Loading...
HomeMy WebLinkAboutC050.3_SWPPP_DETAILSh J u • � \ Tj 173�13�1.1��1 �`.;.;;,: �� • 61 NTS PROFlLE PLAN VIEW 50' MINIMUM LENGIH LENGTH OF STABIIJZE� ROAD 7'-3" �RUSHED ROCK (8" DEPTH) � NON-WOVEN GEOTEXTILE FABRIC . �� �Dv�: 1,��,���' I:� 1} ♦ � ���� �' ^'� • � 1' exisiiNc NOTES 1. ESTABLISH STABILIZED CONSTRUC710N ENTRANCE PRIOR TO THE INITIATION OF SIIE CONSTRUC710N ACTIN7IES. 2. CARE SHOULD BE 7AKEN 70 PREVEN7 MA7ERIAL MOVEMENTINTO ADJACENT WE7LANDS/WATERBODIES. 3. CARE SHOULD BE TAKEN TO MAINTAIN EXISTING ROADSIDE DRAINAGE VIA rui �mor werei i ennu w�u erniurnm a�MP PLACED DONTlROW OF CULVERT. RELEA5E0 FOR CONSTRUCTION Su6ject�o compliance with allregula�ions ofS�a�eantlLocalCodes IZED CONSTRUCTION ACCESS AND SPECIFICATIO City of Carmel r �{�n„� i,.va,�,a! DATE: OF)�� $�2O I INLET PROTECTION - FABRIC DROP /:1:A7 ` 50� MINIMUM LENGTH LENGTH OF STABILIZED ROAD SE�IMENT SUMP sEoiMENt suMP INSTALLATION 1. A FIL7ER FABRIC BAG IS HUNG INSIDE hIE INLET, BENEAhI hIE GRAlE. 2. REPLACE GRATE, WHICH N7LL HOLD BAG IN PLACE. 3. ANCHOR FIL7ER BAG VA7H 1' REBAR FIX2 REMOVAL FROM INLET. 4. FLAPS OF BAG THAT E7C7END BEYOND 7HE BAG CAN BE BURIED IN SOIL IN EARTH AREAS. MAW7ENACE •DROP INLET FlL7ER5 SHOULD BE INSPEC7ED ROUIINELY AND AF7ER EACH MAJOR RAIN EVENT. •DAMAGED FlL1ER BAGS SHOULD BE REPLACED. •CLEAN AND/OR REPLACE FIL7ER BAG WHEN 1/2 FULL. REPLACE CLOGGED FABRIC IMMEDIAiELY. •IF NEEDED, INIiIATE REPAIRS IMMEDIAlELY UPON INSPEC710N. •REMOVE EN71RE PR07ECiIVE MECHANISM WHEN UPGRADIENT AREAS ARE STABILIZED AND S7F2EET5 HAVE BEEN SWEPT. •CAN ONLY ACCOMMODA7E SMALL FLOW QUAN7171ES. •REQUIRES FREQUENT MAINTENANCE. •PONDING MAY OCCUR ARWND STORM DRAINS IF FILTER IS CLOGGED. BURY UPSLOPE END OF BLANKET IN 7RENCH 6" VADE BY 6' DEEP UPSLOPE BLANKE�� 12' OVER DOWNSLOPE BLANKET. SEWRE W17H STAPLES INSTALLATON 1. PREPARE SUBGRADE TO PROPER GRADE AND COMPACTION REQUIREMENTS. 2. REMOVE RUTS, ROOTS, SOIL CLODS, OR O7HER DEBRIS FROM SURFACE SUBJECT TO MULCH BLANKET INSTALLA710N. O�ERLAP BLANKETS 3. SPREAD OR DRILL SEED. SIDE BY SIDE USING A 4. CONSULT Wlhl EROSION CON7ROL MATERIAL SUPPLIER TO SELECT EROSION - 4' OYERLAP VATH ������ UPSLOPE BLANKET CONTROL BLANKET BASED ON SLOPE GRADIENT, EXPECTED SURFACE LAID O�ER RUN-OFF, AND PROlEC710N 7ERM NECESSARY (LONG OR SHORT 7ERM). DOWNSLOPE BLANKET 5. POSITION SELECiED MULCH BLANKET AS CLOSE AS POSSIBLE TO INTENDED USE LOCATION. 6. INSTALL BLANKET AT TOP OF SLOPE, FIRST ANCHORING TOE IN 7RENCH 6" NADE X 6" DEEP, PROGRESSING DOWN-SLOPE OR DOWN-GRADIENT MAhI APPROXIMAlELY 12" OF BLANKET ExTENDED BEYOND THE UP-SLOPE PORTION OF hIE 7F2ENCH. 7. ANCHOR 7HE BLANKET 1N7H STAPLES/STAKES PLACED APPRO%IMAlELY 12" APART IN hIE BOTTOM OF hIE 7F2ENCH. BACKFILL AND COMPACT 7HE ����".T,�.T� iRENCH AF7ER SECURING. �"�^" 8. APPLY SEED TO COMPACTED SOIL AND FOLD iHE 12' POR710N OF hIE BURY TOE OF BLANKETIN BLANKET OVER COMPACTED AREA AND SECURE N7hi A ROW OF 7RENCH 6" VADE BY 6' STAPLES/STAKES PLACED 12" APART ACROSS 7HE WIDhI OF hIE BLANKET. DEEP 9. UNROLL hIE BLANKETS DONTJ OR HORIZONTALLY ACROSS hiE SLOPE. OVERLAP BLANKET EDGES BY A MINIMUM OF 4" AND BLANKET ENDS BY A MINIMUM OF 12". NOTES: 1 PLACE EROSION CON7ROL BLANKET PARALLEL TO FLOW AND �0. OVERLAPS SHOULD BE IN THE DIRECTION OF EXPECTED FLOW WITH THE ANCHOR SECURELY. UP-SLOPE BLANKET PLACED OVER THE DONT!-SLOPE BLANKET EDGE. 2 WHEN BLANKE7S ARE USED IN FLOWING DI7CH, BLANKE75 ��, SECURE DOWN-SLOPE END OF BLANKET WITH STAPLES/STAKES AND SHWLD NO7 OVERLAP IN DI7CH CENTER PARALLEL 70 FLOW. �ENCH IN. 3 STAPLES INSTALLED/SECURED ACCORDING TO MANUFACTURER'S SPEqFlCATIONS. MAIN7ENANCE 4 WHERE POSSIBLE, CONS7RUCT MAhI BIODEGRADABLE MA7ERIAL. , CHECK AF7ER A RAIN E�ENT TO ENSURE hIE BLANKET IS S71LL IN PLACE. • KEEP ERODED SOIL, VEHICULAR AND PEDES7ftIAN TRAFFlC, AND CONCENTRATED RUNOFF AWAY FROM hIE BLANKEiED AREA. • EROSION CONTROL BLANKETS AND ANCHORS MAY INHIBIT MON7NG. B2 EROSION CONTROL BLANKET NTS XXX INSTALLA710N 1. STABILIZED CONS7F2UCTION ACCESS ROAD SHWLD BE ESTABLISHED AT THE IXJSET OF hiE CONSTRUCiION AC7IVITIES AND MAIN7AINED IN PLACE FOR hiE DURA710N OF 7HE CONSTRUCTION PROJECT. 2. INSTALLA710N OF THIS PRAC7ICE SHWLD BE THE RESPONSIBILI7Y OF THE 517E CLEARING IXt E%CAVAiING CON7FEACTOR. 3. ACCESS LOCA710N SHOULD BE CLEARED OF WOODY vecernnoN. 4. NON-WOVEN GEOTEXTLE FABRIC SHALL BE PLACED OVER 7HE EXIS7ING GROUND PRIOR TO PLACING STONE. 5. ACCESS SI2E SHWLD BE A MINIMUM OF 50'. 6. ACCESS WIDhI SHWLD BE 12' MINIMUM, FlARED AT THE E%ISiING ROAD TO PROVIDE A TURNING RADIUS. 7. CRUSHED AGGREGAIE (2" TO 3"), OR RECLAIMED OR RECYCLED CONCRETE EQUIVALEN7, SHALL BE PLACED AT LEAST 8' DEEP OVER hIE LENG7H AND WIDTH OF hiE INGRESS/EGRE55 COF2RIDOR. MAINTENANCE •PERIODIC INSPEC710N AND NEEDED MAINTAINENCE SHALL BE PRONDED AFTER EACH RAIN EVENT. •STABILIZED EN7RANCES SHALL BE REPAIRED AND ROCK ADDED AS NECESSARY. •SEDIMENT DEPOSIIED ON PUBLIC RIGHTS-OF-WAY SHALL BE REMOVED IMMEDIAIELY AND RETURNED TO THE CONS7RUC710N SIIE. •IF SOILS ARE SUCH THAT WASHING OF 71RES IS REQUIRE�, IT SHALL BE �ONE IN A WASH RACK AREA, STABILIZED N7TH STONE, IMAfEDIAlELY PRIOR 70 THE CONSTRUC110N ACCE55 STABWZED CORRIDOR. •AT THE PROJECT COMPLETION, ROCK ACCESS ROAD SHWLD BE REMOVED AND DISPOSED OF UNLESS U7ILIZED AS SUBGRADE FOR FlNAL ROAD. •EFFECTIVENESS LIMI7ED, SEDIMENT MAY BE 7RACKED ONTO ROADS REQUIRING ADDI710NAL AC710N. u \ UNDISNRBED cernno- FENCE P0575 DRIVEN SPACING 6-10� MAX _ i INTO GROUND 1' MIN. INSTALLATION �ROLL JOINT 1. INSTALL PARALLEL TO A CONTOUR. 2. THE SILT FENCE TO BE NUTEC3-NE56 OR AN � APPROOED EQUAL. . 3. SIL7 FENCE SHWLD ACCOMODATE NO MORE THAN � 1/2 TO 1 ACRE OF DRAINAGE PER 100' OF FENCE AND ON SLOPES LESS 7HAN 1:2 (V:H). �8' ANCHOR 7F2ENCH 4. DIG A 6" TRENCH ALONG hiE AREA WFiERE 7HE FENCE IS TO BE INSTALLED. 1' MIN. �� �\ �\ \��\ 5. PLACE 6" OF 7HE SILT FENCE BOTTOM FLAP INTO 7HE 7F2ENCH. 6. BACKFlLL THE 7RENCH N7TH SOIL AND COMPACT SILT FENCE B 7HE SqL ON BOTi SIDES. CREATE A SMALL RIDGE ON THE UP-SLOPE SIDE OF THE FENCE. � FABRIC TO BE NRAPPED AROUND 7. INSTALL WOODEN STAKES 8- 10' APART AND DRI�E SILT FENCE A FENCE POST INTO THE GROUND A MINIMUM OF 12�. ROLL JOINTS 8. STAPLE 7HE GEOTEXTILE FABRIC TO 7HE WOODEN 1' MIN. A2 NTS STAKES. 9. JOIN SEC710N5 OF SILT FENCE BY WRAPPING GEOTEX7ILE FIL7ER ENDS TOGE7HER (SEE DRAVANG). FABRIC FASTENED ON UPHILL SIDE, TOWARDS MAIN7ENANCE EARhi DISRUP710N •INSPECT FREQUEN7LY AND IMMEDIATELY AFTER EACH STORM EVENT. CHECK SEVERAL TIMES DURING PROLONGED STORM EYE�lTS. IF NECESSARY, REPAIR IMMEDIATELY. RIDGE OF COMPAC7ED EARTH ON UPHILL SIDE .IF 7HE SEDIMENT HAS REACHED 1/3 7HE HEIGH7 OF hiE �OF FlLTER FABRIC FENCE, hIE SOIL SHOULD BE REMO�ED AND DISPOSED OF IN A STABLE UPLAND SITE. ��SHEEf �-�W •THE FENCE SHWLD BE RE-INSTALLED IF WAlEFt IS SEEPING UNDERNEATH IT OR IF 7HE FENCE HAS BECOME INEFFECTIVE. �6'x6' ANCHOR TRENCH •SILT FENCE SHOULD BE REMOVED ONCE VEGETATION IS ESTABLISHED AND UP-SLOPE AREA HAS STABILIZED. •SILT FENCE MAY CAUSE IEMPORARY PONDING AND COULD FAIL IF T00 MUCH WATER FLON5 7HROUGH THE AREA. •DO NOT USE IN AREAS Wlhi CONCEN7RAlE0 FLOWS. •CHANCE OF FAILURE INCREASES IF FENCE IS INSTALLED INCORREC7LY OR IF SEDIMENT ACCUMULA710N IS NOT REMOVED. SILT FENCE � u B3 NTS woa�c w7 A J � -- � 01 T OETAIL swoenc-� iaxi�vusnc unixc-� �LL� ii:k -'i�ar�TON A-A �.,o� �. oo'oin�iiwi un�rw'�feoums�erim�usw�uc�nr°c��sir°�mnaarvn�'ane�E.swc��u�u' crimicr rw uwio+rm sa..io w�srz. � roh"vr°ORic�mT.rw'o9x�+ae��uuwRxno�m.iownsrzhwnc�ncrt`wrzxi�i+s�cawnrzopini�r+rva ro WASH WLPROGFLYAES ]. WLYUMAElEi0.WMILLFINUCXCMNE5A10.�D9E'MA9IFLINNW�SNOUlPR ♦ vusncuwxcunhwius�wu�oaz�uixiuuww�oxnvo�r[mr�rss�u*ixonxosrww ee mEc tt xaus. ic�i+s. ae omea ovEcrs TM<r muvxaix mc iurcnwEneamce m[ xnmei.LL. s. uH�mwimm�saiu�e�vv.ttouvaiRiuohv�u�rv°m�orcocw-�ucusrenwsiu�w.rumc e. mTMvm� iu����oi� or��i mcnrs va ��w cnruu��i�iuiice w� uwu+�c �ro�iva�iav axc�ii WIS401IifK'ILITESSM010.01NClWE PENQNNC�II��ISFLSINGOfHMWNmCW.'GIEIE �N�PETMNINGTIE �N �O�E��TM� �^L �µ0^�µOFIlFD IXMM1E Y�IEPIKS SXOYW � PfY��4V ONO OISPMFD Ci. �. niCOXio�xmtv�hwu�'"v�ou�Eum'n�ru u�ccµc�s�"iw��iinaz�rn�umciu°rmicurosrzo 9. MELG1-NfRMA4�Wi0AEP5NP1lBFflfP11PFU�XO�OflENUPGmA51ECEg�MYIOM�INiIANfIPICItt rox wnshn caurn� 8, p��WEWSNWiI5J5SSNLLEµ�•��FK'NT6WST��SAIMROM'OPFODYiCPUSF �a au�i�"iavn� s�rna. nu cwc� s�w. ee �o�o mow mE sne aHo �wur ois>osEo a �* CONCRETE TRUCK WASH OUT I�A7 � 15" MINU� RIP-RpP � H MIN m r (WHE E m � 3� � V 1 SIDE GEOTE%TILE FOHRIC (TOE IN EDGES 12" AIINJ PIPE L H DIA (FEET) ffEET) 12 15 5 z 18 1 24 10 3 30 36 42 4B 15 4 54 60 A3 NTS _ � _ RIP RAP END TREATMENT DETAIL 11:�7 W V W � •� 1.7 ' W � � O � �.i W W V H /�/ � Lf O W � N Q Z Q� Q J W W w 2 � � O � � U m 0 W a Z A � O Q Li � � O�/ � (� a 0-' IJ� W = U � V U � �m r i�v�a a g � anasreii �o r m w� ISSUANCES PERMITS osmnois REVISIONS NO. DATE DESCRIPTION FlLE NUMeER 10050012 PROJECTMANAGER JPM PROFESSIONAL JPM �RANIN BY NAF CHECKEDBY SWPPP DETAILS C5.2 �