Department Review Status Report
Project Name: PZ-2020-00076 DP ADLS Avant Phase II
Workflow Started: 05/29/2020 2:50 PM
Report Generated: 05/10/2021 02:34 PM
Department
CycleReviewerEmailStatusReviewer CommentsApplicant Comments
Addressing
Dave McCoyDMcCoy@carmel.in.govApprovedAcknowledged.
Carmel Information
Theresa Krueskamptkrueskamp@carmel.in.govApprovedAcknowledged.
Systems
Please see our changemarks and checklist items and
Engineering
Alex Jordanajordan@carmel.in.govRevisions RequestedAcknowledged.
address the plans accordingly.
Provide one set of hard copy too scale plans to the CFD
Fire
Carmel Firecfdinspections@carmel.in.govPendingAs requested, plans delivered to CFD 7/6/20.
for review. The plans can be delivered to: Carmel Fire
Dept. 2 Civic Square Carmel, IN Attn: Plan Review
Please see changemarks and checklist items for
Planning & Zoning
Rachel Keeslingrkeesling@carmel.in.govRevisions RequestedAcknowledged.
comments.
Please provide a response to all UNRESOLVED change
marks in the 'Applicant Response' column of the
CrossRoad Engineers
Willie Hallwhall@crossroadengineers.comRevisions RequestedAcknowledged.
Changemark Viewer indicating the action taken, or reason
no action was taken, to resolve all comments.
Please see my comments. Thank you. Chad Miller
Vectren Energy
Chad MillerChad.R.Miller@centerpointenergy.comApprovedAcknowledged.
Vectren Energy
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govRevisions RequestedAcknowledged.
Urban Forestry
Daren Mindhamdmindham@carmel.in.govRevisions RequestedAcknowledged.
What is the bedroom breakdown? How many 1 br, 2br, Requested information was provided to Carmel Utilities
1
Carmel Utilities
Lisa Kempalkempa@carmel.in.govRevisions Requested
etc?and water & sewer fees calculated and received 7/9/20.
Police
Teresa Andersontanderson@carmel.in.govApprovedAcknowledged.
Carmel_Clay Parks
Michael Klitzingmklitzing@carmelclayparks.comNo CommentsAcknowledged.
Carmel Redevelopment
Larysa Glaspielglaspie@carmel.in.govNo CommentsAcknowledged.
Commission
Please click "View/Edit Changemark Items" for my
comments, respond to each comment, and upload
Zoom meeting 7/27/20 with Nathan Chavez, Mark Leach
Revisions Requested but revised drawings. You can also view the changemarks by
Sign Permits
Nathan Chaveznchavez@carmel.in.govand Steve Hormann; see re-submittal documents and
Released for Public Hearingclicking on the red pencil and exclamation point icons
Applicant Response to Changemarks Report Ref #2.
next to the documents. Please let me know if you have
any questions.
Hamilton County Surveyor
Samuel ClarkSamuel.Clark@hamiltoncounty.in.govApprovedAcknowledged.
Carmel Water Operations
Steve Cookscook@carmel.in.govRevisions RequestedAcknowledged.
Utility standard details are not TRICO use Camel Sewer
Carmel Wastewater
Revisions Requested but
Carmel SewerJFaucett@carmel.in.govStandards. POC for Carmel Sewer. Jason Stewart 317-Acknowledged.
Operations
Released for Public Hearing
571-2634 ext 1644 jjstewart@carmel.in.gov
Please see all new and remaining unresolved
Engineering
Alex Jordanajordan@carmel.in.govRevisions RequestedRefer to updated plans and report
changemarks and checklist items.
Page 1 of 3
2
Department
CycleReviewerEmailStatusReviewer CommentsApplicant Comments
Indiana Fire Code Section 3313.1 Where required. In
buildings required to have standpipes by Section 905.3.1,
not less than one standpipe shall be provided for use
during construction. Such standpipes shall be installed
when the progress of construction is not more than 40
feet (12 192 mm) in height above the lowest level of fire
department vehicle access. Such standpipe shall be
provided with fire department hose connections at
accessible locations adjacent to usable stairs. Such
standpipes shall be extended as construction progresses
Approved with
to within one floor of the highest point of construction
Fire
Carmel Firecfdinspections@carmel.in.govUnderstood
Conditions/Commitments
having secured decking or flooring. Section 3310.1
Required Fire Department Vehicle Access. Approved
Asphalt fire apparatus access roads shall be provided to
the FDC and Fire hydrants during construction. Fire
Apparatus access road must be capable of supporting the
weight of fire apparatus and maintained clear at all times.
Section 3312.1 Fire Hydrants shall be fully functional
tested and approved by Carmel Water Utilities prior to any
combustible materials arriving on the site or at the time
the required construction standpipe it to be placed in
service.
I made some new comments this round after some
Revisions Requested but
Planning & Zoning
Rachel Keeslingrkeesling@carmel.in.govRefer to updated changemark listq
2changes were provided. Please see changemark items
Released for Public Hearing
list.
Please refer to the 'Reviewer Response' column of the
Changemark Viewer for updates to all remaining
UNRESOLVED comments. Provide a response to all
UNRESOLVED change marks in the 'Applicant
Response' column of the Changemark Viewer indicating
Updated plans and drainage report included in
CrossRoad Engineers
Willie Hallwhall@crossroadengineers.comRevisions Requestedthe action taken, or reason no action was taken, to resolve
resubmittal
all comments. Many of the updates that were noted in the
"Applicant Response" column for this cycle were not
found on the uploaded plans and report. Please make
sure that all revisions are being completed and uploaded
in the next cycle.
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govRevisions RequestedRefer to changemark list and updated documents
Urban Forestry
Daren Mindhamdmindham@carmel.in.govRevisions RequestedRefer to changemark list and updated documents
Carmel Utilities
Lisa Kempalkempa@carmel.in.govRevisions Requestedsee water comments for more infoWater Comments updated
Carmel Water Operations
Steve Cookscook@carmel.in.govRevisions Requestedlots 77-90 shown on plan set in construction limits????Lots 77-90 part of Phase II, not being built at this time
Please click "View/Edit Changemark Items" for my
comments, respond to each comment, and upload
Revisions Requested but revised drawings. You can also view the changemarks by
Sign Permits
Nathan Chaveznchavez@carmel.in.govNoted. Additional signage information will be provided
Released for Public Hearingclicking on the red pencil and exclamation point icons
next to the documents. Please let me know if you have
any questions.
Carmel Wastewater
Jason Stewartjjstewart@carmel.in.govApproved
Operations
Please see our remaining unresolved changemarks as
Noted. We have posted updated plans and provided
Engineering
Alex Jordanajordan@carmel.in.govRevisions Requested
well as Crossroads remaining comments. Please let us
updated calculations.
know if you would like to meet and discuss.
When applying for sign permits Spandrel Panels will need
Sign Permits
Nathan Chaveznchavez@carmel.in.govApproved
to be identified to ensure compliance with the UDO Sign
Standards.
Urban Forestry
Daren Mindhamdmindham@carmel.in.govNo Comments
Planning & Zoning
Rachel Keeslingrkeesling@carmel.in.govApprovedThank you for your work on this project.
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govRevisions RequestedNoted. Please see updated bicycle garage information.
Carmel Water Operations
Steve Cookscook@carmel.in.govRevisions RequestedNoted, we have made the requested revisions.
Carmel Wastewater
Call me prior to starting any construction. Hani Soueidan
Jason Stewartjjstewart@carmel.in.govApprovedNoted. we have passed your information to the owner.
Operations
317-719-9231 11-5-2020
3
Page 2 of 3
Department
CycleReviewerEmailStatusReviewer CommentsApplicant Comments
Please refer to the 'Reviewer Response' column of the
3
Changemark Viewer for updates to all remaining
UNRESOLVED comments. It appears that although it is
noted that all items have been addressed, the majority of
changemarks have not been addressed at all. Prior to any
further reviews being completed on this project, the Understood. We have updated the responses per our
CrossRoad Engineers
Willie Hallwhall@crossroadengineers.comRevisions Requested
applicant will need to provide specific DETAILED prior correspondence.
responses to EACH UNRESOLVED change mark in the
'Applicant Response' column of the Changemark Viewer
indicating the action taken, or reason no action was taken,
to resolve all comments. If there are questions concerning
the changemarks, please contact for clarification.
See water request for more info and fees have not been
Carmel Utilities
Lisa Kempalkempa@carmel.in.govRevisions RequestedNoted, fee payment will be forthcoming from the owner.
paid
Carmel Water Operations
Steve Cookscook@carmel.in.govNo Comments
We have no further comments on the plans. Before a
storm water management can be issued, the following will
need to be provided: 1. 6 sets of plans 2. A signed and
recorded O&M manual 3. An erosion control engineers
estimate covering anything not included in the mass
Approved with grading bond 4. An erosion control performance bond for Understood. These items will be forwarded to your
Engineering
Alex Jordanajordan@carmel.in.gov
Conditions/Commitments100% of the approved estimate 5. A right-of-way attention.
improvement bond for any improvements proposed within
City right-of-way 6. A right-of-way improvement bond for
100% of the approved estimate 7. BPW waiver letters or
4
emails sent to Caleb Warner in our office 8. A right-of-way
permit and $5,000 license and permit bond
We have posted the bike rack detail to the architectural
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govRevisions Requested
plans. The requested walk along the front has been
provided to connect to the adjacent parcel to the north
Carmel Utilities
Lisa Kempalkempa@carmel.in.govRevisions Requestedfees have not been paidUnderstood. Fees will be paid at time of building permit
The conditional approval is based on information provided
Approved with
via email on March 3, 2021. Final approval/CRC will be
CrossRoad Engineers
Willie Hallwhall@crossroadengineers.comPlans and waiver have been posted to project dox
Conditions/Commitments
issued upon the revised plans and waiver request being
uploaded in Project Dox.
Carmel Utilities
Lisa Kempalkempa@carmel.in.govRevisions Requestedfees have not been paid
CrossRoad Engineers
Willie Hallwhall@crossroadengineers.comApprovedConsultant Review Complete
5
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govRevisions Requested
Approved with
Carmel Utilities
Lisa Kempalkempa@carmel.in.govFees will need to be before building permit is pulled.
Conditions/Commitments
6
Transportation Systems
David Littlejohndlittlejohn@carmel.in.govApproved
Page 3 of 3
Duke Energy Indiana Urban Development
Information Form
Project Name: ___________________________________________________________________
Type of Project: Single Residential Homes Commercial Units
(Select all that apply) Streetscaping Apartments
Condo or Town Homes Stand-alone Commercial
Parking Garage Road Improvement
CONTACT INFORMATION
Contact Name: ________________________________
Company Name: ______________________________
Mailing Address: _______________________________ City/State/Zip: _____________________
Legal Name for Contracts (if different from above): _______________________________________
Office Phone: _________________________________ Cell Phone: _______________________
Email Address: ___________________________________________________________________
SITE DESCRIPTION
Location: Street/Road: _________________________ City/Town: _________________________
Zip Code: ___________ ST: ___________ County: ______________
Environmental Permitting or Environmental Considerations (describe): ________________________________________________
___________________________________________________________________________________________________________
Make Ready Work (Relocations/Removals) Required – Need plans showing required work: YES NO
DRAWINGS
All drawings must be approved (no preliminary/concept drawings)
Email drawings to: UrbanDesignIN@duke-energy.com
Drawings Required:
a) MicroStation or AutoCAD file(s) of Site Plan and Utility Site Plan
Note: If CAD/MicroStation file is too large to email, the file can be uploaded to the Duke Energy Builder Portal.
Do you need assistance with the Builder Portal? YES NO
b) Full .pdf set of APPROVED CONSTRUCTION PLANS, which include the following: overall site plans, road/street plans,
lighting plans, relocation or removal plans, entire set of electrical drawings (which includes, but is not limited to electrical site
plan, single lines and load schedules) Note: Meter Locations must be shown on electrical site plans.
SITE DEVELOPMENT PLAN/APPROXIMATE START DATES (MM/DD/YY)
Make Ready Work (Relocations/Removals): ________________________________
Estimated Paving Date (Driving/Parking Areas): ______________________________
Estimated Site Ready Date: _______________________________
Start Construction Date: _______________________________________
Information Sheet must be filled out and all required files must be received by Duke Energy before design will begin.
RESIDENTIAL LOAD INFORMATION
(Note: Each Building will require a separate Load Information page)
Building Number/Name: ________________________________
Voltage Requirements and Load Information:
120/240 volt – 3 wire, single phase 120/208 volt – 4 wire, single phase
Please remember to list any other phase or voltage requirements such as elevators, lift station, pumps.
Unit Square Footage # of Units Gas Total Electric A/C Size (Tons) Total Demand kW
0 – 1000
1001 – 1250
1251 – 1500
1501 – 1750
1751 – 2000
2001 – 2500
2501 – 3000
>3001
COMMERCIAL LOAD INFORMATION
Voltage Requirements and Load Information:
120/240 volt – 3 wire, single phase 277/480 volt – 4 wire, three phase
120/208 volt – 4 wire, three phase
Please remember to list any other phase or voltage requirements such as elevators, lift station, pumps.
Larger motors may require starting compensation
Largest 1 Phase 3 Phase Total kW
(Tons/HP)
Total
Demand kW
*A/C or Heat Pump (Tons)
Heat Strip
Lighting
Refrigeration
Water Heating
Cooking
Miscellaneous
Receptacles
List of Motors (Horsepower and Description):____________________________________________________________
_______________________________________________________________________________________________
_______________________________________________________________________________________________
Description/Number of Commercial Units:
Type: (Retail, Office, Restaurant) Square Footage Type: (Retail, Office, Restaurant) Square Footage
__________________________ _____________ __________________________ _____________
__________________________ _____________ __________________________ _____________
__________________________ _____________ __________________________ _____________
__________________________ _____________ __________________________ _____________
Building Load Summary:
Total Connected kW: ____________________________ Total Demand kW: __________________________
Total Building Square Footage: _______________ # of Units: ____________ Perm Power Date:____________
Size of Main (Panel Size): _______________ # of Meters: _______________ # of Stories: ________________
Secondary Conductor Size: ______ AL _____ CU _____ Building Service Entrance: OH _____ UG _____
Neutral Conductor Size: ______ AL _____ CU _____ # of Conductors per phase (Sets/Runs) ____________
Temporary Power Needs – For Construction
(Separate account/request will be needed for each Temporary Power Need)
Temporary Power Needed for Construction Trailer(s): YES NO
120/240 volt – 3 wire, single phase 120/208 volt – 4 wire, three phase 277/480 volt – 4 wire, three phase
Temporary Power Needed for Crane(s): YES NO
120/240 volt – 3 wire, single phase 120/208 volt – 4 wire, three phase 277/480 volt – 4 wire, three phase
Temporary Power Needed for Building(s): YES NO
120/240 volt – 3 wire, single phase 120/208 volt – 4 wire, three phase 277/480 volt – 4 wire, three phase
STREET AND AREA LIGHTING
Duke Energy Lighting: YES NO
Payment/Billing Information
Lump Sum Payment Information (Equipment Charge):
Contact Name: _________________________________________
Company Name: ________________________________________
Mailing Address: ________________________________________ City/State/Zip: ___________________________________
Legal Name for Contracts (if different from above: ________________________________________________________________
Office Phone: __________________________________________ Cell Phone: _____________________________________
Email Address: _________________________________________
Monthly Energy/Maintenance Billing Information:
Contact Name: _________________________________________
Company Name: ________________________________________
Mailing Address: ________________________________________ City/State/Zip: ___________________________________
Existing Account #: ______________________________________
To set up new account #, email your lighting application to MWConstruction@duke-energy.com
Office Phone: __________________________________________ Cell Phone: _____________________________________
Email Address: _________________________________________
Lighting Options:
Please visit our Design-A-Light tool to choose your lighting needs.
***You must select your State in the top left corner to see the applicable lighting options for your area.***
Please note that MH is no longer available, and HPS is obsolete as of the end of 2018.
***PLEASE ALSO NOTE ONLY STYLE A POLE IS A DIRECT BURY. THE OTHER STYLES WILL NEED AN ANCHOR BASE, WHICH WILL RAISE
THE PRICE PER LOCATION.***
Pole: Style A Style B Style C Style D Style E Style F Wood
Pole Height assumed at 12ft unless specified here: ________________
Luminaire Type: LED IS THE ONLY TYPE AVAILABLE
Fixture Style (from Design-A-Light tool above): ___________________________________
Wattage of Fixture: _______________