Loading...
HomeMy WebLinkAboutEP101GENERAL SHEET NOTES A. SEESHEETE�001FORSVMBOLSANDABBREVIATIONS. B. SEESHEETE604FORNITCHENEQIIIPMENTSCHE�ULE. G SEESHEETE�604FORMECHANICALEpUIPMENTPOWERSCHEDULE. �. SEESHEETSEb01THR0UGHE603FORPANELSCHE�ULES. E. SEESHEETSE-501,E-SWAN�E-5�3FORELECTRICALDETAILS. F. WIRINGSYSTEMSHALLBECON�UITAN�CON�UCTORUNLESSNOTED OTHERWISE USESOLIDCONDUCTORFORSIZENIOAWGANDSMALLER. USESTRAN�E�CON�UCTORFORLARGERS¢ES. G. ALLCOVERPLATESFORELECiRICAL�EVICESSHALLBEOFACOLORTO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR �ESIGNER. H. ALLWORKSHALLCOMPLVWRHALLNATIONAL,STATEAN�LOCALCO�ES AN� OR�INANCES PERTAINWG TO THE WORK IN THIS PROJECT. L EXPOSE�CON�UITSHALLBERONPARALLELTOAN�ATRIGHTANGLESTO BWL�ING LINES. J. REFERTOARCHITECTURALORAWINGSFORDESIGNATIONANDLISTINGOF FIRERATE�ASSEMBLIES. WORDINATEALL�ESIGNEFFORTSWITHFIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. K. ALLE%TERIOREQUIPMENTANDDEVICESSHALLBEWEAiHERPR00FAND RAIN TIGHT. L ELECTRICALCONTRACTORSHALLFURNISHAN�INSTALLALL INTERCONNECT WIRING FOR MECHANICAL AND PLUMBING EQUIPMENT FORNISHED BV OTHERS. A �Y h��=. =__ =,--. --�--- �� — — �l OFCU-1 O O 2k0,#1 ND-914"C '�-- — __ _ —� — — � � _— � � 1 2 3 2#8, f110GND314"C FCLL2 ���� =1___ - 1 � —s — —Z. �C — — —=1=__—�— � SECOND FLOOR POWER PLAN � VQ"=PA� 0 2� P 8� I 0 A :R EWH-1 — � . — O � 2lt12. #12GND�3/4"C 21t12, #12GN�314"C O EWH"1\ _ i _ � . �� -�_ i _i_—_=i_ — - - — = t--= --_ — -- ,._ _ —EwH-,/ — — O 2p12, k12GN0.71a'C 2p12 k12GND314"C O EWH � — — — - _ I� _ �� � — — �-- SECOND FLOOR POWER PLAN - ALTERNATE „a.-,_o. I _� � _� EW H-1� O � _-O �— � � � zni�, nizcNoa�aro zniz. nizcNo-aia•c � _— �J _� _� O SHEET PLAN NOTES 1 PROVI�EA60ADISCONNECTFORFANCOILUNITSFCU4ANDFCU�2. CONNECT FAN COIL UNRS TO A 45N2P CIRCUIT BRFAKER WRH IN PANEL90ARD "2HA1" LOCATED ON THE 2ND FLOOR OF iHE HOLLAN� BUILDMG. 2 PROVI�EA30AWEATHERPROOFDISCONNECiFORCONDENSINGUNITSCU4 AN� CO 2 LOCATE� ON THE ROOF. CONNECT THE CON�ENSING UNRS TO A 20N2PQRWITBREANERWITHAWIRESIZEOF2p12.k12GN�314'C FE�FROM PANELBOARD "aHAt" LOCATED ON THE 2ND FLOOR OF HOLLAND BUILDING. 3 PROVI�EAWEATHERPROOF(GFCpRECEPTACLEONCONDENSINGUNIT LOCATE� ON ROOF. CONNECT RECEPTACLES TO THE SAME 20A CIRCUIT AS RECEPTACLES WITH IN THE AREA FE�FROM PANEL "4HAP LOCATE� ON THE 4TH FLOOR OF HOLLAN� BUILDING. 4 PROVI�EA20ADISCONNECTFORELECTRICWALLHEATERS"EWH-1". CONNECT ELECTRIC WALL HEATERS TO A 20N2P CIRCUIT BREAKER WITH IN PANELBOARD "2HB1" LOCAiED ON THE 2ND FLOOR OF THE HOLU+ND BUILDING. 5 PROVIDEAWEATHERPROOF(GFC1�RECEPTACLEMOUNTE�ONSTEEL COLUMN. CONNECT RECEPTACLES TO THE SAME 20A qRCUIT FED FROM PANEL "2HA1"LOCATED ON THE 2ND FLOOR OF HOLLAND BUILDING. 6 SKVBRIDGEPASSAGEI�OORSECUREDTHROUGHACCESSWNTROLSVSTEM FEO FROM HOLLAND BUIL�MG. ] ROUTE�t)CAT6CABLEFROMHOLLANDBUILOINGIDFROOMLOCAiEDON THE 2ND FLOOR ARFA A TO SECURIN CAMERA. VERIFV LOCATION ANO MOONTING HEIGHT WITH ARCHITECTURAL DRAWINGS PRIOR TO INSTALLATION. � CIRCLE DESIGN GROUP Engineer: � Developer: P E D C O R �:� �'B�x DEVELOPMENT CO. Project � � � � ��\ 1�� •M� � Ld.d � N L M .� � � � � Z � O - � O a� � � � +r m � � U � � O � N � � _ Construction Documents Sellssue Dale Sheetlssue Date 09123I2019 08/23/2019 Drawn By Checked By CaAstonElliatl BarrySimpson Last Revision Date: CDG Numbec 19092 sneet ritle: POWER PLANS Sheel Number: EP101 RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel �un��V l�rcNal�l.�� � DATE: O6�Z4�2O