HomeMy WebLinkAboutM004.0115A: Hea}ing. Venfila}ing. and Air Condi}ioning:
15A 1 GENERAL INSIRUCTIONS
15A 1-1 GENERAL REOUIREMEMS
REOUIREMENiS UNDER DIVISION ONE AND 7HE GENERa1 AN� SUPPLEMENTARY
CON�ITIONS Of THESE SPECIFICAPONS SHALL BE A PAR� OF 7H15 SECTION.
CONTRACTOR SHALL BECOME THOROUGHLY ACQUNNTED WI1H RS CONIENTS AS TO
REOUIRENENiS THAT AFFECT THIS DMSION OR SEC110N. THE WORK REQUIRE�
UN�ER THIS SECTION INCLU�ES MATEftIAL E�WPMEM APPl1ANCE5
TSRYSNEM�ASARI�QOIRE�NBYESMEN�FAWBNGS kPNOISPECIRCAT�lONS� �E EMIRE
THE SPECIfICAPONS AND DRAWINGS FOR 7HE PROJECT ARE COMPLEMENTARY AND
PORTIONS OF THE WORK DESCRIBE� IN ONE, SHALL BE PRONDED AS IF �ESCRIBE�
CNARPRCATION PREOR TO PROCEE�M6 WRH SiHE WORKTINVOWEpEER PND REQUEST
15A 7-2 �EFINIIIONS
FORNISH: THE 7FRM "NRNISH" IS USED TO MEPN 'SUPPLY AND DEWER TO 7HE
SIMUERTOPEERATIONSX FOR UNLOPDING, UNPACKING, ASSEMBLY, INSTAWTION AN�
INSTALL: THE TERM 1NSTP1�" IS USED TO DESCRIBE OPERlSIONS AT THE PRQIECT
SRE INCWDING 7HE ACNPL UNLOADING UNPACKING ASSEMBLY EREC110N
PIACMG ANCHORING APPLYING, WORKING TO DIM�NS�ON, FlNISHING, CURMG,
PROIECANG, QEWI�IG, AND SIMIIAR OPERATIONS.
PRONDE: THE TERM 'PROVIDE" MEWS TO NRNISH PND INSTALL, COMPLEfE AND
REA�Y FOR THE MTEN�E� USE."
THE TERA15 'APPROVE�' "APPROVED EQUAC AN� 'EOUAL' REFER TO APPROVAL BY
iHE ENGWEER AS AN ACCEPTPALE ALTERNATE BI�. NO SUBSiIiIlTI0N5 WILL BE
CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO AIATERIAL SUBSTINTIONS
SHPLL BE CONSI�ERED FOR APPROVAL PRIOR TO AWARD OF CONTRACi.
EOUIPMENTECAN BEEINSTAILED�ASTMSHOWN�ONWHE CONSTRUCTION DFPWIN SNTE�
WIIHOU� MO�IFlCAPON TO ASSOCN7E� S1S�EA15 OR ARCHITECTURAL OR
ENGWEERING �ESIGN. INCLU�E A��ITIONAL COSTS FOR PRCHITECTURAL AND
ENGINEERING DESIGN FEES IN BID IF DRAWINC MODIFICATIONS ARE REQUIRED
BECAUSE OF SUBSIIiOTE� E�IIIPMENT.
15A 1-9 SHOP DRAWMGS
pPON BEING AWARDE� A COMj+ACT SUBMIT i0 THE ARCHITECT FOR APPROVPL, SI%
(6 COPIES OF MANUFACTURER S SAOP �RAWINGS FOR EOUIPAIENT TO BE
F�RNISHED UNDER THIS CONTRACT ITEA15 RE UIRING COORDINATION BEIWEEN
FURNISHED BY OWNER OR NRNISHED BY OIHERS: THE ITEM WILL BE NRNISHED BY COMFACTORS AN� SHWEf MEfAL dl1CPNORN �ABRIGTRION �RAwMGS. 9EFORE
THE OWNER OR OTHERS. IT IS TO BE INSTALLED AND CONNECIE� UNDER 7HE SUBMIT7ING SHOP DRA NGS AN� NATERIAL LISTS E FY THAT EOUIPMENT
REQUIREMEMS OF THIS DIVISION, COMPLEfE AND RFADY FOR OPERATION SUBMITiED IS MUTUALLY COMPATIBIE AND SUITABLE FOR THE IN7EN�E0 USE, AN�
INCLU�ING ITEMS INCI�EMAL TO THE WORK INCWOINC SERVICES NECESSAR! FOR WILL FlT THE AVAIIABIE SPACE AND ALLOW AMPIE ROOM FOR MAIMENPNCE.
PROPER INSTALUTION AND OPERATION. TH� INSiALLATION SHALL BE INCLUDED
UNDER THE GUARPNTEE RE�UIRED BY THIS DIVISION. THE ENGINEER'S CHECKING AN� SUBSEOUENT APPROVAL Of Sl1CH SHOP DRAWING$
ENGINEER: WHERE REFERENCED IN 7HIS �IVISION 'ENGINEER' IS 7HE ENGINEER OF 'NILL NOT RELIEVE iNE CONTRACTOR fROM RESPONSIBILIIY FOR ERRORS IN
RECORO AN� iHE �ESIGN PROFESSION�L FOR hYE WORK UNOER 7HIS �MSION AN� �IAIENSIONS �ETNLS, SIZE OF MEMBERS QUAMITIES, OMISSIONS OF COMPONEMS
IS A CONSULTPNT TO AND AN pUIHORRED REPRESENTATNE OF, THE ARCHITECY AS OR FITiINGS COOR�IN4TION OF ELECTRIL`AL REQl11REMENiS; OR FOR
DEFINE� IN iHE GENERPL PND/OR SUPPLEMEMARY CONDRIONS. wHEN USE� IN COORDINATI�IG ITEMS WITH ACTUAL BUILDING CONDITIONS. PROCEED WIiH THE
THIS DINSION, R MEWS INCRFASED INVOLVEMENT 8Y PND OBLIGATIONS T0, THE 7ROWREMEM AN� INSTALlATION Of E�IIIPMENT ONLY AF7ER RECEIVING
�,NGINEER IN PDDOION TO IM�OL�EMEM BY, AND OBLIGATIONS T0, 1HE APPROVED SHOP DRAWINGS REUTIVE TO FACH ITEM.
ARCHIIECi.
CATALOG DATA SHALL BE PROPERLY BOUND, I�EMIFlED, INDEXED AND TABBED W 4
AHJ: 7HE LOGL CO�E PND/OR INSPECTION AGENCY (AUhIORIIY) HANNG J-RING BIN�ER. EACH ITEM OR MO�EL NUAIBER SHAl1 BE CIFARLY AIARKED AND
JORISDICiION OVER THE WORK. ACCESSORIES IN�ICAIE� IABEL THE CATALOG �ATA WIIH THE E�IIIPNENT
DENTIFlCATION ACRONYM OR NUMBER AS USED ON 7HE DRAWINGS AND INCLODE
THE IERMS "APPROVE� EQl1AC ' UIVALENT" OR 'E�I1Pl' ARE IlSE� PERFORAIANCE Cl1RVE5 CAPACIIIES SIZES MAIERIPL$ FlNISHES WIRING
SYNONYMOUSLY AND SHALL MEAN�ACCEPTED�BY OR ACCEP,TPBLE TO THE ENGINEER DIAGRAMS AND DENATIONS FROM ShEQFlED E�UIPME�JT OR MATERIALS. M4RK OUT
�S EQUIVAI,�NT TO THE ITEA1 OR NANUFACTURER SPEQFlED . THE IERR �PLICABLE IIEMS. SHOP DFAWINGS WILL 9E REfURNED WIIHOUT REVIEW IF 7HE
APPROVE� SHALL MEpN UBELED LIST�D, OR BOTH BY A NATIONALLY RECOGNIZED NBOVE MEMIONE� REOUIREMENiS PRE NOT MET.
TESTING IABORATORY (E.G. UL, E7C, CSA , AN� ACCEpTA9LE TO 7HE AHJ OVER THIS �SA 1-10 ELECTRONIC �RAWING FIl6
PROJECT
15A 1-3 PREBI� SITE NSIT
PRIOR TO SUBAIIIIING BID VISIT THE SRE OF THE PROPOSE� WORH AN� BECOME
FOILY WFORME� AS TO TNE CON�ITIONS UN�ER WHICH 7HE WORK IS TO BE DONE.
FNWRE i0 DO SO WILL NOi BE CONSIDERED SUfFICIEM JUSTIfICAPON i0
RE�llESi OR OBTAM EX�RI� COMPENSATION OVER AN� ABOVE THE COMRACT
PRICE.
i5A 1-4 MATERIAL AND WORKMANSHIP
PRON�E NEW MATERIAL EQWPMEM, AN� APPAAATOS 11N�ER THIS CONTRACT
UNLE55 OTHERWISE STATE� HEREIN OF BESi QUALIIY NORMALLY USED fOR THE
PURPOSE IN C00� COMMERCIAL PfiACTICE AN� FREE fROM �EFECIS. IAO�EL
NUMBERS LISTED IN THE SPEQFlCA710N5 bR SHOWN ON 7HE �RAWINGS ARE NOT
NECESSARILY INTEN�ED TO �ESIGNATE THE REQUIRED TRIM, WRR7EN
DESCRIPTIONS OF THE 7RIM GOVERN MO�EL NUMBERS.
PIAPhSILOCATED IN THEEUNTED�S�ATE�D VALVES SHP�L BE MANUFACTORE� IN
WORK PERFOR ED UNDER THIS CONiRaCT SHALL PRONDE A NFAi PN�
'WORKMANLIKE� PPPFARPNCE WHEN COMPLEfED TO THE SAIISFACTION OF THE
ARCHIiECT AN� ENGMEER. WORKMFNSHIP SHAIL BE THE FINEST POSSIBLE BY
E%PERIENCED AIECHANICS. INSTALU➢ONS SHALL CONPLY WOH APPIICABLE CODES
AND lAWS.
iHE COMPIETE INSTALUTION SHALL FUNCiION AS DESIGNED AND INTENDE� WITH
RESPECT TO EFFlCIENCY CAPACIIY NOISE LEVE ETC. ABNORMAL NOISE CAUSE�
BY RAIIIING EQUIPMENr, PIPING bUCTS, NR D CES, AN� SQUEAKS IN ROTATING
COMPONENTS WILL NOT BE ACCEP�ABIf. IN GENERAL MATERIALS AND EQUIPMEM
SHPLL BE OF COMMERCIAL SPECIFIGTION GRADE IN QUALIiY. IIGM DUIY AND
RESI�ENiIAL ttPE EOUIPMENT wILL NOT BE ACCEPTE�.
REMOVE FROM THE PREMISES WASTE MATERNL PRES T AS A RESULT OF WORK,
INCWOING CA2TON5 CRAPNG PAPER $iICNERS ANO OR IXC.4VATION MATERWL
NOT USED IN BACKfILLING, EfC. CLFAN EDUIPME INSTALLED UNDER THIS
CONTRACT TO PRESENT A NFAT AND CLFAN INSiALUTION AT 7HE TERMINAPON OF
THE WORK.
REPAIR OR REPIACE Pl1BUC AND PRNATE PROPER7Y DAAi4GED AS A RESl1LT OF
WORK PERFORAIED UNDER 7HIS COMRACT TO THE S4TISFACTION OF AUTHORITIES
AN� REGUUTIONS HAVING JURIS�IC110N.
15A 1-5 COOR�INAPON
COOR�INATE WORK WIiH THAT OF O1HER TRADES 50 THAT THE VARIOUS
COMPONENTS OF THE SYSTEAIS WILL BE INSTALLE� AT 7HE PROPER TIME WILL FlT
REQUIRINGBldNNSEANUNCENDCOMPONEMS WMCHRARERINIS�ALLE�EWIIHOIRHREGAR�MS
TO iHE PBOVE SHALL BE RELOC.4TE0 AT NO ADDITIONnL COST TO THE OWNER.
UNlESS OTHERWISE IN�ICATE�, THE GENERAL CONTRACTOR WILL PROVI�E CHASES
AND OPENINGS IN BOILDING CONSTRUCTION REQUIRE� FOR WSTALLATION OF THE
SYSTENS SPECIFlE� HEREIN. CONTRACTOR SHALL FORNISH THE GENERAL
CONTRACTOR WITH WFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED.
KEEP INFORMED AS TO iHE wORK OF OTHER 7RP�ES ENGAGED IN THE
CONSiRUCTION OF THE PROJECT AND E%ECl17E WORK IN A MANNER AS TO NOT
INIERFERE WI1H OR DEIAY THE WORK OF OTHER TRA�ES.
FIGURED DIMENSIONS SHALL BE TPHEN IN PREFERENCE TO SC4lE DIA7ENSIONS.
VPRIATIONS MAY OCCTIIRKE CONOW�NT�MREAWUREBE HEID RESPoNSIB EGk R ERRORS
TH4T COULD H4VE BEEN AVOIDED BY PRO�PER CHECKING PND INSPEC➢ON.
wALL�ORMFL00R�FINISHESRI���YWI�A�R�OOPERLM00EL NUNBERS O�EpEINNG�E
THE�REQUIREDSTOIMSHOWN ON THE DRAWINGS ARE NOT INiENDED TO DESIGNATE
15A 1-6 ORDINANCES AND CODES
PROCURE AND PAY FOR PERMRS AND LICENSES REOUIRED FOR THE
ACCOMPLISHMENT OF ME WORK HEREIN �ESCRIBED. wHERE REQUIRED OBTAIN,
PAV FOR AN� NRNISH CERIIFICATES OF WSPECTION TO OWNER. CONTRACTOR
WILL BE HELD RESPONSIBLE FOR VIOUTIONS OF iHE IAW.
15A 1-7 PROIECTION OF EOOIPMENT AND AIATERNLS
STORE AND PROTECT FROM �AMACE EQUIPAIENT AN� NATERNLS �ELNERED TO JOB
SITE COVER WITH WAIERPR00F 7FAR-RESISTANT HEAVI TARP OR POLYEIHYLENE
PHYSIICAL DAMA�EREEQUIPMEM ANDFMATERIALSTHAY HAS BEENr'DAAIAGR�O�R,
CONSIRUCTION ACTIVITIES WILL BE REJEC7E�, AN� CONTRACTOR IS OBl1GATE0 TO
FURNISH NEW EOUIPMENT AND MATERInL OF A LIKE KIND.
KEEP PREMISES BROOM CLFAN FROM FOREIGN MATERIAL CRFATE� DURING WORK
ANpFOR� APPDFARANCIE AONHrnE IER�INAPON OFPT EMSIORK. SHPLL HAVE A NEAT
PWG OR CAP OPEN EN�S OF �UCPNORK AN� PIPINC SS7EMS WHILE STORED PND
INSTALLED DURMG CONSTRUCTION WHEN NOT IN USE TO PREVEM THE ENiRANCE
OF DEBRIS IMO 7HE SYSIEMS.
RELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 06�� $�2O
N PREPNWTION OF SHOP �RAWINGS COMRACTOR MAY, AT HIS OPiION, OB�AIN
IEIECTRONIC �RAWING FlLES IN Al1TOCPD OR �XF FORMAT ON 3.5 INCH ROPPY �ISK
100 MB ZIP DISK OR Cp-ROM DISK, AS DESIRED FROM 7HE ENGINEER f0Q A SHIPDING
AN� HAN�LING fEE OF I200 FOR A �RAWING SE� UP TO 12 SHEEIS AN� j15 PER
SHEEf FOR EACH ADDRIONAL SHEH. CONTRACTOR SHP1.L CONTACT THE
ARCHITECT FOR WRIiTEN AUIHORIZATION AN� ENGWEER FOR THE NECESS4RY
RELFASE AGREEMEM fORM AND TO SPEQfY S{iIPPING ME7HOD AND DRAWING
FORMAT. IN A��RION TO PAYMENT ARCHIIECT S WRITfEN AU7HORIZATION PND
DRAWIN6 FlLES WI�LL BE SENT NT FbRN MOST BE RECENE� BEFORE EIECTRONIC
15A 1-11 OPERA➢ON AND NAINTENANCE INSTROCTIONS
BROCHUREEOF�EQUIPMEMC�U NSHED AND�INSTALLED ON�THIS PROJECT�INCW�E
OPERATIONAL AN� AVJMEWJJCE INSTRUCTIONS MANUFACTUREft"S GITALOG
SHEEfS WIRING DIAGRANS, PARTS LISiS, APPf�OVED SHOP DRAWINCS AND
i ESCRIPTIVE 11TERATURE AS FURNISHED BY THE EQUIPMEN� MANUFACTURER.
ARCHIT�ECTNCO S�LTW6VEENGWEER,TGENE�RALSCONTRACTOR�TSUB-C'ONTRACTORNER,
nNo n� idoez av wr�NTs.
SUBMIT THREE COPIES OF LITERATURE BOUN� IN APPROVE� BIN�ERS WITH IN�E%
AND TABS SEPARATING E UIPMENT lYPES TO TNE ARCHIiECT AT THE TERMINATION
0
OF THE WORK. PAPER CLIPS STAPLES RUBBER HANOS ANO MAILING ENVELOPES
ARE NOT CONSI�ERE� APPROV�E� BINDERS. FINP� APPROVAL OF 11ECWWICAL
SYSiEMS INSTALLED UN�ER THIS COMRACT WILL BE WITHHELD UN11L THIS
EOUIPMENT BROCHl1RE IS RECENE� AN� �EEME� COMPLETE BY THE PRCHIiECT
wIH THENEQUIPMENTTRRSELF�FOR NCL�SION�INREQSIRBROCH RE RE SHIPPED
iH
PROVIDE 'AS-BUILT° DRAWINGS (SEE DNISION 1 AND GENERAL CONDRIONS).
15A 1-12 TRAINING
AT A TIME MUNPLLY AGREED UPON BE7WEEN THE OWNER AND CONIRACTOR
PROVIDE 7HE SERVICES OF A FACTORY TRNNED AND AVIHORIZED REPRESENtA71VE
OF TENEQUIPMEM ROV�ED�FOR THISNPROJECTHE OPERATION PN� AUJNiEN4NCE
PROVIDE TRAI INC TO INCLUDE BUT NOT BE LIMITED TO AN OVERVIEW OF 7HE
SYSIEM AN� OR EOUIPMENT AS R REUTES TO 7HE FACILIIY AS A WHOLE;
OPE2ATION N� AVJNTENANCE PROCE�URES AN� SCHE�l1LE5 REIAIE� TO
IMAAMENANCE�AN��AP RNdPRRA�TEB PERATOIk INTEmENTION'PANOER IEV�FN OF �ATA
NCLUDED IN THE OPERATION AND MAIMENANCE MANUAL$.
SUBMIT A CERTIFICATION LHiER TO THE ARCHITECT STATING THAT THE OWNER'S
DESIGNATE� REPRESEMATNE FVS BEEN TRAINED AS SPECIFlED HEREIN. LEfiER
SHALL INCLU�E �ATE PA1E AiiEN�EES AN� SU&IECT OF 7RNNING. 7HE
CONiRACTOR AND THE OWiSER 5 REPRESEMATIVE SHALL SIGN THE CERiIFlCAlION
LETfER IN�ICATING AGREEMEM 7HAT THE TRNNING HAS BEEN PRON�ED.
SCHEDULE OWNER TWVNING WRH AT LFAST 7 DAYS' ADVANCE NO110E.
15A 1-13 SPPRE PPRiS
EOUIPMENT NRNIS�{ED FOR TH6��RQTMIECT LLOWING SPPRE PARTS FOR 1HE
A ONE SEf OF SPARE FlLTERS OF EACH IYPE REOUIRE� FOR FACH UNIT. IN A��RION
ADJUSTINGPPANDS&�41ANCING�WORKNPND �BEFORE TURNINGR�SITIEM TOI�R YO OWNER.
B. FURNISH ONE CONPIFIE SEf OF BELTS FOR FACH FAN.
C� REQUIRE THEME OPERAPNG KEYS FOR EACH 1YPE OF NR OUiLET PND INLEf TH4T
i5A 1-14 WARRAMIES
WPRW�NT FACH SYSTEN AND EACH ELEMENT 1HEREOF AG4INST ALL DEFECTS DUE
i0 FAULtt WORNMANSHIP DESIGN OR MATERIPL FOR A PERIOD OF 12 MOMHS FROM
AALONGERSWARR�MIIY�INdhIE COjNS'TRUcnON OOCUMEN SE ORAM4NU AC�NR�R'S��
WIIHINA7HE WAR�RMI�I'lEPEREO�(S)2 AS SMTASE� PN MH�EY GENERAFECO�IDI�IIONSRAND
DIVISION 1.
WPRRPNTIES SHPLL MCLUDE IABOR AN� MATERIPL. Ai41(E REPAIRS OR
REPIACEMENTS WRHOUT PM' PDDOIONAL COSTS TO 1HE OWNER.
PERFORM THE RENEDIPL WORK PROMPTLY, UPON WRRiEN NOTICE iROM THE
ENGINEER OR OWNER.
AT THE TIME OF SUBSTPNTIAL COMPIFIION DELNER TO THE OWNER ALL
WARRANTIES, IN WRIIING AN� PROPERLY EXECURU INCLU�ING TERM LIAIl1S FOR
WARRANTIES E%iENDING BE70ND THE ONE YEW PERIOD FACH WARRANtt
NSTRUTAENT BEING A��RESSE� TO 7HE OWNER AND STAPNG 7HE COMMENCEMEM
I�ATE AN� TERM.
i5A 1-15 CIIIIING AN� PATCHING
WORK �NDER THIS �SEC ONS�OBTAINRSdERMI5510fJ RON hIEE�CHR�ECT PRORp TO
CUTfING. �0 NOT CU� OR DISTURB STRUCTURAL MEMBERS WIIHOU� PRIOR
APPftOVAL fA0A1 THE ARCHIiECT. CU� HOLES AS SAIALL AS POSSIBIE. GENERAL
T�IS�SECi�ONS PATCHINGHSHP�LLS�FLOHRS�E ORIGINALEYA7IERNLBAND RK UNDER
CONSTRUCTION. REPAIR AND REFINISH ARFAS DISiURBED BY WORK TO 7HE
CONDITION Of A�JOINING SURFACES IN A MPNNER S4TISFACTORY TO 7HE
ARCHITECT.
i5A 1-16 ROl1GH-IN
COOR�INATE WITHOUT DEIAY ROUGHING-IN WIIH GENERPL CONSTRUCPON.
CONCEPL PIPING PND CONDUIT ROUGH-M E%CEPT IN UNFlNISHm ARFAS AND WHERE
OTHERWISE SHOWN.
1S4 1-17 CONCREfE R45E5
PRONDE CONCREiE &45E5 FOft EQWPMEM WHERE INDICATED ON THE DRAWINGS
AND !S SPEQFlED HEREIN. CONCREfE &4SE5 SHALL HAOE CHAMFERED EDGES. S2E
OF PPD SHALL BE A MINIMUM OF 4 GREATdi 7WW THE FOOTPRIN� OF 7HE
EQUIPNENT THAT IT IS SUPPORTING AND SHALL WNE A MINIMUM HEIGHT OF 3-1/2".
CONSTROCT E�UIPMEM BASES AN� HOUSEKEEPING PADS OF A MINIMUM 28 DAY,
4000 P51 CONCREIE CONFORMING TO AMERICPN CONCREf� INSTITUTE STANDARD
BUILOING CODE FOR REINFORCE� CONCREIE (ACI 318-991 AN� THE IAIE$T
APPIICPBLE RECOMMENDA710N5 Of THE ACI STANDARD PRACTICE MANUAL.
�RERG4TE CONFORNINGMO ASiM C33 �AN� POTPBLE�W TER PoSEDSE%iEROf(
CONCREIE SHALL COMNN 5 TO 7 PE�iCENT AIR ENiIWNMENT.
UNLE55 OTHERWISE SPECIFIED OR SHOWN ON THE STRUCNRAL DRAWINGS
R�NFORCE EOUIPMENT BASES AN� HOl15EKEEPMG PA�S WIIH N0. 4 REIIIFORCING
&4R5 CONFORMING TO ASiM A 615 OR 6%6 - W2.9 % W2.$ WELDED WIRE MESH
CONFORMING TO ASTM A185. PIACE REINFORCING &4R5 24 ON CENTER WIIH A
MINIMUM OF iW0 BPRS FACH DIRECTION
PROVIOE G4LVAN¢ED ANCHOR BOLTS FOR EQUIPUENr PIACED ON CONCREIE
EQUIPMENT BASES AND HOUSEKEEPING PPDS OR ON CONCREIE SUBS. PNCHOR
BMPNUFACTURERUOfETHENEOUIPMENT.�T SHPLL BE AS RECOMMENDEO BY 7HE
15A 1-18 S7RUCTUFAL SiEEL
STRUCNRAL STEEL USE� FOR SUPPoR� OF EQUIPMEM �l1CiWORK AND PIPING
SHALL BE NEYI, QFAN, PND CONFORM TO ASTN �ESIGII4PON A-36.
SIIPPORT MECHnNICAL COMPoNENiS FROM THE BUILDING STROCNRE. DO NOT
ELECTRRT�MECOMPONEMSMAND OHER NONCSiRUC7lIRLHEFLEME� ICAL OR
15A 1-20 PENETRAPONS
SFAL MECHANICAL fL00R, EaTERIOR WA11 AND ROOF PENEfRAlIONS WAlER71GM
AN� WFATHERTIGHT. $EPL AROUND NECHANIC.4L PENETRAPONS WITH 3N CP-25
FIRE BPRRIER AUIH (7ryICKNE55 AS REaOIRE� PND RECOMMENDE� BY
MANUFACNRER TO MNMAIN FlRE RESISTANCE RAPNG OF FlRE-RAlEO
ASSQABLIES. �
15A 1-21 AIR FlLTQ25
PRONDE FPRR 30�30 PIF.AIED 7HROWAWAY ttPE flL7ERS UNLESS OTHERwISE
INDICATED. NR UNIi SHALL HAVE NEW FILTERS INSTALLED WHQJ R IS OPERATED
BEFORE FIN�L ACCEPTANCE. FlLTERS SHA11 BE MMlUFACNRED BY AMERICAN AIR
FlLTER, FPRR, FLWDERS, OR APPROVID EQUAL.
IF HVAC EOUIPIIEM IS USED DURING 7HE CONSTRUCTION PFRIOD COMRACTOR
SH4LL PROVIDE ONE SEf OF FILIERS WHEN iHE UNR IS STARTEO AND REPIACE
FlLTERS WHEN NEEDEO BU� NOT lESS MMl EVERY MOMH. ON THE OAY OF
AUNEW SET�OFOFl�TERSbNNiTMEC�NN�RACTOR SHP�L QEM! THE UNR ANO PROVIDE
15A 1-22 MOiORS AN� STARTERS
EQUIPMEN��PACKAGE.D MORORS SH�AYLP HAVE COPPERNWIN�INGSISHCUSS B mE
ir+suunaN arvo sralloaeo souiaae� cace wiTH sTnRnNc ToRaue
CHARACTERISTICS SUIiABLE fOR THE EQUIPMEM SERVE�. MOTORS FOR NR
HAN�l1NG EQOIPMEM SHAl1 BE SELECTE� FOR OUIEf OPERAPON. FACH MOTOR
SHALL BE CHECKED i0R PROPER ROTATION AFfER EIECTRICPI CONNECTION HAS
BEEN COMPLEfED. PROVIDE DRIPPROOF ENCLOSURE FOR LOCAiIONS PROlEC7ED
FROM WFATHER AN� NOT IN AIR STRFAM OF FAN' AN� TOTAILY ENCLOSE� FAN
COOLED ENCLOSURE FOR MOTORS E%POSED TO 14EATHER MOTORS ShIULL BE
MANUFACTURED BY CENIDR/, GENEHAL ELECTRIC, WESIINGHOUSE, LOUIS ALLIS, OR
APPROVED EQUAL.
WITHIAN A�PPROVEDTttPEEOF PBUIL�TCIN9rTHERN4L O�VERLOA� NPROTECTION WRHRA
MOTOR STAR�ER EACH STARiER SHAl1 BE PROVI�E� WITH OVERLOA� HEATERS
SRED TO THE MOTOR RATING, AND EVERY THREE PHASE MOiOR STARTER SHALL
HAVE OVERLOAD HEAIERS IN EACH PHASE. AAIBIENT COMPENSATE� HEATERS SFN11
BE WSTALLED WHEREVER NECESS4R(. UNLESS NOTED O7HERWISE MOTOR
STARTERS SHALL BE NRNISHED BY 7HE DIVISION 15 CON7RACTOft FOR
INSTALUTION AN� CONNECPON BY THE �INSION i6 CONTRACiOR. STNiIERS SHALL
BE ALLEN-BRADLEY, CURK, FURNAS, SOUARE D, OR APPROVED EQUAL.
ISA 1-23 ELEC7RICP1 WIRING
LINE VOLTAGE WIRING SH4LL BE PROVI�E� BY DMSION 1fi. 11NE VOLiAGE CONi20l
AND IMERLOCK WIRING FOR MECHPNIGL SYSTEAIS SHALL AL50 BE PRONDED BY
�IVISION 16 COMRACTOR LOW VOLTAGE CONTROL WIRING SHALL BE PROVI�E� HY
THE DNISION 15 CONTRACTOR. fURNISH WIRING DWGRANS TO THE DINSION 16
CONIRACTOR AS REQUIRE� FOR PROPER EOUIPMENT HOOKUP. COOROINAIE WITH
THE DMSION 16 CONTRACTOR THE ACIDAL WIRE SRMG PMPS FOR MECH4NICAL
EQUIPNENT FROM THE EQUIPMENT NAMEPIATE TO ENSURE PROPER INSTALUTION.
( )
15A 1-24 REFRIGERANi ANO OIL
PRONDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CON�ITIONWG
REFRIGERA710N SYS7EMS, PND IA41MA1N R FOR NLL IERM OF THE GUAFAMEE.
15A 1-25 FINPL 7FSTING PND AQIUS7MEMS
ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST
ARCHITECYTHAT ADJUSTGENTS HAVEPBEENRMA�DE ANDCIE�NT O�REA�IOS�OPEMTINGTO
SATISfACTORILY. FURTHER ADJUSTAIENTS SHAl1 BE MADE TO OBiNN UNIFORAI
IEMPERATIIRE IN SPACES. CAl1BRATE SEf AN� ADJUST AOTOMAPC iEMPERATl1RE
CONTROLS. CHECK PROPER SEQUENCING bF INTERLOCK SYSIEMS, AND OPERATION
OF S4FElY CONTROLS.
15A 1-26 EOUIPMENT FURNISHE� BY O7HER5
PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY
7HE E�UIPMENT SOPPIIER OR OWNER TO COMPLETE INSTALLATION OF COOKING
EQUIPMENT, WASHING EOUIPAIENT �7F, NRNISHED BY OTHERS IN LOCATIONS AS
IN�ICAIE� ON THE �RAWINGS ANb/OR �ESCRIBE� IN THE GEN�NAL NOlES TO 7HIS
CONTRACTOR. EpUIPMENT AN� ACCESSORIES NOT PROVI�E� BV THE E IIIPMEM
SUPPLIER AIAY INCWDE FWES, VENTS INTAKES, ASSOCIATED ROOF JACKS AN� CPPS
TO OUIUOOftS �AMPERS, IN-LWE FA�JS ROOF FANS CON7ROL WTERLOCNS ETC. AS
REQUIRE� FOR PROPER QPERPTION Of YHE COMPLEfE SYSTEM IN ACCORDANCE
W1TH 7HE MANUFACTURER S INSTRl1CTI0N5.
CON7RACTOR SHAl1 BE RESPONSIBIE FOR CORRECT ROUGH-IN OINENSIONS ANO
SHALL VERIFY SAME WITH ARCHITECT PN�/OR EQUIPMENT SUPPLIER PRIOR f0
SERVICE INSTPLUiIONS.
15A 1-28 BUILDING OPERATION
CONPLY WITH THE SCHE�l1lE OF OPERATIONS 0.5 OIITLWED W THE ARCHITECTORAL
PORTIONS OF iHIS SPECIFIGTION. BUILDING SHALL BE IN COMINUOUS OPERA710N.
ACCOMPLISH WORK RE$QUIRING IMEftRIlPTION OF BUIIDING OPERA710N AT A TIME
BUIIDINGEOWNER AN�/OR�TE AN�PE�COIORdINATD INNERRIIIPHI0NRI0FE BUIL�INB AL OF
OPERATION WIIH THE OWNER AND/OR TENANT A MINIMUM OF SEVEN DAYS IN
ADVPNCE OF WORK.
15A 1-29 NBRA710N ISOLIIION
Ai4NI1FACIDRERS: PROVI�E NBRATION ISOUTION E OIPMEM AN� M4TERIPL$ 6Y A
SINGLE AIANUFACTURER. APPROVED AIANOFACTURE 5 PRONDED THEIR SYSIEMS
ARE IN COMPLIANCE WITH THE SPECIFIE� �61GN AN� PERFORMANCE
RE�UIREMENiS INCLUDE AMBER BOOTH KWEfICS NOISE CONTROL MASON
IN�USTRIES, INC., V19RAPON ELIMINATOF CO., INC., AN� VIBRPTIO�I MOUNTING AN�
CONTROLS.
GENERAL REOUIREMEN75: SELECT VIBRATION ISOUTORS BY THE WEIGHi
DISTRIBUTION TO PRODUCE UNIfORM �EFLECTION NBRA➢ON ISOUTORS SHALL
HAVE EITHER KNOWN UN-0EFLECTE� HEIGHIS OR CALIBRAPON MARKINGS 50 THAT,
AF7ER ADJUSTNENT, THE STAPC DEFLECTION GN BE VERIFlED 7HU5 DETERMINING
TFNT THE LOA� IS WITHIN THE PROPER RANGE Of THE ISOUfOR ISOUTORS SHALL
OPERAIE IN iHE LWEAR PORTION OF 7HEIft LOA� VERSUS �EFIECPON CIIRVES.
SPRING ISOUTORS SHALL HAVE 50 PERCEM E%CE55 CAPACIN WITHOUT BECOMING
COIL BOUN�. COAT V19RATION ISOIATORS WITH FACTORY-APPLIE� PAINT. COAT
VIBRATION ISOUi0R5 EXPOSED TO WEAiHER AND OiHER CORROSNE
ENNRONMEMS WITH FACTORY-APPLIED CORROSION RESISTANCE PROTECTION.
INSTAl1 AN� A�JUST VIBFATION ISOlAi0R5 IN ACCOR�ANCE WRH MANUFACTURERS
WRIIIEN WSTRUCTIONS.
PIPE CONNECTIONS FLE%IBLE PIPING CONNECTORS SHALL BE INSTALLED TO
CONNECT PIPING TO RECIPROCATING OR ROTATINC EQUIPAIENT. FABRICAIE
FLE%IBLE PIPING CONNECTORS FROM STAINLE55 STEEL BRONZE OR RUBBER
MATERNIS AS SUITABLE FOR SYSTEN FLUID. FLE%IBLE PIPING CONNECTORS SH4LL
BE BELLOWS SPHERICAL OR BRN�E� HOSE IYPE AS RECOMMEN�E� HY THE
M4NUFACNRER FOR THE APPl1CATI0N.
ISOUTOR lYPEIS �� /
A� WA fLE� ONABOTH PIS �ES. PRMANBFAC7UREIPA�STWITH BR��GE BEARING QUABlP�YOR
PERCEMESTRAIN.SEINCORPORATEMS�TE�EL�LOADRSPREADMG PUTES WHERENR�QU�REDS
BEIYlEEN THE EQIIIPMEM AN� 7HE NEOPRENE PAD. IF iHE ISOUTOR IS BOLTE� TO
THE STRUCTURE, INSTpLL A NEOPRENE VIBRATION ISOlATION WASHER AND SLEEVE
(UNIROYAL IYPE 620/660 OR AS APPROVFD) SHALL BE INSTAl1E� 11N�ER THE BOLT
NFAD BEIWEEN THE STEEL WASHER PND 1HE BASE PUTE. PROVIDE MASON
INDUSTRIES IYPE W OR EQUAL
�
15A 1-30 PIPE ANO VAWE M4RKERS
PRONDE MANUFACTURER'S STPNDARD PRE-PRINTED, SEMI-RIGID SNeP-ON OR
PIPEA MARKERS TOI�Ea�PRYSWIORE-�SSNAm3E NNYL PIPE M4RKERS. COLOR CODE
INSTAl1 PIPE MN2KER5 ON EACH HVAC PIPING SYSTEAI ANO INCW�E ARROWS TO
SHOW NORMAL DIRECTION OF ROW.
i5A 2 INSl1lATI0N PN� SHEEf NEfAL WORK
i5A 2-1 �UCi MSUTAPON
PROVIDEg �U�T( �l1NER IN RECT�A�NGUUR SUPPLY AND RENRN NR DUC7WORK. LINER
CORP "�OUGHG4IRDbUORROWENS CORNIN65°AEROFLE%EDUCT LINERGLI�NER 3URF CE�
A�LCSER3438 FOR FUN61 RESISTANCEIAND S�HALL BE CLEANABLE U� GSpuL� NEET
QFANING METHO�S AN� E UIP ENT OU7LINE� BY NORTH AAIERICAN INSUUTION
M4NOFACTIIRERS ASSOCIATION NAIMA) DOCT CLFANING GOIDE. INSTALL WITH 11NER
ADHESIVE AND MECHANICAL F�ENERS IN ACCORDANCE WITH MUNUFACNRER'S
INSIRUCTIONS AN� RECOMMEN�ATIONS. �UC7WORK SIZES SHOWN ON �RAWINGS
ARE INSI�E CLFAR DIMENSIONS. INCREASE SHEEf AIEfAL BY LWER THICKNESS IN
BO7H �IRECPONS WHERE LWER IS INSTALLED.
COVER CONCFNE� RIGI� ROUN� AN� RECTPNGUWt SUPPLY AN� RETURN NR
DUC7WORK ROON� OUISIDE NR �OCiWORK PND ROUN� AN� RECTANGOIAR
E%HAUST AN� R LIEF NR �UCIYIORK WRHI�1 10 FffT OF E%�ERIOR DISCHARCE
�
OIITLEiS WI7H 2 (MINIMU�A R-8.0) 7HICK DUCT WRPP CERTAINTEE� OR E�UPL
OWENS-CORNING J/4 POUND NSItt WRH HFAW-dUIY FOIL-SCRIM-KR�Ff FACWG
� ,
AN� WITH JOIMS iAPE� WI7H 3 WI�E�FOIL TAPE.
INSUN7INC MATERIALS PDHESNES COA7INGS EfC. SH4LL NOT E%CEED FUME
SPREPD RATING OF 2$ AND SMOI�E DEYELOdEO RAiING OF 50 PQt ASiM E 84.
CONTNNERS FOR MASTICS PND PDHESIVES SHALL H4�E U.L. IFBEL.
15A 2-2 DUCIWORK
PRONDE GPIVrWIZE� SIEEL DUC7WORK AN� HOOSINGS AS SHOWN ON �RAWINGS.
CONS7RUCT DUCIWORK INCLUDING FRiINGS AND 1RANSmONS IN CONFORAIANCE
WIiH CURRENT S�AACNA STAN�AR�S REUTNE TO GAl1GE BRACING, JOIMS EfC.
MINIMUM THICKNESS Of DUCT SHAL�, BE 26-GA G� SHEEf MEfAL. REWfORC�
HOUSINGS AN� �UCIWORH OVER 30 WRH 1-1 4 ANGLES NOT lESS THAN 5-6° ON
CEMERS, AN� CLOSER IF REQl11RE� FOR SOFFl IENT RIGI�IIY TO PREVENT
VIBRPTION. SUPPORT HORIZONTPL RUNS OF DUCT FROM STRAP IRON HANCERS ON
CEMERS NOT TO EXCEE� 8-0. �0 NOT SOPPOR� CEIl1NG GRI� CON�OIIS PIPES,
EQUIPMEM EfQ FROA1 DUCIWORK COORDINATE ROUTINC OF DUCIWORK WI7H
5 PPORIS�ARE NOTSRO�IE� 7HROIIG NGiHE DUCRTNORN ON�l1R, AN� ASSOCIAIED
CONSIRIICT SUPPLY �OCTS TO MEEf SMACNA POSIIIVE PRESSl1RE OF 2" W.G.
CONSiRUCT REfURN OUTDOOR AND EXHqUST DUCIWORK UPSTRFAM OF FANS TO
MEET SMACNA NEGATNE PRESSURE OF 2 W.G. CONSTRUCT E%HAU,�T DUCTNORN
DOWNSTREAM OF FANS TO MEEf SMACNA POSITNE PRESSURE OF 2 W.G.
P L0�'fMERCpPOR010�HUNII�ED M�QGIL�L D4C�T SEALER OR �PRO�D EOUPL�APPCUED
ACCORDMG TO SFAIANT AIANl1Fl�IDRER$ MSTRUCPONS. FOR �11CT5 WIYH
PRESSURE CUSAFlCATION OF 2 W.G. SFPL LONGRUDINAL AND TRANSVERSE
DUCIWORK JOINTS AIRTIGFR TO MEEf SN�CNA CVSS B. FOR �UC1S WITH
PRESSURE ClA59FlCAPON LE55 TH4N 2 W.G. SEPL TRANSVERSE JOINTS AIRiIGHT
TO MEEf SMACNA CIASS C. TAPES AND MASTICS SHALL BE LISIED AND UBELED IN
ACCORDANCE WITH IlL 181A.
PROVIDE RA�IUS ElBOWS, TURNS AND OFFSEfS WIIH A MINIMUM CEMERLWE
R�A�IUS �LBOWS/PROVI�E SHOR�CRA U�hEL90WSEWITH AEMI�IMUM�OFP7WOIT FULL
CONTIN00115 SPLIIER VANES VANES SHAl1 BE THE EMIRE IENGTH OF THE BEN�.
PRONDE MIIERED ELBOWS WHERE SPACE �OES NOT PERMR RADNS ELBOWS,
WHERE SHOWK ON THE �RAWINGS OR AT 7HE OPTION OF 7HE COMRACTOR WITH
THE ENGWEER 5 APPROVAL. MITERED ELBOWS LE55 THAN 45 DEGREES SHALL NOT
REQUIRE iURNING VANES. MIiERE� ElBOWS 45-�EGREES AND GRFATER SHALL HAVE
SINGLE THICKNESS IDRNING VPNES OF S4NE GAUGE AS Ol1CTNORK RIGIDLY
FASTENED WI7H CUIDE STRIPS IN DUC7WORK. VANES FOR MIiERED �LBOWS SfNll
AIR DUCIWORK THAT HAS AN NR VELOCIiY FX6EEDIN6 1000 MP�ETURN AN� OUiSIDE
DUC75 SHALL BE CONNECTE� W FANS FAN CASINGS AND FAN PLENUMS BY MEANS
OF FLEXIBLE CONNECTORS. fLEXIBLE EONNECTORS SHALL BE NEOPRENE COAIED
GIASS CLOTH CANVAS CONNECTIONS, �ORO-DYNE ELGEN, VENTFABRIC OR E�OAL
FLE%IBLE CONNECTORS SHALL HAVE A FUME SPdEAD OF 25 OR LE55 AND SMOKE
�EVELOPE� RqTI�'G NOT HIGHER THAN 50. MAl(E AIR�IGFR JOIMS AN� INSTAl1 WIIH
MINIMUM 1-1/2 SUCK.
ROUN� OR OVAL �UC7WORK SHALL BE SEMCO, UNIIE� WESCO OR E UAL
SHEEfMHAL WIiH SMOOTH INTERIOR SURPq,CE WITH LOW PRESSURE DUCY
PRESSURE ClASS UP TQ AN� INCLU�ING 2 �l.G.1 ROUND �UC7WORK G4UGES PER
THE FOLLOWMG iABLE IREFERENCE SMACN4 HVAC DUGJ CO@STRUCTION
STANOPRDS FOR G4UGE5 WHEN PRESSURES IXCEE� 2 W.G.J:
Td`& UN�EI� 3�
15" THRU 26 24
28" THRU 36" 22
b8" THRII 50" 20
52" THRU 60" 1B
LOW PRESSURE �UCT PRESSURE CU55 UP i0 AND INCLUDING 2" W.G. FRiINGS 24"
IN �IAMEIER AN LESS SHALL BE PREFABRICATED SPOIWELDED AND I RNPLLY
SEALED. CONTINl1005LY WEL� FRiMG�S URGER TaAN 24" IN �IPME�ER. FIIIING
GAUGE SfNLL BE 22 GqUGE FOR 36 FlIIINGS ANO UN�ER, 20 G4UGE FOR URGER
SRES. 90 �EGREE lEE S SHAl1 BE CONICAL IYPE SEAL LONGINOINAL ANO
TRANSVERSE DUCiWORK JOINi$ AIRTIGHi WITH HFAW LIOUID SFPIPNT PPPLIm
ACCORDING TO MANq FACTURER S INSIRUCTIONS PRQVIDE G4UGE 7HICKNESS IN
AImIUA1 PRESSURE IUOCT PRESSURE CUSS 3 TO 6 W.G.J DUC7Y/ORK AS
RECOMMENDED BY SMACNA.
3
15A 2-4 FWES
ISA 3-22 REFRIGERPNT PIPING AN� INSUTATION
PROVIDE ASIM B 88, ttPE L OR ASTM B 280 IYPE ACR HAR� �RPWN COPPQi
REFRIGERANT PIPING CLEANED AND SFALED Ai THE FACTORY AND SPECIFICALLY
ocsicNco roR RcniicEanNr. rimNcg stw{,�E HaRo oaaWN allo navi �or+c
RADIUS TURNS. SOLDER JOINTS WITH SIlF05 15 PERCENT SILVER, 5 PERCENT
iEMPERAT�RS�I.BSOL�EREJ0INTOP�ER� A.7(SILQWES7RFAMFOFR�RY NITROGEN PASSING
THROUGH THE PIPING.
NSUTATE SUCiION LWES WITH 3 4" FOAMED PlASTIC INSUUTION ARMAFLE% OR
IEOUAL. PIPING INSIIIATION SHA L HAVE A FUME SPRFAD OF 2$ OR LESS, AN� A
ASTMK E84�COATEIN UUPON THAO OREXP03 DHTO 7HE�ELEMNEMS�WR�AE W�
PROTECTIVE SFALER. INSTALL AN� Sl1PPOR� PIPING TO KEEP NOISE AN� NBRATION
TO A MINIMUM. SUPPORT AN� SECURE PIPING TO UNISIRUT IYPE SUPPORTS 50 THAT
NO VIBRAPON PASSES TO iHE BWL�ING SIRUCTURE. PIPE ATTACHMEN75 SHALL 6E
COPPER-PIATED OR H4�E NONA7EfALLIC COATWG FOR ElEC7ROLttIC PROiEC110N
WHERE FWES ARE IN�ICATED ON THE �RAWINGS PRON�E SELKIRK MEfALBESTO�S , WHERE AIIACHMENTS ARE IN DIRECT CONiACT WI1H COPPER NBING. INSTALL A
MODEL aC OR RV OR EQUAL BY A1EfAL-fAB SIAPSON OR VAN-PACKER NPE B SUPPORT wIIHIN ONE FOOT OF EACH CHANGE OF �IRECTION. MOUNT PIPE WWGERS
�OUBIE WALL C#S VEM FIUES fROM THE JARIOl15 ITEA15 Of GAS-FlRED E�UIPMENT PROUND THE OUTSIDE OF THE INSUlATION WITH S4DDLE5 TO PREVENT HPNGERS
UP TO FLUE CAPS PBWE hIE RWE SINGLE WALL fLUES ARE UNACCEPTABLE. fROM RUPNRINC 7HE INSUNTION. REPIACE INSUTAPON 7HAT IS CUT OR BROKEN
FLUES SHALL BE COMPI£TE WRH NECESSARY FIIIINGS CONNECTORS, FNSHING BY THE HANGERS.
ANDESH4LLRBECINST�ALtEDIA4 RECOMME DEDGB�Y THEE$A�ANUfACTURERAAND INRIES, RUN REFRIGERPNT LINES PNULLEL AN� PERPQJ�ICULAR TO WALL AN� ROOR LMES
CONFORMANCE WIiH APPLIC.4BLE CO�ES. FlASH FWES wATERIIGHT AT THE ROOF PND TO APP„FPR ST�2qIGHT AND IN GOOD ORDER. PRCH SUCTION 11NE5 OOWN
IINE. SIIGMLY !1 IN 20'1 TOwARDS 1HE COMPRESSOR. PROVIDE OIL TRPPS AT 7HE &4SE
OF VERiICA4 SUCTIOfl RISERS OVER 6 FEET HIGH.
WSTPLL LIaUI� LINE SIGFR GNSSES M LIQUI� LMES NEPREST THE CON�ENSING
ONITS. FACTORY A70UM EXPANSION VPLYES WITH THE SENSING BULBS SHIPPED
LOOSE. FlELD MOUNT IXPANSION VALVE BULB PFTER REFRIGERMl� PIPI@G IS
COMPlE7E �DPMAGE MAY OCCUR IF BULBS COME IN COMACT WRH HFATJ.
OPTION�TO PROVIDE COPPER REFRIGERANT TUBING LINECSETRSIZE�R�SHALL HAVE THE
RECOAIMEN�E� BY EQUIPMEM A�lUFACIDRER AN� OF LENGTH AS REOUIRE� FOR
1HE INSTALLATION. PROVIDE 3/4" THICK FOA�AED PUSiIC WSUUiION ARMAFLE% OR
EOUAL ON THE SUCTION LINE. PROVIDE QUICK-CONNECT FNRE TUBING
COFIPIFESSION FlTiINGS OR SOL�ER CONNECPONS AS REOUIRED TO MATCH THE
CONNECTIONS OF iHE CONDENSING UNIT AND EVAPoRPTOR COIL.
i5A 3-23 SYSTEM EVACOATION AND CHARGING
BLOW OOT REFRIGERATION 11NE5 WRH �RY NIIROGEN AT A SUITABLE PRESSURE
BEFORE MAKING FlNAL CONNECTION AT THE CONDENSING UNIT OR COIL TO ENSURE
AGNNST �IRT $G1LE, OR OTHER FOREIGN MATERIAL BEING IN THE LWES. �RAW A
VACUUM TO P9 OF MERCURY. BRFqK THIS VACUUM BY CHARGING DRV REFRIGERANT
G4S IMO 7HE SYSTEM RAISING THE PRESSURE TO 0 PSIG. REPEAT 7HE UiIER 7W0
SiEPS FOR A TRIPLE EVACUATION BEFORE THE FlNAL EVACOATION IS STARTE�. MAl(E
FINPL EVACUATION BY REDUCING T� SYSTEN ABSOWTE PRESSURE TO A MPXIMUM
OF �.5 WLLIMETERS 500 MICRONS AN� ALLOWING THE POAIP TO Rl1N AT THIS
PRESSURE FOR A MIIMUM OF iW0 HOURS.
REPFAT THE PROPER AMOUNT Oi REfRIGERANT CHARGE PER THE MANUfACNRER'S
RECOMMENDAPONS. RECORD THE AMOUNT OF REFRIGERAM BY WEIG CFNRGED
INTO THE SYSIEM FOR FACH CIRCl1R RECOR�E� TO 7HE NFAREST 1 4 POUNO ON
TAGS AND ATfACH TAGS TO THE LIQUID LINE NFAR THE CONDENSIN UNIT.
REFRIGERANi SHALL BE SUPPIIE� BY 7HE HVAC COMRACTOR.
15.4 4 TEMPERATURE CONTROLS
15A 4-1 GENERPL REOUIREMEMS
PRONDE A SYSTEM OF TEMPERATURE CONTROLS INCLUDING THERMOSTATS
R�IAY� RE0 REd TO PROVII�CE ESFIE��ESIRE� SE aUENC�EAO OPERAT�I01��(. �PRON�E
INTEGRATED WIRING DWGRAAIS SHOWINC IN7ERCONNECilONS BE7WEEN FlELD
INSTALLf� EOUIPMENT AN� PACKAGE WIRING Fl1RNI5HE� WITH 7HE HVAC
EQUIPMEM.
PRON�E SIIPERVISION AN� ON-JOB CHECKOIIT SERVICE 0.5 RE�UIRED TO ENSURE
THAT INSTALLATION MEEfS REQUIREMENTS OF 7HE SPECIFICAiION. THE 5YS7EM
SHALL BE CIIARANTEE� FOR A PERI � OF ONE YEAR FOLLOWING 7HE ACCEPTANCE
OP THE SYSTEM BY THE ARCHIiECT9ENGWEER. CORRECT DEFECTS OCCURRING
DURING 7H15 PERIO� AT NO A��ITIONAL COST TO THE OWNER.
15A 4-2 E�UIPNEM
AluNUFACNRERS AND MODEL NUMBERS ARE LIS1E� FOR REFERENCE AS TO UPLIIY
AN� FFATURES REOUIRE� FOR 7HE CONTROL �EVICES. PROVIDE COMROL 0 ICES
BY BPRBER-COLMAN HONEVWELL JOHNSON CONTR045 TRANE OR WHRE RODGERS
WRH QUALIIY AND FiATURES AS �IN�ICATE�. '
SEVEN DAY PROGRAMMABLE, OCCUPIED UNOCCUPIED 1HERMOSTATS FOR MUL71PlE
SiAGES OF HFAPNG AN� COOLING SH 11 BE HONEYWEL� SERIES T7350 OR EQUAL
WITH INTEGRPL SUBBASE. INSTALL THERMOSTATS AT 48 PFF TO MEET ADA
RE UIREMEMS UNLESS OTHERW6E NOIE� ON 7HE PfANS.
Q
PRONDE �AMPER OPERATOR fOR EACH AUTOMATIC DAMPER WRH SUFFlCIEM
CAPACIIY TO OPERATE THE �AMPER 11N�ER ALL CON�ITIONS AN� TO CIIARAMEE
TIGHT CLOSE-0Ff Of DANPERS ACAINST SYSIEM PRESSURE ENCOUMERED. FACH
OPERATOR SHALL BE PRON�E� WIIH SPRING-REfURN FOR NORMALLY CLOSE� OR
NORNAILY OPEN POSRION FOR FNL SAFE OPERATION TO ACCOONT FOR FlRE LOW
TEMPERATURES, OR POWER IMERRUPTION AS REQUIRED BY iHE SEOUENCE dF
OPERA710N. �AMPER OPERlSORS SHALL BE MANUFACTORE� BY BEl1M0, JOHNSON
CONTROLS OR APPROVED EQUAL.
DMSION 16 SHALL PROVIDE DUCT iYPE 5)MOKE DEfECTORS WITH UL LISTING fOR
FANTl1PON A�TIVAiIONPERPRON�E REMOTENSU PND AUDIBLE AURM�DEVICE�WPAN
PANEOVADpLONCBE �DEVICEMAS�'AIR DUCT DEIECTORTTR0U8LE�'TED TO A FIRE A1ARM
15.4 5 SEOUENCE OF OPERAPON
15A 5-1 AIR HAN�l1NG UNIT CONTROL
DURING OCCUPIE� HOURS, OPERATE AIR WWDLING UNR SUPPLY FPN CONTINUOUSLY AND
R00 NTH�RMOS ERS$Tc'AGP�11TOF(75%� G�REE3GF�RENHERNC O�IJN�G,Ir70 DEGREES
FAHRENHER HFATINGJ. ��CT IAOUMFD SNOKE �ETECTORS SHALL SHUiDOWN UNIT
UPON AURA1.
DURING UNOCCUPIm HOURS, CY0.E THE NR HPNDIING UNR SUPPLY FAN AND COOIING
OR HFATING SYS9EM TO M4INTNN UNOCCUPIEO SE7&4CK TEMPERPTURE SEf
POINiS. OUTDOOR NR pVAPER SHALL BE CLOSED DURMG UNOCCUPIED HOURS.
i5A5-2 RESTROOM E%HAUST FAN COMROL
E%H4UST FANS EF-1 PND EF-2 SFNLL BE MTERLOCKED wIIH LIGFR SWRCH. FAN
SH4LL BE ENERGRED WHEN 11GHi IS ON PN� �E-ENERGIZE� WHEN 11GHT IS OFF.
i5A5-3 G4RAGE E%HAl15T FAN CONiROL
E%H4UST FAN EF-3 SH4LL BE IMERLOCKE� wITH wALL SwITCH ANO
MOTORRED OUTSIDE AIR DAMPER AND FAN SHALL BE ENERGIZED WHEN WALL
SWRCH IS ON AND OE-ENERGIZED WHEN WALL SWITCH IS OfF.
15A5-4 GARAGE OSCILLA7ING SUPPLY FPN CONTROL
SUPPLY FANS SF-7 iHROUGH SF4 SHALL BE IMERLOCKED WITH WALL SWITCH AND
SH4LL BE ENERGIZE� WHEN WALL SWRCH IS ON PND DE-ENERGRED WHEN WALL
SWRCH IS OFF.
i5A5-5 G4RAGE RPDIANT HFATING
RADNM HFAIERS RH-1 7HROUGH RH-3 SHALL ENERGIZE TO MNMAIN
THERMOSTAT SEf PoINT PND SHALL DE-ENERGRE WHEN SPACE SEf PoINT
IS RFACHEO.
isa z-� aR onnc�s
PRON�E AIR �EVICES AS SCHE�l1LE� ON �RAWINGS, MANUFACTl1RE� BY C.4RNES
E.H. PRICE KRUEGER WULOR INDUSTRIES OR TITUS. SELECT AIR DEVICES TO LIMIT
ROOAI N01$E IEVEL �0 NO HIGHER 7HAN NC-30 UNlE55 O7HERWISE SHOWN.
PRONDE DEVICES WIiH A SOR PUSiIC GASKEf TO MAKE AN AIRTIGHi SFAL
MOUMING 7EYP�OFTIAIR �ENCES�WITHOO�RDIHIAECTPIIRAL R��LEC�Eb C�EIIMI�JG PWJS.
SOBMR COMPLETE SHOP �RAWINGS INCLU�ING MFORMATION ON NOISE IEVEL
PRESSURE DROP TNROW CFM FOR FACH AIR DENCE S1riE5 BORDERS EfC.
CLFARLY MURKEd WRH SVECIFlE� EOUIPMENT NUMBEf�. SUBAIR SPMPLE$ OF FACH
AIR DEVICE a5 RE�IlESTED BY THE ENGWEER.
i5A 2-10 LOl1VER5. PIENUAIS. SCREENS
PRON�E IMAI(E NR LOUVIII BY RUSKIN MO�EL ELF375M OR EQIIAL GREENHECH,
AMERICPN WARMING & VEMIUTING, CESCO INDUSTRIAL LOlNERS OR LOUVERS &
DAMPERS AS SCHEDULED ON THE DRAWINGS. COORDINAIE E%ACT SIZE AND
LOCA710N WIIH ARCHITECIDRAL �RAWINGS LOWER SHAl1 BE STATIONAsY WI7H
MILL FINISH. LOWER SHALL HAVE E%TRUOED ALUMINUAI BUDES, 0.080 WALL
THICKNE55, 45 �EGREE Bll�E ANGLE BIADES ON 5' CENTERS; FRAME SHALL BE
E%1RUDED AWMINl1M 0 OBO WALL TIIICKNE55' WITH E%PAN�E� FUTiENE�
AWMINUAI BIRDSCREEN. PROVIDE LOUVER WIiH A MINIM�IM fREE ARFA Of 45
PERCENT, WITH A MAXIMUM NR PRESSURE �ROP OF 0.1 AT SCHE�IILE� AIftFLOW.
CONSTRUCT PLENl1M WITH GALVANRE� STEEL FRAMING MEMBERS AN� G>LVANIZE�
SHEETMETAL BRACED WITH GALVANIZED ANGLES. G4UGE5 AND BRACINC SHALL
CONFORAI TD SAiACNA RECOAIMENDATIONS FOR �UCiWORK OF LIKE SIZES. WHERE
ACCE55 �OORS ARE SHOWN PROVI�E HINGE� �OORS WITH q202 VENiLOK IATCH.
M4KE WATERTICHT CONNECTIbNS TO LOWER SLOPING BOTfOM OF PLENUM TO
D2AIN WATER i0 WEEPHOLES IN BOTTOM OF LOWER.
PRON�E BIR�SCREENS AN� OR INSECi SCREEN ON LOUVER, DUCTS HOO�S, FANS,
AND OPENINGS TO THE 0 OORS AS $C�IE�ULE� PND/OR NOTE� bN THE
DRAWINGS. BIRDSCREENS SHALL BE 1/2 A1ESH INSECT SCREENS SHPLL BE
ALUMINUM AIESH.
15A 2-11 FlRE �AMPERS
PROVI�E �YNAMIC, CINCH IYPE PIATES WITH IMEGRl�L MOUNTING SLEEVE. �AMPER
SHALL BE A AIINIMUM OF 20 GAGE GALVANIZE� STEEL AN� BU�E SHALL BE ONE
PIECE 14 GAGE NININUM GALVANIZE�. BFARINGS SHAl1 BE STAWLESS STEEL SIEEVE
PRESSE� IN THE FRAME NANUFACNRERE� BY Rl15NIN COMPANY MO�EL NR25
ROUN� FlRE �AMPER. SUITABIE FOR USE IN W00� STII� CONS7I2UCTION AN� RAiE�
FOR DYNPMIC CLOSIIRE AT 2000 FPM AN� 4" W.G �IRE DAMPERS SHALL BE
EPUCEPBLE0165G�EG FLRATED.FIRE RATING: 1-1/2 HOUR FUSIBIE LINKS:
15A 2-13 EKHAOST NR SYSTEMS
PRON�E CEILING MOUMED E%HAUST FANS AS SCHE�l1lE� ON 7HE DRAWINGS OR
EQUAL COOK GREENHECK CARNES TNIN CIIY FANS ACME OR PENN&4RRY �
CO�APIETE WITH ISOUiE��BLOWER LNIT AN� CEILING GRILLE PRONDE
DISCONNECT SWITCH &4CKDRAfT DAMPER DISCHARGE DUCT ROOF GOOSENECK
AN� NEOPRENE VIBIiATION ISOIATORS WITN Al1-iHRFA� HANGING RO�S. �
i5A 3 HVAC EOUIPMEM
15A 3-4 CONDENSING UNIIS [1 5-5 TONSI
PRONDE SPLR SYSTEM, NR COOLED CONDENSING UNITS AS SCHE�ULED ON 7HE
15A 3-14 GAS TUBE RADIANT HFATERS
PRON�E WHERE INDICATE� ON THE DRAWINGS, STANDARD ttPE GAS-FlRED
TUBE RPDWNT UNIT HFATERS, MANUFACTURE� BY SCHWANK. N(S SUBS7RUiIDNS
ALLOWED fURNISH WITH CAPACIIIES NOIED AN� COMPLHE WIiH SOl1D STATE
G4S RE55 RE REGU�lAYORINPFESS RE�SWRCH�AN� WIiH5�100 P RICEM AU�O AYIC GA$
SHU�OFf CONTROL. BURNER SHALL OPERAiE ON 120 VOLT, 60 CYCLE SINGLE
PHASE OPERATION. BORNER WILL PRON�E COAIBUSIION NR FLOW �IR�CTLY TO
THE BORNER ASSEMBLY 50 THAT ELEC7RONIC COMPONEMS ARE ISOIATED FROM
THE NR ROW. HFATERS SHALL BE CONTROLLE� BY iHE USE Of A WALL MOUMED
SCHWANN LOW VOLTAGE THERMOSTAT. PRON�E MANUFACTl1RER'S REUY $WRCH PND
REFER TO MANUFACTUER�S WIRINC REOUIREAIENTS WHEN MULTIPLE HFAIERS SH4RE
ONE THERMOSTAT
FNNG GAS-FIRE� HEAiERS USING A 45 MOUMING ANGLE CEWNG SUSPENSION
KR fROM SIRUCTURE IN A MANUFACTURER APPROVED MrWNER.
LOCATE EACH HFATER 50 THERE WILL BE VERTIGL CLEAFPNCE OF NOT LESS
THAN 6" FRO� 7F,{E TOP OF 7HE 11NIT TO A COMBl15TIBlE MATERIPL. GARAGE
CEILING IS 14-0 AFF. MOUNT BOIIOM OF UNIT ACCORDINGLY.
s ir�.;.-�mmreoi
�Edifica � case
engineenng
��� x� �, fia ,�
s i icn_ize �i.��ai
rrrm.ioo �i��,n�e
F rar ay.n:a i �
,a���....e�am .N.�,�°i
cmnricnTeoF nun roarry �o. �oi nm:oo„n i
� ��
C 0 R T L A N D
M 0 R fi A X
ARCHITECT
711 N. FIELDER RD.
ARLINGTON, TX 76012
PH: (817) 635-Sfi96
FA%: (817) 635-5699
�
V` 0
�+ -� z
A \ .i� 1�1
W �
�
I �C A
�
�I� � a �,.y
rC M
� • rl I q �
�1 � O h�p U
O � '�
� m �I p
O
U
O
�
.,.�
�
CJ; � �„� rl
1"1 O � �~
� � �
�� I z �0
. p.� � � O h�l
�'/� m w
�
Vl �� � d
.� A O
C. rl
�
1J�1
` ; � �
1�
� � U
�
a
T-�
d �
� d
O
D �'
�T-i
.�
I� O
p
�
�
� �
y�
V�
.1� �
�
�
.�� �
� "'
U
- • r[19100I62 °
s rai c or
" 9''•:;�'DUHP; •
,`7�s ..
��s.i0,l:,1 ��`�v.e^:
5/17/19
Date
Revisions
5/10/19 - Issuetl for CBA
Review
5l1]119- Issuetl for Builtling
Permit Submittal
6/19/19 - Revision 1- Per Sewer
Permi[ Camments 8 Owner
Project No. 19-01
Drawn By: STAFF
Date: 5/17/1 g
IECHANICAL
PECIFICATIC
I-4.01
9LHN-04-2019
isa z-a r�zie�E oucr
i5A 1-B SUBS7INTIONS
15A 3-6 AIR HAN�l1NG UNI75 WIIH GAS HFAT �ANO �% COIL 1 5-5 TONS1