Loading...
HomeMy WebLinkAboutC010.2_SWPPP_NARRATIVEF � 3 SWPPP FOR CONSTRUCTION SITES 7. 14 DIGIT WATERSHED HVDROLOGIC 11NIT CODE�. 05120201120080 2. RECENINGWATERS EAGLECREEK-LONG BRANCH / IRISHMAN RUN 3. 10�YEAR POST CONSTRUCTION PEAK DISCHARGE: 44] CFS 4. STORMWATER UISCHARGE LOCATIONS $TORMWATER WILL �ISCHARGE FROM THE SITE TO A CATCH BASM (CB 2 2) IN RE�� ROAD.ON THE EAST SIDE OF THE PROPERTV. 5. THERE ARE NO PROPOSED GROUNDWATER DISCHARGE LOCATIONS FOR THE PROPOSED PROJECT 6. SOILS MAP: soa n�oo eoo.,� c��mv. ma�a��. a�u H����,s� oo��n.. ma��oa i r - � _ _4F. 5:� � _ � i � ,,� r�� .,...w,..,. �.,,..�,�,.,.�. ��:r.� �� , ;� �� � � ��, ��Mx�,-��� .� ��rs rvnwoinozo�Re: HALFSCALE wrnsP+s���.ey � w�i:r.aiooserme r�ee���.co��.eas�resoas«Er �i � \ \��. � __ , \\� \\ \ \\:. z:�vso��r. P¢i�a I aC Map Unit Legend MaR �ni15ym6ol Map Unit Nam¢ Ac�es in AOI PaYcontof AOI l/fn� Lirban lan6-Cmsby�5realy �.3 I,4�fi complex fire loamy subsoil. O:o 2 percoa� slopes llmyA �rhan Ian�Treaty cOmpler, 0 0$ 759s to 1 Ro2nnl slopns Subto[als FarSoil Survey Area 0.6 14.9"!0 TelaEg fer 6rea e( InlBrest 0.0 100 09a Map Ilntl Symbol Map Onit Name Aaes in AOI PsmunS W A61 �r Bronkslon silty clay foam, O l0 0.4 10.'.% 2 pGmom SfpPea CrA Grosay sii� i�m. fne-�o�mY 3.❑ �SP% S��h56�3. p 1p $ �¢rGB�t sbpes SublotalsSar8oll5urveyRrea 9,4 85,1% TotaEs For Area of InMrest 4.0 100,0% AND SWALES TO ADEQUATELY DRAIN THE SITE. ]. Bi DESCRIPTION OF POTENTIAL POLLUTAI THE FOLLOWING POTENTIAL POLLUTANT SOURCES MAY BE ASSOCIATED WITH CONSTRUCTION ACTIVITIES ON SITE: • MATERIALSTORAGEAREAS(MORESPECIFICALLYDESCRIBEDBELOW) • CONSTRUCTION WASTE MATERIAL • FUEL STORAGE AREASAN� FUELING STATIONS • EXPOSED SOILS • LEANINGVEHICLESAN�E�UIPMENT • SANITARYWASTEFROMTEMPORARVTORETFACILITIES • LITTER • WIN�BLOWN DUST • SOILTRAGKMG OFF SITE FROM GONSTRUCTION EQUIPMENT THE FOLLOWING CONSTRUCTION MATERIALS WILL BE STAGED OR STORED ON SITE AT VARIOUS POINTS DURMG DEVELOPMENT OF THE SITE. • STRUCTURAL FILL • ROADANDPAVEMENTBASE • STORM DRAINAGE PIPE RELEA5E0 FOR CONSTRIICTI�N Su6ject �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalMf �' DATE: 06�� $�2O I 8. TEMPORARYANDPERMANENTSTORMWATERQUALITYMEASURES TEMPORARY SILT FENCE LOCATION: CHRISTIAN BROTHERS SITE, SEE SHEETS Ci AND C7.1 FOR LOCATIONS DIMENSIONS: 1,ID�LF $PEGFICATIONS' $EEDETAILSHEETC52FORDETAILSAND SPECIFICATIONS CONSTRUCTION�ETAILS: SEEDETAILSHEETC52PoRDETAILSAND SPECIFICATIONS. MONITORING AND MAINTENANCE'. INSPECT SILT FENCE AT LEAST ONCE EVERY $EVEN (�) CALENDAR DAY$ AN� FOLLOWMG ANY STORM EVENT. INLET PROTECTION FABRIC DROP LOCATION: GHRISTIAN BROTHERS SITE. SEE SHEET G1.1 FOR LOCATIONS QUANTIN' 9 DIMENSIONS: VARIES � SRE APPROPRIATELY FOR 4' GATGH BASINS AND YARD DRAINS. $PEGFICATIONS' $EE�ETAILSHEETC52FORDETAILSAND SPECIFICATIONS CONSTRUCTION�ETAILS' SEEDETAILSHEETC52FORDETAILSAND SPECIFICATIONS. MONITORING AND MAINTENANCE�. INSPECT INLET PROTECTION FABRIC DROPS AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAVS AN� PoLLOWING ANV STORM EVENT. STABILIZEO CONSTRUCTION ACCE55 LOCATION: CHRISTIANBROTHERSSITE,SEESHEETCi AND G1.1 FOR LOGATION DIMENSIONS: fi4h20'(LxW) SPEGFICATIONS' SEEDETAILSHEETC52FORDETAILSAND SPECIFICATIONS CONSTRUCTION�ETAILS: SEEDETAILSHEETC52PoRDETAILSAND SPEGFIGATIONS. MONITORING AND MAINTENANCE'. INSPECT CONSTRUCTION ACCE55 AT LEAST ONCE EVERY SEVEN Q) CALENDAR DAVS AND FOLLOWING ANV STORM EVENT. EROSION CONTROL BLANKET LOCATION: CHRISTIANBROTHERSSITEONTHESOUTHSIDE OF THE PROPOSE� BUILDING. SEE SHEET G1.1 FOR LOCATIONS DIMENSIONS_ 315'x25(LxW) SPEGFIGATIONS' SEE�ETAILSHEETG52FORDETAILSAN� SPECIFlCATIONS CONSTRUCTION�ETAILS' SEEDETAILSHEETC52FORDETAILSAND SPECIFICATIONS. MONITORINGANDMAINTENANCE�. WSPECTEROSIONCONTROLBLANKET AT LEAST ONCE EVERY SEVEN Q) CALENDAR DAVS AND FOLLOWING ANV STORM EVENT. PERMANENT STORMWATER DETENTION BASIN LOCATION: WESTARIAAPARTMENTDEVELOPMENT DIMENSIONS t800FT(LONG)xt185FT�WIDE) SPEGRCATIONS: SEEARIASITEDEVELOPMENTPLANSAND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BV WEIHE ENGINEERS. CONSTRUCTION�ETAILS' SEEARIASITE�EVELOPMENTPLANSAND "STORMWATERTECHNICALREPORTFOR: MICHIGAN ROAD SITE", BV WEIHE ENGINEERS. MONITORINGANDMAINTENANCE SEEARIASITEDEVELOPMENTPLANSAND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BV WEIHE ENGINEERS. WATER �UALITV MECHANICAL UNITS LOCATION: WESTARIAAPARTMENTDEVELOPMENT QUANTITY: 3 MECHANICAL WATER �UALITY UNITS DIMENSIONS: TOBE�ETERMINED SPECIFICATIONS: SEEARIASITEDEVELOPMENTPLANSAND "STORMWATER TECHNICAL REPORT FOR: MICHIGAN ROAD SITE", BV WEIHE ENGINEERS. CONSTRUCTION�ETAILS: SEEARIASITEDEVELOPMENTPLANSAND "STORMWATER TECHNIGAL REPORT FOR: MICHIGAN ROAD SITE", BV WEIHE ENGINEERS. MONITORINGAN�MAINTENANGE'. SEEARIASITE�EVELOPMENTPLANSAND "STORMWATERTECHNICALREPORTFOR: MIGHIGAN ROAD SITE". BY WEIHE ENGMEERS. STORMWATER CATCH BASINS ANO VARD URAMS WITH SUMP LOCATION: CHRISTIAN BROTHERS SITE. SEE SHEET G3 FOR LOCATIONS QUANTITY: 9 DIMENSIONS: 48-INCH AND 12-INCH DIAMETER SPECIFlCATIONS: SEEDETAILSHEETC5.IPoRDETAILSAND SPECIFICATIONS CONSTRUCTIONDETAILS: SEEDETAILSHEETC5.IFORDETAILSAND SPEGFICATIONS. MONITORINGAN�MAINTENANGE'. STORMWATERCATGHBASINSAND MANHOLES WILL NEED TO BE INSPECTED AND GLEANE� BASE� ON 0 AND M MANUAL MAINTENANCESCHEDULE. PERMANENTSEEDINGIPLANTINGS LOCATION: CHRISTIAN BROTHERS SITE. SEE SHEET C3 FOR LOCATIONS �IMENSIONS: SEE SHEET C3 FOR �IMENSIONS SPECIFICATIONS: SEEDETAILSHEETC5.IFORDETAILSAND SPEGFICATIONS CONSTRUCTION�ETAILS' SEE�ETAILSHEETC5.iFOR�ETAILSAN� SPEGFlCATIONS. MONITORINGANDMAINTENANCE� STORMWATERCATCHBASINSAND MANHOLES WILL NEED TO BE INSPECTED AND GLEANE� BASED ON 0 AND M MANl1AL MAIMENANCE SCHE�ULE. �9.GENERALCONSTRUCTIONSEQUENCE � EQUIPMENT FUELING AND STORAGE AREAS POST CONSTRUCTION SWPPP 7. THENOTICEOFIMENT�N01)LETTERSHALLBESUBMITTEDTOIDEMPRIORTO INITIATIONOFANVLANDDISTURBINGACTIVITIES E�UIPMENTFUELING,MAINTENANCE,ANDCLEANINGSHOULDONLVBECOMPLETEDIN �,POTENTIALPOLLUTANTSOURCES 2. DESIGNATETHEPERSONRESPONSIBLEFORCOMPLYINGWITHTHEONSITE PROTECTE�AREASQ.E.,BERME�NREA).LEAKINGE�UIPMENTAN�MAINTENANCE SWPPP.COOR�INATERESPONSIBILITYPoRCOMPLETINGTHESITEREVIEWS FLUIDSWILLBECOLLECTEDANDNOTALLOWEDTO DISCHARGEONTOSOILWHERE pOTENTIALPOLWTANTSOl1RCE�. PASSENGERVEHICLES,DELNERYVEHICLES,TRUCKS, AFTEREACH'-"RAINFALLAN�AMINIMUMOFONETIMEAWEEK. THEYMAYBEWASHE�AWAVDURINGARAINEVENT. z AND FUEL DELIVERV TRUCKS 3. APRE-WNSTRUCTIONMEETINGWITHCITYOFCARMELMUSTBEHELDBEFORE EQUIPMENTWASHDOWN�EXCEPTFORWHEELWASHES�SHOULDTAKEPLACEWITHIN ANY LAN� DISTURBMG ACTIVITIES MAY COMMENCE. AFTER THE PERIMETER pN AREA SURROl1NDED BY A BERM. THE USE OF DETERGENTS IS PROHIBITED. T1'PE OF POLLUTANT:OIL, GASOLME, DIESEL FUEL, ANV HYDROCARBON ASSOCIATED PRACTICES HAVE BEEN WSTALLED, NOTIFY ROB BECK. RULE 5 COORDINATOR, AT WITH VEHIGULAR FUELS AND LUBRICANTS, GREASE, ANTIFREEZE, WINDSHIELD (317) 233486G OR RBECK@IDEM.STATE.IN.US AND THE CITV OF CARMEL (31]) CLEANER SOWTION, BRAKE FW ID, BRAKE DUST, RUBBER, GLASS, METAL AND PLASTIC 571-2441. HAZANDOUS MATERIAL STORAGE FRAGMENTS, GRIT. ROAD DE-ICING MATERIALS 4. POSTTHECONTACTINFORMATIONATTHECONSTRUCTIONENTRANCE.INCLUDE ACOPVOFTHENOIAN�THECONTACTINFORMATIONFORTHEPERSON CHEMICALS,PAINTS.SOLVENTS.FERTILRERS,ANDOTHERTOXICORHAZARDOUS pOLLUTANTSOURCBTRASHDUMPSTER RESPONSIBLEFORIMPLEMENTINGTHESWPPP.THESWPPPSHOULDBEONSRE MATERIALSSHOULDBESTORE�IN THEIRORIGINALCONTAINERSQFORIGINAL rypEOFPOLLUTANT:CLEANINGSOLUTIONSORSOLVENTS,LITTER(PAPER,PLASTIC, ANDWEEKLYSITEREPORTSNEEDTOBEAVAILABLEWITHIN48HOURSOFA CONTAWERISNOTRESEALABLE,STORETHEPRODUCTSINCLEARLVLABELED. REQUEST. WATERPROOFCONTAINERS�.E%GEPTDURINGAPPLICATION,THECONTAINERSSHOULD GENERALREFUSEASSOCIATEO WITH�ISTRIBUTIONOPERATIONS),UNEATENF00� 5. INSTALL SILT FENCE AND INLET PROTECTION ON EXISTING INLETS AND BE KEPT IN TRUCKS OR IN BERMED AREAS WITHIN COVERED STORAGE FAQLITIES. 7RODUCTS, BACTERIA CONSTRUCTTEMPORARV CONSTRUCTION ENTRANCE. RUNOFF CONTAINING SUCH MATERIALS SHALL BE COLLECTED, REMOVED FROM THE 6. INSTALL FUELMG AREA, PORT-A-LET, CONSTRUCTION DUMPSTER. CONCRETE SITE, AND �ISPOSED OF IN ACCOR�ANCE WITH THE FE�ERAL, STATE, AND LOCAL POLWTANT SOURCE: IAWN AN� LANDSCAPEARFAS WASHOUTFACILITVANDSTAGINGAREA. REGULATIONS. TYPEOFPOLLUTANL FERTILIZERS,SOIL,ORGANICMATERIAL(LEAVES,MULCH,GRASS ]. INSTALL SANITARY AN� WATER MAINS, AN� STORM SEWER. CLIPPINGS) 8. ROUGH GRA�E SITE. AS MAY BE REQUIRED BV FEDERAL, STATE. OR LOCAL REGULATIONS, THE CONTRACTOR 9. CONSTRUCTROADWAVINCLUDINGCURB,DRNES.ANDSIDEWALKS. SHOULDHAVEAHAZARDOUSMATERIALSMANAGEMENTPLANAND/ORHAZARDOUS THEANTICIPATEDPOLWTIONSOURCESARETHEVEHI0.ESTHATWILLUSETHESE 10. PERFORMFINALGRADING. MATERIALSSPILLANDPREVENTIONPROGRAMIN PLACE.AFOREMANORSUPERVISOR FUTUREFACILITIES,INCLUDINGBOTHTRUCKANDPASSENGERVEHICLETRAFFIC. 17. PLACE S00 ANO REMAINING LAN�SCAPING, AN� REVIEW FINAL STAeILI7ATI0N. SHOULD BE �ESIGNATED IN WRITING TO OVERSEE, ENFORCE. AND INSTRUCT POSSIBLE POLLUTANTS INCLUDE OIL, GASOLWE, ANT6FREEZE AND OTHER POLLUTANTS CONSTRUCTION WORKERS ON PROPER HAZAR�OUS MATERIALS STORAGE AND ASSOGIATED WITH VEHIGULAR TRAFFIG. 72. REMOVESILTFENCE,ANDMLETPROTECTIONANDCLEANALLPERMANENTBMPS HANDLINGPROCEDURES.THELOCATIONOFANYHAIARDOUSMATERIALSTORAGE AFTER ALL AREAS ARE STABILIZED. AREAS SHOUL� BE INDIGATED ON THE STORMWATER POLLUTION PREVENTION PLAN BY 2. POST-CONSTRUCTION STORMWATER UALITY MEASURES 13. ONGETHECONSTRUCTIONACTIVITVISCOMPLETED(BYRULELANGUAGE,WHEN THEOPERATORFOLLOWMGON-SRELOCATIONOFTHESTORAGEAREAS. Q FlNAL STABILIZATION HAS OCCURRED�, A COMPLETE RULE 5 NOTICE OF TERMINATION(NOT�FORMMUSTBESUBMITTEDTOIDEM,WITHACOPYBEING 14.CONTACTINFORMATION SEE#8'PERMANENTSTORMWATERQUALITVMEASURES"UN�ERTHE"SWPPPFOR SENT TO CIN OF CARMEL ENGINEERING DEPARTMENT. CONSTRUGTION SITES' NOTES, THIS SHEET. 70. LOCATION OF PROPOSED SOIL STOCKPILES SioBMWAiEH POLLUTiON aREVENnON SIiE CONTACTTo BE oEiEHMiNED. 3. STORMWATER QUALIN IMPLEMENTATION SOILANDTOPSOILSTOCKPILEAREASWILLBEFIELDDETERMINE�ON-SITE.APROPOSED SWPPP NOTES STORMWATERDETENTIONBASINANDWATERQUALINMECHANICALUNITSWILLBE STOCKPILE LOCATION IS SHOWN ON SHEET Ci 1. ALL STOCNPILES ARE TO BE INSTALLED AS PART OF THE ARIA APARTMENT DEVELOPMENT TO THE WEST. SEE ARIA ENCOMPASSED BV SILT FENCE. SRE �EVELOPMENT PLANS FOR IMPLEMENTATION SEQUENCE. 1. THECONTRACTORSHALLMAINTAINACOPYOFTHESWPPPONTHESITEFORTHE DURATION OF CONSTRUCTION. 17. TEMPORARY AND PERMANENT SURFACE STABILIZATION METHODS cnTCH ensms oN siTe wa� ee coNsieucTeo nFreR reMPORnev soi� eRosioN 2 THECONTRACTORSHALLADHERETOTHESWPPP�URINGCONSTRUCTION CONTROLMEASURESAREINSTALLEDANDTHESITEHASBEENSTRIPPEDOFTOPSOIL. SEE�ING AND Ml1LCHING SPECIFICATIONS ARE PROVIDED ON LANDSCAPE PLANS LP-0 OPERATIONS. p71N THE "9. GENERAL CONSTRUGTION SEQUENCE", THIS SHEET. ANDLP-2. 3. THESWPPPINCW�ESTHESWPPPDRAWINGS,NOTES,NARRATIVE.AND pERMANENTSEEDING/PLANTINGSWILLBEIMPLEMENTEDAFTERALLSITE ASSOCIATE� DETAIL SHEETS. IMPROVEMENTS HAVE BEEN CONSTRUCTE� AN� FINAL GRA�ING HAS TAKEN PLACE. 514 72.EROSIONANDSEDIMENTCONTROLSPEGFICATIONS q. ITISTHECONTRACTOR'SRESPONSIBILINTOMAINTAINAN�REPAIRALLBMP'S INTHE'9.GENERALWNSTRUCTIONSEDUENCE",THISSHEET. DURING CONSTRUCTION. eaosioN nNo seoiMeNi coNrao� sPeciFicnnoNs nRe sHowN oN sHeers c7.i, cs 2. 4. STORMWATER QUALITY MEASURES TO PRESERVE STREAMS OR ANDTHISSHEET. 5. ALLEARTH-DISTl1RBINGCONSTRl1CT10NACTIVITIESSHALLBEPERFORMEDWITHIN RIPARIANHABITATS THE LIMITS OF DISTURBANCE AS INDICATE� ON THE SWPPP DRAWINGS. 73. MATERIAL HANDLING, STORAGE, AND SPILL PREVENTION PLAN 6. THE CONTRAGTOR IS RESPONSIBLE FOR REVIEWING THE LIMITS OF �ISTURBANGE THE PROPOSED SITE IS NOT ADJACENTTO NOR DOES IT IMPACT NEARBV STREAMS OR SHOWN ON THE �RAWINGS AND FlLED-STAKING THE LIMIT OF �ISTURBANCE LME RIPARIAN HABITATS. SOLID WASTE OISPOSAL PRIOR TO THE START OF CONSTRUCTION. 7. PERIMETEREROSIONANDSEDIMENTCONTROLMEASURESARETOBEWSTALLED NO SOLIO MATERIAL, WCLU�ING BUIL�ING MATERIALS. IS PERMITTE� TO BE 7RIOR TO THE START OF ANV LAND CLEARING OR GRADING ACTIVITIES. S. OPERATION AND MAINTENANCE MANUAL DISCHARGED TO SURFACE WATERS OR BURIED ON SRE ALL SOLID WASTE MATERIALS, g. THE CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION MGLUDINGDISPOSABLEMATERIALSINGIDENTALTOTHECONSTRUGTIONACTIVITV, CONTROLMEASURESWHENRE�UIREDBVTHESEPLANDRAWINGSANDIMPLEMENT OFF-SITE MUST BE COLLECTED W CONTAWERS OR CLOSED DUMPSTERS. THE COLLECTION ADDITIONAL MEASURES AS �ICTATED BY SITE CONDITIONS. CONTAMERS MUST BE EMPTIED PERIO�ICALLY AND THE COLLECTED MATERIAL HAULED TOALANDFlLLPERMITTEDBYTHESTATEAND/ORAPPROPRIATELOCALMUNICIPALITY 9� THECONTRACTORISRESPONSIBLEFORENSURINGTHATANVSEDIMENTATION POST-CONSTRUCTIONSTORMWATERDETENTIONBASINANDMECHANICALVVATER TOACCEPTTHEWASTEFORDISPOSAL. RESULTINGFROMWORKONTHESITEISCONTAINEDONTHESITEANDNOT QUALINl1NITSWILLBECONSTRl1CTE�AN�MAINTAME�ASPARTOFTHEARIA ALLOWE� TO COLLECT ON ANY OFFSITE AREAS OR IN WATERWAVS. APARTMENT DEVELOPMENT. SEE ARIA �EVELOPMENT PLANS FOR OPERATION AND AFOREMANORSUPERVISORSHOULDBEDESIGNATEDINWRITINGTOOVERSEE, 10. SLOPESARETOBELEFTINAROUGHENE�CON�ITION�URINGTHEGRA�ING MAINTENANCEMANUAL. ENFORCE, AN� INSTRUCT CONSTRUCTION WORKERS ON PROPER SOLID WASTE PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION. PROCEDl1RES. ON-SITE 11. CONTRACTORLAYDOWN.STAGINGANDSTOCKPILEAREASARETOBELOCATE� WITHIN THE PERMITTED LIMITS OF DISTURBANCE. ON-SITE STORMWATER �UALITY MEASURES OPERATION AND MAIMENANCE INCLl1�E M GASE OF EMERGENGES, SPILLS OR POTENTIAL CONTAMINATION. PLEASE GALL THE APPROPRIATENUMBERASLISTEDBELOW: 12 SILTFENCEISTOBEINSTALLE�AROUN�THEPERIMETEROFON-SITESOIL CATGHBASINSWITH2FOOTSUMPAN�PERMANENTSEE�INGIPLANTINGS. STOCKPILEAREAS AS �ICTATED BV SITE CONDITIONS. ADDITIONALLV, INACTIVE A. IFANEMERGENCYOCWRS.CALL911. PORTIONSOFTHESTOCKPILEARESARETOBESTABILIZEDASREQUIREDHEREIN. DESCRIPTION:PERMANENTSEEDING/PLANTINGSISTHEFlRSTLINEOFDEFENSEIN 13. IMPLEMENTTEMPORARVSTABILIZATIONMEASURESONANYDISTURBEDAREAS WATER�UALITYTREATMENTBVPREVENTINGSE�IMENTRUNOFFINTOTHESTORM B. MINOR SPILLS OF HAZARDOUS MATERIAL MUST BE REPORTED BV CALLING SVSTEM AN� FlLTERMG AND WFlLTRATING STORMWATER RUNOFF. ON-SITE CATCH JOHNSONCOUNTVEMERGENCYMANAGEMENTAGENCV317136-9064 WHERECONSTRUCTIONACTIVITIESWILLNOTRESUMEFORI4DAYSORMORE. gq51NSWITHSUMPSSERVEA5THE5ECON�WATER�UALITVMEASUREPROVI�ING IMPLEMENTATIONOFTEMPORARYSTABILRATIONMEASURESMUSTBEINITIATED SETTLWGOFSE�IMENTSANDINITIALCAPTUREOFOILTRASH,ANDDEBRIS. C. IDEM 24 HOUR SPILL HOTLINE 1�888-233�7745 IMMEDIATELV AND COMPLETED WITHIN SEVEN Q) DAYS FROM WHEN CONSTRUCTION ACTIVITIES TEMPORARILV GEASE� ON ANY PORTION OF THE SITE. HAZARDOUS WASTE CONTACT INFORMATION'. THE OWNER OF THE ON-SITE BMP'S WILL BE THE PROPERTV 14 EXPOSEDAREASARETOBESEEDED/STABILIZEDASSPECIFlEDWITHINSEVEN�7) OWNER. DAYS FOLLOWING THE GONCLUSION OF FINAL GRADING IN THAT AREA. WHENEVER POSSIBLE, MINIMIZE THE 11SE OF HAZARDOUS MATERIALS AND GENERATION OF HAZARDOUS WASTES. ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED IN THE 15. THE CONTRACTOR IS RESPONSIBLE PoR REGULARLV CHECKING SODDED AREAS TO THE SITE OWNER IS RESPONSIBLE FOR ALL MAINTENANCE AND GOSTS ASSOCIATED MANNERSPECIFIEDBVFEDERAL,STATE,ORLOCALREGULATIONSORBYTHE SEETHATAGOODSTANDOFVEGETATIONISESTABLISHED.AREASSHOULDBE WITHTHEON-SITEBMPs. MANUFACTURER. FERTILIZED, WATERE�. AND RE-SEE�ED AS NEEDE�. THE CONTRACTOR IS RESPONSIBLETOENSUREVEGETATIONISESTABLISHEDPoRAWARRANTYPERIOD THECITVOFCARMELHASTHERIGHTTOINSPECTANDMAINTAINON-SITEBMPSAS OF TWO FULL GROWING SEASONS. NECESSARY. USE CONTAINMENT BERMS M FUELING AN� MAINTENANCE AREAS AND WHERE POTENTIALFORSPILLSISHIGH. ifi. TRACKMGOFSOILANDSEDIMENTONTOOFF-SITEROADWAYSSHALLBEMINIMIZED THROUGH THE USE OF APPROPRIATE MEASURES. THE CONTRACTOR SHALL MAINTENANCE: AFOREMANORSUPERVISORSHOULDBEDESIGNATEDINWRITINGTOOVERSEE, IMMEDIATELVREMOVEANVSOILORSE�IMENTTRACKEDONTOTHEROADWAYS. ENFORCE AN� INSTRUGT CONSTRUGTION WORKERS ON PROPER HAZARDOUS WASTE �7. THE CONTRAGTOR SHALL BRMG TO THE SITE AND USE ONLV EQUIPMENTTHAT IS CATCH BASINS- INSPECT REGULARLY. REMOVE ACCUMULATED SEDIMENT. AN� PROCEDURES. THE LOCATION OF ANV HAZARDOUS WASTE STORAGE AREAS SHOULD BE WELLMAINTAWED AND WITHOUT LEAKS FLOATABLES AS NEE�ED 1151NG VACUUM TRUCK. INDICATE� ON THE STORMWATER POLLUTION PREVENTION PLAN BY THE OPERATOR FOLLOWMGON-SITELOCATIONOFTHEFACILITV. 18. NOVEHICLESANDE�UIPMENTGLEANINGISALLOWEDATLOCATIONSWHERE pERMANEMSEEDING/PLANTINGS�AWARRANTVPERIODOFONEYEARFROMDATEOF RUNOFFSHALLFLOWDIRECTLYINTOAWATERCOURSE. Sl1B5TANTIALCOMPLETIONCOVERSREPLACEMENTMATERIALSFORLAN�SCAPING. �USTCONTROLIOFF-SREVEHICLETRACKING 19. EMPTVCANISTERS,GANS,OROTHERCHEMICALCONTAINERSQ.E.FROMHVDRAULIC ALLPLANTINGSSHALLBEALIVEANDWITHINAHEALTHVVIGOROUSMANNERATTHE FWIDS,ETC.)ANDALLOTHERWASTEMATERIALSARETOBEKEPTINAPPROPRIATE ENDOFTHEWARRANTYPERIO�ORSHALLBEREPLACEDWITHINI0DAY5. DURING CONSTRUCTION, WATERTRUCKS SHOULD BE USED, AS NEEDED, BV EACH SEALED WASTE CONTAINERSAND UNTIL THEY CAN BE REMOVED FROM THE SITE CONTRACTOR OR SUBCONTRACTOR TO REDUCE DUST. AFTER CONSTRUCTION, THE FOR PROPER OFF-SITE DISPOSAL LAWN SHALL BE MOWED AT A HEIGHT OF NOT LESS THAN T TO INCREASE ROOT MASS. SITE SHOULD BE STABILIZED TO REDUCE DUST. p0. MAINTAIN LANDSCAPE BUFFER WHERE INDICATED ON STORM WATER POLLUTION LAWN SHALL NOT BE FERTIL2E� MORE THAN TWIGE PER YEAR AND SHALL BE PREVENTION PLAN. IMMEDIATELV WATERED INTO THE SOIL AFTER APPLICATION. CONSTRUCTION TRAFFlC SHOULD ENTER AND EXIT THE SITE AT A CONSTRUCTION ENTRANCEWITHAROCKPADOREQUIVALENTDEVICE.THEPURPOSEOFTHEROCKPA� 21. THEPREDOMINANTSOILTVPEONSITEISLOAMPERTHEl1SGSS01L5URVEV. I$ TO MINIMIZE THE AMOUNT OF $OIL AN� MU� THAT IS TRACKE� ONTO EXISTING STREETS. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE. OFFSITE AC W MULATIONS OF SE�IMENT MUST BE REMOVE� AT A FREQUENCY SUFFICIENT TO MINIMRE OFFSITE IMPACTS. SANITARV I SEPTIC CONTRAGTORS AN� SUBCONTRACTORS MUST COMPLY WITH ALL STATE AN� LOGAL SANITARV SEWER. PORTABLE TOILET, OR SEPTIC SYSTEM REGULATIONS. SANITARV FACILITIES SHALL BE PROVI�ED ATTHE SITE BY EAGH CONTRAGTOR OR SUBCONTRACTOR THROl1GH0UT CONSTRUCTION ACTIVITIES. THE SANITARY FACILITIES SHOULDBE UTILIZEDBYALLCONSTRUCTIONPERSONNELANDBESERVICED REGULARLY.ALLEXPENSESASSOCIATE�WITH PROVI�INGSANITARVFAGLITIESARE THE RESPONSIBILIN OF THE CONTRACTORS AND SUB W MRACTORS. THE LOCATION OF ANY SANITARV FAGILITIES SHOl1L� BE INDICATED ON THE STORMWATER POLLUTION PREVENTION PLAN BV THE OPERATOR FOLLOWING ON-SRE LOCATION OF SAID FAGILITIES. WATERSOURCE WATER USED TO ESTABLISH AND MAINTAIN GRASS, TO CONTROL �UST. AND FOR OTHER CONSTRl1CTI0N Pl1RPOSES MUST ORIGINATE FROM A PUBLIC WATER SUPPLY OR PRIVATEWELLAPPROVE�BYTHESTATEORLOCALHEALTH �EPARTMENT. � V W � •� � � � � O � � W V H � � � � W � � N Q Z Q� Q J W � W 2 � � O � � U m 0 W a Z A � O Q Li � � O � C9 a 2 � � U U � V � r oi ��T�6 �iiiyv�ar.�o � a,a sgnawa ana sreii �o� oa uame a� ISSUANCES PERMITS osmnois REVISIONS NO. DATE DESCRIPTION FlLE Nl1M8ER PROJECTMANAGER PROFESSIONAL �RANIN BY CHECKEDBY SWPPP NARRATIVE C1.2 10050012 JPM JPM JRS �