A. SEESHEETE�001FORSVMBOLSANDABBREVIATIONS.
B. SEESHEETE604FORNITCHENEQIIIPMENTSCHE�ULE.
G SEESHEETE�604FORMECHANICALEpUIPMENTPOWERSCHEDULE.
�. SEESHEETSEb01THR0UGHE603FORPANELSCHE�ULES.
E. SEESHEETSE-501,E-SWAN�E-5�3FORELECTRICALDETAILS.
F. WIRINGSYSTEMSHALLBECON�UITAN�CON�UCTORUNLESSNOTED
OTHERWISE USESOLIDCONDUCTORFORSIZENIOAWGANDSMALLER.
USESTRAN�E�CON�UCTORFORLARGERS¢ES.
G. ALLCOVERPLATESFORELECiRICAL�EVICESSHALLBEOFACOLORTO
MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR
�ESIGNER.
H. ALLWORKSHALLCOMPLVWRHALLNATIONAL,STATEAN�LOCALCO�ES
AN� OR�INANCES PERTAINWG TO THE WORK IN THIS PROJECT.
L EXPOSE�CON�UITSHALLBERONPARALLELTOAN�ATRIGHTANGLESTO
BWL�ING LINES.
J. REFERTOARCHITECTURALORAWINGSFORDESIGNATIONANDLISTINGOF
FIRERATE�ASSEMBLIES. WORDINATEALL�ESIGNEFFORTSWITHFIRE
RESISTANCE OF MATERIALS AND CONSTRUCTION.
K. ALLE%TERIOREQUIPMENTANDDEVICESSHALLBEWEAiHERPR00FAND
RAIN TIGHT.
L ELECTRICALCONTRACTORSHALLFURNISHAN�INSTALLALL
INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT
FORNISHED BV OTHERS.
A
�Y h��=. =__ =,--. --�---
�� —
— �l
OFCU-1
O
O
2k0,#1 ND-914"C
'�-- — __ _ —� — —
�
�
_—
�
�
1 2 3
2#8, f110GND314"C
FCLL2
����
=1___ - 1
� —s
— —Z. �C — —
—=1=__—�—
� SECOND FLOOR POWER PLAN
� VQ"=PA� 0 2� P 8�
I 0
A
:R EWH-1 — � . —
O �
2lt12. #12GND�3/4"C
21t12, #12GN�314"C
O
EWH"1\ _ i
_ � .
��
-�_
i
_i_—_=i_ —
- - — = t--=
--_ — -- ,._ _ —EwH-,/ — —
O
2p12, k12GN0.71a'C
2p12 k12GND314"C
O
EWH � — —
— - _ I� _ �� � — — �--
SECOND FLOOR POWER PLAN - ALTERNATE
„a.-,_o.
I
_�
�
_�
EW H-1�
O
�
_-O
�— �
�
�
zni�, nizcNoa�aro
zniz. nizcNo-aia•c
�
_— �J
_�
_�
O SHEET PLAN NOTES
1 PROVI�EA60ADISCONNECTFORFANCOILUNITSFCU4ANDFCU�2.
CONNECT FAN COIL UNRS TO A 45N2P CIRCUIT BRFAKER WRH IN
PANEL90ARD "2HA1" LOCATED ON THE 2ND FLOOR OF iHE HOLLAN�
BUILDMG.
2 PROVI�EA30AWEATHERPROOFDISCONNECiFORCONDENSINGUNITSCU4
AN� CO 2 LOCATE� ON THE ROOF. CONNECT THE CON�ENSING UNRS TO A
20N2PQRWITBREANERWITHAWIRESIZEOF2p12.k12GN�314'C FE�FROM
PANELBOARD "aHAt" LOCATED ON THE 2ND FLOOR OF HOLLAND BUILDING.
3 PROVI�EAWEATHERPROOF(GFCpRECEPTACLEONCONDENSINGUNIT
LOCATE� ON ROOF. CONNECT RECEPTACLES TO THE SAME 20A CIRCUIT AS
RECEPTACLES WITH IN THE AREA FE�FROM PANEL "4HAP LOCATE� ON THE
4TH FLOOR OF HOLLAN� BUILDING.
4 PROVI�EA20ADISCONNECTFORELECTRICWALLHEATERS"EWH-1".
CONNECT ELECTRIC WALL HEATERS TO A 20N2P CIRCUIT BREAKER WITH IN
PANELBOARD "2HB1" LOCAiED ON THE 2ND FLOOR OF THE HOLU+ND
BUILDING.
5 PROVIDEAWEATHERPROOF(GFC1�RECEPTACLEMOUNTE�ONSTEEL
COLUMN. CONNECT RECEPTACLES TO THE SAME 20A qRCUIT FED FROM
PANEL "2HA1"LOCATED ON THE 2ND FLOOR OF HOLLAND BUILDING.
6 SKVBRIDGEPASSAGEI�OORSECUREDTHROUGHACCESSWNTROLSVSTEM
FEO FROM HOLLAND BUIL�MG.
] ROUTE�t)CAT6CABLEFROMHOLLANDBUILOINGIDFROOMLOCAiEDON
THE 2ND FLOOR ARFA A TO SECURIN CAMERA. VERIFV LOCATION ANO
MOONTING HEIGHT WITH ARCHITECTURAL DRAWINGS PRIOR TO
INSTALLATION.
�
CIRCLE DESIGN GROUP
Engineer:
�
Developer:
P E D C O R
�:� �'B�x
DEVELOPMENT CO.
Project
�
�
�
� ��\
1��
•M� �
Ld.d � N
L M
.� � �
� � Z
� O -
� O a�
� � �
+r m
� � U
�
� O
� N
�
�
_
Construction Documents
Sellssue Dale Sheetlssue Date
09123I2019 08/23/2019
Drawn By Checked By
CaAstonElliatl BarrySimpson
Last Revision Date:
CDG Numbec
19092
sneet ritle:
POWER PLANS
Sheel Number:
EP101
RELEA5E0 FOR CONSTRUCTION