1.00 1.00 1.00
DEMAND: 0.0 1.4 �4 0.0 0.0 0.0 25
DEMAND KVA' n 4 DEMAND AMPS: 32
VOLTAGE�. 480,'9] MOUNTING: SURFACE
PHASE�3 WIRE�4 PQN E L H 1 NE�TRA�:,00,
MAIN'. MCB MCB AMPS'. 400 IG' NO
BUS AMPS'. 400 AIC: 14,000
LOAD DESCRIPTION TP LOAD GKT OGP PH OGP CKT LOAD TP LOAD DESGRIPTION
SERVICECORRIDORLIGHTS L 1.1 1 20A A 2 10 H
RETAIL SHELL SPACE LIGHTS L 20 3 20A B 15A3P 4 1.0 H SERVICE CORRIOOR HEATERS
5 20A C 6 1.0 H
� 20A A 8 1.0 H
9 20A B 15A-3P 10 1.0 H SERVICE CORRIOOR HEATERS
11 20A C 12 1.0 H
13 20A A 14 1.0 H
15 20A B 15A3P 16 1.p H SEFVICE COFFIOOR HFATERS
1] 20A C 18 1.p H
19 20A A 20 6.� H
21 20A B 30A3P 22 6.] H RETAILSHELLSPACEHEATERS
23 20A C 24 6.] H
H 1.� 25 A 26 3.3 H
FETAILSHELLSPACEHEATERS H �.� 2] 15A3P B 15A3P 20 3.3 H RETAILSHELLSPACEHEATERS
H �,7 29 C 30 3.3 H
H 2.5 31 A 32 6.] H
REfAIL SHELL SPACE HEATERS H 25 33 15A3P B 30A3P 34 6.] H FETAIL SHELL SPACE HFATERS
H 25 35 C 36 6.] H
H 6.] 3] A 38 6.] H
RETNL SHELL SPACE HEATERS H 6.] 38 30A3P B 30A3P 40 6.] H RETAIL SHELL SPACE HEATERS
H 6.] 41 C 42 6.] H
PHASETOTALS A:3824 8�,39.13 C�,3Z15
LOADTVPE�TP) Lighting Recep�acle Mo�or Larges� Hea� Kitchen Other
Nonslmupaneous = 0 Mo�or
TOTAL SECTION 1: 3.1 0.0 0.0 0.0 111.5 0.0 0.0
ALL SECTIONS:
DEMAND FACTOR: 1.00 Calculation 1.00 125 1.Op 1.00 1.00
DEMAND: 3.1 0.0 OD OD 111.5 0.0 0.0
�EMAN� KVA� 114.5 DEMAND AMPS 138
LIGHTING FIXTURE SCHEDULE
LAMPQTY FIXTURE
TYPE IMAGE MANUFACTURER'SCATALOGNUMBER MOUNT ANDTYPE VOLTA6E WATTA6E DESCRIPTION
A LITHONIA�. ZL1D-L48-SMR-SOOOLM-FST-MVOLT35K-80CRI PENDANT LED UNIV 41 4'LEDSTRIPLI6HTWITHDROPLENSEANDUPLI6HT
METALUX:4SNLED-LDS-49SL-LC-UNV-L835-CD1-U SOOOLM
� 3500K
X EMERGI-LITE: EIX400RN SURFACE MULTIPLE UNIV --- SURFACEMOUNTEDTHERMOPIASTIC(WHITE)SINGLE
�CVI�, MERCURY�. MER-EZXTEU2-RWEM LEDS FACEEXITSIGNWITHREDLETTERSANDNI-CADBATTERY.
CA SURE-LITES: LPX7 ARROWSASINDICATEDONTHEDRAWIN65.
�SIN6LE FACE EXITSI6N)
EM EMERGI-LITEEL-2LEDA SURFACE 2/LED UNIV --- CEILING/WALLMOUNTEDEMERGENCYLIGHTINGUNIT
- MERCURYLIGHTINGMERRILED SURELITESAPEL WITHTW0�2�LEDLIGHTINGHEADS.
. �EMERGENCY LIGHTIN6 UNIT)
e�v�ritv
F N G I N E E R I N G r
Engineer:
�_
�� . .,,� `,: '?ip9
\ ?�p
P, �
� . ..�...; Ic�
�
i� �
BY
��,X� �--
Developer:
P E D C O R
�� �4/N��
DEVELOPMENT CO.
Project
� M
� �
� �
�
� �
� �
� ' �
�
W -
�
i �
(� U
�
1W%Coostruchal Daum¢�S
SeUssue Date Sheetlssue Date
0&37/17 aa/isli9
Drawn By Checked By
SJG BKS
as evision a e:
1� HAMILTON WEST OS/i6/19
Enveriry Number:
7l788
SheetTitle:
ELECTRICAL
SCHEDULES
Sheet Number:
E-601