Loading...
HomeMy WebLinkAboutCBA Carmel IN - Comcheck ReportsCOMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:New Construction Construction Site: 10950 Michigan Rd Carmel, IN Owner/Agent: Jonathan Wakefield Christian Brothers Automotive 17725 Katy Freeway, Suite 200 Houston, TX 77094 281-675-6100 jwakefield@cbac.com Designer/Contractor: Cortland Morgan Cortland Morgan Architect 711 N. Fielder Rd Arlington, TX 76012 817-635-5696 tricia@cmaia.net Project Information Energy Code: CBA Carmel IN Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-garage (Automotive Facility)5193 0.90 4674 4674Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures 1-garage (Automotive Facility) CBA - A1: A1: 4'-0" SURFACE: Other:2 6 36 216 CBA - B: B: 8' TANDEM INDUSTRIAL: Other:4 12 70 840 CBA - C: C: 6" RECESSED CAN: Other:1 4 14 56 CBA - D1: D1: 4' WALL MOUNTED: Other:2 1 36 36 CBA - D2: D2: 3' WALL MOUNTED: Other:3 1 27 27 CBA - H: H: DECORATIVE PENDANT: Other:3 4 27 108 CBA - K: K: JELLY JAR: Other:1 1 27 27 CBA - M: M: 2' X 4' LED HIGHBAY: Other:1 10 203 2030 CBA - R: R: 4' STRIP: Other:1 1 36 36 3376Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES: Design 28% better than code Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 61 ofPage Darrell R. Case 5/22/2019 COMcheck Software Version 4.1.1.0 Exterior Lighting Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:New Construction Construction Site: 10950 Michigan Rd Carmel, IN Owner/Agent: Jonathan Wakefield Christian Brothers Automotive 17725 Katy Freeway, Suite 200 Houston, TX 77094 281-675-6100 jwakefield@cbac.com Designer/Contractor: Cortland Morgan Cortland Morgan Architect 711 N. Fielder Rd Arlington, TX 76012 817-635-5696 tricia@cmaia.net Project Information Energy Code: CBA Carmel IN Allowed Exterior Lighting Power A Area/Surface Category B Quantity C Allowed Watts / Unit D Tradable Wattage E Allowed Watts (B X C) Illuminated length of wall or surface 466 ft 5 No 2330 Total Tradable Watts (a) = Total Allowed Watts = Total Allowed Supplemental Watts (b) = 0 2330 116 (a) Wattage tradeoffs are only allowed between tradable areas/surfaces. (b) A supplemental allowance equal to 117 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Illuminated length of wall or surface (466 ft): Non-tradable Wattage CBA - F3: F3: EXTERIOR WALL PACK: Other:1 4 20 80 CBA - F5: F5: EXTERIOR WALL PACK: Other:1 7 66 462 CBA - G3: G3: EXTERIOR DECORATIVE SCONCE: Other:1 2 31 62 0Total Tradable Proposed Watts = Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed exterior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Exterior Lighting PASSES: Design 0.0% better than code Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 62 ofPage Darrell R. Case 5/22/2019 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.4.1.1, 8.4.1.2 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 63 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 9.4.1.1 [EL1]2 Automatic controls to shut off all building lighting installed in buildings >5,000 ft2. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.2 [EL2]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.3 [EL3]2 Automatic lighting controls for exterior lighting installed. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.2 [EL5]3 Ballasted one and three lamp fixtures with >30 W/lamp have two lamp tandem wired ballasts when >=2 fixtures in same space on same control. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.4 [EL7]1 Exterior grounds lighting over 100 W provides >60 lm/W unless on motion sensor or fixture is exempt from scope of code or from external LPD. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.6.2 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 64 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 8.7.1 [FI16]3 Furnished as-built drawings for electric power systems within 30 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.2.2.3 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. 9.4.5 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 65 ofPage Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 66 ofPage COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:New Construction Location:Carmel, Indiana Climate Zone:5a Construction Site: 10950 Michigan Rd Carmel, IN Owner/Agent: Jonathan Wakefield Christian Brothers Automotive 17725 Katy Freeway, Suite 200 Houston, TX 77094 281-675-6100 jwakefield@cbac.com Designer/Contractor: Cortland Morgan Cortland Morgan Architect 711 N. Fielder Rd Arlington, TX 76012 817-635-5696 tricia@cmaia.net Project Information Energy Code: CBA Carmel IN Mechanical Systems List Quantity System Type & Description Heating: 1 each - Duct Furnace, Gas, Capacity = 80 kBtu/h Proposed Efficiency = 80.00% Ec, Required Efficiency: 80.00 % Ec Cooling: 1 each - Split System, Capacity = 48 kBtu/h, Air-Cooled Condenser Proposed Efficiency = 14.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 1 | Office -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 1600 CFM, 1.0 motor nameplate hp 1 HVAC System 1 (Single Zone): Electric Storage Water Heater, Capacity: 20 gallons No minimum efficiency requirement applies 1 Water Heater 1: Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 91 ofPage Darrell R. Case 5/22/2019 Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2, 6.4.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-4.01 4.2.2, 7.4.1 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-4.01 6.7.2.4 [PR5]1 Detailed instructions for HVAC systems commissioning included on the plans or specifications for projects >=50,000 ft2. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 92 ofPage Section # & Req.ID Footing / Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.4.3.8 [FO9]3 Freeze protection and snow/ice melting system sensors for future connection to controls. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 93 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions 7.4.3 [PL1]2 Service hot-water piping systems insulated. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: P-1.01 7.4.4.1 [PL2]3 Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use). Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: P-1.01 7.4.6 [PL4]3 Heat traps installed on non-circulating storage water tanks. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: P-5.01 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 94 ofPage Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.4.1.4, 6.4.1.5 [ME1]2 HVAC equipment efficiency verified. Non-NAECA HVAC equipment labeled as meeting 90.1. Efficiency:_____Efficiency:_____Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. 6.4.3.4.1 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.4.3.4.2, 6.4.3.4.3, 6.4.3.4.4 [ME4]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Exception: Gravity dampers acceptable in buildings 3 stories. 6.4.3.4.5 [ME5]3 Ventilation fans >0.75 hp have automatic controls to shut off fan when not required. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M- 1.01 6.4.3.9 [ME6]1 Demand control ventilation provided for spaces >500 ft2 and >40 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Not applicable 6.4.4.1.1 [ME7]3 Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M- 4.01 6.4.4.1.2 [ME8]2 HVAC ducts and plenums insulated. R-_____R-_____Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M- 4.01 6.4.4.1.3 [ME9]2 HVAC piping insulation thickness._____ in._____ in.Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M- 4.01 6.4.4.2.1 [ME10]2 Ducts and plenums sealed based on static pressure and location. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M- 4.01 6.4.4.2.2 [ME11]3 Ductwork operating >3 in. water column requires air leakage testing. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.2.3 [ME19]3 Dehumidification controls provided to prevent reheating, recooling, mixing of hot and cold airstreams or concurrent heating and cooling of the same airstream. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Not applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 95 ofPage Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.5.4.1 [ME25]3 HVAC pumping systems >10 hp designed for variable fluid flow. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Not applicable 6.5.6.1 [ME30]1 Exhaust air energy recovery on systems >=5,000 cfm and 70% of design supply air. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.1 [ME32]2 Kitchen hoods >5,000 cfm have make up air >=50% of exhaust air volume. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.7.2 [ME33]1 Fume hoods exhaust systems >=15,000 cfm have VAV hood exhaust and supply systems, direct make-up air or heat recovery. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.8.1 [ME34]3 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Exception: Requirement does not apply. 6.5.9 [ME35]1 Hot gas bypass limited to: <=240 kBtu/h – 50% >240 kBtu/h – 25% Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.2 [ME36]2 Service water heating equipment meets efficiency requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 96 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-4.01 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 97 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 6.4.3.1.1 [FI2]2 Heating and cooling to each zone is controlled by a thermostat control. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-1.01 6.4.3.1.2, 6.4.3.2, 6.4.3.3, 6.4.3.3.1, 6.4.3.3.2 [FI3]2 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-1.01 6.4.3.7 [FI6]3 When humidification and dehumidification are provided to a zone, simultaneous operation is prohibited. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: Not applicable 6.7.2.1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.2 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.3 [FI9]1 An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-4.01 7.4.4.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: P-1.01 6.4.3.2 [FI20]1 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-1.01 6.4.3.3.1 [FI21]1 HVAC systems equipped with at least one automatic shutdown control. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-1.01 6.4.3.3.2 [FI22]1 Setback controls allow automatic restart and temporary operation as required for maintenance. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: M-4.01 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 98 ofPage Project Title: Data filename: CBA Carmel IN N:\2019\Icon Architects\Christian Brothers Automotive\IHCI-01-2019 Carmel IN\Mech\Revised mech CBA Carmel IN - 90.1 2007 comcheck envelope.cck 05/22/19Report date: 99 ofPage