HomeMy WebLinkAboutCBA Carmel IN - Comcheck ReportsCOMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Construction Site:
10950 Michigan Rd
Carmel, IN
Owner/Agent:
Jonathan Wakefield
Christian Brothers Automotive
17725 Katy Freeway, Suite 200
Houston, TX 77094
281-675-6100
jwakefield@cbac.com
Designer/Contractor:
Cortland Morgan
Cortland Morgan Architect
711 N. Fielder Rd
Arlington, TX 76012
817-635-5696
tricia@cmaia.net
Project Information
Energy Code:
CBA Carmel IN
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-garage (Automotive Facility)5193 0.90 4674
4674Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-garage (Automotive Facility)
CBA - A1: A1: 4'-0" SURFACE: Other:2 6 36 216
CBA - B: B: 8' TANDEM INDUSTRIAL: Other:4 12 70 840
CBA - C: C: 6" RECESSED CAN: Other:1 4 14 56
CBA - D1: D1: 4' WALL MOUNTED: Other:2 1 36 36
CBA - D2: D2: 3' WALL MOUNTED: Other:3 1 27 27
CBA - H: H: DECORATIVE PENDANT: Other:3 4 27 108
CBA - K: K: JELLY JAR: Other:1 1 27 27
CBA - M: M: 2' X 4' LED HIGHBAY: Other:1 10 203 2030
CBA - R: R: 4' STRIP: Other:1 1 36 36
3376Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 28% better than code
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
61 ofPage
Darrell R. Case 5/22/2019
COMcheck Software Version 4.1.1.0
Exterior Lighting Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Construction Site:
10950 Michigan Rd
Carmel, IN
Owner/Agent:
Jonathan Wakefield
Christian Brothers Automotive
17725 Katy Freeway, Suite 200
Houston, TX 77094
281-675-6100
jwakefield@cbac.com
Designer/Contractor:
Cortland Morgan
Cortland Morgan Architect
711 N. Fielder Rd
Arlington, TX 76012
817-635-5696
tricia@cmaia.net
Project Information
Energy Code:
CBA Carmel IN
Allowed Exterior Lighting Power
A
Area/Surface Category
B
Quantity
C
Allowed
Watts / Unit
D
Tradable
Wattage
E
Allowed Watts
(B X C)
Illuminated length of wall or surface 466 ft 5 No 2330
Total Tradable Watts (a) =
Total Allowed Watts =
Total Allowed Supplemental Watts (b) =
0
2330
116
(a) Wattage tradeoffs are only allowed between tradable areas/surfaces.
(b) A supplemental allowance equal to 117 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Illuminated length of wall or surface (466 ft): Non-tradable Wattage
CBA - F3: F3: EXTERIOR WALL PACK: Other:1 4 20 80
CBA - F5: F5: EXTERIOR WALL PACK: Other:1 7 66 462
CBA - G3: G3: EXTERIOR DECORATIVE SCONCE: Other:1 2 31 62
0Total Tradable Proposed Watts =
Exterior Lighting Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Exterior Lighting PASSES: Design 0.0% better than code
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
62 ofPage
Darrell R. Case 5/22/2019
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the lighting and
electrical systems and equipment and
document where exceptions to the
standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.4.1.1,
8.4.1.2
[PR6]2
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the electrical systems
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
63 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
9.4.1.1
[EL1]2
Automatic controls to shut off all
building lighting installed in buildings
>5,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.2
[EL2]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.3
[EL3]2
Automatic lighting controls for exterior
lighting installed.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.2
[EL5]3
Ballasted one and three lamp fixtures
with >30 W/lamp have two lamp
tandem wired ballasts when >=2
fixtures in same space on same
control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.4
[EL7]1
Exterior grounds lighting over 100 W
provides >60 lm/W unless on motion
sensor or fixture is exempt from scope
of code or from external LPD.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.6.2
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
64 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
8.7.1
[FI16]3
Furnished as-built drawings for
electric power systems within 30 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.7.2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.2.2.3
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
9.4.5
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
65 ofPage
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
66 ofPage
COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:New Construction
Location:Carmel, Indiana
Climate Zone:5a
Construction Site:
10950 Michigan Rd
Carmel, IN
Owner/Agent:
Jonathan Wakefield
Christian Brothers Automotive
17725 Katy Freeway, Suite 200
Houston, TX 77094
281-675-6100
jwakefield@cbac.com
Designer/Contractor:
Cortland Morgan
Cortland Morgan Architect
711 N. Fielder Rd
Arlington, TX 76012
817-635-5696
tricia@cmaia.net
Project Information
Energy Code:
CBA Carmel IN
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Duct Furnace, Gas, Capacity = 80 kBtu/h
Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec
Cooling: 1 each - Split System, Capacity = 48 kBtu/h, Air-Cooled Condenser
Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER
Fan System: FAN SYSTEM 1 | Office -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Constant Volume, 1600 CFM, 1.0 motor nameplate hp
1 HVAC System 1 (Single Zone):
Electric Storage Water Heater, Capacity: 20 gallons
No minimum efficiency requirement applies
1 Water Heater 1:
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
91 ofPage
Darrell R. Case 5/22/2019
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2,
6.4.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-4.01
4.2.2,
7.4.1
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-4.01
6.7.2.4
[PR5]1
Detailed instructions for HVAC
systems commissioning included on
the plans or specifications for projects
>=50,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
92 ofPage
Section
#
& Req.ID
Footing / Foundation
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.3.8
[FO9]3
Freeze protection and snow/ice
melting system sensors for future
connection to controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
93 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
7.4.3
[PL1]2
Service hot-water piping systems
insulated. Where piping is installed in
or under a slab, verification may need
to occur during Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: P-1.01
7.4.4.1
[PL2]3
Temperature controls installed on
service water heating systems
(<=120ºF to maximum temperature
for intended use).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: P-1.01
7.4.6
[PL4]3
Heat traps installed on non-circulating
storage water tanks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: P-5.01
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
94 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency
verified. Non-NAECA HVAC
equipment labeled as meeting
90.1.
Efficiency:_____Efficiency:_____Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list
for values.
6.4.3.4.1
[ME3]3
Stair and elevator shaft vents
have motorized dampers that
automatically close.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.4.3.4.2,
6.4.3.4.3,
6.4.3.4.4
[ME4]3
Outdoor air and exhaust systems
have motorized dampers that
automatically shut when not in
use and meet maximum leakage
rates. Check gravity dampers
where allowed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Gravity dampers
acceptable in buildings 3
stories.
6.4.3.4.5
[ME5]3
Ventilation fans >0.75 hp have
automatic controls to shut off fan
when not required.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-
1.01
6.4.3.9
[ME6]1
Demand control ventilation
provided for spaces >500 ft2 and
>40 people/1000 ft2 occupant
density and served by systems
with air side economizer, auto
modulating outside air damper
control, or design airflow >3,000
cfm.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Not applicable
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage.
Insulation outside of the
conditioned space and associated
with cooling systems is vapor
retardant.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-
4.01
6.4.4.1.2
[ME8]2
HVAC ducts and plenums
insulated.
R-_____R-_____Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-
4.01
6.4.4.1.3
[ME9]2
HVAC piping insulation thickness._____ in._____ in.Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-
4.01
6.4.4.2.1
[ME10]2
Ducts and plenums sealed based
on static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-
4.01
6.4.4.2.2
[ME11]3
Ductwork operating >3 in. water
column requires air leakage
testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.2.3
[ME19]3
Dehumidification controls
provided to prevent reheating,
recooling, mixing of hot and cold
airstreams or concurrent heating
and cooling of the same
airstream.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Not applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
95 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.5.4.1
[ME25]3
HVAC pumping systems >10 hp
designed for variable fluid flow.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec:
Not applicable
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70%
of design supply air.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.1
[ME32]2
Kitchen hoods >5,000 cfm have
make up air >=50% of exhaust
air volume.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.7.2
[ME33]1
Fume hoods exhaust systems
>=15,000 cfm have VAV hood
exhaust and supply systems,
direct make-up air or heat
recovery.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.8.1
[ME34]3
Unenclosed spaces that are
heated use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement
does not apply.
6.5.9
[ME35]1
Hot gas bypass limited to: <=240
kBtu/h – 50% >240 kBtu/h – 25%
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.2
[ME36]2
Service water heating equipment
meets efficiency requirements.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
96 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
10.4.1
[EL9]2
Electric motors meet requirements
where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-4.01
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
97 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-1.01
6.4.3.1.2,
6.4.3.2,
6.4.3.3,
6.4.3.3.1,
6.4.3.3.2
[FI3]2
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-1.01
6.4.3.7
[FI6]3
When humidification and
dehumidification are provided to a
zone, simultaneous operation is
prohibited.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: Not applicable
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system
balancing report is provided for HVAC
systems serving zones >5,000 ft2 of
conditioned area.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-4.01
7.4.4.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: P-1.01
6.4.3.2
[FI20]1
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-1.01
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least
one automatic shutdown control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-1.01
6.4.3.3.2
[FI22]1
Setback controls allow automatic
restart and temporary operation as
required for maintenance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: M-4.01
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
98 ofPage
Project Title:
Data filename:
CBA Carmel IN
N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised
mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck
05/22/19Report date:
99 ofPage