HomeMy WebLinkAboutA100.5FURNISH & INSTALL NEW 1X6 R/S CEDAR OUTSIDE & INSIDE CORNER
TRIM, PAINTED
FURNISH & INSTALL NEW 1X8 R/S CEDAR FRIEZE BOARD WITH COVE
MOLDING TO MATCH EXISTING AS CLOSELY AS POSSIBLE, PAINTED
FURNISH & INSTALL NEW 1X6 R/S CEDAR FASCIA & 3/8" R/S FIR PLYWOOD
SOFFIT & ALUMINUM SOFFIT VENTS, PAINTED
FURNISH & INSTALL NEW 6" ALUMINUM GUTTERS (PROFILE & COLOR TO
MATCH EXISTING AS CLOSELY AS POSSIBLE)
FURNISH & INSTALL NEW 3-TAB SHINGLES WITH HIP & RIDGE CAPS TO
MATCH EXISTING AS CLOSELY AS POSSIBLE OVER SYNTHETIC
UNDERLAYMENT WITH CONTINUOUS RIDGE VENT
FURNISH & INSTALL NEW VINYL WINDOWS WITH SCREENS
FURNISH & INSTALL NEW FIBER CEMENT SIDING WITH WOOD-GRAIN
TEXTURE & 6" LAP EXPOSURE, PAINTED
FURNISH & INSTALL NEW STONE VENEER TO MATCH EXISTING AS
CLOSELY AS POSSIBLE
PREP & PAINT ALL EXISTING FASCIA, SOFFIT, & FRIEZE BOARD
FURNISH & INSTALL NEW 1X4 R/S CEDAR BAND BOARD WITH ALUMINUM
Z-FLASHING, PAINTED
- 1' 0"
TOP OF NEW SUBFLOOR
0' 0"
TOP OF EXISTING SUBFLOOR
+ 8' 0" (MATCH EXISTING)
BOTTOM OF NEW CEILING
NEW 88"W X 80"H CASED OPENING IN EXISTING
WALL WITH NEW JAMB MATERIAL & NEW DOOR
CASING TO MATCH EXISTING AS CLOSELY AS
POSSIBLE, PAINTED
NEW 48"W X 80"H CASED OPENING IN EXISTING
WALL WITH NEW JAMB MATERIAL & NEW DOOR
CASING TO MATCH EXISTING AS CLOSELY AS
POSSIBLE, PAINTED
NEW 12"D STEP AT EACH NEW CASED OPENING
- 1' 0"
TOP OF NEW SUBFLOOR
+ 8' 0" (MATCH EXISTING)
BOTTOM OF NEW CEILING
(3) NEW 40"W X 60"H WHITE DOUBLE-HUNG
WINDOWS WITH SCREENS, MULLED
TOGETHER, WITH INTERIOR WINDOW
CASING TO MATCH EXISTING AS CLOSELY
AS POSSIBLE ON EAST WALL, PAINTED
NEW BASE & SHOE MOLDING TO MATCH
EXISTING AS CLOSELY AS POSSIBLE,
PAINTED
- 1' 0"
TOP OF NEW SUBFLOOR
0' 0"
TOP OF EXISTING SUBFLOOR
+ 8' 0" (MATCH EXISTING)
BOTTOM OF NEW CEILING
NEW 36"W X 80"H FIBERGLASS HALF-LITE
SIMULATED DIVIDED LITE DOOR WITH ASSOCIATED
HARDWARE & INTERIOR DOOR CASING ON NORTH
WALL, PAINTED
NEW 12"D STEP AT NEW CASED OPENING
- 1' 0"
TOP OF NEW SUBFLOOR
0' 0"
TOP OF EXISTING SUBFLOOR
+ 8' 0" (MATCH EXISTING)
BOTTOM OF NEW CEILING
(2) NEW 40"W X 60"H WHITE DOUBLE-HUNG
WINDOWS WITH SCREENS IN NEW ROUGH
OPENINGS, WITH INTERIOR WINDOW CASING TO
MATCH EXISTING AS CLOSELY AS POSSIBLE ON
SOUTH WALL, PAINTED
NEW 12"D STEP AT NEW CASED OPENING
PERMIT
#0
ISSUE DATE:
2020-06-03
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared by Case
Design & Remodeling solely for its use and
should not be reproduced or relied upon by any
other parties. Dimensions shown or scaled are
subject to change per actual job condition and
must be verified. Materials are to be supplied as
specified as equal or standard when not
uniquely specified. Installed materials may vary
in appearance from drawings. Reference
manufacturer's product data for actual
appearance and specifications.BRICKER - SUTTON PROJECTROOM ADDITIONJON BRICKER & SUE SUTTON10923 BRAEWICK DRIVECARMEL, INDIANA 46033Approved By:
Date:
A502
Craig Dice
Architectural Designer
cdice@caseindy.com
David Null
Project Developer
dnull@caseindy.com
242590141
JOB NUMBER:
SOUTH EXTERIOR ELEVATIONA
A502
A
A502 SCALE: 1/4" = 1'-0"
WEST INTERIOR ELEVATIONB
A502
B
A502 SCALE: 1/4" = 1'-0"
EAST INTERIOR ELEVATIONC
A502
C
A502 SCALE: 1/4" = 1'-0"
NORTH INTERIOR ELEVATIOND
A502
D
A502 SCALE: 1/4" = 1'-0"
SOUTH INTERIOR ELEVATIONE
A502
E
A502 SCALE: 1/4" = 1'-0"
06/24/20
Adam Schriner