CU�fl WN�ENSING UNITS INCLUDED
�� INSKYBRIDGEPROJECT
CU-fl
cu�i�a�� lcu���s�o
l�
CU-1�5f0�_ _✓CU-1-3f0
�� ��T HP-1.101�
HP-1.d01�
Co� Co�
I�I � �
i:
ELECTRIC HEAT FAN COIL UNIT SCHEDULE
FAN�ATA HEATINGCOIL�ATA DXCOOLINGCOIL�ATA FILTERDATA UNITCONNECTION�ATA
UNIT MANOFACTURERWITH
MARK LOCATION CONFIGURATION OOT�OOR EAT LAT WEIGHT NOTES
AIRFLOW qIRFLOW ESP iVPE MBH EAT �qT TOTAL SENSIBLE iVPE MCA VOLTS PH (LBS) MODELNUM9ER
(CFM) (CFM) MBH MBH DB WB DB WB
FCU-0 SEEPNNS HORIZONTAL W9 U 00 �IRECT 205 ]00 894 29.3 234 ]5 61 535 502 1'MERVB 384 208 1 161 TRANEFC�-08
FCU�2 SEEPLANS HORIZONTAL 919 0 00 DIRECT 20.5 ]00 89A 293 234 ]5 61 53.5 502 1'MERVB 984 208 1 i6d TRANEFCD�08
NOTES:
1
2.
CONDENSING UNIT SCHEDULE
DESIGN ELECTRICAL�ATA UNIT
NOMINAL MIN. LI�UID VAPOR MANUFACTURERWITH
MARK LOCATION TONS AMB EER LINE LINE WEIGHT MO�ELNUMBER NOTES
TEMP MCA MOCP VOLTS PH (�gS)
CU41 HOLLAND ROOF 3 95130 13 24 35 208 � 3B" 314" 283 TRANEJTTR]036A
CU42 HOLLAN� ROOF 3 9580 1� 24 35 208 1 Y8" Y4" 283 TRANE4TTRI036A
NOTES.
1.
2
� Holland Building Roof HVAC Plan
� 118"=1'�0"
3
SPRINKLER PIPE. REFER TO
iFlRE PROTECTION DRAWINGS
1�
�
INBETWEEN
ELECTRIC UNIT HEATER SCHEDULE - ALTERNATE ONLY
SPECIFICATION SECTION 238201
nEnriNconrn E�EcrRica�onrn accEssoRiEs
MARK LOCATION WNFlGURATION AIRFLOW MANUFACTORERWITH NOTES
�CFM) MW FAN DISCONNECT INiEGRAL WALL MODELNUMBER
� MBH RISE HP AMPS VOLTS 7H SWITCH THERMOSTAT BRACKET
EWH-0 SEEPLANS WALL 100 20 6.8 632 - 9.6 208 1 VES YES NO OMARKAWH4408F 1
NOTES:
1. PROVIDESURFACEMOUNTINGKIT.
INSULATE�
REFRIGERANT LWES
TIGHT TO STRUCTURE
BRIDGE ROOF
125' - 4112�
1" CONDENSATE AND P-TRAP
MOUNT AT ]'9" ABOVE
FINISHED FLOOR
=CONDFLOOR
_ FR4MING
iis�-o-0
BRIDGE MECHANICAL SECTION
2 114,-, o.
'�ULATION AND ALUMINUM
;KETING ON EXTERIOR
STRUCTURE
CONDENSING UNIT
� 1�1/4' WIDE METAL STRAPPMG
THICKNESS TO BE .031"
1-0/4" WIDE METAL STRP
THICKNESS TO B
� EQUIPMENT BASE
WOOD NAILER
INSTALLCURBS PER NRCA
AND MFGRS RECOMMENDATIONS
CAULK OVER BOLT
�HEAD�S)
� z�-#,a�A�
BOLTS
PROVI�E 2 PER SI�E
ROOF, SEE ARCH
� PLANS FOR DETAILS
LpROVI�E2X6W00�BLOCKING REFERTOSTRIICTURAL�WGS
BELOW CURBS TYPICAL FOR SUPPORTATTACHMENTTO
( 1 STRUCTURE BELOW
CAULK OR GASKET
EpUIPMENT
SUPPORTCURBOR
RAIL (iVPICAL)
FlELD APPLIED
CANT�
ROOF .
NUItJ:
1. PROVIDE2-1414'WIDEMETALSTRAPSOVERTOPOFUNIT,ONEONEACHSIOESTRAPSSHALLBEANCHOREDTOE�UIPMENTRAILSATTHE
WHITE, 2 COATS FACH MINIMOM.ON BOTH SI�ES PRIOR TO INSTALL.
2. PROVIDE2-M1aLAGBOLTS,SPACED5/0'APART,ATTHEENDOFEACHMETALSTRAP.BOLTSSHALLGOTHROUGHMETALSTRAPPINGANDINTOWOODNAILEROFEQUIPMENTRAILSTO
ANCHOR UNIT TO EQUIPMENT RAILS.
3. STRAPSSHALLBEPIACE�AMINIMUMOF3'INFROMTOPE�GEOFUNIT.
4. STRAPPINGSHALLBEVERIFIEDBVE�UIPMENTMANUFACTURERTOENSUREADEQUATERESTRAINTOFSUPPLIEDEQUIPMENTAT115MPHWINDLOADANYDEVIATIONSFROMABOVEMUST
BE SU9MITfEO TO ENGMEER FOR REVIEW.
� Condensing Unit Support Detail
� NOTTOSCALE
SUPPORT WITH
STRAP
PIPE
�
3'-0"
�,_y..
WORDINATE FlTTING SRING
WITH OTHER TRA�ES
THREA�ED GALVAWZE�
SCHEOULE40PIPE
COOPLING
\ ` 1.5 RAOIUS ELBOWS
I ` CONDENSATE SLOPED
INTERIOR AT��B"PER1'�0"
JT
BVOTHERS
�
�
�
�
0
'^
� ° . � . . .
ATfACH TO WOOD
NAILER EVERV 3"
POWER WIRING AN� REFRIGERANT PIPING
FROM BUILDING UP THROUGH ROOF IN
CUSTOM SHEETMETALENCLOSURE.
REFRIGERANT PIPING TO
CON�ENSMG UNRS ON
EACH SIDE
. � ° . .. .. . .
INSULATION.
SEAL CAVITY WITH MMERAL
woo� �Ns��r�oN
� Condensate to Downspout Tie-In
L NOTTOSCALE
� Roof Penetration Detail
V NOTTOSCALE
CHANNEL
iNsuinnoN
B Pi e Roof Su ort Detail
NOT TO SCALE
REFRIGERANT
LWES
� COOLING COIL
., CONDENSATE
FAN WIL UNIT
THREA�E� RO�,11NI5TRUT AN� NEOPRENE
ISOLATION HANGER PROVIDE ADDITIONAL
RESTRAINT AS RE�UIREO BV SEISMIC DESIGN.
� Horizontal Fan Coil Unit Detail
V NOTTOSCALE
�
CIRCLE DESIGN GROUP
Engineer:
�
Developer:
P E D C O R
(Ji�G (Jen�ez
DEVELOPMENT CO.
Project
Vi
�
�
�
� �/�\
•� 1��
Ld.d � N
L M
. � (� �
� � z
\ O �
^
� � �C
� � L
�� �
� � U
� �
�
� N
r�
O
2
Construction Documents
Sellssue Dale Sheetlssue Date
09123I2019 08/23/2019
Drawn By Checked By
ThomasNennetly Ross Maue
Last Revision Date:
CDG Numbec
19092
Sheet Title:
HVAC SCHEDULES
Sheel Number:
H-501
DATE: O6�Z4 2O