Loading...
HomeMy WebLinkAbout42200037 - JGC 169 - Truss DetailsDE DANSCO ENGINEERING, LLC P.O. Box 3400 Apollo Beach, FL 33572 Telephone (813) 645-0166 Facsimile (813) 645-9698 The truss drawing(s) listed below have been prepared by Stark Truss, Inc. under my direct supervision based on the parameters provided by the truss designers. Job: 1802419-12T 97 truss design(s) 60084-W1 7/24/18 Samuel A. Greenberg, P.E. Indiana Reg. #19700485 Note: Gable end frames with stud lengths exceeding 4’ require permanent bracing. On structural gables, where studs may be made from two or more boards as they cross diagonals, the 4’ length is the distance from the top chord to bottom chord. The seal on these drawings indicate acceptance of professional engineering responsibility solely for the truss components shown. The suitability and use of this component for any particular building is the responsibility of the building designer, per ANSI/TPI 1-2007 Chapter 2. Warning !—Verify design parameters and read notes before use. These designs are based only upon parameters shown, and are for individual building components to be installed and loaded vertically. Applicability of design parameters and proper incorporation of component is responsibility of building designer – not truss designer or truss engineer. Bracing shown is for lateral support of individual web members only. Additional temporary bracing to ensure stability during construction is the responsibility of the erector. Additional permanent bracing of the overall structure is the responsibility of the building designer. For general guidance regarding fabrication, quality control, storage, delivery, erection and bracing, consult ANSI/TPI 1 National Design Standard for Metal Plate Connected Wood Truss Construction and BCSI 1-03 Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses from Truss Plate Institute, 583 D’Onofrio Drive, Madison, WI 53719 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss J01 TrussType Jack-Open Qty 8 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:342018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-2ejh2SRBt4Z2jb3d7mFghzSh?L?7KwJxTHigAvyv3WN Scale:3/4"=1' T1 B1 1 2 8 9 3 4 2x4 3-2-8 3-2-8 -0-10-12 0-10-12 3-2-8 3-2-8 0-4-72-6-22-0-142-6-28.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.10 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 4-7 4-7 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-2-8 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=67/Mechanical, 2=163/0-4-0(min. 0-1-8), 4=38/Mechanical Max Horz2=106(LC 16) Max Uplift3=-56(LC 16), 2=-22(LC 16), 4=-16(LC 13) MaxGrav3=83(LC 30), 2=187(LC 2), 4=58(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-1-12zone;cantileverleft exposed ; endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss J02 TrussType DiagonalHipGirder Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:342018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-2ejh2SRBt4Z2jb3d7mFghzSgNL?YKwJxTHigAvyv3WN Scale=1:15.3 T1 B1 1 2 8 3 4 2x4 4-4-15 4-4-15 -1-3-3 1-3-3 4-4-15 4-4-15 0-4-72-5-62-0-132-5-65.6612 PlateOffsets(X,Y)-- [2:0-0-6,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.14 0.13 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.03 -0.00 (loc) 4-7 4-7 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-4-15 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=70/Mechanical, 2=130/0-5-7(min. 0-1-8), 4=33/Mechanical Max Horz2=113(LC 16) Max Uplift3=-48(LC 16), 2=-83(LC 16), 4=-18(LC 11) MaxGrav3=82(LC 2), 2=151(LC 2), 4=67(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Trapezoidal Loads(plf) Vert: 2=0(F=25,B=25)-to-3=-56(F=-3,B=-3), 5=0(F=10,B=10)-to-4=-22(F=-1,B=-1) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss J03 TrussType Jack-Open Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:352018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-WqH3FoSpeOhvLkeqhTmvEB?rEkL03NZ4iwSEjMyv3WM Scale=1:17.2 T1 B1 1 2 8 9 3 4 2x4 3-7-0 3-7-0 -0-10-12 0-10-12 3-7-0 3-7-0 0-4-72-9-22-3-142-9-28.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.14 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.00 (loc) 4-7 4-7 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-7-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=76/Mechanical, 2=176/0-4-0(min. 0-1-8), 4=43/Mechanical Max Horz2=117(LC 16) Max Uplift3=-64(LC 16), 2=-21(LC 16), 4=-18(LC 13) MaxGrav3=94(LC 30), 2=201(LC 2), 4=65(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 3-6-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss J04 TrussType Jack-Open Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:362018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-_1qRT8TRPhpmzuC0FAH8mOX1x8huoqpDxaBnFoyv3WL Scale=1:14.7 T1 B1 1 2 8 3 4 2x4 0-2-0 0-2-0 2-10-0 2-8-0 -0-10-12 0-10-12 2-10-0 2-10-0 0-4-72-3-21-9-152-3-28.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.08 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 4-7 4-7 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-10-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=58/Mechanical, 2=151/0-4-0(min. 0-1-8), 4=33/Mechanical Max Horz2=96(LC 16) Max Uplift3=-48(LC 16), 2=-23(LC 16), 4=-14(LC 13) MaxGrav3=72(LC 30), 2=173(LC 2), 4=50(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 2-9-4zone;cantileverleft exposed ; endverticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss J05 TrussType DiagonalHipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:372018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-SDOpgUU3A?yda2nCpuoNJc4BcY0sXH3NAExKnEyv3WK Scale=1:14.1 T1 B1 1 2 8 3 4 2x4 0-2-1 0-2-1 3-10-10 3-8-9 -1-3-3 1-3-3 3-10-10 3-10-10 0-4-72-2-75.6612 PlateOffsets(X,Y)-- [2:0-4-1,0-0-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.14 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 -0.00 (loc) 4-7 4-7 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 11 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-10 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)3=53/Mechanical, 2=119/0-5-11(min. 0-1-8), 4=24/Mechanical Max Horz2=106(LC 16) Max Uplift3=-51(LC 16), 2=-81(LC 16), 4=-20(LC 11) MaxGrav3=62(LC 2), 2=145(LC 18), 4=55(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 3, 2, 4. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-2=-51 Trapezoidal Loads(plf) Vert: 2=0(F=25,B=25)-to-3=-49(F=1,B=1), 5=0(F=10,B=10)-to-4=-19(F=0,B=0) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB01 TrussType Piggyback Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:382018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xPyCtqUhxJ4TCCMPMbJcrpdOPyNCGkJWOuguKhyv3WJ Scale=1:8.4 T1 T1 B11 2 3 45 3x4 2x4 2x4 2-6-0 2-6-0 1-3-0 1-3-0 2-6-0 1-3-0 0-5-31-3-00-1-100-5-30-1-1012.0012 PlateOffsets(X,Y)-- [2:0-2-6,0-1-0], [3:0-2-0,Edge], [4:0-2-6,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.02 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 4 4 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-6-0 oc purlins. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=66/1-4-6(min. 0-1-8), 4=66/1-4-6(min. 0-1-8) Max Horz2=27(LC 15) Max Uplift2=-14(LC 16), 4=-14(LC 17) MaxGrav2=76(LC 2), 4=76(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB02 TrussType Piggyback Qty 13 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:392018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-PbWa5AVJicCKqMxbwJqrO19XaMi7?BygdYQRs7yv3WI Scale=1:18.7 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 4x4 2x4 2x41.5x4 8-4-7 8-4-7 4-2-3 4-2-3 8-4-7 4-2-3 0-4-72-9-80-1-100-4-70-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.18 0.10 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 5 5 4 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 22 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=156/6-10-3(min. 0-1-8), 4=156/6-10-3(min. 0-1-8), 6=221/6-10-3(min. 0-1-8) Max Horz2=-68(LC 14) Max Uplift2=-50(LC 16), 4=-59(LC 17) MaxGrav2=180(LC 2), 4=180(LC 2), 6=245(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 4-2-3,Exterior(2) 4-2-3 to 7-2-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 4. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB02GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:402018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-to4yIWWxTwKBRWWnU0M4wEij5l3MkeEpsC9?OZyv3WH Scale=1:18.7 T1 T1 B1 ST1 ST1 1 2 3 4 5 6 7 9 8 10 11 3x4 2x4 2x41.5x4 1.5x4 1.5x4 1.5x4 8-4-7 8-4-7 4-2-3 4-2-3 8-4-7 4-2-3 0-4-72-9-80-1-100-4-70-1-108.0012 PlateOffsets(X,Y)-- [4:0-2-0,Edge], [5:0-0-1,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.06 0.04 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 7 7 6 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 23 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 6-10-3. (lb)-Max Horz2=68(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 9, 8 MaxGravAllreactions 250 lb orless at joint(s) 2, 6, 9, 8 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-2-3,Interior(1) 3-2-3 to 4-2-3,Exterior(2) 4-2-3 to 7-2-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 8. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB03 TrussType Piggyback Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:412018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-L_eKWsXaEES23f5_2ktJTSFt49OzT4Yz5svYw?yv3WG Scale=1:18.8 W1 T1 T2 B1 ST1 1 2 3 4 6 5 7 8 1.5x4 1.5x4 4x4 2x41.5x4 5-6-1 5-6-1 1-3-14 1-3-14 5-6-1 4-2-3 1-9-42-9-80-1-100-4-70-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.18 0.08 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 0.01 0.00 (loc) 4 4 3 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 17 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-6-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)6=22/4-8-15(min. 0-1-8), 3=141/4-8-15(min. 0-1-8), 5=187/4-8-15(min. 0-1-8) Max Horz6=-87(LC 12) Max Uplift6=-28(LC 13), 3=-35(LC 17), 5=-5(LC 12) MaxGrav6=42(LC 30), 3=161(LC 2), 5=222(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 4-3-14,Interior(1) 4-3-14 to 5-2-11zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 6, 3, 5. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 12)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB04 TrussType GABLE Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:422018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-pACijBYC?XavhpgAbROY0fn?QZfrCUH6JWe5TSyv3WF Scale=1:68.0 W1 T2 W2 B1 ST3 ST2 ST1 T1 1 2 3 4 5 6 11 10 9 8 7 12 13 3x5 3x5 3x4 1.5x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 15-8-0 15-8-0 15-8-0 15-8-0 1-4-311-11-30-1-1011-9-80-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.33 0.42 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 74 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x6SPF No.2 *Except* W2: 2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7, 5-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 15-8-0. (lb)-Max Horz11=399(LC 16) Max UpliftAll uplift 100 lb orless at joint(s) 11, 7, 9 except 8=-156(LC 16), 10=-356(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 7 except 11=404(LC 16), 8=374(LC 29), 9=321(LC 29), 10=422(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-11=-289/193, 1-12=-504/382, 2-12=-484/417, 2-3=-323/266 WEBS 5-8=-291/206, 3-9=-252/164, 2-10=-354/286 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-2-12 to 3-2-12,Interior(1) 3-2-12 to 15-6-4zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 7)Gablestudsspaced at 4-0-0 oc. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 11, 7, 9 except (jt=lb) 8=156, 10=356. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB05 TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:432018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-HNl5xXYqmrimIzFM98vnYtKBDz2wxyjFYAOf?uyv3WE Scale=1:68.5 T2 W1 B1 ST3 ST2 ST1T1 B21 2 3 4 5 6 7 11 10 9 8 12 13 3x4 1.5x4 1.5x4 3x4 1.5x4 1.5x4 1.5x4 1.5x4 5x6 1.5x4 17-10-12 17-10-12 17-10-12 17-10-12 0-4-711-11-30-1-1011-9-80-1-108.0012 PlateOffsets(X,Y)-- [11:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.26 0.17 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 0.01 0.00 (loc) 1 1 8 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 77 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-8, 6-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 17-1-10. (lb)-Max Horz2=474(LC 16) Max UpliftAll uplift 100 lb orless at joint(s) 8 except 9=-154(LC 16), 10=-122(LC 16), 11=-190(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 8 except 2=262(LC 32), 9=386(LC 23), 10=295(LC 30), 11=462(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-12=-486/367, 3-12=-469/399, 3-4=-328/222, 4-5=-325/262 WEBS 6-9=-296/207, 3-11=-337/230 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 17-9-0zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Gablerequirescontinuous bottomchord bearing. 7)Gablestudsspaced at 4-0-0 oc. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8 except(jt=lb) 9=154, 10=122, 11=190. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB06 TrussType Piggyback Qty 10 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:442018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-lZJT8tZSX9qdw7qYjsQ054tNTNPNgOnPnq7CXKyv3WD Scale=1:50.2 T1 T1 B1 ST3 ST2 ST1 ST2 ST1 B11 2 3 4 5 6 7 8 9 14 13 12 11 10 15 16 17 18 4x4 3x4 5x6 3x4 23-1-9 23-1-9 11-6-12 11-6-12 23-1-9 11-6-12 0-4-77-6-147-8-80-1-100-4-70-1-108.0012 PlateOffsets(X,Y)-- [12:0-3-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.17 0.09 0.19 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 8 9 8 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 78 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 21-7-5. (lb)-Max Horz2=-196(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2 except 13=-156(LC 16), 14=-129(LC 16), 11=-156(LC 17), 10=-129(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 2, 8 except 12=260(LC 33), 13=370(LC 30), 14=316(LC 30), 11=369(LC 31), 10=316(LC 31) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 4-13=-289/206, 6-11=-289/206 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-6-12,Interior(1) 3-6-12 to 11-6-12,Exterior(2) 11-6-12 to 14-6-12 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)All plates are 1.5x4MT20 unless otherwiseindicated. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 13=156, 14=129, 11=156, 10=129. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB06GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:452018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-DltrLDa4ISyUYHPlHZxFdIPZpmmRPtLY?Utm3nyv3WC Scale=1:50.2 T1 T1 B1 ST5 ST4 ST3 ST2ST1 ST5 ST4 ST3 B1 ST2 ST1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 26 25 24 23 22 21 20 19 18 17 16 27 28 29 30 3x4 3x4 3x4 3x4 23-1-9 23-1-9 11-6-12 11-6-12 23-1-9 11-6-12 0-4-77-6-147-8-80-1-100-4-70-1-108.0012 PlateOffsets(X,Y)-- [8:0-2-0,Edge], [9:0-0-0,0-0-0], [10:0-0-0,0-0-0], [11:0-0-0,0-0-0], [12:0-0-0,0-0-0], [13:0-0-0,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.07 0.04 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.01 (loc) 14 14 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 98 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 21-7-5. (lb)-Max Horz2=-196(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 22, 23, 24, 25, 26, 19, 18, 14, 17, 16 MaxGravAllreactions 250 lb orless at joint(s) 2, 22, 23, 24, 25, 26, 20, 19, 18, 14, 17, 16 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 11-6-12,Exterior(2) 11-6-12 to 14-6-12 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 22, 23, 24, 25, 26, 19, 18, 14, 17, 16. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 13)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB07 TrussType Piggyback Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:472018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-A8?bmvbKq4CCnaY7O__jjjVn2aQjtoZrToMs8fyv3WA Scale=1:13.7 0-1-13T1 T2 W2 B1 W1 1 2 3 4 6 5 7 8 4x4 3x8 2x4 1.5x4 6-8-10 6-8-10 6-8-10 6-8-10 0-4-70-11-141-1-110-1-100-10-40-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.59 0.18 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=187/5-11-8(min. 0-1-8), 2=-34/5-11-8(min. 0-1-8), 6=332/5-11-8(min. 0-1-8) Max Horz2=26(LC 13) Max Uplift5=-47(LC 12), 2=-107(LC 7), 6=-13(LC 13) MaxGrav5=266(LC 35), 2=22(LC 36), 6=416(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 3-6=-287/156 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 5-11-7,Interior(1) 5-11-7 to 6-6-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 6 except(jt=lb) 2=107. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB08 TrussType Piggyback Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:482018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-eKZ__FczaNK3Pk7KyiVyFw12y_nhcFy?iS5Qg5yv3W9 Scale=1:15.3 0-1-13T1 T2 W1 B1 ST1 1 2 3 4 6 5 7 4x4 1.5x4 1.5x42x41.5x4 6-8-10 6-8-10 3-8-8 3-8-8 6-8-10 3-0-1 0-4-72-3-142-5-110-1-102-2-40-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.20 0.07 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 19 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-8-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=110/5-11-8(min. 0-1-8), 2=113/5-11-8(min. 0-1-8), 6=241/5-11-8(min. 0-1-8) Max Horz2=79(LC 13) Max Uplift5=-28(LC 12), 2=-26(LC 16), 6=-42(LC 13) MaxGrav5=156(LC 35), 2=197(LC 36), 6=258(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 3-8-8,Exterior(2) 3-8-8 to 6-6-14zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB09 TrussType Piggyback Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:492018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-6X7MBbdbLhSw0uiWWP0Bo8a70O6VLhv8w6rzCYyv3W8 Scale:1/2"=1'0-1-13T1 T2 W1 B1 ST1 1 2 3 4 6 5 7 8 4x4 1.5x4 1.5x42x41.5x4 6-8-10 6-8-10 5-8-8 5-8-8 6-8-10 1-0-1 0-4-73-7-143-9-110-1-103-6-40-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.63 0.16 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.02 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 23 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)5=-11/5-11-8(min. 0-1-8), 2=185/5-11-8(min. 0-1-8), 6=271/5-11-8(min. 0-1-8) Max Horz2=132(LC 13) Max Uplift5=-67(LC 7), 2=-35(LC 16), 6=-29(LC 16) MaxGrav5=2(LC 35), 2=308(LC 36), 6=364(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-3-5,Interior(1) 3-3-5 to 5-8-8,Exterior(2) 5-8-8 to 6-6-14zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2, 6. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss PB10 TrussType Piggyback Qty 1 Ply 2 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:492018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-6X7MBbdbLhSw0uiWWP0Bo8aFzO8SLia8w6rzCYyv3W8 Scale=1:27.8 T1 W1 B1 ST1 1 2 3 4 6 5 7 8 1.5x4 1.5x42x41.5x4 1.5x4 6-8-10 6-8-100-4-74-5-120-1-104-4-20-1-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.12 0.04 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 0.00 0.00 (loc) 1 1 5 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 44 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=90/5-11-8(min. 0-1-8), 2=90/5-11-8(min. 0-1-8), 6=256/5-11-8(min. 0-1-8) Max Horz2=161(LC 13) Max Uplift5=-34(LC 13), 2=-11(LC 12), 6=-128(LC 16) MaxGrav5=119(LC 30), 2=122(LC 31), 6=312(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 3-6=-260/188 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-3-5 to 3-4-5,Interior(1) 3-4-5 to 6-6-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Gablerequirescontinuous bottomchord bearing. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 5, 2 except(jt=lb) 6=128. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11)SeeStandardIndustryPiggybackTruss Connection Detail for Connection to base truss as applicable, orconsult qualified building designer. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T01 TrussType Common Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:502018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-ajhkPweD6?ame2Hi37XQKL7GZnNv46vH9maWl_yv3W7 Scale=1:55.2 T1 T2 B1 W3 W2W2 W1 W1 1 2 3 4 5 6 9 8 7 10 11 12 13 14 15 4x4 4x8 4x6 4x63x8 1.5x41.5x4 4x8 7-10-0 7-10-0 15-8-0 7-10-0 -1-3-12 1-3-12 4-0-12 4-0-12 7-10-0 3-9-4 11-7-4 3-9-4 15-8-0 4-0-12 1-3-09-1-01-3-012.0012 PlateOffsets(X,Y)-- [2:0-4-15,Edge], [6:0-4-15,0-0-0], [7:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.41 0.22 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.20 0.01 (loc) 8-9 8-9 7 l/defl >999 >928 n/a L/d 240 180 n/a PLATES MT20 Weight: 71 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=622/0-6-0(min. 0-1-8), 7=541/0-6-0(min. 0-1-8) Max Horz9=266(LC 13) Max Uplift9=-87(LC 16), 7=-69(LC 16) MaxGrav9=707(LC 2), 7=611(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-10=-616/109, 3-10=-551/138, 3-11=-504/159, 11-12=-477/173, 4-12=-467/188, 4-13=-473/196, 13-14=-477/181, 5-14=-505/166, 5-15=-489/144, 6-15=-616/126, 2-9=-617/204, 6-7=-519/137 BOT CHORD 8-9=-115/431, 7-8=-43/352 WEBS 4-8=-163/472 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-1-3-12 to 1-8-4,Interior(1) 1-8-4 to 7-10-0,Exterior(2) 7-10-0 to 10-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 7. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T01GE TrussType Common SupportedGable Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:512018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-2vE6cGfrtIidGCsvdq2ftZfZ6BompaDROQK4HQyv3W6 Scale=1:56.0 W1 T1 T1 W1 B1 ST4 ST3 ST2 ST1 ST3 ST2 ST1 1 2 3 4 5 6 7 8 9 10 11 20 19 18 17 16 15 14 13 12 21 22 2x4 3x4 4x4 3x4 2x4 15-8-0 15-8-0 -1-3-12 1-3-12 7-10-0 7-10-0 15-8-0 7-10-0 16-11-12 1-3-12 1-3-09-1-01-3-012.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.21 0.11 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 0.00 (loc) 11 11 12 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 90 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud*Except* ST4: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 6-16 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 15-8-0. (lb)-Max Horz20=-279(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) except 20=-162(LC 12), 12=-140(LC 13), 17=-111(LC 16), 18=-106(LC 16), 19=-189(LC 16), 15=-111(LC 17), 14=-107(LC 17), 13=-183(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 20, 12, 17, 18, 19, 15, 14, 13 except 16=360(LC 17) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 5-21=-272/328, 6-21=-258/342, 6-22=-258/342, 7-22=-272/328 WEBS 6-16=-409/257 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-1-3-12 to 1-10-0,Exterior(2) 1-10-0 to 7-10-0, Corner(3) 7-10-0 to 10-10-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 10)Gablestudsspaced at 2-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 12)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 162 lb uplift at joint 20, 140 lb uplift at joint 12, 111 lb uplift at joint 17, 106 lb uplift at joint 18, 189 lb uplift at joint 19, 111 lb uplift at joint 15, 107 lb uplift at joint 14 and 183lb uplift at joint 13. 13)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T01GE TrussType Common SupportedGable Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:522018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-W6oUpcfTecqUtMR5BXZuQmCksb8?Y1Sac43dptyv3W5 LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T02 TrussType PiggybackBase Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:532018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-_IMt1yg5PwzLVV0HlF57y_klR?NiHQjkrkpBLJyv3W4 Scale=1:67.8 T1 T2 T3 B1 W1 W2 W3 W4 W3 W5 W6 HW1 W7 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 17 18 19 20 21 22 4x8 4x4 3x4 3x6 1.5x4 3x4 3x8 3x6 1.5x45x6 5x6 4x8 7-5-0 7-5-0 10-7-0 3-2-0 13-1-0 2-6-0 17-9-12 4-8-12 22-10-0 5-0-4 7-5-0 7-5-0 10-7-0 3-2-0 13-1-0 2-6-0 17-9-12 4-8-12 22-10-0 5-0-4 24-1-12 1-3-12 0-5-011-0-01-3-011-0-012.0012 PlateOffsets(X,Y)-- [1:0-2-7,Edge], [1:0-5-13,0-3-7], [1:0-1-12,0-1-12], [3:0-6-4,0-1-12], [4:0-2-4,0-1-12], [6:0-4-15,0-0-0], [8:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.86 0.53 0.40 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.13 -0.16 0.01 (loc) 13-16 13-16 1 l/defl >663 >548 n/a L/d 240 180 n/a PLATES MT20 Weight: 134 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W6,W7: 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-13, 3-11, 4-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=958/0-6-0(min. 0-2-4), 1=178/Mechanical, 8=569/0-6-0(min. 0-1-8) Max Horz1=306(LC 15) Max Uplift13=-69(LC 16), 1=-152(LC 12), 8=-142(LC 17) MaxGrav13=1453(LC 39), 1=272(LC 54), 8=798(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 18-19=-107/266, 2-19=-77/465, 2-3=-386/307, 3-4=-323/244, 4-20=-360/250, 20-21=-390/213, 5-21=-454/213, 5-22=-534/150, 6-22=-744/122, 6-8=-708/211 BOT CHORD 9-10=0/419, 8-9=0/419 WEBS 2-13=-1265/101, 2-11=0/479, 3-11=-465/0, 3-10=-75/522, 5-10=-396/241 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 10-7-0,Exterior(2) 10-7-0 to 13-1-0, Interior(1) 17-3-15 to 24-1-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C for members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 69 lb uplift at joint 13, 152 lb uplift at joint 1 and 142 lb uplift at joint 8. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T02GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:542018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-TUwFEIhjAD5C7fbTIycMVBHxcPgT0pEt4OYkulyv3W3 Scale=1:67.8 T1 T2 T1 B1 W1 W2 W3 W3 W4 HW1 W6 B2 ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8 W5 1 2 3 4 5 6 7 8 14 13 12 11 10 9 33 34 35 36 37 4x4 4x4 5x6 3x6 3x6 3x4 3x4 3x6 4x6 6x6 2x4 2x4 7-5-0 7-5-0 10-7-0 3-2-0 13-1-0 2-6-0 17-9-12 4-8-12 22-10-0 5-0-4 -0-5-12 0-5-12 7-5-0 7-5-0 10-7-0 3-2-0 13-1-0 2-6-0 17-9-12 4-8-12 22-10-0 5-0-4 24-1-12 1-3-12 0-5-011-0-01-3-011-0-012.0012 PlateOffsets(X,Y)-- [2:0-2-7,Edge], [2:0-5-13,0-3-7], [2:0-1-12,0-1-12], [4:0-2-4,0-1-12], [5:0-2-4,0-1-12], [7:0-4-15,0-0-0], [9:Edge,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.83 0.75 0.64 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.14 -0.33 0.02 (loc) 14-32 10-11 9 l/defl >650 >546 n/a L/d 240 180 n/a PLATES MT20 Weight: 179 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W6: 2x6SPF No.2, W5: 2x4SPFStud OTHERS 2x4SPFStud*Except* ST5,ST6,ST7: 2x4SPF No.2 WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-3 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=534/0-4-0(min. 0-1-8), 14=462/0-6-0(min. 0-1-8), 9=732/0-6-0(min. 0-1-10) Max Horz2=316(LC 15) Max Uplift2=-199(LC 17), 14=-221(LC 13), 9=-173(LC 17) MaxGrav2=746(LC 39), 14=712(LC 47), 9=1048(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-33=-777/268, 33-34=-625/292, 3-34=-473/320, 3-4=-719/365, 4-5=-440/271, 5-35=-548/288, 35-36=-636/251, 6-36=-734/251, 6-37=-984/192, 7-37=-1036/163, 7-9=-939/227 BOT CHORD 2-14=-1/378, 13-14=-1/378, 12-13=-1/378, 11-12=0/387, 10-11=0/605, 9-10=0/605 WEBS 3-14=-665/158, 3-12=-193/323, 4-12=-241/341, 6-11=-384/238 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-5-12 to 2-6-4,Interior(1) 2-6-4 to 10-7-0,Exterior(2) 10-7-0 to 13-1-0, Interior(1) 17-3-15 to 24-1-12zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft exposed;C-C for members and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 199 lb uplift at joint 2, 221 lb uplift at joint 14 and 173 lb uplift at joint 9. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T02GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:542018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-TUwFEIhjAD5C7fbTIycMVBHxcPgT0pEt4OYkulyv3W3 NOTES- 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T03 TrussType Jack-Closed Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:552018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xgUdSeiMxXD3kp9gsg7b1PqB_o6WlQW0J2IHQByv3W2 Scale=1:15.5 T1 W1 B1 1 2 3 7 8 9 3x4 1.5x4 1.5x4 6-2-0 6-2-0 6-2-0 6-2-0 0-4-52-5-02-1-80-3-82-5-04.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.47 0.38 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.16 -0.18 0.01 (loc) 3-6 3-6 1 l/defl >450 >397 n/a L/d 240 180 n/a PLATES MT20 Weight: 16 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=213/0-4-0(min. 0-1-8), 3=213/0-1-8(min. 0-1-8) Max Horz1=82(LC 12) Max Uplift1=-95(LC 12), 3=-124(LC 12) MaxGrav1=241(LC 2), 3=241(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 6-0-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5)Bearing at joint(s) 3 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 6)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 3. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 95 lb uplift at joint 1 and 124 lb uplift at joint 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T03GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:562018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-Pt2?f_i_irLwMzksQNeqacMNtCQ0UtmAXi1ryeyv3W1 Scale=1:15.5 T1 W1 B1 ST1 1 2 3 10 11 12 43x4 1.5x4 1.5x4 1.5x4 1.5x4 5-4-0 5-4-0 6-2-0 6-2-0 0-4-52-5-02-1-80-3-82-5-04.0012 PlateOffsets(X,Y)-- [1:0-1-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.40 0.43 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.09 0.00 (loc) 4-9 4-9 1 l/defl >999 >723 n/a L/d 240 180 n/a PLATES MT20 Weight: 18 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=177/0-4-0(min. 0-1-8), 4=312/0-4-0(min. 0-1-8), 3=-63/0-1-8(min. 0-1-8) Max Horz1=91(LC 15) Max Uplift1=-40(LC 12), 4=-32(LC 16), 3=-126(LC 7) MaxGrav1=202(LC 2), 4=346(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 6-0-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablestudsspaced at 2-0-0 oc. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 3 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 3. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 40 lb uplift at joint 1, 32 lb uplift at joint 4 and 126 lb uplift at joint 3. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T04 TrussType MonopitchGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:572018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-t3cNtKjcT8Tn_7J2_5937qvclcn0DHQJmMnOU4yv3W0 Scale=1:15.5 T1 W3 B1 W1 W2 1 2 3 5 4 8 9 104x4 1.5x4 2x4 4x4 3x4 3-6-9 3-6-9 6-2-0 2-7-8 3-6-9 3-6-9 6-2-0 2-7-8 0-4-52-5-04.0012 PlateOffsets(X,Y)-- [1:0-3-13,0-0-9] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.13 0.38 0.23 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.03 0.01 (loc) 5-7 5-7 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 24 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=414/0-4-0(min. 0-1-8), 4=635/Mechanical Max Horz1=89(LC 9) Max Uplift1=-205(LC 8), 4=-382(LC 12) MaxGrav1=488(LC 2), 4=759(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-869/397 BOT CHORD 1-9=-386/818, 5-9=-386/818, 5-10=-386/818, 4-10=-386/818 WEBS 2-5=-220/464, 2-4=-903/448 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 205 lb uplift at joint 1 and 382 lb uplift at joint 4. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 8) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 252 lb down and 172 lb up at 2-0-12, and 252 lb down and 172 lb up at 4-0-12, and 262 lb down and 161 lb up at 6-0-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 9)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 1-4=-20 Concentrated Loads(lb) Vert: 4=-215(B) 9=-204(B) 10=-204(B) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T05 TrussType PiggybackBase Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:582018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-LF9m4gkEESbecHuFXogIf1SbM04Gyf_T??Wy1Wyv3W? Scale=1:75.0 T1 T2 T3 B1 W3 W4 W5 W6 W6 W5 W7 W8W1 W2 W10 W9 T4 B3B2 1 2 3 4 5 6 7 8 9 17 16 15 14 13 12 11 10 18 19 20 21 22 23 24 25 26 4x6 5x6 5x6 3x6 3x4 3x6 3x5 4x4 3x8 3x4 3x8 3x5 4x6 4x4 6x12MT18H 3x6 5-10-13 5-10-13 11-6-2 5-7-5 19-10-9 8-4-7 27-3-13 7-5-4 35-0-8 7-8-12 5-10-13 5-10-13 11-6-2 5-7-5 15-8-6 4-2-3 19-10-9 4-2-3 27-3-13 7-5-4 35-0-8 7-8-12 36-2-4 1-1-12 3-9-1511-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [3:0-4-4,0-2-4], [5:0-3-8,0-2-8], [8:0-3-0,0-1-12], [10:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.91 0.57 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.29 0.06 (loc) 13-15 13-15 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 196 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W8,W1,W2,W10: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-15, 4-15, 4-13, 7-13 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)17=1275/Mechanical, 10=1335/0-6-0(min. 0-2-8) Max Horz17=-355(LC 12) Max Uplift17=-132(LC 16), 10=-191(LC 17) MaxGrav17=1606(LC 39), 10=1602(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-18=-1392/213, 18-19=-1291/221, 19-20=-1264/225, 2-20=-1152/244, 2-21=-1420/302, 3-21=-1251/336, 3-22=-1044/328, 4-22=-1044/328, 4-5=-1171/336, 5-23=-1405/342, 23-24=-1452/314, 6-24=-1573/298, 6-7=-1617/297, 7-25=-1783/281, 25-26=-1923/254, 8-26=-2023/235, 1-17=-1550/240, 8-10=-1530/289 BOT CHORD 16-17=-284/332, 15-16=-170/1074, 14-15=-83/1117, 13-14=-83/1117, 12-13=-98/1600, 11-12=-98/1600, 10-11=-104/283 WEBS 2-16=-543/148, 3-15=-62/401, 4-15=-380/188, 4-13=-148/276, 5-13=-44/430, 7-13=-603/264, 1-16=-140/1230, 8-11=-41/1427 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-6-2,Exterior(2) 11-6-2 to 24-1-8, Interior(1) 24-1-8 to 36-2-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9) Refer to girder(s) for truss to trussconnections. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 132 lb uplift at joint 17 and 191 lb uplift atjoint 10. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T05 TrussType PiggybackBase Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:07:592018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-pSj8I?ls?mjVDQTR5WBXCF_m6QQVh5EcDfGVZzyv3W_ NOTES- 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T05GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:012018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-lqruihm6XNzDTkdqDwE?Hg4DGDAl94lvhzlcdryv3Vy Scale=1:73.8 W1 T1 T2 T3 W2 B1 ST7ST7ST6 ST5 ST4 ST3 ST2 ST1 ST7 ST7 ST6 ST5 ST4 ST3 ST2 ST1 ST8 T4 B1B2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 2223 44 4342 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 45 46 47 48 3x4 2x4 3x6 3x6 3x6 4x4 4x6 3x6 3x6 35-0-8 35-0-8 11-6-2 11-6-2 19-10-9 8-4-7 35-0-8 15-2-0 36-2-4 1-1-12 3-9-1511-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [8:0-3-0,0-0-2], [13:0-3-0,0-0-2], [17:0-1-13,Edge], [22:0-3-0,Edge], [24:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.42 0.26 0.21 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.02 (loc) 23 23 24 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 242 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPF No.2 *Except* ST3,ST2,ST1,ST8: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 10-36, 9-37, 7-38, 6-39, 11-34, 12-33, 14-31, 15-30 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 35-0-8. (lb)-Max Horz44=-355(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 36, 37, 39, 40, 41, 42, 34, 33, 31, 30, 29, 28, 27, 26 except 44=-199(LC 14), 24=-266(LC 13), 43=-201(LC 13), 25=-261(LC 12) MaxGravAllreactions 250 lb orless at joint(s) 44, 36, 37, 38, 39, 40, 41, 42, 34, 33, 31, 30, 29, 28, 27, 26 except 24=373(LC 30), 43=307(LC 14), 25=344(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 5-6=-258/304, 6-7=-324/381, 7-8=-294/343, 8-9=-289/348, 9-10=-289/348, 10-46=-289/348, 11-46=-289/348, 11-12=-289/348, 12-13=-289/348, 13-14=-294/343, 14-15=-324/381, 15-16=-258/304, 18-19=-240/250, 19-48=-257/258, 20-48=-264/249, 20-21=-265/247, 21-22=-352/318, 22-24=-292/209 BOT CHORD 43-44=-266/296, 42-43=-266/296, 41-42=-266/296, 40-41=-266/296, 39-40=-266/296, 38-39=-266/296, 37-38=-266/296, 36-37=-266/296, 35-36=-266/296, 34-35=-266/296, 33-34=-266/296, 32-33=-266/296, 31-32=-266/296, 30-31=-266/296, 29-30=-266/296, 28-29=-266/296, 27-28=-266/296, 26-27=-266/296, 25-26=-266/296, 24-25=-266/296 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 11-6-2, Corner(3) 11-6-2 to 22-8-6, Exterior(2) 22-8-6 to 36-2-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T05GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:012018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-lqruihm6XNzDTkdqDwE?Hg4DGDAl94lvhzlcdryv3Vy NOTES- 7)Provide adequate drainage to preventwater ponding. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 11)Gablestudsspaced at 2-0-0 oc. 12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 36, 37, 39, 40, 41, 42, 34, 33, 31, 30, 29, 28, 27, 26 except(jt=lb) 44=199, 24=266, 43=201, 25=261. 14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T06 TrussType PiggybackBase Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:032018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-iDze7NoN2_Dwi2nCKLGTM59Ro1nRdvEC8HEihkyv3Vw Scale=1:74.7 T1 T2 T3 B1 W3 W4 W5 W6 W6 W5 W7 W8W1 W2 W10 W9 T4 B3B2 1 2 3 4 5 6 7 8 16 15 14 13 12 11 10 9 17 18 19 20 21 22 23 24 25 26 4x6 5x6 5x6 3x6 3x4 3x6 3x5 4x4 3x8 3x4 3x8 3x5 4x6 3x5 4x6 3x6 5-10-13 5-10-13 11-6-2 5-7-5 19-10-9 8-4-7 27-3-13 7-5-4 35-0-8 7-8-12 5-10-13 5-10-13 11-6-2 5-7-5 15-8-6 4-2-3 19-10-9 4-2-3 27-3-13 7-5-4 35-0-8 7-8-12 3-9-1511-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [3:0-4-4,0-2-4], [5:0-3-0,0-2-3], [8:0-3-0,0-1-8], [9:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.93 0.57 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.29 0.06 (loc) 12-14 12-14 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 195 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W8,W1,W2,W10: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-14, 4-14, 4-12, 7-12 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)16=1276/Mechanical, 9=1268/0-6-0(min. 0-2-7) Max Horz16=-340(LC 12) Max Uplift16=-132(LC 16), 9=-162(LC 17) MaxGrav16=1607(LC 38), 9=1536(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-17=-1393/214, 17-18=-1292/222, 18-19=-1265/226, 2-19=-1153/245, 2-20=-1421/303, 3-20=-1253/337, 3-21=-1045/330, 21-22=-1045/330, 4-22=-1045/330, 4-5=-1173/338, 5-23=-1407/346, 23-24=-1456/318, 6-24=-1577/302, 6-7=-1621/301, 7-25=-1786/283, 25-26=-1933/253, 8-26=-2026/252, 1-16=-1552/240, 8-9=-1463/236 BOT CHORD 15-16=-277/317, 14-15=-179/1075, 13-14=-92/1119, 12-13=-92/1119, 11-12=-151/1609, 10-11=-151/1609 WEBS 2-15=-543/148, 3-14=-63/401, 4-14=-382/188, 4-12=-147/276, 5-12=-50/433, 7-12=-613/268, 1-15=-140/1231, 8-10=-91/1473 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-6-2,Exterior(2) 11-6-2 to 24-1-8, Interior(1) 24-1-8 to 34-10-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 16=132, 9=162. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T07 TrussType PiggybackBase Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:042018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-APX1Ljp?pILnKCLOu3nivIig3R4vMFgLNxzGDAyv3Vv Scale=1:74.9 T1 T2 T3 B1 W3 W4 W5 W6 W6 W5 W7 W8 W9 W10 W1 W2 W12 W11 T4 B3B2 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 19 20 21 22 23 24 25 26 274x6 5x6 5x6 3x4 3x6 3x5 3x8 3x8 3x4 3x8 8x8 3x4 4x6 4x8 4x6 6x8 3x6 5-6-10 5-6-10 11-6-2 5-11-9 19-10-9 8-4-7 26-4-11 6-6-2 33-0-8 6-7-13 35-0-8 2-0-1 5-6-10 5-6-10 11-6-2 5-11-9 15-8-6 4-2-3 19-10-9 4-2-3 26-4-11 6-6-2 33-0-8 6-7-13 35-0-8 2-0-1 36-2-4 1-1-12 3-9-1511-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [3:0-3-12,0-2-0], [5:0-3-12,0-2-0], [6:0-4-0,0-5-0], [11:0-3-8,0-2-0], [17:0-3-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.74 0.97 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.32 0.10 (loc) 14-16 14-16 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 213 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3,T4: 2x6SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5,W6,W7: 2x4SPF No.2, W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-7-7 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-16, 6-14 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)18=1552/Mechanical, 10=2363/0-6-0(min. 0-4-3) Max Horz18=-356(LC 14) Max Uplift18=-190(LC 16), 10=-406(LC 17) MaxGrav18=1887(LC 39), 10=2650(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-19=-1615/266, 19-20=-1526/272, 20-21=-1396/289, 2-21=-1391/294, 2-22=-1773/370, 3-22=-1599/406, 3-23=-1335/391, 4-23=-1335/391, 4-5=-1658/442, 5-24=-1662/423, 24-25=-2006/475, 25-26=-2139/464, 6-26=-2284/456, 6-27=-2511/460, 7-27=-2877/449, 7-8=-2419/391, 1-18=-1835/299, 8-10=-2632/459 BOT CHORD 17-18=-285/331, 16-17=-217/1287, 15-16=-163/1507, 14-15=-163/1507, 13-14=-232/2263, 12-13=-232/2263, 11-12=-278/1999 WEBS 2-17=-720/184, 2-16=-156/363, 3-16=-95/560, 4-16=-666/252, 4-14=-140/565, 5-14=-44/373, 6-14=-899/319, 7-12=-49/279, 7-11=-1121/258, 1-17=-200/1495, 8-11=-331/2244 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-6-2,Exterior(2) 11-6-2 to 24-1-8, Interior(1) 24-1-8 to 36-2-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 18=190, 10=406. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T07 TrussType PiggybackBase Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:042018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-APX1Ljp?pILnKCLOu3nivIig3R4vMFgLNxzGDAyv3Vv NOTES- 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 576 lb down and 110 lb up at 20-9-8, and 576 lb down and 110 lb up at 33-0-8 on top chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-5=-61, 5-24=-51, 7-8=-51, 8-9=-51, 10-18=-20 Concentrated Loads(lb) Vert: 7=-500 24=-500 Trapezoidal Loads(plf) Vert: 24=-51-to-7=-101 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T08 TrussType PIGGYBACK BASE Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:062018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-6oenmPqFLvbVZVVn?UqA_jn0aEmQq97eqFSNI3yv3Vt Scale=1:75.7 T1 T2 T3 B1 W3 W4 W5 W6 W6 W5 W7 W8 W9 W10 W1 W2 W12 W11 T4 B3B2 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 19 20 21 22 23 24 25 26 27 28 29 4x6 5x6 5x6 3x4 3x6 3x5 3x8 3x8 3x4 3x8 8x8 3x4 4x6 4x8 5x6 6x8 3x6 5-6-10 5-6-10 11-6-2 5-11-9 19-10-9 8-4-7 26-4-11 6-6-2 33-0-8 6-7-13 35-0-8 2-0-0 5-6-10 5-6-10 11-6-2 5-11-9 15-8-6 4-2-3 19-10-9 4-2-3 26-4-11 6-6-2 33-0-8 6-7-13 35-0-8 2-0-0 37-5-4 2-4-12 3-9-1511-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [3:0-3-12,0-2-0], [5:0-3-12,0-2-0], [6:0-4-0,0-5-0], [11:0-3-8,0-2-0], [17:0-3-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.74 0.97 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.32 0.10 (loc) 14-16 14-16 10 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 215 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3,T4: 2x6SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W4,W5,W6,W7: 2x4SPF No.2, W12: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-7-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 10-11. WEBS 1 Row at midpt 4-16, 6-14 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)18=1548/Mechanical, 10=2430/0-6-0(min. 0-4-4) Max Horz18=-371(LC 12) Max Uplift18=-189(LC 16), 10=-436(LC 17) MaxGrav18=1883(LC 39), 10=2718(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-19=-1611/262, 19-20=-1522/268, 20-21=-1484/284, 2-21=-1387/290, 2-22=-1769/365, 3-22=-1594/401, 3-23=-1331/387, 23-24=-1331/387, 4-24=-1331/387, 4-5=-1652/438, 5-25=-1655/414, 25-26=-1998/466, 26-27=-2131/448, 6-27=-2276/447, 6-28=-2493/442, 7-28=-2860/431, 7-29=-2364/378, 8-29=-2375/367, 1-18=-1832/298, 8-10=-2701/516 BOT CHORD 17-18=-292/346, 16-17=-208/1296, 15-16=-154/1502, 14-15=-154/1502, 13-14=-179/2249, 12-13=-179/2249, 11-12=-221/1945 WEBS 2-17=-718/184, 2-16=-156/362, 3-16=-94/557, 4-16=-661/252, 4-14=-138/561, 5-14=-40/371, 6-14=-888/313, 7-12=-24/322, 7-11=-1122/247, 1-17=-199/1491, 8-11=-311/2249 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-6-2,Exterior(2) 11-6-2 to 24-1-8, Interior(1) 24-1-8 to 37-5-4zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 18=189, 10=436.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T08 TrussType PIGGYBACK BASE Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:062018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-6oenmPqFLvbVZVVn?UqA_jn0aEmQq97eqFSNI3yv3Vt NOTES- 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 576 lb down and 110 lb up at 20-9-8, and 576 lb down and 110 lb up at 33-0-8 on top chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-5=-61, 5-25=-51, 7-8=-51, 8-9=-51, 10-18=-20 Concentrated Loads(lb) Vert: 7=-500 25=-500 Trapezoidal Loads(plf) Vert: 25=-51-to-7=-101 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T09 TrussType PiggybackBase Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:072018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-a_C9zkrt6DjMBf4zZBLPXxK8JeAoZhKo3vCwqVyv3Vs Scale=1:66.6 W1 T1 T2 B1 W2 W1 W3 W4 W6 W5 T3 B2 1 2 3 4 5 6 11 10 9 8 7 12 1314 15 16 17 18 1.5x4 4x4 5x6 3x5 3x4 4x8 3x5 4x4 3x4 6x12MT18H 5-6-1 5-6-1 12-11-5 7-5-4 20-8-0 7-8-12 5-6-1 5-6-1 12-11-5 7-5-4 20-8-0 7-8-12 21-9-12 1-1-12 11-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [2:0-3-0,0-2-3], [5:0-3-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.89 0.48 0.65 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.20 0.02 (loc) 7-8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 118 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W4,W6: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-5-9 oc bracing. WEBS 1 Row at midpt 1-11, 2-10, 4-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=766/0-6-0(min. 0-1-8), 7=796/0-6-0(min. 0-1-9) Max Horz11=-423(LC 17) Max Uplift11=-213(LC 17), 7=-64(LC 17) MaxGrav11=829(LC 36), 7=995(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-11=-789/255, 1-12=-346/102, 12-13=-346/102, 13-14=-346/102, 2-14=-346/102, 2-15=-293/42, 15-16=-405/22, 3-16=-420/21, 3-4=-634/0, 4-17=-898/36, 17-18=-1039/9, 5-18=-1137/0, 5-7=-926/104 BOT CHORD 10-11=-379/424, 9-10=0/865, 8-9=0/865, 7-8=-100/266 WEBS 1-10=-242/817, 4-10=-689/283, 4-8=0/270, 5-8=0/706 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 5-6-1,Exterior(2) 5-6-1 to 8-6-1zone; cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7 except(jt=lb) 11=213. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T09GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:092018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XNKwOQs8eq_4QzEMhcNtcMPY6SsM1jC4XDh1vOyv3Vq Scale=1:73.5 W1 T1 T2 W2 B1 ST1 ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8 T3 B2 ST9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 27 26 25 24 23 22 21 20 19 18 17 16 15 28 29 3x4 6x16MT18H3x4 5x6 3x6 20-8-0 20-8-0 5-6-1 5-6-1 20-8-0 15-2-0 21-9-12 1-1-12 11-6-01-4-1111-6-08.0012 PlateOffsets(X,Y)-- [4:0-2-0,0-2-3], [8:0-3-0,0-3-0], [13:0-1-3,0-1-12], [15:0-0-0,0-1-12], [15:Edge,0-3-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.62 0.41 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.01 (loc) 14 14 15 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 MT18H Weight: 145 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W2: 2x4SPFStud OTHERS 2x4SPF No.2 *Except* ST5,ST6,ST7,ST8,ST9: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-9-4 oc bracing. WEBS 1 Row at midpt 1-27, 2-26, 3-25, 5-23, 6-22, 7-21 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 20-8-0. (lb)-Max Horz27=-423(LC 17) Max UpliftAll uplift 100 lb orless at joint(s) 27, 26, 25, 23, 22, 21, 20, 19, 18, 17 except 15=-421(LC 15), 16=-1017(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 27, 26, 25, 23, 22, 21, 20, 19, 18, 17 except 15=1193(LC 17), 16=457(LC 15) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 8-9=-253/203, 9-10=-315/252, 10-11=-380/303, 11-12=-450/359, 12-13=-724/578, 13-15=-664/562 BOT CHORD 26-27=-380/458, 25-26=-380/458, 24-25=-380/458, 23-24=-380/458, 22-23=-380/458, 21-22=-380/458, 20-21=-380/458, 19-20=-378/457, 18-19=-378/457, 17-18=-378/457, 16-17=-378/457, 15-16=-378/457 WEBS 12-16=-435/488 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-1-12 to 3-1-12,Exterior(2) 3-1-12 to 5-6-1, Corner(3) 5-6-1 to 8-6-1zone; cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablerequirescontinuous bottomchord bearing. 10)Truss to be fullysheathed from one face orsecurely braced againstlateralmovement(i.e. diagonalweb). 11)Gablestudsspaced at 2-0-0 oc.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T09GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:092018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XNKwOQs8eq_4QzEMhcNtcMPY6SsM1jC4XDh1vOyv3Vq NOTES- 12)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 27, 26, 25, 23, 22, 21, 20, 19, 18, 17 except(jt=lb) 15=421, 16=1017. 14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T10 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:102018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-?ZuIbmtmP86x27pYEJu68ZyiUrApm??EltRaRqyv3Vp Scale=1:81.3 T1 T2 T4 B1 W3 W4 W3 W5 W3 W5 W3 W6 W3 W7 W8 W9 W1 W2 T3 T5 B3B2 HW2 1 2 3 4 5 6 7 8 9 10 11 12 2120 19 18 17 16 15 14 13 25 26 27 28 29 30 31 4x6 8x8 4x6 5x8 3x6 2x4 3x6 3x5 3x8 1.5x4 3x8 1.5x4 3x8 1.5x4 3x4 3x4 3x4 1.5x4 3x6 3x8 1-8-3 1-8-3 8-2-13 6-6-10 14-9-7 6-6-10 21-4-0 6-6-10 24-9-12 3-5-12 32-11-8 8-1-12 41-3-0 8-3-8 1-8-3 1-8-3 8-2-13 6-6-10 14-9-7 6-6-10 21-4-0 6-6-10 24-9-12 3-5-12 30-2-14 5-5-2 35-8-1 5-5-2 41-3-0 5-6-15 42-4-12 1-1-12 10-4-811-6-00-6-811-6-08.0012 PlateOffsets(X,Y)-- [2:0-5-12,0-2-0], [5:0-3-0,Edge], [7:0-6-4,0-2-4], [11:0-0-10,0-0-14], [11:0-1-3,0-5-5], [11:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.64 0.52 0.85 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.24 0.02 (loc) 13-15 13-15 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 266 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W9: 2x4SPFStud WEDGE Right: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-20, 3-19, 4-16, 6-16, 7-16, 8-15, 1-21 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)21=642/Mechanical, 16=2002/0-6-0(min. 0-3-8), 11=556/0-4-0(min. 0-1-8) Max Horz21=-451(LC 17) Max Uplift21=-143(LC 12), 16=-237(LC 12), 11=-139(LC 17) MaxGrav21=851(LC 38), 16=2236(LC 38), 11=732(LC 49) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-25=-386/123, 3-25=-386/123, 3-26=-386/123, 4-26=-386/123, 4-5=0/382, 5-27=0/382, 27-28=0/382, 6-28=0/382, 6-7=0/382, 7-29=-59/266, 8-30=-563/200, 9-30=-660/180, 9-10=-750/166, 10-31=-774/171, 11-31=-879/146, 1-21=-852/152 BOT CHORD 20-21=-336/450, 19-20=-272/446, 18-19=-223/376, 17-18=-223/376, 16-17=-223/376, 15-16=-278/288, 14-15=0/358, 13-14=0/358, 11-13=-24/676 WEBS 2-20=-740/222, 2-19=-161/515, 3-19=-624/202, 4-19=-29/370, 4-18=0/268, 4-16=-1108/156, 6-16=-539/168, 7-16=-1061/165, 7-15=-147/698, 8-15=-731/279, 8-13=-76/481, 10-13=-321/208, 1-20=-146/838 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 24-9-12,Exterior(2) 24-9-12 to 29-0-11zone;cantileverright exposed ; end verticalright exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 21=143, 16=237, 11=139. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T10 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:102018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-?ZuIbmtmP86x27pYEJu68ZyiUrApm??EltRaRqyv3Vp LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T11 TrussType PiggybackBase Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:122018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xy020Sv0xlMfHQzxMkwaD_12BfvEEtiXDBwhViyv3Vn Scale=1:84.7 T1 T2 T4 B1 W3 W4 W3 W5 W3 W6 W3 W7 W3 W8 W9 W10 W11 W1 W2 T3 T5 B2 1 2 3 4 5 6 7 8 9 10 11 2120 19 18 17 16 15 14 13 12 25 26 27 28 29 30 31 32 4x6 5x8 3x6 6x8 5x10 2x4 3x6 3x4 3x8 1.5x4 4x8 2x4 4x8 1.5x4 3x4 3x5 3x5 1.5x43x6 3x5 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-1-14 6-4-2 37-6-0 6-4-2 37-9-0 0-3-0 41-3-0 3-6-0 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-1-14 6-4-2 37-6-0 6-4-2 41-3-0 3-9-0 42-4-12 1-1-12 10-4-811-6-00-6-811-6-08.0012 PlateOffsets(X,Y)-- [2:0-6-4,0-2-4], [7:0-5-8,0-1-12], [8:0-1-0,0-3-4], [10:0-0-0,0-0-6] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.69 0.33 0.96 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.07 -0.12 0.02 (loc) 13-15 13-15 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 269 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W9,W10,W11: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-6-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-20, 3-19, 4-18, 4-16, 6-16, 7-16, 8-15, 1-21 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)21=469/Mechanical, 18=1470/0-6-0(min. 0-2-13), 12=1261/0-6-0(min. 0-2-4) Max Horz21=-451(LC 17) Max Uplift21=-114(LC 12), 18=-444(LC 12), 12=-266(LC 12) MaxGrav21=602(LC 38), 18=1776(LC 38), 12=1453(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 4-27=-486/385, 5-27=-486/385, 5-6=-486/385, 6-28=-486/385, 28-29=-486/385, 7-29=-486/385, 7-30=-661/504, 8-30=-817/476, 8-31=-760/497, 9-31=-986/473, 9-32=-182/364, 10-32=-201/282, 1-21=-601/154 BOT CHORD 20-21=-336/450, 19-20=-289/442, 18-19=-285/358, 17-18=-285/358, 16-17=-285/358, 15-16=-135/553, 14-15=-237/735, 13-14=-237/735 WEBS 2-20=-491/178, 2-19=-128/283, 3-19=-540/165, 4-19=-45/430, 4-18=-1645/570, 4-16=-542/961, 6-16=-612/201, 7-16=-414/201, 7-15=-299/345, 8-15=-323/213, 8-13=-277/91, 9-13=-463/1023, 9-12=-1325/651, 1-20=-127/578 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 24-9-12,Exterior(2) 24-9-12 to 29-0-11zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 21=114, 18=444, 12=266. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T11 TrussType PiggybackBase Qty 2 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:122018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xy020Sv0xlMfHQzxMkwaD_12BfvEEtiXDBwhViyv3Vn NOTES- 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T11GE TrussType GABLElGablelGableCOMMONllGable l Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:162018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-pjFZspyX__s4m2Giba?WOqBj9GGuAp268puveUyv3Vj Scale=1:81.5 T1 T2 T4 B1 W4 W5 W4 W6 W4 W2 T3 T5 B3B2 W7 W4 W8 W4 W9 W10 W11 W12 W3 ST8 ST9 ST6 ST7 ST4 ST5 ST2 ST3 ST1 ST10 ST11 ST12 ST13 ST14 ST15 ST16 ST17 ST18 ST19 ST20 ST21 ST22 ST23 ST24 ST25 ST26 ST27 ST28 W1 1 2 3 4 5 6 7 8 9 10 11 323130 29 282726 25 242322 20 19 18 17 16 141312 75 76 77 78 79 80 81 82 21 15 4x6 5x8 3x6 6x8 5x10 2x4 3x63x4 3x8 4x8 3x6 3x5 4x8 3x4 3x4 3x5 1-8-3 1-8-3 7-1-2 5-4-14 12-3-0 5-1-14 12-6-0 0-3-0 15-5-8 2-11-8 18-7-14 3-2-6 24-9-12 6-1-14 31-1-14 6-4-2 36-0-8 4-10-10 37-6-0 1-5-8 41-3-0 3-9-0 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-1-14 6-4-2 37-6-0 6-4-2 41-3-0 3-9-0 42-4-12 1-1-12 10-4-811-6-00-6-811-6-08.0012 PlateOffsets(X,Y)-- [2:0-6-4,0-2-4], [7:0-5-8,0-1-12], [8:0-1-0,0-3-4], [10:0-0-0,0-0-10], [20:0-2-4,0-1-8], [69:0-1-13,0-0-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.35 0.49 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.12 0.02 (loc) 16-18 16-18 72 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 455 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W10,W11,W12: 2x4SPFStud OTHERS 2x4SPFStud*Except* ST6,ST4,ST1,ST11,ST14,ST15,ST19,ST20: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-4-13 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing,Except: 10-0-0 oc bracing: 18-19,16-18. WEBS 1 Row at midpt 2-31, 2-27, 3-27, 4-27, 4-23, 1-32, 6-19, 7-19, 8-18, 1-31 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 15-9-0 except(jt=length) 10=5-6-0, 13=5-6-0, 14=5-6-0, 12=5-6-0, 21=0-3-8, 15=0-3-8, 10=5-6-0. (lb)-Max Horz32=-451(LC 17) Max UpliftAll uplift 100 lb orless at joint(s) 32, 31, 10, 22, 12 except 27=-315(LC 12), 23=-128(LC 12), 13=-209(LC 17), 14=-185(LC 7) MaxGravAllreactions 250 lb orless at joint(s) 32, 31, 10, 25, 26, 28, 29, 30, 22, 12, 24, 21, 10 except 27=1173(LC 38), 23=878(LC 38), 13=1180(LC 39), 15=311(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 4-77=-506/207, 5-77=-506/207, 5-6=-506/207, 6-78=-506/207, 78-79=-506/207, 7-79=-506/207, 7-80=-687/226, 8-80=-849/191, 8-81=-815/172, 9-81=-1041/148 BOT CHORD 31-32=-338/450, 30-31=-339/445, 29-30=-339/445, 28-29=-339/445, 27-28=-339/445, 26-27=-251/355, 25-26=-251/355, 24-25=-251/355, 23-24=-251/355, 22-23=-251/355, 21-22=-251/355, 20-21=-251/355, 19-20=-251/355, 18-19=0/572, 17-18=0/783, 16-17=0/783 WEBS 2-27=-266/50, 3-27=-543/166, 4-27=-422/180, 4-23=-831/137, 4-19=-171/913, 6-19=-614/202, 7-19=-442/116, 7-18=-83/412, 8-18=-386/226, 9-16=-4/879, 9-13=-1174/220 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 24-9-12,Exterior(2) 24-9-12 to 29-0-11zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T11GE TrussType GABLElGablelGableCOMMONllGable l Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:162018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-pjFZspyX__s4m2Giba?WOqBj9GGuAp268puveUyv3Vj NOTES- 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)All plates are 1.5x4MT20 unless otherwiseindicated. 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 32, 31, 10, 22, 12, 10 except(jt=lb) 27=315, 23=128, 13=209, 14=185. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T12 TrussType PiggybackBase Qty 6 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:182018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-m6NJHVznWb6o?LQ5i?1_TFH3e4yaea8Pb7N?jMyv3Vh Scale=1:83.8 T1 T2 T4 B1 W3 W4 W3 W5 W3 W6 W3 W7 W3 W8 W9 W10 W11 W1 W2 T3 T5 B2 1 2 3 4 5 6 7 8 9 10 2019 18 17 16 15 14 13 12 11 24 25 26 2728 29 30 31 4x6 5x8 3x6 6x8 2x4 3x6 3x4 3x8 1.5x4 4x8 2x4 4x8 1.5x4 3x4 5x10 3x5 3x5 1.5x4 3x53x6 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-2-1 6-4-5 37-6-6 6-4-5 37-9-0 0-2-10 41-3-0 3-6-0 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-2-1 6-4-5 37-6-6 6-4-5 41-3-0 3-8-10 10-4-811-6-00-6-811-6-08.0012 PlateOffsets(X,Y)-- [2:0-6-4,0-2-4], [7:0-5-8,0-1-12], [8:0-5-0,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.34 0.96 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.07 -0.12 0.02 (loc) 12-14 12-14 11 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 268 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W9,W10,W11: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-5-6 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-19, 3-18, 4-17, 4-15, 6-15, 7-15, 8-14, 1-20 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)20=472/Mechanical, 17=1477/0-6-0(min. 0-2-13), 11=1193/0-5-4(min. 0-2-3) Max Horz20=-424(LC 17) Max Uplift20=-113(LC 12), 17=-448(LC 12), 11=-259(LC 12) MaxGrav20=604(LC 37), 17=1780(LC 37), 11=1384(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 4-26=-491/385, 5-26=-491/385, 5-6=-491/385, 6-27=-491/385, 27-28=-491/385, 7-28=-491/385, 7-29=-671/511, 8-29=-834/482, 8-30=-799/508, 9-30=-1026/484, 1-20=-602/152 BOT CHORD 19-20=-317/423, 18-19=-269/415, 17-18=-265/334, 16-17=-265/334, 15-16=-265/334, 14-15=-142/559, 13-14=-266/769, 12-13=-266/769 WEBS 2-19=-493/176, 2-18=-126/285, 3-18=-540/165, 4-18=-47/429, 4-17=-1650/577, 4-15=-547/969, 6-15=-612/201, 7-15=-426/206, 7-14=-306/365, 8-14=-350/222, 9-12=-393/954, 9-11=-1255/589, 1-19=-125/579 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 24-9-12,Exterior(2) 24-9-12 to 29-0-11zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=113, 17=448, 11=259. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T13 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:192018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-EIxiUr_PHvEfdV?HGiYD0TpEMUIfN1MZqn6ZFoyv3Vg Scale=1:82.9 T1 T2 T4 B1 W3 W4 W3 W5 W3 W6 W3 W7 W3 W8 W9 W10 W11 W1 W2 W13 W12 T3 T5 B3B2 1 2 3 4 5 6 7 8 9 10 2120 19 18 17 16 15 14 13 12 11 22 23 24 25 26 27 28 29 4x6 5x8 3x6 6x8 2x4 3x6 3x4 3x8 1.5x4 4x8 2x4 4x8 1.5x4 3x4 5x10 3x4 3x5 3x4 2x4 4x6 3x6 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-2-1 6-4-5 37-6-6 6-4-5 37-9-0 0-2-10 40-1-8 2-4-8 1-8-3 1-8-3 7-1-2 5-4-14 12-6-0 5-4-14 18-7-14 6-1-14 24-9-12 6-1-14 31-2-1 6-4-5 37-6-6 6-4-5 40-1-8 2-7-2 10-4-811-6-01-3-811-6-08.0012 PlateOffsets(X,Y)-- [2:0-6-4,0-2-4], [7:0-5-8,0-1-12], [8:0-5-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.35 0.97 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.07 -0.12 0.02 (loc) 13-15 13-15 12 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 269 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W9,W10,W11,W13,W12: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-4-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 2-20, 3-19, 4-18, 4-16, 6-16, 7-16, 8-15, 1-21 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)21=476/Mechanical, 18=1482/0-6-0(min. 0-2-13), 12=1093/0-5-4(min. 0-2-0) Max Horz21=-374(LC 17) Max Uplift21=-113(LC 12), 18=-447(LC 12), 12=-260(LC 12) MaxGrav21=606(LC 37), 18=1784(LC 37), 12=1285(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 4-24=-497/392, 5-24=-497/392, 5-6=-497/392, 6-25=-497/392, 25-26=-497/392, 7-26=-497/392, 7-27=-683/519, 8-27=-851/491, 8-28=-837/532, 28-29=-1048/508, 9-29=-1063/491, 1-21=-605/156 BOT CHORD 20-21=-320/374, 19-20=-272/367, 18-19=-264/293, 17-18=-264/293, 16-17=-264/293, 15-16=-161/569, 14-15=-314/803, 13-14=-314/803 WEBS 2-20=-495/179, 2-19=-127/288, 3-19=-540/165, 4-19=-50/426, 4-18=-1654/579, 4-16=-556/976, 6-16=-612/201, 7-16=-436/212, 7-15=-317/384, 8-15=-373/240, 9-13=-349/883, 9-12=-1172/536, 1-20=-128/581 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 24-9-12,Exterior(2) 24-9-12 to 29-0-11zone;cantileverright exposed ; end verticalright exposed; porchright exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 21=113, 18=447, 12=260. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T14 TrussType Common Qty 5 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:202018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-iUV4iB?12DMWEfaTqQ4SYgMUjtbm6Xei2Rs6oFyv3Vf Scale=1:50.5 T1 T1 B1 W1 W2 W3 W4 W5 W6 B212 3 4 5 6 7 8 12 11 10 9 19 20 21 22 4x4 3x5 3x4 3x5 1.5x4 3x8 4x4 3x4 1.5x4 3x4 6-0-15 6-0-15 11-9-0 5-8-1 20-10-8 9-1-8 21-0-0 0-1-8 23-6-0 2-6-0 -0-10-12 0-10-12 6-0-15 6-0-15 11-9-0 5-8-1 16-5-12 4-8-13 20-10-8 4-4-12 23-6-0 2-7-8 24-4-12 0-10-12 0-4-78-2-70-4-78.0012 PlateOffsets(X,Y)-- [2:0-2-9,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.34 0.55 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.22 -0.34 0.03 (loc) 9-10 9-10 9 l/defl >999 >728 n/a L/d 240 180 n/a PLATES MT20 Weight: 98 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W3: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-4-12 oc purlins. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=778/0-6-0(min. 0-1-8), 9=977/0-3-0(min. 0-1-12) Max Horz2=220(LC 15) Max Uplift2=-137(LC 16), 9=-161(LC 17) MaxGrav2=881(LC 2), 9=1107(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-19=-1128/720, 3-19=-958/747, 3-20=-739/554, 4-20=-634/572, 4-21=-634/566, 5-21=-719/548 BOT CHORD 2-12=-513/926, 11-12=-513/926, 10-11=-513/926, 9-10=-274/540 WEBS 3-10=-454/347, 4-10=-504/456, 5-9=-936/469 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 11-9-0,Exterior(2) 11-9-0 to 14-9-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchright exposed;C-C formembers and forces & MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=137, 9=161. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T14GE TrussType Common SupportedGable Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:222018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-etcq6t1IaqcEUzksxr6wd5RuUhODabR?WkLDs7yv3Vd Scale=1:53.6 T1 T1 B1 ST6 ST5 ST4 ST3 ST2ST1 ST5 ST4 ST3 ST2 ST1 B212 3 4 5 6 7 8 9 10 11 12 13 14 15 27 26 25 24 23 22 21 20 19 18 17 16 28 29 4x4 3x4 3x4 3x4 23-6-0 23-6-0 -0-10-12 0-10-12 11-9-0 11-9-0 23-6-0 11-9-0 24-4-12 0-10-12 0-4-78-2-70-4-78.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.07 0.03 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.01 (loc) 14 15 14 l/defl n/r n/r n/a L/d 120 120 n/a PLATES MT20 Weight: 112 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud*Except* ST6: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 23-6-0. (lb)-Max Horz2=-220(LC 14) Max UpliftAll uplift 100 lb orless at joint(s) 2, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16, 14 MaxGravAllreactions 250 lb orless at joint(s) 2, 21, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16, 14 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)-0-10-12 to 2-1-4,Exterior(2) 2-1-4 to 11-9-0, Corner(3) 11-9-0 to 14-9-0 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablerequirescontinuous bottomchord bearing. 9)Gablestudsspaced at 2-0-0 oc. 10)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2, 22, 23, 25, 26, 27, 20, 19, 18, 17, 16, 14. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T15 TrussType PiggybackBase Qty 4 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:232018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-63ACKD1wL8k557I2VYd9AJ_v_5dzJ?M8lO4mOayv3Vc Scale=1:69.6 W1 T1 W1 B1 W2 W3 W2 B1B2 1 2 3 8 7 6 5 4 9 10 4x6 3x8 3x4 1.5x4 3x4 4x6 3x6 3x6 7-10-0 7-10-0 15-8-0 7-10-0 7-10-0 7-10-0 15-8-0 7-10-0 11-0-811-6-00-5-811-0-80-5-811-6-0PlateOffsets(X,Y)-- [4:0-2-7,0-1-7], [8:0-3-14,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.72 0.45 0.33 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.20 -0.01 (loc) 4-6 4-6 4 l/defl >999 >921 n/a L/d 240 180 n/a PLATES MT20 Weight: 104 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SPF No.2 *Except* B2: 2x4SPF No.2 WEBS 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-8, 3-4, 2-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=621/0-1-8(min. 0-1-8), 4=621/0-1-8(min. 0-1-8) Max Uplift8=-129(LC 12), 4=-129(LC 12) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-8=-555/165, 1-9=-261/54, 2-9=-261/54, 2-10=-261/54, 3-10=-261/54, 3-4=-555/165 WEBS 1-6=-93/445, 2-6=-558/266, 3-6=-93/445 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 15-6-4zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3)Provide adequate drainage to preventwater ponding. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5)Bearing at joint(s) 8, 4 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 6)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 8, 4. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 8=129, 4=129. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T16 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:242018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-aGkbXZ2Y6RsyjGtE3G8OjWX5wV0O2Q?Iz2qKx0yv3Vb Scale=1:73.8 T1 T2 W6 B1 W3 W4 W3 W5 W3 W4W1 W2 T3 B3B2 1 2 3 4 5 6 13 12 11 10 9 8 7 143x4 4x8 3x4 3x5 1.5x4 3x4 3x4 3x10 1.5x4 3x4 3x5 4x6 3x6 1-8-4 1-8-4 7-0-12 5-4-8 14-2-7 7-1-12 19-6-15 5-4-8 1-8-4 1-8-4 7-0-12 5-4-8 14-2-7 7-1-12 19-6-15 5-4-8 10-4-811-6-011-0-80-5-811-6-08.0012 PlateOffsets(X,Y)-- [1:0-1-12,0-1-8], [2:0-5-12,0-2-0], [6:0-1-12,0-1-8], [7:0-2-7,0-1-6], [9:0-1-12,0-1-8], [11:0-4-4,0-1-8], [12:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.64 0.31 0.49 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.15 0.01 (loc) 9-11 9-11 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 160 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except* B3: 2x6SPF No.2 WEBS 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 6-7, 2-12, 4-11, 5-9, 1-13 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)13=764/Mechanical, 7=779/0-1-8(min. 0-1-8) Max Horz13=43(LC 16) Max Uplift13=-122(LC 13), 7=-175(LC 13) MaxGrav13=996(LC 35), 7=1087(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-466/84, 3-4=-466/84, 4-5=-466/84, 5-14=-408/67, 6-14=-408/67, 6-7=-1045/197, 1-13=-971/114 BOT CHORD 10-11=-67/408, 9-10=-67/408 WEBS 2-12=-842/158, 2-11=-119/763, 4-11=-640/198, 5-9=-731/225, 6-9=-156/954, 1-12=-106/895 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 5-11-2,Interior(1) 5-11-2 to 19-5-3zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing plate at joint(s) 7. 10)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=122, 7=175. 11)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T17GE TrussType GABLECOMMON Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:252018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-3SIzlu3Atl?pLQSRdzfdFk3CouFInqPRCiZtTSyv3Va Scale=1:42.6 0-1-13T1 T2 W6 B1 B2 B3W2 W3 W4 W5 W1 ST13 ST11 ST12 ST9 ST10 ST8ST6 ST7 ST5 ST4ST3 ST2 ST1 1 2 3 4 5 13 12 11 10 9 8 7 6 34 35 36 37 6x12MT18H 4x4 6x10 3x4 5x8 2x4 6-9-15 6-9-15 7-4-0 0-6-1 14-5-0 7-1-0 21-10-0 7-5-0 -0-10-12 0-10-12 6-9-15 6-9-15 7-4-0 0-6-1 14-5-0 7-1-0 21-10-0 7-5-0 0-11-15-3-145-5-115-3-143-6-88.0012 6.0012 PlateOffsets(X,Y)-- [2:0-1-13,0-2-12], [3:0-8-12,0-2-0], [5:0-2-0,0-1-12], [6:0-4-0,0-0-2], [7:0-4-0,0-3-0], [8:0-2-0,0-1-0], [13:0-0-0,0-2-12], [18:0-1-9,0-0-12], [21:0-1-9,0-0-12], [26:0-1-9,0-0-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.96 0.71 0.67 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.34 0.21 (loc) 7 6-7 6 l/defl >999 >524 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 116 lb FT= 14% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W3,W5: 2x4SPF No.2, W1: 2x6SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing,Except: 5-6-6 oc bracing: 12-13 10-0-0 oc bracing: 6-7. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 7-4-0 except(jt=length) 6=0-3-8. (lb)-Max Horz13=214(LC 15) Max UpliftAll uplift 100 lb orless at joint(s) 11 except 13=-590(LC 35), 9=-219(LC 12), 10=-362(LC 35), 12=-131(LC 13), 6=-110(LC 13) MaxGravAllreactions 250 lb orless at joint(s) 10, 11 except 13=280(LC 42), 9=1993(LC 35), 12=379(LC 35), 6=614(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-34=-241/737, 3-34=-169/811, 3-35=-1378/442, 35-36=-1379/442, 4-36=-1381/442, 4-37=-1379/441, 5-37=-1379/441, 5-6=-556/184, 2-13=-436/366 BOT CHORD 12-13=-617/214, 11-12=-617/214, 10-11=-617/214, 9-10=-617/214, 8-9=-581/210, 7-8=-683/255 WEBS 3-9=-1232/320, 3-7=-470/1999, 4-7=-800/254, 5-7=-498/1372 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-9-15,Exterior(2) 6-9-15 to 11-0-14 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 7)Provide adequate drainage to preventwater ponding. 8)All plates areMT20 plates unless otherwiseindicated. 9)All plates are 1.5x4MT20 unless otherwiseindicated. 10)Gablestudsspaced at 2-0-0 oc. 11)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads.Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T17GE TrussType GABLECOMMON Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:252018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-3SIzlu3Atl?pLQSRdzfdFk3CouFInqPRCiZtTSyv3Va NOTES- 12)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverifycapacity of bearingsurface. 13)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 11 except(jt=lb) 13=590, 9=219, 10=362, 12=131, 6=110. 14)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T18 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:262018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XesLyE4oe37gza1dAgAsoxcP7IfQWJzaRMJQ?uyv3VZ Scale=1:44.6 0-1-13T1 T2 W10 B1 B2 B3 W3 W4 W5 W6 W7 W8 W9 W1 W2 1 2 3 4 5 6 7 12 11 10 9 8 13 14 15 16 17 4x4 3x45x8 4x4 3x4 3x4 1.5x4 5x8 3x8 2x4 3x5 7-4-0 7-4-0 8-9-15 1-5-15 14-5-0 5-7-1 21-10-0 7-5-0 -0-10-12 0-10-12 3-5-1 3-5-1 7-4-0 3-10-15 8-9-15 1-5-15 14-5-0 5-7-1 21-10-0 7-5-0 0-11-16-7-146-9-116-7-143-6-88.0012 6.0012 PlateOffsets(X,Y)-- [2:0-2-0,0-0-12], [4:0-1-12,0-1-8], [5:0-2-0,0-1-0], [9:0-4-0,0-2-12], [11:0-6-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.79 0.46 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.36 0.17 (loc) 8-9 8-9 8 l/defl >999 >719 n/a L/d 240 180 n/a PLATES MT20 Weight: 109 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T2: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W9: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 9-2-5 oc bracing. WEBS 1 Row at midpt 7-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=852/0-4-0(min. 0-1-8), 12=855/0-6-0(min. 0-1-11) Max Horz12=266(LC 15) Max Uplift8=-187(LC 13), 12=-118(LC 16) MaxGrav8=1106(LC 35), 12=1073(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-13=-281/30, 3-14=-1019/189, 4-14=-957/205, 4-5=-1029/236, 5-15=-1963/407, 15-16=-1963/407, 6-16=-1965/407, 6-17=-1962/406, 7-17=-1962/406, 7-8=-1044/264, 2-12=-357/105 BOT CHORD 11-12=-393/901, 10-11=-346/894, 9-10=-362/1008 WEBS 4-11=-345/150, 4-10=-103/285, 5-9=-275/1216, 6-9=-722/230, 7-9=-502/2075, 3-12=-965/174 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 8-9-15,Exterior(2) 8-9-15 to 13-0-14 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Bearing at joint(s) 8 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 8=187, 12=118. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T19 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:282018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-T1z5Nw52AgNNCuB0I5DKtMhih6KX_EntugoX4nyv3VX Scale:1/4"=1'0-1-130-1-13W1 T1 T2 T3 W10 B1 B2 B3 W2 W3 W4 W5 W6 W7 W8 W9 1 2 3 4 5 6 11 10 9 8 7 12 13 14 3x4 1.5x4 6x6 4x4 3x45x8 3x4 3x4 1.5x4 5x8 4x4 2-3-3 2-3-3 7-4-0 5-0-13 10-9-15 3-5-15 14-5-0 3-7-1 21-10-0 7-5-0 2-3-3 2-3-3 7-4-0 5-0-13 10-9-15 3-5-15 14-5-0 3-7-1 21-10-0 7-5-0 2-3-67-11-148-1-117-11-143-6-88.0012 6.0012 PlateOffsets(X,Y)-- [2:0-2-11,Edge], [3:0-1-12,0-1-8], [4:0-2-0,0-1-0], [6:0-2-0,0-1-12], [8:0-4-0,0-2-12], [10:0-6-0,0-2-8], [11:0-1-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.98 0.49 0.51 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.10 (loc) 7-8 7-8 7 l/defl >999 >776 n/a L/d 240 180 n/a PLATES MT20 Weight: 111 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W10,W9: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 8-8-2 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=810/0-6-0(min. 0-1-8), 7=845/0-4-0(min. 0-1-8) Max Horz11=305(LC 15) Max Uplift11=-109(LC 16), 7=-189(LC 13) MaxGrav11=915(LC 39), 7=1056(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-1164/176, 3-12=-1048/183, 4-12=-1015/205, 4-13=-1241/290, 5-13=-1242/290, 5-14=-1238/289, 6-14=-1238/289, 6-7=-992/289 BOT CHORD 10-11=-441/959, 9-10=-392/986, 8-9=-397/977 WEBS 2-11=-1211/233, 3-10=-305/202, 4-8=-166/670, 5-8=-674/218, 6-8=-419/1399 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-3-3,Interior(1) 2-3-3 to 10-9-15,Exterior(2) 10-9-15 to 13-9-15 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=109, 7=189. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T20 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:292018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xDXUaG6hw_VEq2mCspkZQaEvRWfMjeB17KX5cDyv3VW Scale=1:55.5 0-1-130-1-13W1 T1 T2 T3 W10 B1 B2 B3 W2 W3 W4 W5 W6 W7 W8 W9 1 2 3 4 5 6 12 11 10 9 8 7 13 14 15 16 1718 19 3x4 2x4 6x6 4x6 3x4 5x8 3x4 3x4 6x8 1.5x4 4x4 4-3-3 4-3-3 7-4-0 3-0-13 12-9-15 5-5-15 14-5-0 1-7-1 21-10-0 7-5-0 4-3-3 4-3-3 7-4-0 3-0-13 12-9-15 5-5-15 14-5-0 1-7-1 21-10-0 7-5-0 3-7-69-3-149-5-119-3-143-6-88.0012 6.0012 PlateOffsets(X,Y)-- [2:0-2-11,Edge], [3:0-1-12,0-1-8], [4:0-3-0,0-1-0], [6:0-1-8,0-1-12], [9:0-1-10,0-0-13], [9:0-4-0,0-3-8], [11:0-6-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.85 0.51 0.69 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.08 (loc) 7-8 7-8 7 l/defl >999 >785 n/a L/d 240 180 n/a PLATES MT20 Weight: 120 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W10,W9: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-2-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-8-14 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)12=818/0-6-0(min. 0-1-8), 7=837/0-4-0(min. 0-1-8) Max Horz12=356(LC 15) Max Uplift12=-123(LC 16), 7=-190(LC 13) MaxGrav12=885(LC 38), 7=1005(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-14=-1113/143, 3-14=-989/161, 3-15=-1068/164, 15-16=-917/166, 4-16=-913/184, 4-5=-881/235, 5-17=-871/232, 17-18=-871/232, 18-19=-871/232, 6-19=-871/232, 6-7=-937/318 BOT CHORD 11-12=-435/977, 10-11=-430/1051, 9-10=-433/1000, 8-9=-395/946 WEBS 2-12=-1146/207, 3-11=-311/199, 4-9=-186/662, 5-8=-732/243, 6-8=-402/1068 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 12-9-15,Exterior(2) 12-9-15 to 15-9-15zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 12=123, 7=190. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T21 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:302018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-PP5soc7JhHd5RBLOPWFoynn2Nv0xS42AM_He8gyv3VV Scale=1:63.2 0-1-130-1-13W1 T1 T2 T3 W8 B1 B2 B3 W2 W3 W4 W5 W6 W7 1 2 3 4 5 9 8 7 6 10 11 12 13 14 151617 3x4 3x4 4x6 4x6 3x5 5x8 5x8 3x4 4x6 6-3-3 6-3-3 7-4-0 1-0-13 14-5-0 7-1-0 21-10-0 7-5-0 6-3-3 6-3-3 7-4-0 1-0-13 14-9-15 7-5-15 21-10-0 7-0-1 4-11-610-7-1410-9-1110-7-143-6-88.0012 6.0012 PlateOffsets(X,Y)-- [2:0-3-12,0-2-0], [3:0-1-12,0-1-8], [4:0-3-4,0-1-12], [5:0-2-12,0-2-0], [6:0-2-8,0-1-4], [7:0-4-0,0-3-0], [8:0-5-8,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.97 0.49 0.71 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.12 -0.31 0.07 (loc) 6-7 6-7 6 l/defl >999 >846 n/a L/d 240 180 n/a PLATES MT20 Weight: 117 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3: 2x4SPF 1650F 1.5E BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W8: 2x4SPF 1650F 1.5E,W2,W5,W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 8-5-2 oc bracing. WEBS 1 Row at midpt 5-6, 2-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=826/0-6-0(min. 0-1-8), 6=829/0-4-0(min. 0-1-8) Max Horz9=407(LC 15) Max Uplift9=-137(LC 16), 6=-191(LC 13) MaxGrav9=936(LC 38), 6=954(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-9=-277/83, 2-3=-953/94, 3-12=-1052/102, 12-13=-1019/130, 13-14=-815/132, 4-14=-759/152, 4-15=-694/198, 15-16=-695/198, 16-17=-695/198, 5-17=-695/198, 5-6=-891/354 BOT CHORD 8-9=-421/964, 7-8=-481/1125 WEBS 2-9=-1071/198, 2-8=-333/416, 3-8=-714/298, 3-7=-287/182, 5-7=-412/994 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 14-9-15,Exterior(2) 14-9-15 to 17-9-15zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=137, 6=191. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T22 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:312018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-tcfE?y8xSbly3LwbzEm2V?JCfJNvBURKae0Bg6yv3VU Scale=1:66.1 0-1-13W1 T1 T2 T3 W9 B1 B2 B3 W2 W3 W1 W4 W5 W6 W7 W81 2 3 4 5 6 11 10 9 8 7 1213 14 15 16 171819 3x4 2x4 4x8 8x12MT18H 3x55x8 5x8 3x4 1.5x4 1.5x4 4x6 7-4-0 7-4-0 8-3-3 0-11-3 14-5-0 6-1-13 21-10-0 7-5-0 3-9-12 3-9-12 7-4-0 3-6-4 8-3-3 0-11-3 15-1-6 6-10-4 21-10-0 6-8-10 6-3-611-0-03-6-88.0012 6.0012 PlateOffsets(X,Y)-- [4:0-5-0,0-2-0], [5:0-2-0,0-5-12], [6:0-2-12,0-2-0], [7:0-2-12,0-1-8], [8:0-4-0,0-3-0], [10:0-6-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 1.00 0.44 0.96 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.12 -0.31 0.06 (loc) 7-8 7-8 7 l/defl >999 >821 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 133 lb FT= 14% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W9: 2x4SPF 2100F 1.8E,W8: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 8-4-12 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)11=839/0-6-0(min. 0-1-9), 7=834/0-4-0(min. 0-1-8) Max Horz11=419(LC 15) Max Uplift11=-153(LC 16), 7=-194(LC 13) MaxGrav11=1015(LC 38), 7=984(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-13=-752/89, 3-13=-752/89, 3-4=-750/88, 4-14=-959/116, 14-15=-782/124, 15-16=-765/126, 5-16=-727/146, 5-17=-645/200, 17-18=-645/200, 18-19=-645/200, 6-19=-645/200, 6-7=-919/369 BOT CHORD 10-11=-463/718, 9-10=-480/1073, 8-9=-492/1104 WEBS 2-11=-940/220, 2-10=-74/584, 4-10=-921/167, 6-8=-430/983 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 15-1-6,Exterior(2) 15-1-6 to 18-1-6 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)All plates areMT20 plates unless otherwiseindicated. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 11=153, 7=194. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T23 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:322018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-LoDcDI8ZDvtphVUnXxHH1CsOHjjawxFTpImlDYyv3VT Scale:3/16"=1'0-1-13W1 T1 T2 T3 W8 B1 B2 B3 W2 W1 W3 W4 W5 W6 W7 1 2 3 4 5 10 9 8 7 6 11 12 13 14 151617 3x4 4x4 4x8 5x6 3x5 5x8 5x8 3x4 3x4 4x6 7-4-0 7-4-0 10-3-3 2-11-3 14-5-0 4-1-13 21-10-0 7-5-0 7-4-0 7-4-0 10-3-3 2-11-3 15-1-6 4-10-4 21-10-0 6-8-10 7-7-611-0-03-6-88.0012 6.0012 PlateOffsets(X,Y)-- [1:0-1-12,0-2-0], [3:0-5-0,0-2-0], [4:0-4-0,0-2-0], [5:0-2-12,0-2-0], [6:0-2-12,0-1-8], [7:0-4-0,0-3-0], [9:0-6-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.94 0.42 0.92 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.07 (loc) 6-7 6-7 6 l/defl >999 >795 n/a L/d 240 180 n/a PLATES MT20 Weight: 131 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W8: 2x4SPF 2100F 1.8E,W3,W4,W5,W6: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 8-3-8 oc bracing. WEBS 1 Row at midpt 1-10, 5-6 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)10=850/0-6-0(min. 0-1-11), 6=842/0-4-0(min. 0-1-8) Max Horz10=417(LC 15) Max Uplift10=-176(LC 16), 6=-193(LC 13) MaxGrav10=1089(LC 38), 6=1038(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-10=-1016/245, 1-11=-737/91, 11-12=-737/91, 2-12=-737/91, 2-3=-898/111, 3-13=-868/147, 13-14=-845/150, 4-14=-803/167, 4-15=-699/200, 15-16=-699/200, 16-17=-699/200, 5-17=-699/200, 5-6=-972/373 BOT CHORD 9-10=-465/484, 8-9=-464/848, 7-8=-501/1062 WEBS 1-9=-230/1019, 2-9=-974/205, 2-8=-83/506, 3-8=-512/118, 5-7=-430/959 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 15-1-6,Exterior(2) 15-1-6 to 18-1-6 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 10=176, 6=193. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T24 TrussType PiggybackBase Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:342018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-IBLNezAplW7Xwpe9eMKl7dxkrXO5OtvmGcFrHRyv3VR Scale:3/16"=1'0-1-13W1 T1 T2 T3 W8 B1 B2 B3 W2 W1 W3 W4 W5 W6 W7 1 2 3 4 5 10 9 8 7 6 11 12 13 141516 3x4 4x4 4x8 5x6 3x55x8 5x8 3x4 3x4 4x6 7-4-0 7-4-0 12-3-3 4-11-3 14-5-0 2-1-13 21-10-0 7-5-0 7-4-0 7-4-0 12-3-3 4-11-3 15-1-6 2-10-4 21-10-0 6-8-10 8-11-611-0-03-6-88.0012 6.0012 PlateOffsets(X,Y)-- [1:0-1-12,0-1-12], [3:0-5-8,0-2-0], [4:0-2-12,0-1-15], [5:0-2-12,0-2-0], [6:0-2-12,0-1-8], [7:0-4-0,0-3-0], [9:0-6-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.94 0.41 0.79 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.12 -0.32 0.07 (loc) 6-7 6-7 6 l/defl >999 >805 n/a L/d 240 180 n/a PLATES MT20 Weight: 137 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W8: 2x4SPF 2100F 1.8E,W4,W5,W6: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 8-3-12 oc bracing. WEBS 1 Row at midpt 1-10, 5-6, 2-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)10=860/0-6-0(min. 0-1-13), 6=852/0-4-0(min. 0-1-8) Max Horz10=414(LC 15) Max Uplift10=-223(LC 12), 6=-192(LC 13) MaxGrav10=1151(LC 38), 6=1104(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-10=-1079/270, 1-11=-678/107, 2-11=-678/107, 2-12=-923/152, 3-12=-920/152, 3-13=-942/181, 4-13=-904/193, 4-14=-768/202, 14-15=-768/202, 15-16=-768/202, 5-16=-768/202, 5-6=-1038/376 BOT CHORD 9-10=-445/459, 8-9=-457/774, 7-8=-491/1033 WEBS 1-9=-253/1035, 2-9=-1001/212, 2-8=-73/398, 3-8=-372/104, 3-7=-337/114, 5-7=-433/1056 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 15-1-6,Exterior(2) 15-1-6 to 18-1-6 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 10=223, 6=192. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T25 TrussType PiggybackBaseGirder Qty 1 Ply 2 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:362018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-EZS73fB4H7NF96oYmnMDC209JK89smc3kwkyMJyv3VP Scale:3/16"=1'0-1-13W1 T1 T2 T3 W9 B1 W2 W1 W3 W1 W4 W5 W6 W7 W8 W7 B2 1 2 3 4 5 6 7 13 12 11 10 9 8 14 15 16 17 18 19 20 21 22 23 24 25 3x4 4x6 5x6 5x6 3x6 8x8 3x4 8x8 1.5x4 6x6 4x8 4x4 6x6 5-7-3 5-7-3 9-10-1 4-2-14 13-11-3 4-1-2 15-1-6 1-2-4 18-3-15 3-2-9 21-10-0 3-6-1 5-7-3 5-7-3 9-10-1 4-2-14 13-11-3 4-1-2 15-1-6 1-2-4 18-3-15 3-2-9 21-10-0 3-6-1 10-0-1211-0-08.0012 PlateOffsets(X,Y)-- [1:0-2-0,0-1-8], [4:0-2-11,Edge], [5:0-3-12,0-2-0], [6:0-1-12,0-2-0], [7:0-2-8,0-2-8], [8:0-3-12,0-1-8], [9:0-1-12,0-3-12], [10:0-1-12,0-2-0], [11:0-3-8,0-6-0], [12:0-3-8,0-4-0], [13:0-2-4,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.62 0.18 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.18 0.01 (loc) 10-11 10-11 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 456 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x8SP 2400F 2.0E WEBS 2x4SPF No.2 *Except* W9: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 1-13, 7-8, 6-9 REACTIONS.(lb/size)13=3880/0-6-0(min. 0-1-12), 8=4910/0-4-0(min. 0-2-3) Max Horz13=-285(LC 10) Max Uplift13=-838(LC 8), 8=-923(LC 9) MaxGrav13=4206(LC 34), 8=5216(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-13=-3684/742, 1-2=-1974/384, 2-3=-2535/452, 3-14=-2534/452, 14-15=-2531/452, 4-15=-2530/452, 4-5=-2534/449, 5-6=-2046/374, 6-16=-1348/245, 7-16=-1348/245, 7-8=-4367/809 BOT CHORD 12-19=-405/1974, 19-20=-405/1974, 11-20=-405/1974, 11-21=-420/2297, 21-22=-420/2297, 10-22=-420/2297, 10-23=-245/1348, 23-24=-245/1348, 9-24=-245/1348 WEBS 1-12=-789/3975, 2-12=-1747/435, 2-11=-286/1366, 3-11=-429/120, 4-11=-152/610, 4-10=-2176/429, 5-10=-219/1263, 6-10=-444/2304, 6-9=-2467/504, 7-9=-801/4410 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-5-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3) Unbalancedroofliveloads have been considered for this design. 4)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 5)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 6) Unbalancedsnowloads have been considered for this design. 7)Provide adequate drainage to preventwater ponding. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 13=838, 8=923. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T25 TrussType PiggybackBaseGirder Qty 1 Ply 2 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:362018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-EZS73fB4H7NF96oYmnMDC209JK89smc3kwkyMJyv3VP NOTES- 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 582 lb down and 134 lb up at 1-11-4, 584 lb down and 133 lb up at 3-11-4, 584 lb down and 133 lb up at 5-11-4, 584 lb down and 133 lb up at 7-11-4, 586 lb down and 133 lb up at 9-11-4, 584 lb down and 133 lb up at 11-11-4, 584 lb down and 133 lb up at 13-11-4, 584 lb down and 133 lb up at 15-11-4, and 582 lb down and 134 lb up at 17-11-4, and 1807 lb down and 305 lb up at 19-11-4 on bottom chord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-4=-61, 4-5=-51, 5-7=-61, 8-13=-20 Concentrated Loads(lb) Vert: 11=-586(B) 17=-582(B) 18=-584(B) 19=-584(B) 20=-584(B) 21=-584(B) 22=-584(B) 23=-584(B) 24=-582(B) 25=-1807(B) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T26 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:372018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-im0VG?Ci2RV6nGNkJUtSkGZLrkLybEoCzaTWumyv3VO Scale=1:80.3 0-1-13T2 T3 W6 B2 B3 W1 W2 W3 W4 W5 HW1 T1 1 2 3 4 5 6 11 10 9 8 7 15 16 17 18 19 20 3x4 4x4 2x4 3x5 3x4 3x4 1.5x4 3x4 3x10 3x5 4x6 3x8 9-4-0 9-4-0 18-0-9 8-8-9 22-9-15 4-9-6 6-10-8 6-10-8 12-3-12 5-5-5 18-0-9 5-8-13 22-9-15 4-9-6 0-5-1112-4-412-6-15-4-07-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-11,Edge], [5:0-2-0,0-1-12], [6:0-2-4,0-1-8], [9:0-2-7,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.57 0.72 0.71 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.36 0.07 (loc) 9-11 9-11 7 l/defl >999 >746 n/a L/d 240 180 n/a PLATES MT20 Weight: 97 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W5: 2x4SPF No.2 WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-6-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=732/0-6-0(min. 0-1-8), 8=114/0-6-0(min. 0-1-8), 1=806/0-6-0(min. 0-1-8) Max Horz1=386(LC 16) Max Uplift7=-250(LC 13), 8=-87(LC 16), 1=-89(LC 16) MaxGrav7=795(LC 35), 8=209(LC 41), 1=975(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-15=-2392/475, 2-15=-2305/500, 2-16=-2123/414, 3-16=-1890/448, 3-4=-938/156, 4-17=-892/157, 17-18=-769/172, 5-18=-685/189, 5-19=-641/211, 19-20=-642/210, 6-20=-642/210, 6-7=-924/295 BOT CHORD 1-11=-735/2102, 10-11=-487/1490, 9-10=-466/1515 WEBS 2-11=-346/242, 3-11=-138/653, 3-9=-872/346, 6-9=-297/1079 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 18-0-9,Exterior(2) 18-0-9 to 22-3-8zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8, 1 except(jt=lb) 7=250. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T26GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:382018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-AyatTLDKpldzPQyxtCOhHT6dV8rHKs9MBED3QCyv3VN Scale=1:15.4 T1 W1 B1 1 2 3 2x4 1.5x4 1.5x4 3-0-0 3-0-0 0-5-112-5-118.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.13 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=101/3-0-0(min. 0-1-8), 3=101/3-0-0(min. 0-1-8) Max Horz1=82(LC 13) Max Uplift1=-9(LC 16), 3=-39(LC 16) MaxGrav1=114(LC 2), 3=129(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)Gablestudsspaced at 2-0-0 oc. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T27 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:392018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-e88GhhEya2lq0aX7RvvwqheeiY?q3E4VQuycyeyv3VM Scale=1:88.2 0-1-13T2 T3 W6 B2 B3 W1 W2 W3 W4 W5 HW1 T1 B1 1 2 3 4 5 10 9 8 7 6 14 15 16 4x6 3x4 3x5 3x4 3x4 1.5x4 6x8 4x8 4x4 4x6 3x8 10-10-3 10-10-3 20-0-9 9-2-6 22-9-15 2-9-6 7-2-7 7-2-7 13-4-10 6-2-4 20-0-9 6-7-15 22-9-15 2-9-6 0-5-1113-8-413-10-16-8-07-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-11,Edge], [3:0-4-0,Edge], [4:0-3-0,0-1-12], [8:0-1-11,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.74 0.89 0.34 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.22 -0.59 0.07 (loc) 10-13 10-13 7 l/defl >999 >457 n/a L/d 240 180 n/a PLATES MT20 Weight: 102 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W5: 2x4SPF No.2 WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-7-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-6, 3-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)6=703/0-6-0(min. 0-1-10), 7=127/0-6-0(min. 0-1-10), 1=803/0-6-0(min. 0-1-8) Max Horz1=414(LC 16) Max Uplift6=-207(LC 13), 7=-233(LC 16), 1=-77(LC 16) MaxGrav6=848(LC 39), 7=247(LC 41), 1=944(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-2256/468, 2-14=-2170/495, 2-15=-1908/336, 3-15=-1689/373, 3-16=-669/102, 4-16=-475/130, 4-5=-407/161, 5-6=-1019/293 BOT CHORD 1-10=-756/2048, 9-10=-471/1428, 8-9=-454/1457 WEBS 2-10=-429/284, 3-10=-94/643, 3-8=-1016/398, 5-8=-314/1110 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 20-0-9,Exterior(2) 20-0-9 to 22-8-3zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 6=207, 7=233. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T28 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:402018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-6Lieu1EaLMugek6J?dR9MuBo3xPGoYdefYiAV5yv3VL Scale:1/8"=1'0-1-13T2 T3 W7 B2 B3 W1 W2 W3 W4 W5 W6 HW1 T1 B1 1 2 3 4 5 6 11 10 9 87 15 16 17 3x4 5x6 3x4 1.5x4 3x5 3x5 1.5x4 3x4 3x5 5x12 4x6 3x8 7-5-8 7-5-8 14-8-10 7-3-2 22-0-9 7-3-15 22-3-15 0-3-6 22-9-15 0-6-0 7-5-8 7-5-8 14-8-10 7-3-2 22-0-9 7-3-15 22-9-15 0-9-6 0-5-1115-0-415-2-18-0-07-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-11,Edge], [5:0-3-0,0-2-3], [8:0-9-12,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.83 0.62 0.90 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.11 -0.26 0.07 (loc) 11-14 10-11 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 111 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W1,W2,W3: 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-9-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=-417/0-6-0(min. 0-1-13), 8=1246/0-6-0(min. 0-1-13), 1=784/0-6-0(min. 0-1-8) Max Horz1=596(LC 16) Max Uplift7=-548(LC 35), 8=-423(LC 16) MaxGrav7=37(LC 16), 8=1686(LC 35), 1=886(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-15=-2116/332, 2-15=-2023/362, 2-3=-1374/109, 3-16=-1279/128, 4-16=-1140/153, 6-7=-103/335 BOT CHORD 1-11=-828/1914, 10-11=-823/1918, 9-10=-440/1119, 8-9=-438/1166 WEBS 2-11=0/270, 2-10=-827/370, 4-10=-45/537, 4-8=-1147/419, 5-8=-628/294 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 22-0-9,Exterior(2) 22-0-9 to 22-8-3zone; cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)TheFabricationTolerance at joint 5 = 4% 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 7=548, 8=423. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T29 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:422018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-3jqOJiGqtz8Ot1Fi62TdRJG81l4AGTax6sBHZzyv3VJ Scale=1:98.6 0-1-13T2 T3 W8 B2 B3 W1 W2 W3 W4 W5 HW1 T1 B1 W7 W6 1 2 3 4 567 13 12 11 109 8 17 18 19 3x4 8x8 2x4 2x4 3x4 5x8 3x5 1.5x4 3x4 3x5 3x4 4x6 3x8 2x4 7-3-4 7-3-4 14-5-11 7-2-7 21-8-3 7-2-7 22-3-15 0-7-13 22-9-15 0-6-0 7-3-4 7-3-4 14-5-11 7-2-7 21-8-3 7-2-7 22-3-15 0-7-13 22-9-15 0-6-0 0-5-1114-9-514-11-27-9-17-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-11,Edge], [5:0-1-5,Edge], [9:0-2-12,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.80 0.59 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.11 -0.27 0.07 (loc) 13-16 12-13 9 l/defl >999 >978 n/a L/d 240 180 n/a PLATES MT20 Weight: 119 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T3: 2x6SPF No.2 BOT CHORD2x4SPF No.2 *Except* B3: 2x6SPF No.2 WEBS 2x4SPF No.2 *Except* W8,W1,W2,W3: 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-9-9 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=-773/0-6-0(min. 0-1-12), 9=1611/0-6-0(min. 0-1-12), 1=778/0-6-0(min. 0-1-8) Max Horz1=584(LC 16) Max Uplift8=-1119(LC 35), 9=-720(LC 16) MaxGrav8=344(LC 16), 9=2251(LC 35), 1=883(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-17=-2119/333, 2-17=-2029/362, 2-3=-1391/116, 3-18=-1295/134, 4-18=-1155/159, 4-19=-303/0, 7-8=-125/348 BOT CHORD 1-13=-818/1914, 12-13=-815/1920, 11-12=-436/1135, 10-11=-413/1174 WEBS 2-13=0/267, 2-12=-814/362, 4-12=-51/515, 4-10=-1104/409, 5-10=-75/532, 6-9=-312/65, 5-9=-826/277 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 21-8-3,Exterior(2) 21-8-3 to 22-8-3zone; cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 8=1119, 9=720. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10)This truss haslarge upliftreaction(s) from gravityloadcase(s).Properconnectionisrequired to secure truss against upward movement at the bearings.Building designermust provide for upliftreactionsindicated. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T30 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:432018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XvNmX2HTdHGFVBqugl_s_XpLC9OR?un5LWwq6Pyv3VI Scale=1:87.5 0-1-13T2 T3 W7 B2 B3 W1 W2 W3 W4 W5 W6 W7 W8 HW1 T1 B1 1 2 3 4 5 67 13 12 11 10 98 17 18 19 20 3x4 6x6 3x4 3x5 3x4 5x6 3x5 1.5x4 3x4 3x5 3x5 4x4 4x6 3x8 6-7-4 6-7-4 13-1-11 6-6-7 19-8-3 6-6-7 22-3-15 2-7-13 23-5-8 1-1-9 6-7-4 6-7-4 13-1-11 6-6-7 19-8-3 6-6-7 22-3-15 2-7-13 23-5-8 1-1-9 0-5-1113-5-513-7-26-5-17-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.70 0.72 1.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.33 0.09 (loc) 12-13 12-13 8 l/defl >999 >837 n/a L/d 240 180 n/a PLATES MT20 Weight: 119 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-5-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-7-14 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=859/Mechanical, 1=828/0-6-0(min. 0-1-8) Max Horz1=409(LC 16) Max Uplift8=-238(LC 16), 1=-89(LC 16) MaxGrav8=1023(LC 35), 1=981(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-17=-2435/488, 2-17=-2291/512, 2-3=-1822/309, 3-18=-1741/324, 4-18=-1586/348, 4-19=-814/135, 5-19=-626/173 BOT CHORD 1-13=-771/2173, 12-13=-770/2189, 11-12=-477/1521, 10-11=-464/1556, 9-10=-228/553 WEBS 2-12=-690/308, 4-12=-39/456, 4-10=-1014/366, 5-10=-193/821, 5-9=-907/265, 6-9=-276/958, 6-8=-821/300 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 19-8-3,Exterior(2) 19-8-3 to 23-3-12 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 8=238. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T31 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:442018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-?6x8kOI5ObO67LP4ESV5WkMXSZjkkPlEaAgNesyv3VH Scale=1:79.5 0-1-13T2 T3 W7 B2 B3 W1 W2 W3 W4 W5 W6 W7 W8 HW1 T1 B1 1 2 3 4 5 67 13 12 11 10 98 17 18 19 20 21 3x5 6x6 2x4 3x5 3x4 5x6 3x5 1.5x4 3x4 3x5 3x5 3x5 4x6 3x8 5-11-4 5-11-4 11-9-11 5-10-7 17-8-3 5-10-7 22-3-15 4-7-13 23-5-8 1-1-9 5-11-4 5-11-4 11-9-11 5-10-7 17-8-3 5-10-7 22-3-15 4-7-13 23-5-8 1-1-9 0-5-1112-1-512-3-25-1-17-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [5:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.61 0.78 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.32 0.09 (loc) 12-13 12-13 8 l/defl >999 >862 n/a L/d 240 180 n/a PLATES MT20 Weight: 111 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-4-5 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-9-6 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=875/Mechanical, 1=832/0-6-0(min. 0-1-8) Max Horz1=381(LC 16) Max Uplift8=-195(LC 16), 1=-97(LC 16) MaxGrav8=947(LC 35), 1=1001(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-17=-2506/497, 2-17=-2380/517, 2-3=-1995/356, 3-4=-1765/383, 4-18=-1077/191, 18-19=-906/209, 5-19=-846/226, 7-8=-114/260 BOT CHORD 1-13=-754/2182, 12-13=-755/2202, 11-12=-501/1648, 10-11=-488/1679, 9-10=-281/787 WEBS 2-12=-573/264, 4-12=-34/395, 4-10=-914/328, 5-10=-165/757, 5-9=-798/222, 6-9=-180/841, 6-8=-1120/342 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 17-8-3,Exterior(2) 17-8-3 to 21-11-1 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 8=195. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T32 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:452018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-TIVXxkIj9uWzkV_HnA0K3yuchy4GTqXNopPxAIyv3VG Scale=1:71.0 0-1-13T2 T3 W5 B2 B3 W1 W2 W3 W4 W5 W6 HW1 T1 B1 1 2 3 4 5 6 11 10 9 8 7 15 16 17 18 19 20 3x4 6x6 6x6 1.5x4 3x5 6x8 3x5 1.5x4 3x4 1.5x4 4x6 3x8 7-10-7 7-10-7 15-8-3 7-9-11 22-3-15 6-7-13 23-5-8 1-1-9 7-10-7 7-10-7 15-8-3 7-9-11 22-3-15 6-7-13 23-5-8 1-1-9 0-5-1110-9-510-11-23-9-17-0-48.0012 3.8612 PlateOffsets(X,Y)-- [1:0-3-4,Edge], [1:0-0-15,0-1-9], [4:0-3-5,Edge], [8:0-5-12,0-3-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.96 0.76 0.86 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.16 -0.35 0.10 (loc) 9-11 9-11 7 l/defl >999 >805 n/a L/d 240 180 n/a PLATES MT20 Weight: 97 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T2: 2x4SPF 2100F 1.8E BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W2,W4: 2x4SPF No.2 WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied, except end verticals. BOT CHORD Rigidceiling directly applied or 6-8-9 oc bracing. WEBS 1 Row at midpt 2-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=889/Mechanical, 1=838/0-6-0(min. 0-1-8) Max Horz1=422(LC 16) Max Uplift7=-183(LC 16), 1=-75(LC 16) MaxGrav7=982(LC 34), 1=1034(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-15=-2575/437, 15-16=-2482/443, 2-16=-2360/469, 2-3=-1422/177, 3-17=-1237/195, 17-18=-1205/200, 4-18=-1134/222, 4-19=-364/79, 19-20=-365/79, 5-20=-366/78, 5-6=-399/87, 6-7=-960/208 BOT CHORD 1-11=-735/2185, 10-11=-732/2170, 9-10=-707/2197, 8-9=-283/1059 WEBS 2-11=0/293, 2-9=-1095/429, 4-9=-73/601, 4-8=-826/232, 5-8=-830/297, 6-8=-306/1411 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 15-8-3,Exterior(2) 15-8-3 to 19-11-1 zone;cantileverleft exposed ; end verticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 1 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 7=183. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T33 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:462018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xU3v94JLwCeqMfZTLtXZc9RuzMVdCKfX1T9Uikyv3VF Scale=1:58.1 0-1-13T1 T2 W9 B2 B3 W3 W4 W5 W6 W7 W8 W9W10 W1 W2 B11 2 3 4 5 6 13 12 11 10 9 8 7 14 15 16 17 1819 20 3x8 6x6 1.5x4 3x5 3x4 5x6 3x5 3x5 3x4 3x4 3x4 3x5 2x4 5-7-12 5-7-12 11-0-0 5-4-4 16-8-0 5-8-0 22-3-15 5-8-0 23-5-8 1-1-9 5-7-12 5-7-12 11-0-0 5-4-4 16-8-0 5-8-0 22-3-15 5-8-0 23-5-8 1-1-9 2-3-29-5-59-7-22-5-17-0-48.0012 3.8612 PlateOffsets(X,Y)-- [3:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.54 0.43 0.67 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.13 0.05 (loc) 9-11 9-11 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 108 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-3-4 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-8-11 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=911/Mechanical, 13=853/0-6-0(min. 0-1-9) Max Horz13=246(LC 13) Max Uplift7=-205(LC 13), 13=-82(LC 16) MaxGrav7=1148(LC 34), 13=1074(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-14=-1496/215, 14-15=-1388/226, 2-15=-1356/247, 2-16=-1276/246, 16-17=-1197/253, 3-17=-1133/278, 3-18=-1390/286, 18-19=-1391/286, 4-19=-1392/286, 4-20=-589/123, 5-20=-589/123, 1-13=-1038/189 BOT CHORD 12-13=-358/390, 11-12=-458/1230, 10-11=-344/1026, 9-10=-324/1044, 8-9=-347/1475, 7-8=-132/535 WEBS 2-12=-321/118, 2-11=-304/175, 3-11=-62/326, 3-9=-138/505, 4-9=-299/192, 4-8=-855/192, 5-8=-109/800, 5-7=-1416/296, 1-12=-118/1100 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 11-0-0,Exterior(2) 11-0-0 to 15-2-15 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 13 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 13 except(jt=lb) 7=205. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T34 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:472018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-PhdHMQKzhVmh_p8fvb3o8N_1vmnYxp8gG7u2FByv3VE Scale=1:61.0 0-1-130-1-13T1 T2 T3 W13 B2 B3 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W1 W2 B11 2 3 4 5 6 7 15 14 13 12 11 10 9 8 16 17 18 3x6 6x6 4x12 1.5x4 3x5 3x5 5x6 3x5 3x4 3x4 3x5 4x4 3x4 4x6 1.5x4 4-7-12 4-7-12 9-0-0 4-4-4 14-7-7 5-7-7 20-2-15 5-7-7 22-3-15 2-1-1 23-5-8 1-1-9 4-7-12 4-7-12 9-0-0 4-4-4 14-7-7 5-7-7 20-2-15 5-7-7 22-3-15 2-1-1 23-5-8 1-1-9 2-3-28-1-510-4-143-4-107-0-41-1-18.0012 3.8612 PlateOffsets(X,Y)-- [3:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.59 0.58 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.09 -0.21 0.08 (loc) 12 10-12 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 109 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-5-15 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-1-14 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=890/Mechanical, 15=862/0-6-0(min. 0-1-8) Max Horz15=280(LC 13) Max Uplift8=-257(LC 16), 15=-132(LC 16) MaxGrav8=1019(LC 37), 15=1041(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-16=-1319/279, 2-16=-1110/296, 2-3=-1335/367, 3-17=-1944/461, 17-18=-1945/460, 4-18=-1947/460, 4-5=-1970/404, 5-6=-535/117, 1-15=-1008/238 BOT CHORD 14-15=-413/418, 13-14=-518/1139, 12-13=-444/1170, 11-12=-524/2038, 10-11=-513/2054, 9-10=-459/2073, 8-9=-108/332 WEBS 2-14=-383/145, 3-12=-154/984, 4-12=-648/195, 5-9=-1693/376, 6-9=-275/1227, 6-8=-971/278, 1-14=-186/986 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 9-0-0,Exterior(2) 9-0-0 to 13-2-15, Interior(1) 20-2-15 to 23-3-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Bearing at joint(s) 15 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 8=257, 15=132. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T35 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:492018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-M3l1n6LDD70PD6I2005GDo3RCaThPgPzjRN8J3yv3VC Scale=1:61.0 0-1-130-1-13T1 T2 T3 W17 B2 B3 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W1 W2 B1 1 2 3 4 5 6 7 8 9 19 18 17 16 15 14 13 12 11 10 20 21 22 23 24 25 3x5 6x6 5x12MT18H 1.5x4 3x5 3x5 5x63x5 3x4 3x4 4x4 3x8 4x4 6x6 3x8 5x6 5x6 3x8 1.5x4 3-7-12 3-7-12 7-0-0 3-4-4 10-9-0 3-8-15 14-5-15 3-8-15 18-2-15 3-8-15 20-3-7 2-0-8 22-3-15 2-0-8 23-5-8 1-1-9 3-7-12 3-7-12 7-0-0 3-4-4 10-9-0 3-8-15 14-5-15 3-8-15 18-2-15 3-8-15 20-3-7 2-0-8 22-3-15 2-0-8 23-5-8 1-1-9 2-3-26-9-510-4-143-4-107-0-4-0-2-158.0012 3.8612 PlateOffsets(X,Y)-- [3:0-3-0,0-1-0], [4:0-3-8,0-1-8], [6:0-8-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.35 0.60 0.74 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.46 0.10 (loc) 13-14 13-14 10 l/defl >999 >603 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 128 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x4SPF No.2 *Except* T2: 2x6SP 2400F 2.0E BOT CHORD2x4SPF No.2 *Except* B2: 2x4SP 2400F 2.0E WEBS 2x4SPFStud*Except* W11: 2x6SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-8-7 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 7-7-9 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)10=881/Mechanical, 19=872/0-6-0(min. 0-1-8) Max Horz19=280(LC 13) Max Uplift10=-257(LC 16), 19=-132(LC 16) MaxGrav10=957(LC 37), 19=979(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-20=-1101/248, 20-21=-1031/251, 21-22=-1021/258, 2-22=-1012/261, 2-3=-1379/360, 3-23=-2072/487, 4-23=-2078/486, 4-24=-3275/699, 5-24=-3275/699, 5-25=-4976/1044, 6-25=-4967/1045, 6-7=-2063/448, 7-8=-501/114, 1-19=-950/231 BOT CHORD 18-19=-408/403, 17-18=-513/1045, 16-17=-478/1212, 15-16=-607/2171, 14-15=-599/2190, 13-14=-830/3432, 12-13=-1126/4983, 11-12=-447/1801, 10-11=-103/312 WEBS 2-18=-458/153, 2-17=-78/339, 3-16=-205/1223, 4-16=-1037/233, 4-14=-242/1349, 5-14=-842/211, 5-13=-345/1710, 6-13=-893/231, 6-12=-2993/636, 7-12=-271/1394, 7-11=-1475/383, 8-11=-266/1122, 8-10=-915/268, 1-18=-181/883 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 7-0-0,Exterior(2) 7-0-0 to 11-2-15, Interior(1) 18-2-15 to 23-3-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)All plates areMT20 plates unless otherwiseindicated. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Bearing at joint(s) 19 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 10=257, 19=132. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T35 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:492018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-M3l1n6LDD70PD6I2005GDo3RCaThPgPzjRN8J3yv3VC LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T36 TrussType Jack-Closed Qty 7 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:492018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-M3l1n6LDD70PD6I2005GDo3OeaXKPqOzjRN8J3yv3VC Scale=1:38.1 W1 T1 W4 B1 B2 W2 W3 1 2 3 6 5 4 7 8 9 3x5 3x6 1.5x4 4x44x6 3x4 3-11-7 3-11-7 7-1-8 3-2-1 3-11-7 3-11-7 7-1-8 3-2-1 0-11-45-8-43-4-102-3-108.0012 8.0012 PlateOffsets(X,Y)-- [2:0-1-12,0-1-8], [3:0-2-0,0-0-8], [5:0-3-0,0-2-8], [6:0-5-0,0-0-7] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.52 0.37 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.07 -0.16 0.11 (loc) 5 5 4 l/defl >999 >520 n/a L/d 240 180 n/a PLATES MT20 Weight: 27 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)6=242/0-6-0(min. 0-1-8), 4=242/Mechanical Max Horz6=186(LC 16) Max Uplift4=-144(LC 16) MaxGrav6=273(LC 2), 4=300(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-6=-404/158, 1-7=-493/168, 7-8=-442/171, 2-8=-439/180 BOT CHORD 5-6=-326/545, 4-5=-256/422 WEBS 2-5=-109/289, 2-4=-429/266 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-11-12zone;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 5) Refer to girder(s) for truss to trussconnections. 6)Bearing at joint(s) 6 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 4=144. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T36GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:502018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-qGJQ?RMs_Q8GrGtEajcVm?cfXzwz8Hx7y57irVyv3VB Scale=1:38.1 W1 T1 W4 B1 B2 W2 W3 ST2 ST3 ST1 ST1 1 2 3 7 6 5 4 15 16 1.5x4 1.5x4 1.5x4 4x44x4 3x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 1.5x4 3-11-7 3-11-7 7-1-8 3-2-1 3-11-7 3-11-7 7-1-8 3-2-1 0-11-45-8-43-4-102-3-108.0012 8.0012 PlateOffsets(X,Y)-- [2:0-1-12,0-1-8], [6:0-2-0,0-2-4], [8:0-1-10,0-0-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.19 0.15 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.04 -0.00 (loc) 6-7 6-7 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 30 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 3-2-1 except(jt=length) 7=0-6-0. (lb)-Max Horz7=175(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 7, 4 except 6=-101(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 7, 4, 5 except 6=302(LC 29), 6=255(LC 1) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. BOT CHORD 6-7=-340/328, 5-6=-269/270, 4-5=-269/270 WEBS 2-6=-251/80 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 3-1-12,Interior(1) 3-1-12 to 6-11-12zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablestudsspaced at 2-0-0 oc. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Bearing at joint(s) 7 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 7, 4 except(jt=lb) 6=101. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T37 TrussType Roof SpecialGirder Qty 1 Ply 2 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:532018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-Er_YdTPkHLWqikbpFr9COeE1ZBtiLTpZe3LMSqyv3V8 Scale=1:50.4 W1 T1 T3 W7 B1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W1 W2 W3 W4 W5 W6T2 B2 1 2 3 4 5 6 7 8 9 10 20 19 18 17 16 15 14 13 12 11 21 22 23 24 25 26 27 28 29 30 31 3x8 5x8 4x6 3x85x12MT18H6x8 2x4 6x8 2x4 6x8 2x4 2x4 3x8 2x4 8x8 6x12MT18H 2x4 2x4 8x10 5x8 3-4-14 3-4-14 6-7-15 3-3-2 9-11-1 3-3-2 13-2-2 3-3-2 16-5-4 3-3-2 19-6-9 3-1-6 22-9-8 3-2-15 26-4-0 3-6-7 3-4-14 3-4-14 6-7-15 3-3-2 9-11-1 3-3-2 13-2-2 3-3-2 16-5-4 3-3-2 19-6-9 3-1-6 22-9-8 3-2-15 26-4-0 3-6-7 3-4-107-10-143-4-108.0012 PlateOffsets(X,Y)-- [10:0-1-12,0-1-12], [12:0-3-0,0-2-8], [19:0-3-0,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.71 0.47 0.77 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.43 0.08 (loc) 14-15 14-15 11 l/defl >999 >726 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 407 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x6SP 2400F 2.0E BOT CHORD2x6SP 2400F 2.0E WEBS 2x4SPFStud*Except* W7: 2x6SPF No.2, W2,W4: 2x4SPF No.2, W6: 2x4SPF 1650F 1.5E BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)20=3815/0-6-0(min. 0-1-12), 11=5820/0-6-0(min. 0-2-7) Max Horz20=163(LC 45) Max Uplift20=-1383(LC 8), 11=-1556(LC 12) MaxGrav20=4190(LC 30), 11=5931(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-20=-3954/1280, 1-2=-4255/1361, 2-3=-4255/1361, 3-4=-10039/2939, 4-21=-10039/2939, 5-21=-10039/2939, 5-6=-12052/3058, 6-7=-12052/3058, 7-8=-12052/3058, 8-9=-4196/948, 9-10=-4113/1012, 10-11=-5352/1429 BOT CHORD 19-24=-2496/7579, 18-24=-2496/7579, 18-25=-2496/7579, 17-25=-2496/7579, 17-26=-3374/11686, 16-26=-3374/11686, 15-16=-3374/11686, 15-27=-3374/11686, 14-27=-3374/11686, 14-28=-2552/10050, 13-28=-2552/10050, 13-29=-2566/10129, 29-30=-2566/10129, 12-30=-2566/10129 WEBS 1-19=-1834/5651, 2-19=-277/126, 3-19=-4468/1295, 3-18=-209/474, 3-17=-832/3308, 4-17=-280/94, 5-17=-2302/354, 5-15=-263/825, 5-14=-132/813, 8-14=-938/2747, 8-13=-266/1589, 8-12=-8968/2254, 9-12=-336/233, 10-12=-2107/8208 NOTES- 1) 2-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x4- 1 row at 0-9-0 oc, 2x6- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=1383, 11=1556. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T37 TrussType Roof SpecialGirder Qty 1 Ply 2 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:532018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-Er_YdTPkHLWqikbpFr9COeE1ZBtiLTpZe3LMSqyv3V8 NOTES- 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 255 lb down and 164 lb up at 1-4-12, 255 lb down and 164 lb up at 2-10-12, 255 lb down and 164 lb up at 4-4-12, 255 lb down and 164 lb up at 6-4-12, 255 lb down and 164 lb up at 8-4-12, 255 lb down and 164 lb up at 10-4-12, 255 lb down and 164 lb up at 12-4-12, 937 lb down and 277 lb up at 14-4-12, 999 lb down and 277 lb up at 16-4-12, 1128 lb down and 225 lb up at 18-4-12, 962 lb down and 203lb up at 20-4-12, and 927 lb down and 215 lb up at 22-4-12, and 1003 lb down and 258 lb up at 24-4-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-8=-61, 8-10=-51, 11-20=-20 Concentrated Loads(lb) Vert: 16=-235(B) 18=-235(B) 14=-999(B) 22=-235(B) 23=-235(B) 24=-235(B) 25=-235(B) 26=-235(B) 27=-937(B) 28=-1128(B) 29=-962(B) 30=-927(B) 31=-1003(B) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T38 TrussType Roof SpecialGirder Qty 1 Ply 3 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:552018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-AD6J29Q_pzmYx1lCNGCgT3JVt_YbpLqs6NqTXjyv3V6 Scale=1:50.4 W1 T1 T3 W9 B1 W2 W3 W4 W3 W4 W3 W4 W3 W4 W3 W4 W5 W6 W7 W8T2 B2 1 2 3 4 5 6 7 8 9 10 20 19 18 17 16 15 14 13 12 11 21 22 23 24 25 26 27 28 29 30 31 32 5x12MT18H 8x8 6x8 6x88x12MT18H10x14MT18H 3x6 6x10 3x6 8x10 3x6 3x6 4x8 3x6 8x8 8x12MT18H 3x8 3x6 10x20MT18H 8x8 3-5-7 3-5-7 6-9-1 3-3-11 10-0-12 3-3-11 13-4-7 3-3-11 16-8-2 3-3-11 19-10-0 3-1-15 22-11-4 3-1-4 26-4-0 3-4-12 3-5-7 3-5-7 6-9-1 3-3-11 10-0-12 3-3-11 13-4-7 3-3-11 16-8-2 3-3-11 19-10-0 3-1-15 22-11-4 3-1-4 26-4-0 3-4-12 3-6-157-10-143-6-158.0012 PlateOffsets(X,Y)-- [1:0-3-0,0-3-8], [8:0-5-12,0-4-0], [10:0-2-4,0-3-8], [11:Edge,0-5-8], [12:0-4-0,0-4-0], [14:0-1-8,0-5-0], [17:0-3-12,0-5-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.21 0.50 0.87 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.25 -0.52 0.10 (loc) 15 14-15 11 l/defl >999 >598 n/a L/d 240 180 n/a PLATES MT20 MT18H Weight: 743 lb FT= 20% GRIP 197/144 197/144 LUMBER- TOP CHORD2x8SP 2400F 2.0E BOT CHORD2x8SP 2400F 2.0E WEBS 2x4SPFStud*Except* W1,W9: 2x6SP 2400F 2.0E,W2,W8: 2x4SPF 1650F 1.5E W4,W6: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)20=12289/0-6-0(min. 0-3-8), 11=12038/0-6-0(min. 0-3-6) Max Horz20=277(LC 9) Max Uplift20=-1280(LC 8), 11=-1374(LC 12) MaxGrav20=12666(LC 30), 11=12160(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-20=-11217/1159, 1-2=-12103/1200, 2-3=-12103/1200, 3-4=-25572/2616, 4-21=-25572/2616, 5-21=-25572/2616, 5-6=-25667/2704, 6-7=-25667/2704, 7-8=-25667/2704, 8-9=-8135/909, 9-10=-7761/912, 10-11=-10785/1255 BOT CHORD 20-22=-292/528, 22-23=-292/528, 19-23=-292/528, 19-24=-2090/20389, 24-25=-2090/20389, 18-25=-2090/20389, 18-26=-2090/20389, 17-26=-2090/20389, 17-27=-2841/27126, 16-27=-2841/27126, 15-16=-2841/27126, 15-28=-2841/27126, 14-28=-2841/27126, 14-29=-2137/20061, 13-29=-2137/20061, 13-30=-2150/20197, 30-31=-2150/20197, 12-31=-2150/20197 WEBS 1-19=-1591/15745, 2-19=-190/302, 3-19=-11141/1172, 3-18=-178/2367, 3-17=-733/6969, 5-17=-2169/288, 5-15=-188/2274, 5-14=-1962/171, 8-14=-794/7695, 8-13=-270/2777, 8-12=-18690/2023, 9-12=-279/614, 10-12=-1813/16021 NOTES- 1) 3-ply truss to be connected togetherwith 10d (0.131"x3") nails as follows: Topchordsconnected as follows: 2x6- 2 rowsstaggered at 0-9-0 oc, 2x8- 2 rowsstaggered at 0-9-0 oc. Bottomchordsconnected as follows: 2x8- 2 rowsstaggered at 0-4-0 oc. Websconnected as follows: 2x4- 1 row at 0-9-0 oc. 2)Allloads areconsidered equally applied to all plies, exceptif noted as front(F) or back(B) facein the LOAD CASE(S)section.Ply to plyconnections have been provided to distribute onlyloads noted as(F) or(B), unless otherwiseindicated. 3)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 5) Unbalancedsnowloads have been considered for this design. 6)Provide adequate drainage to preventwater ponding. 7)All plates areMT20 plates unless otherwiseindicated. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T38 TrussType Roof SpecialGirder Qty 1 Ply 3 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:552018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-AD6J29Q_pzmYx1lCNGCgT3JVt_YbpLqs6NqTXjyv3V6 NOTES- 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 20=1280, 11=1374. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 11) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 1586 lb down and 152 lb up at 1-4-12, 1586 lb down and 152 lb up at 2-10-12, 1586 lb down and 152 lb up at 4-4-12, 1586 lb down and 152 lb up at 6-4-12, 1586 lb down and 152 lb up at 8-4-12, 1587 lb down and 152 lb up at 10-4-12, 1587lb down and 152 lb up at 12-4-12, 1867 lb down and 210 lb up at 14-4-12, 1867 lb down and 210 lb up at 16-4-12, 1863 lb down and 209 lb up at 18-4-12, 1863 lb down and 209 lb up at 20-4-12, and 1867 lb down and 210 lb up at 22-4-12, and 1867 lb down and 210 lb up at 24-4-12 on bottomchord.The design/selection of such connection device(s)is the responsibility of others. LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-8=-61, 8-10=-51, 11-20=-20 Concentrated Loads(lb) Vert: 16=-1587(F) 14=-1867(F) 22=-1586(F) 23=-1586(F) 24=-1586(F) 25=-1586(F) 26=-1586(F) 27=-1587(F) 28=-1867(F) 29=-1863(F) 30=-1863(F) 31=-1867(F) 32=-1867(F) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T39 TrussType HipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:572018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-7cE3TrSFKa1GBLvaUhE8YUOjLoFkHH29ZhJZbbyv3V4 Scale=1:34.9 0-1-130-1-13T1 T2 T1 B1 W1 W2 W3 W2 W3 W2 W1 B1 1 2 3 4 5 6 7 8 13 12 11 10 9 18 19 20 21 22 23 24 25 26 27 28 6x6 6x6 4x4 5x62x43x8 3x4 1.5x4 4x8 3x8 4x6 3-2-8 3-2-8 7-4-15 4-2-7 11-9-1 4-4-3 15-11-8 4-2-7 19-2-0 3-2-8 -0-10-12 0-10-12 3-2-8 3-2-8 7-4-15 4-2-7 11-9-1 4-4-3 15-11-8 4-2-7 19-2-0 3-2-8 20-0-12 0-10-12 0-4-72-4-52-6-20-4-72-4-58.0012 PlateOffsets(X,Y)-- [2:0-0-3,Edge], [3:0-3-5,Edge], [6:0-3-5,Edge], [12:0-3-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.72 0.40 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.19 -0.32 0.05 (loc) 10-12 10-12 7 l/defl >999 >723 n/a L/d 240 180 n/a PLATES MT20 Weight: 93 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SP 2400F 2.0E WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-4-13 oc purlins. BOT CHORD Rigidceiling directly applied or 8-4-8 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=1095/0-4-0(min. 0-1-8), 7=1675/0-4-0(min. 0-1-8) Max Horz2=-69(LC 10) Max Uplift2=-586(LC 9), 7=-804(LC 8) MaxGrav2=1209(LC 34), 7=1790(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-2124/1060, 3-18=-3358/1551, 18-19=-3360/1550, 4-19=-3362/1551, 4-20=-3807/1709, 20-21=-3807/1709, 5-21=-3807/1709, 5-22=-3809/1710, 22-23=-3807/1710, 6-23=-3806/1710, 6-7=-3355/1517 BOT CHORD 2-13=-908/1788, 13-24=-902/1776, 12-24=-902/1776, 12-25=-1550/3359, 11-25=-1550/3359, 11-26=-1550/3359, 10-26=-1550/3359, 10-27=-1234/2741, 27-28=-1234/2741, 9-28=-1234/2741, 7-9=-1262/2818 WEBS 3-12=-749/1758, 4-12=-685/288, 4-10=-227/516, 5-10=-472/210, 6-10=-527/1183, 6-9=-432/1091 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=586, 7=804. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T39 TrussType HipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:572018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-7cE3TrSFKa1GBLvaUhE8YUOjLoFkHH29ZhJZbbyv3V4 NOTES- 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 104 lb down and 159 lb up at 3-2-8, 82 lb down and 62 lb up at 5-3-4 , 82 lb down and 62 lb up at 7-3-4, 82 lb down and 62 lb up at 9-3-4, 82 lb down and 62 lb up at 11-3-4, 82 lb down and 62 lb up at 13-3-4, and 79 lb down and 62 lb up at 15-3-4, and 104 lb down and 159 lb up at 15-11-8 on top chord, and 70 lb down and 88 lb up at 3-2-8, 22 lb down and 34 lb up at 5-3-4, 22 lb down and 34 lb up at 7-3-4, 22 lb down and 34 lb up at 9-3-4, 22 lb down and 34 lb up at 11-3-4, 22 lb down and 34 lb up at 13-3-4, 22 lb down and 34 lb up at 15-3-4, and 958 lb down and 367lb up at 15-6-4, and 70 lb down and 88 lb up at 15-10-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-6=-61, 6-8=-51, 2-7=-20 Concentrated Loads(lb) Vert: 3=-13(B) 6=-13(B) 13=-23(B) 12=-18(B) 4=-9(B) 9=-23(B) 19=-9(B) 20=-9(B) 21=-9(B) 22=-9(B) 23=-9(B) 24=-18(B) 25=-18(B) 26=-18(B) 27=-18(B) 28=-976(F=-958,B=-18) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T40 TrussType Hip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:582018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-bonRgBSt5u97oVUn2PlN5hx_vCZV0p8IoL3772yv3V3 Scale=1:27.8 0-1-130-1-13T1 T2 T3 B1 W1 W2 W2 W1 W4 W3 1 2 3 4 5 6 9 8 7 13 14 15 5x6 5x6 3x5 3x6 3x4 3x4 6x8 3x5 5-2-8 5-2-8 13-11-8 8-9-0 15-5-8 1-6-0 -0-10-12 0-10-12 5-2-8 5-2-8 9-7-0 4-4-8 13-11-8 4-4-8 15-5-8 1-6-0 0-4-73-8-53-10-22-10-23-8-58.0012 PlateOffsets(X,Y)-- [2:0-5-0,0-0-10], [3:0-3-0,0-2-3], [5:0-3-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.35 0.55 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.24 -0.33 0.02 (loc) 8-9 8-9 7 l/defl >760 >562 n/a L/d 240 180 n/a PLATES MT20 Weight: 64 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)2=629/0-4-0(min. 0-1-8), 7=588/Mechanical Max Horz2=140(LC 16) Max Uplift2=-197(LC 13), 7=-213(LC 12) MaxGrav2=756(LC 39), 7=722(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-13=-903/670, 13-14=-895/678, 3-14=-864/698, 3-15=-713/610, 4-15=-716/610, 4-5=-305/284, 5-6=-340/314, 6-7=-812/727 BOT CHORD 2-9=-590/724, 8-9=-509/827 WEBS 3-9=-272/262, 4-8=-657/328, 6-8=-615/713 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 5-2-8,Exterior(2) 5-2-8 to 15-3-12 zone;cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS for reactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 2=197, 7=213. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T41 TrussType Hip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:08:592018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-3_LptWTVsBH_Qf3zc6GcdvT3gcuElJOR0?oggUyv3V2 Scale=1:33.1 0-1-130-1-13T1 T2 T3 B1 W1 W2 W1 W4 W3 HW11 2 3 4 7 6 5 11 12 13 14 15 16 3x6 5x6 3x5 3x61.5x4 6x6 3x8 7-2-8 7-2-8 11-11-8 4-9-0 15-5-8 3-6-0 7-2-8 7-2-8 11-11-8 4-9-0 15-5-8 3-6-0 0-4-75-0-55-2-22-10-25-0-58.0012 PlateOffsets(X,Y)-- [1:0-2-0,0-1-8], [2:0-3-5,Edge], [3:0-3-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.74 0.59 0.25 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.10 -0.12 0.01 (loc) 7-10 7-10 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 63 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-5-11 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-7-1 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=579/0-4-0(min. 0-1-8), 5=552/Mechanical Max Horz1=143(LC 16) Max Uplift1=-153(LC 13), 5=-140(LC 12) MaxGrav1=785(LC 38), 5=643(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-11=-809/509, 11-12=-616/517, 2-12=-585/537, 2-13=-347/355, 13-14=-347/355, 14-15=-347/355, 3-15=-347/355, 3-16=-377/386, 4-16=-469/374, 4-5=-612/460 BOT CHORD 1-7=-428/515, 6-7=-420/510 WEBS 2-7=-263/254, 2-6=-264/207, 4-6=-340/440 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-0-0 to 3-0-0,Interior(1) 3-0-0 to 7-2-8,Exterior(2) 7-2-8 to 15-3-12zone; cantileverleft exposed ; end verticalleft exposed; porchleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 1=153, 5=140. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T42 TrussType HipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:002018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XBvC5sU7dVPr2od9AporA60KU?D_UiZbFfYECwyv3V1 Scale=1:41.5 0-1-130-1-13T1 T2 T3 B1 W1 W2 W3 W4 W3 W5 W6 W7 W8 B2 1 2 3 4 5 6 7 8 13 12 11 10 9 19 20 21 3x4 5x6 6x6 3x5 1.5x4 3x8 3x4 3x5 8x8 3x8 3x10 3x8 4-9-11 4-9-11 9-2-8 4-4-13 9-11-8 0-9-0 12-8-14 2-9-6 15-8-3 2-11-5 19-2-0 3-5-13 4-9-11 4-9-11 9-2-8 4-4-13 9-11-8 0-9-0 12-8-14 2-9-6 15-8-3 2-11-5 19-2-0 3-5-13 20-0-12 0-10-12 0-4-76-4-56-6-20-4-76-4-58.0012 PlateOffsets(X,Y)-- [3:0-3-0,0-2-3], [4:0-3-5,Edge], [7:0-4-1,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.35 0.62 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.13 0.05 (loc) 10 10 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 99 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except* B2: 2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-3-4 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=850/0-4-0(min. 0-1-15), 7=1447/0-4-0(min. 0-2-15) Max Horz1=-168(LC 56) Max Uplift1=-157(LC 12), 7=-369(LC 13) MaxGrav1=1231(LC 35), 7=1860(LC 35) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-1792/228, 2-19=-1388/229, 19-20=-1285/239, 3-20=-1268/254, 3-4=-1053/239, 4-21=-1273/269, 5-21=-1353/253, 5-6=-1906/354, 6-7=-2875/586 BOT CHORD 1-13=-281/1399, 12-13=-281/1399, 11-12=-178/1056, 10-11=-225/1502, 9-10=-416/2349, 7-9=-415/2349 WEBS 2-12=-423/162, 3-12=-135/405, 4-11=-204/670, 5-11=-827/279, 5-10=-237/745, 6-10=-1077/358, 6-9=-311/974 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft and right exposed ; end verticalleft and right exposed; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 1=157, 7=369. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 887 lb down and 314 lb up at 15-6-4 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T42 TrussType HipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:002018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XBvC5sU7dVPr2od9AporA60KU?D_UiZbFfYECwyv3V1 LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-4=-61, 4-8=-51, 7-14=-20 Concentrated Loads(lb) Vert: 9=-887(B) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T43 TrussType HalfHipGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:012018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-?NTaICVlOpXifyCMjXJ4jKZXSPd1D90kUJHnkNyv3V0 Scale=1:18.8 T1 W1 B1 W2 W1 W2 W1 1 2 3 6 5 4 7 8 9 10 2x4 2x4 8x8 4x4 1.5x4 4x4 2-11-4 2-11-4 5-10-8 2-11-4 0-3-0 0-3-0 2-11-4 2-8-4 5-10-8 2-11-4 0-5-82-9-2PlateOffsets(X,Y)-- [5:0-4-0,0-4-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MP 0.21 0.37 0.50 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 5-6 5-6 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 31 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x6SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-8 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)4=907/Mechanical, 6=978/Mechanical Max Uplift4=-294(LC 8), 6=-347(LC 8) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-761/233, 2-7=-761/233, 3-7=-761/233, 3-4=-733/252, 1-6=-760/272 WEBS 1-5=-306/1001, 3-5=-306/1001 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone; porchleft and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 4=294, 6=347. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 9) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 81 lb down and 55 lb up at 0-1-12, and 89 lb down and 54 lb up at 4-8-12 on top chord, and 39 lb down and 30 lb up at 0-1-12, 702 lb down and 233 lb up at 1-11-4, and 623 lb down and 160 lb up at 3-11-4, and 26 lb down and 38 lb up at 4-8-12 on bottomchord.The design/selection of suchconnection device(s)is the responsibility of others. 10)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B). LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-61, 4-6=-20 Concentrated Loads(lb) Vert: 6=-30(B) 1=-39(B) 7=-17(B) 8=-702(F) 9=-623(F) 10=-23(B) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T44 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:022018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-TZ1yWYWN96fZH6nYHEqJFX5dipxxyXoujz1KHpyv3V? Scale=1:49.4 0-1-13W1 T1 T2 W7 B1W2 W3 W4 W5 W6 1 2 3 4 8 7 6 5 9 10 2x4 3x8 4x10 3x4 3x5 3x8 4x4 3x5 2-2-15 2-2-15 7-7-11 5-4-13 13-4-0 5-8-5 2-2-15 2-2-15 7-7-11 5-4-13 13-4-0 5-8-5 1-1-58-7-141-1-58.0012 PlateOffsets(X,Y)-- [7:0-3-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.56 0.46 0.79 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.12 0.02 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 65 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-10-1 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-5 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=481/0-6-0(min. 0-1-8), 5=463/Mechanical Max Horz8=291(LC 16) Max Uplift8=-5(LC 16), 5=-214(LC 16) MaxGrav8=613(LC 34), 5=696(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-8=-555/8, 1-2=-1449/0, 2-3=-798/0 BOT CHORD 7-8=-289/292, 6-7=-278/1366, 5-6=-170/590 WEBS 1-7=0/1463, 2-7=-493/53, 2-6=-787/109, 3-6=0/339, 3-5=-751/216 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-1-12 to 2-2-15,Interior(1) 2-2-15 to 13-2-4zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)Provide adequate drainage to preventwater ponding. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6) Refer to girder(s) for truss to trussconnections. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 8 except(jt=lb) 5=214. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T44GE TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:032018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-xmbKjuW?wQnQvGMkryLYoleuiDOkh811xdmupFyv3V_ Scale=1:42.1 T1 W1 B1 ST5 ST4 ST3 ST2 ST1 1 2 3 4 5 6 7 13 12 11 10 9 8 14 3x4 12-11-6 12-11-6 0-0-48-7-148.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.09 0.04 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 8 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 65 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 7-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 12-11-6. (lb)-Max Horz1=336(LC 16) Max UpliftAll uplift 100 lb orless at joint(s) 1, 8, 9, 10, 11, 12, 13 MaxGravAllreactions 250 lb orless at joint(s) 1, 8, 9, 10, 11, 12, 13 FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-371/309, 2-3=-293/239 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-5-6 to 3-5-6,Exterior(2) 3-5-6 to 12-9-10zone;cantileverleft exposed ; endverticalleft exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)All plates are 1.5x4MT20 unless otherwiseindicated. 6)Gablerequirescontinuous bottomchord bearing. 7)Gablestudsspaced at 2-0-0 oc. 8)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 8, 9, 10, 11, 12, 13. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T45 TrussType Roof SpecialGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:052018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-u8j58aYGS1178aW7yNN0tAj8E01_9yAKPxF_s8yv3Uy Scale=1:53.1 0-1-130-1-13T1 T2 T3 W10 B1 W1 W2 W3 W4 W3 W5 W6 W7 W8 W9 B212 3 4 5 6 7 8 15 14 13 12 11 10 9 19 20 21 22 23 24 25 6x6 4x10 2x4 3x53x4 3x41.5x4 3x4 3x4 3x8 1.5x4 1.5x4 3x4 3x5 2-10-0 2-10-0 6-8-8 3-10-8 10-7-0 3-10-8 14-0-15 3-5-15 18-8-11 4-7-13 23-8-0 4-11-5 -0-10-12 0-10-12 2-10-0 2-10-0 6-8-8 3-10-8 10-7-0 3-10-8 14-0-15 3-5-15 18-8-11 4-7-13 23-8-0 4-11-5 0-4-72-1-58-7-142-1-58.0012 PlateOffsets(X,Y)-- [3:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 NO IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.47 0.24 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.05 0.02 (loc) 14-15 10-11 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 107 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W10: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 8-2-2 oc bracing. WEBS 1 Row at midpt 8-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=392/Mechanical, 2=403/0-4-0(min. 0-1-8), 12=1121/0-6-0(min. 0-2-1) Max Horz2=355(LC 12) Max Uplift9=-200(LC 54), 2=-220(LC 9), 12=-345(LC 12) MaxGrav9=627(LC 43), 2=477(LC 35), 12=1310(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-3=-592/392, 3-19=-541/373, 4-19=-544/373, 4-20=-229/473, 20-21=-229/473, 5-21=-229/473, 5-22=-228/472, 6-22=-228/473, 6-7=-574/0 BOT CHORD 2-15=-527/487, 15-23=-524/481, 14-23=-524/481, 13-14=-457/541, 13-24=-457/541, 24-25=-457/541, 12-25=-457/541, 11-12=-178/550, 10-11=-174/555, 9-10=-128/398 WEBS 4-12=-1078/468, 5-12=-386/151, 6-12=-1088/12, 7-9=-569/183 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0 Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) except(jt=lb) 9=200, 2=220, 12=345. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. 10) Hanger(s) or otherconnection device(s)shall be providedsufficient to supportconcentratedload(s) 150 lb down and 141 lb up at 2-10-1, 75 lb down and 52 lb up at 4-10-12, 75 lb down and 52 lb up at 6-10-12, and 75 lb down and 52 lb up at 8-10-12, and 75 lb down and 52 lb up at 10-3-2 on top chord, and 60 lb down and 78 lb up at 2-10-1, 17 lb down and 30 lb up at 4-10-12, 17 lb down and 30 lb up at 6-10-12, and 17 lb down and 30 lb up at 8-10-12, and 17 lb down and 30 lb up at 10-3-2 on bottomchord. The design/selection of suchconnection device(s)is the responsibility of others. 11)In the LOAD CASE(S)section,loads applied to the face of the truss are noted as front(F) or back(B).Continued on page 2 DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T45 TrussType Roof SpecialGirder Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:052018 Page2 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-u8j58aYGS1178aW7yNN0tAj8E01_9yAKPxF_s8yv3Uy LOADCASE(S)Standard 1) Dead +Snow(balanced): LumberIncrease=1.15,PlateIncrease=1.15 Uniform Loads(plf) Vert: 1-3=-51, 3-6=-61, 6-8=-51, 9-16=-20 Concentrated Loads(lb) Vert: 3=-6(F) 15=-14(F) 14=-13(F) 4=-6(F) 19=-6(F) 20=-6(F) 21=-6(F) 23=-13(F) 24=-13(F) 25=-13(F) DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T46 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:062018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-MLGTLwZuDL9_mj5JW4uFQNGHfQJFuQkTdb?YPayv3Ux Scale=1:53.1 0-1-130-1-13T1 T2 T3 W8 B1 W1 W2 W3 W4 W5 W6 W7 B212 3 4 5 6 7 12 11 10 9 8 16 17 18 19 20 5x6 5x6 1.5x4 3x53x4 3x43x4 3x10 1.5x4 3x10 3x4 4-4-0 4-4-0 10-7-0 6-2-15 15-6-15 4-11-15 23-8-0 8-1-1 -0-10-12 0-10-12 4-4-0 4-4-0 10-7-0 6-2-15 15-6-15 4-11-15 19-5-11 3-10-13 23-8-0 4-2-5 0-4-73-1-58-7-143-1-58.0012 PlateOffsets(X,Y)-- [3:0-3-0,0-2-3], [5:0-3-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.62 0.43 0.47 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.12 -0.30 -0.01 (loc) 8-9 8-9 8 l/defl >999 >516 n/a L/d 240 180 n/a PLATES MT20 Weight: 105 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W8: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 7-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=410/Mechanical, 2=377/0-4-0(min. 0-1-8), 10=1036/0-6-0(min. 0-2-0) Max Horz2=355(LC 16) Max Uplift8=-174(LC 16), 2=-84(LC 13), 10=-177(LC 16) MaxGrav8=613(LC 39), 2=510(LC 39), 10=1256(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-16=-420/306, 3-16=-364/321, 3-17=-341/298, 17-18=-342/298, 4-18=-345/297, 4-19=-510/0, 5-19=-509/0, 5-6=-667/0 BOT CHORD 2-12=-481/354, 8-9=-100/295 WEBS 4-12=-398/532, 4-10=-1142/273, 4-9=0/812, 5-9=-529/42, 6-9=0/382, 6-8=-486/171 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 4-4-0,Exterior(2) 4-4-0 to 8-6-15, Interior(1) 15-6-15 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 8=174, 10=177. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T47 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:072018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-qXqrZGZW_fHrNtgV4oQUybpQSqfndsZdsFk5x0yv3Uw Scale=1:52.9 0-1-130-1-13T1 T2 T3 W7 B1 W1 W2 W3 W4 W5 W6 B2HW112 3 4 5 6 11 10 9 8 7 15 16 17 18 19 20 5x6 4x10 3x4 3x53x8 3x43x4 3x8 1.5x4 3x4 6-4-0 6-4-0 10-7-0 4-2-15 17-6-15 6-11-15 23-8-0 6-1-1 -0-10-12 0-10-12 6-4-0 6-4-0 10-7-0 4-2-15 17-6-15 6-11-15 23-8-0 6-1-1 0-4-74-5-58-7-144-5-58.0012 PlateOffsets(X,Y)-- [2:0-8-4,0-1-6], [3:0-3-0,0-2-3], [6:0-0-13,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.75 0.42 0.56 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.13 0.01 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 105 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W7,W4: 2x4SPF No.2 WEDGE Left: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-6-14 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 6-7 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)7=456/Mechanical, 2=426/0-4-0(min. 0-1-8), 9=941/0-6-0(min. 0-1-13) Max Horz2=355(LC 16) Max Uplift7=-162(LC 16), 2=-76(LC 13), 9=-196(LC 16) MaxGrav7=596(LC 39), 2=647(LC 39), 9=1165(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-15=-472/136, 15-16=-386/143, 3-16=-304/171, 3-17=-259/190, 4-17=-260/189, 4-18=-436/0, 5-18=-433/0, 6-7=-259/130 BOT CHORD 2-11=-331/274, 7-8=-87/431 WEBS 4-11=-355/374, 4-9=-1043/376, 4-8=0/507, 5-7=-523/99 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 6-4-0,Exterior(2) 6-4-0 to 10-7-0, Interior(1) 17-6-15 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 7=162, 9=196. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T48 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:082018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-IjODmba8lyPi?1FieVxjVoLhUE_8MIzm5uUfTTyv3Uv Scale=1:54.2 0-1-130-1-13T1 T2 T3 W9 B1 W1 W2 W3 W4 W5 W6 W7 W8 B212 3 4 5 6 7 8 13 12 11 10 9 17 18 19 20 21 22 5x6 2x4 3x44x43x63x8 1.5x4 3x4 3x4 3x4 3x4 4x10 8-4-0 8-4-0 10-7-0 2-2-15 19-6-15 8-11-15 23-8-0 4-1-1 -0-10-12 0-10-12 4-4-7 4-4-7 8-4-0 3-11-9 10-7-0 2-2-15 15-0-15 4-5-15 19-6-15 4-5-15 23-8-0 4-1-1 0-4-75-9-58-7-145-9-58.0012 PlateOffsets(X,Y)-- [2:0-1-3,Edge], [4:0-3-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.35 0.47 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.35 0.01 (loc) 10-11 10-11 9 l/defl >999 >441 n/a L/d 240 180 n/a PLATES MT20 Weight: 120 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W9: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 8-9 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=439/Mechanical, 2=377/0-4-0(min. 0-1-8), 11=1007/0-6-0(min. 0-1-14) Max Horz2=355(LC 16) Max Uplift9=-143(LC 16), 2=-68(LC 13), 11=-251(LC 16) MaxGrav9=474(LC 39), 2=617(LC 39), 11=1180(LC 38) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-17=-546/116, 17-18=-458/119, 3-18=-367/133, 6-21=-294/12, 7-21=-289/12 BOT CHORD 2-13=-355/385, 10-11=-103/301, 9-10=-44/296 WEBS 3-13=-377/180, 5-13=-420/477, 5-11=-580/468, 6-11=-591/95, 7-9=-508/71 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 8-4-0,Exterior(2) 8-4-0 to 12-6-15, Interior(1) 19-6-15 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 9=143, 11=251. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T49 TrussType Roof Special Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:092018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-mwyb_xbmWGXZdBpuBCSy10upyeO95jQwKYDC?vyv3Uu Scale=1:54.4 0-1-130-1-13T1 T2 T3 W8 B1 W1 W2 W3 W4 W5 W4 W6 W7 B212 3 4 5 6 7 13 12 11 10 9 8 17 18 19 20 6x6 4x12 1.5x4 3x53x4 3x4 3x5 1.5x4 6x6 1.5x4 3x8 1.5x4 5-4-7 5-4-7 10-4-0 4-11-9 10-7-0 0-2-15 15-11-8 5-4-8 21-6-15 5-7-7 23-8-0 2-1-1 -0-10-12 0-10-12 5-4-7 5-4-7 10-4-0 4-11-9 15-11-8 5-7-7 21-6-15 5-7-7 23-8-0 2-1-1 0-4-77-1-58-7-147-1-58.0012 PlateOffsets(X,Y)-- [2:0-4-3,0-0-4], [4:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.56 0.23 0.73 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.06 0.01 (loc) 13-16 9-10 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 128 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud*Except* W8,W4,W7: 2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 10-11. WEBS 1 Row at midpt 7-8 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)8=496/Mechanical, 2=389/0-4-0(min. 0-1-8), 11=938/0-6-0(min. 0-1-10) Max Horz2=355(LC 16) Max Uplift8=-143(LC 16), 2=-41(LC 13), 11=-254(LC 16) MaxGrav8=632(LC 38), 2=576(LC 39), 11=1020(LC 39) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-17=-540/73, 3-17=-309/94, 4-19=-402/69, 19-20=-402/69, 5-20=-404/68, 5-6=-404/69 BOT CHORD 2-13=-289/353, 12-13=-289/353, 11-12=-289/353 WEBS 3-11=-551/358, 4-11=-753/222, 4-10=-77/601, 5-10=-615/194, 6-10=-93/347, 6-8=-674/112 NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 10-4-0,Exterior(2) 10-4-0 to 14-6-15, Interior(1) 21-6-15 to 23-6-4zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces &MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 3) Unbalancedsnowloads have been considered for this design. 4)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 5)Provide adequate drainage to preventwater ponding. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7) Refer to girder(s) for truss to trussconnections. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 8=143, 11=254. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T50 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:102018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-E6W_BHcOHafQELO4lwzBaDR_a1kCqBS3YCzlYLyv3Ut Scale=1:51.6 0-1-13T2 T3 W7 B1 W1 W2 W3 W4 W5 W6 W7 W6 T1 B212 3 4 5 6 7 8 14 13 12 11 10 9 18 19 20 21 22 3x4 6x6 1.5x4 3x4 3x4 3x5 1.5x4 3x4 3x5 3x4 1.5x4 3x8 3x4 5-5-15 5-5-15 10-7-0 5-1-1 12-4-0 1-9-1 17-10-4 5-6-4 23-8-0 5-9-12 -0-10-12 0-10-12 5-5-15 5-5-15 10-7-0 5-1-1 12-4-0 1-9-1 17-10-4 5-6-4 23-8-0 5-9-12 0-4-78-5-58-7-28-5-58.0012 PlateOffsets(X,Y)-- [6:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.56 0.24 0.68 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.07 0.01 (loc) 9-10 9-10 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 134 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W1,W2,W3: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 11-12. WEBS 1 Row at midpt 8-9, 6-11, 7-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=526/Mechanical, 2=439/0-4-0(min. 0-1-8), 12=858/0-6-0(min. 0-1-11) Max Horz2=352(LC 16) Max Uplift9=-114(LC 13), 2=-46(LC 13), 12=-228(LC 13) MaxGrav9=752(LC 35), 2=547(LC 36), 12=1057(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-18=-582/73, 3-18=-385/96, 6-21=-347/55, 7-21=-350/54, 7-22=-347/53, 8-22=-347/53, 8-9=-702/141 BOT CHORD 2-14=-271/413, 13-14=-271/413, 12-13=-271/413 WEBS 3-12=-544/343, 5-12=-651/171, 5-11=-58/454, 6-11=-398/120, 6-10=-54/309, 7-10=-616/191, 8-10=-91/592 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 12-4-0,Exterior(2) 12-4-0 to 16-6-15 zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 9=114, 12=228. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss T51 TrussType HalfHip Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:112018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-iI4MPdd11tnHsVzHJdUQ7RzBIR41ZdgCnsiJ4oyv3Us Scale=1:56.8 0-1-13T2 T3 W7 B1 W1 W2 W3 W4 W5 W6 W7 W6 T1 B212 3 4 5 6 7 8 14 13 12 11 10 9 18 19 20 21 22 3x4 6x6 1.5x43x4 3x4 3x5 1.5x4 3x4 3x5 3x4 1.5x4 3x8 3x4 5-5-15 5-5-15 10-7-0 5-1-1 13-8-0 3-1-1 18-6-4 4-10-4 23-8-0 5-1-12 -0-10-12 0-10-12 5-5-15 5-5-15 10-7-0 5-1-1 13-8-0 3-1-1 18-6-4 4-10-4 23-8-0 5-1-12 0-4-79-4-09-5-139-4-08.0012 PlateOffsets(X,Y)-- [6:0-3-5,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-MSH 0.44 0.20 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.05 0.01 (loc) 14-17 9-10 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 138 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPF No.2 *Except* W1,W2,W3: 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing,Except: 6-0-0 oc bracing: 11-12. WEBS 1 Row at midpt 8-9, 6-11, 7-10 MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)9=511/Mechanical, 2=424/0-4-0(min. 0-1-8), 12=874/0-6-0(min. 0-1-12) Max Horz2=389(LC 16) Max Uplift9=-116(LC 13), 2=-37(LC 13), 12=-212(LC 13) MaxGrav9=712(LC 35), 2=509(LC 36), 12=1101(LC 36) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 2-18=-548/60, 18-19=-479/63, 3-19=-383/82, 6-21=-272/47, 7-21=-273/47, 7-22=-270/46, 8-22=-270/46, 8-9=-667/140 BOT CHORD 2-14=-289/399, 13-14=-289/399, 12-13=-289/399 WEBS 3-12=-506/340, 5-12=-714/201, 5-11=-36/397, 6-11=-298/106, 7-10=-545/170, 8-10=-93/545 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)-0-10-12 to 2-1-4,Interior(1) 2-1-4 to 13-8-0,Exterior(2) 13-8-0 to 17-10-15 zone;cantileverleft exposed ; end verticalleft exposed; porchleft exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)This truss has been designed for greater of minroofliveload of 12.0 psf or 2.00 times flatroofload of 15.4 psf on overhangs non-concurrentwith otherliveloads. 6)Provide adequate drainage to preventwater ponding. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8) Refer to girder(s) for truss to trussconnections. 9)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 2 except(jt=lb) 9=116, 12=212. 10)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V01GE TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:132018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-fhC6pJeHZV2?5o7fQ2WuCs3aYFj_1fzVEABQ8gyv3Uq Scale=1:53.0 T1 T1 B1 B2 B3 B2 B1 ST3 ST2 ST1 ST2 ST1 1 2 3 4 5 6 7 8 9 18 17 16 15 14 13 12 11 10 19 20 3x4 4x4 3x4 3x4 2x4 2x4 3x4 7-1-1 7-1-1 10-9-9 3-8-8 17-10-10 7-1-1 7-1-1 7-1-1 8-11-5 1-10-4 10-9-9 1-10-4 17-10-10 7-1-1 8-11-52-3-012.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.20 0.36 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.05 0.12 (loc) 14 14 9 l/defl >999 >975 n/a L/d 240 180 n/a PLATES MT20 Weight: 85 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 *Except* B2: 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 7-1-1. (lb)-Max Horz1=-224(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 9, 15 except 1=-165(LC 12), 17=-134(LC 16), 18=-150(LC 16), 11=-170(LC 17), 10=-142(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 9, 9, 16, 13, 12, 17, 11, 10 except 15=312(LC 29), 18=257(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. TOP CHORD 1-2=-293/284, 2-3=-250/278, 3-4=-241/363, 4-19=-251/263, 5-19=-228/278, 5-20=-228/258, 6-20=-251/243, 6-7=-241/287 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-C Corner(3) 0-4-4 to 3-4-4,Exterior(2) 3-4-4 to 8-11-5, Corner(3) 8-11-5 to 11-11-5zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)Truss designed forwindloadsin the plane of the truss only.Forstuds exposed to wind(normal to the face),seeStandardIndustry GableEnd Details as applicable, orconsult qualified building designer as perANSI/TPI 1. 4)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 5) Unbalancedsnowloads have been considered for this design. 6)This trussis not designed to support a ceiling and is not intended for usewhere aesthetics are a consideration. 7)All plates are 1.5x4MT20 unless otherwiseindicated. 8)Gablestudsspaced at 2-0-0 oc. 9)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 10)Bearing at joint(s) 15, 13 considers parallel to grainvalue usingANSI/TPI 1 angle to grain formula.Building designershouldverify capacity of bearingsurface. 11)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 9, 15 except (jt=lb) 1=165, 17=134, 18=150, 11=170, 10=142. 12)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V02 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:132018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-fhC6pJeHZV2?5o7fQ2WuCs3b7FnD1fQVEABQ8gyv3Uq Scale=1:47.2 T1 T1 B1 ST2 ST1 ST1 1 2 3 4 5 8 7 6 9 10 11 12 3x4 4x4 3x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 0-0-4 0-0-4 15-2-10 15-2-6 7-7-5 7-7-5 15-2-10 7-7-5 0-0-47-7-50-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.16 0.09 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 56 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 15-2-2. (lb)-Max Horz1=-190(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-254(LC 16), 6=-254(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=395(LC 29), 6=395(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-8=-348/287, 4-6=-348/287 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-7-5,Interior(1) 3-7-5 to 7-7-5,Exterior(2) 7-7-5 to 10-7-5zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 8=254, 6=254. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V03 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:142018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-7tlU1ffvKoAsjyir_m27k3bm2f7Im7XfTqxzh6yv3Up Scale=1:40.9 T1 T1 B1 ST2 ST1 ST1 1 2 3 4 5 8 7 6 9 10 11 12 3x4 4x4 3x4 1.5x41.5x4 1.5x4 1.5x4 1.5x4 0-0-4 0-0-4 12-6-10 12-6-6 6-3-5 6-3-5 12-6-10 6-3-5 0-0-46-3-50-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.15 0.10 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 44 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 12-6-2. (lb)-Max Horz1=-155(LC 12) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5 except 8=-224(LC 16), 6=-223(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 7 except 8=342(LC 29), 6=341(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-8=-321/267, 4-6=-321/267 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 6-3-5,Exterior(2) 6-3-5 to 9-3-5zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5 except(jt=lb) 8=224, 6=223. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V04 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:152018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-b3JtE?gX56IjL6H2YTZMHH8uG2SLVa5oiUgWDZyv3Uo Scale=1:33.6 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 2x4 4x4 2x4 1.5x4 0-0-4 0-0-4 9-10-10 9-10-6 4-11-5 4-11-5 9-10-10 4-11-5 0-0-44-11-50-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.38 0.18 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 31 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=195/9-10-2(min. 0-1-8), 3=195/9-10-2(min. 0-1-8), 4=260/9-10-2(min. 0-1-8) Max Horz1=-120(LC 12) Max Uplift1=-61(LC 17), 3=-61(LC 17) MaxGrav1=224(LC 2), 3=224(LC 2), 4=287(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-4-4 to 3-4-4,Interior(1) 3-4-4 to 4-11-5,Exterior(2) 4-11-5 to 7-11-5zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V05 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:162018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-3GtFSKg9sQQayGsE6B4bpUg61SpyE20xx8Q4l?yv3Un Scale=1:25.4 T1 T1 B1 ST1 1 2 3 42x4 4x4 2x41.5x4 0-0-4 0-0-4 7-2-10 7-2-6 3-7-5 3-7-5 7-2-10 3-7-5 0-0-43-7-50-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.18 0.09 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 22 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=138/7-2-2(min. 0-1-8), 3=138/7-2-2(min. 0-1-8), 4=184/7-2-2(min. 0-1-8) Max Horz1=-85(LC 12) Max Uplift1=-43(LC 17), 3=-43(LC 17) MaxGrav1=159(LC 2), 3=159(LC 2), 4=203(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V06 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:172018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XSRdfghodjYQaQRQfubqMiDJhsA6zVZ59o9dHRyv3Um Scale=1:14.2 T1 T1 B1 ST1 1 2 3 4 2x4 4x4 2x41.5x4 0-0-4 0-0-4 4-6-10 4-6-6 2-3-5 2-3-5 4-6-10 2-3-5 0-0-42-3-50-0-412.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.06 0.03 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 13 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-6-10 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=82/4-6-2(min. 0-1-8), 3=82/4-6-2(min. 0-1-8), 4=109/4-6-2(min. 0-1-8) Max Horz1=-50(LC 12) Max Uplift1=-26(LC 17), 3=-26(LC 17) MaxGrav1=94(LC 2), 3=94(LC 2), 4=120(LC 7) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V07 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:172018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-XSRdfghodjYQaQRQfubqMiDJWsAQzVp59o9dHRyv3Um Scale=1:7.5 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-4 0-0-4 1-10-10 1-10-6 0-11-5 0-11-5 1-10-10 0-11-5 0-0-40-11-50-0-412.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.01 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 4 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 1-10-10 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=42/1-10-2(min. 0-1-8), 3=42/1-10-2(min. 0-1-8) Max Horz1=-15(LC 12) Max Uplift1=-5(LC 17), 3=-5(LC 17) MaxGrav1=47(LC 2), 3=47(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V08 TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:182018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-?e??t0iQO1gHCZ0dDb63vvmLFGRAiy3EOSvAquyv3Ul Scale=1:26.2 T1 W1 B1 1 2 3 4 5 6 2x4 1.5x4 1.5x4 6-5-6 6-5-6 0-0-44-3-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.58 0.36 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=206/6-5-6(min. 0-1-8), 3=206/6-5-6(min. 0-1-8) Max Horz1=155(LC 13) Max Uplift1=-22(LC 16), 3=-76(LC 16) MaxGrav1=233(LC 2), 3=260(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 6-3-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V09 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:192018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-TrZN4Mj29Lo8pjapnJdIR7IbSgppRPJOd6ekMKyv3Uk Scale=1:17.7 T1 W1 B1 1 2 3 4 2x4 1.5x4 1.5x4 4-5-6 4-5-6 0-0-42-11-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.23 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 13 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 4-5-6 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=135/4-5-0(min. 0-1-8), 3=135/4-5-0(min. 0-1-8) Max Horz1=101(LC 15) Max Uplift1=-14(LC 16), 3=-50(LC 16) MaxGrav1=153(LC 2), 3=170(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 4-3-10zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 3) Unbalancedsnowloads have been considered for this design. 4)Gablerequirescontinuous bottomchord bearing. 5)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 6)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 7)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V10 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:202018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-x17lIijgwew?Rt9?L08X_Krm23A_ArIXrmOHumyv3Uj Scale=1:32.6 T1 T2 W1 B1 ST2 ST1 1 2 3 4 7 6 5 8 2x4 4x4 1.5x4 1.5x41.5x41.5x4 1.5x4 8-7-6 8-7-6 7-4-7 7-4-7 8-7-6 1-2-15 0-0-44-10-154-1-08.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.24 0.09 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 32 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 8-7-0. (lb)-Max Horz1=173(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 6 except 7=-159(LC 16) MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 6 except 7=368(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-7=-303/206 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-4-7,Interior(1) 3-4-7 to 7-4-7,Exterior(2) 7-4-7 to 8-5-10zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 6 except (jt=lb) 7=159. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V11 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:212018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-QDg8V2kIhy2s31kCukgmWYOuMTUOvIlh4Q7rQCyv3Ui Scale=1:23.5 T1 T1 B1 ST1 1 2 3 4 5 6 7 8 9 10 2x4 4x4 2x41.5x4 10-8-8 10-8-8 10-8-14 0-0-6 5-4-7 5-4-7 10-8-14 5-4-7 0-0-43-6-150-0-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.40 0.20 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 29 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=186/10-8-2(min. 0-1-8), 3=186/10-8-2(min. 0-1-8), 4=320/10-8-2(min. 0-1-8) Max Horz1=-85(LC 12) Max Uplift1=-53(LC 16), 3=-64(LC 17) MaxGrav1=213(LC 2), 3=213(LC 2), 4=356(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 5-4-7,Exterior(2) 5-4-7 to 8-4-7zone; cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V12 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:212018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-QDg8V2kIhy2s31kCukgmWYOzdTWRvJJh4Q7rQCyv3Ui Scale:3/4"=1' T1 T1 B1 ST1 1 2 3 4 2x4 4x4 2x41.5x4 0-0-6 0-0-6 6-8-14 6-8-8 3-4-7 3-4-7 6-8-14 3-4-7 0-0-42-2-150-0-48.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.13 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 17 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=110/6-8-2(min. 0-1-8), 3=110/6-8-2(min. 0-1-8), 4=189/6-8-2(min. 0-1-8) Max Horz1=-50(LC 12) Max Uplift1=-31(LC 16), 3=-38(LC 17) MaxGrav1=126(LC 2), 3=126(LC 2), 4=211(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V13 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:222018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-uQEWiOlwSGAjgBJOSRB?3lw9CttJem2qJ4tOzfyv3Uh Scale=1:7.3 T1 T1 B1 1 2 3 2x4 3x4 2x4 0-0-6 0-0-6 2-8-14 2-8-8 1-4-7 1-4-7 2-8-14 1-4-7 0-0-40-10-150-0-48.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.01 0.03 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT= 20% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 BRACING- TOP CHORD Structuralwoodsheathing directly applied or 2-8-14 oc purlins. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=63/2-8-2(min. 0-1-8), 3=63/2-8-2(min. 0-1-8) Max Horz1=-15(LC 12) Max Uplift1=-9(LC 16), 3=-9(LC 17) MaxGrav1=71(LC 2), 3=71(LC 2) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 3. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V14 TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:232018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-McouwkmYDZIaILua09iEczTHcHC4NB2zYkcxV5yv3Ug Scale=1:38.0 T1 T2 W1 B1 ST2 ST1 ST1 1 2 3 4 5 9 8 7 6 10 11 12 13 14 3x4 4x4 1.5x4 1.5x41.5x41.5x4 1.5x4 1.5x4 1.5x4 13-10-10 13-10-10 8-11-2 8-11-2 13-10-10 4-11-8 0-0-45-11-72-7-128.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.22 0.12 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 49 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 13-10-10. (lb)-Max Horz1=180(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 6 except 9=-182(LC 16), 7=-160(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 6 except 8=296(LC 29), 9=434(LC 29), 7=366(LC 30) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-9=-322/221, 4-7=-286/207 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 8-11-2,Exterior(2) 8-11-2 to 11-11-2 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=15.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1 4) Unbalancedsnowloads have been considered for this design. 5)Gablerequirescontinuous bottomchord bearing. 6)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 7)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 6 except(jt=lb) 9=182, 7=160. 8)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V15 TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:242018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-qoMG74nB_tQRwVTmasDT8A0S?hYk6f67mOMV1Xyv3Uf Scale=1:29.6 0-1-13T1 T2 T3 W1 B1 ST2 ST1 ST1 1 2 3 4 5 6 10 9 8 7 11 12 13 14 15 3x4 4x4 3x5 1.5x4 1.5x41.5x41.5x4 1.5x4 1.5x4 1.5x4 11-10-10 11-10-10 6-11-2 6-11-2 11-3-10 4-4-8 11-10-10 0-7-0 0-0-41-6-104-7-71-6-108.0012 PlateOffsets(X,Y)-- [5:0-2-8,0-1-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-SH 0.25 0.10 0.09 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 38 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 11-10-10. (lb)-Max Horz1=128(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1 except 7=-165(LC 48), 10=-143(LC 16), 8=-166(LC 17) MaxGravAllreactions 250 lb orless at joint(s) 1, 7 except 9=308(LC 46), 10=331(LC 29), 8=464(LC 48) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-10=-262/186, 4-8=-395/206 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 6-11-2,Exterior(2) 6-11-2 to 9-11-2, Interior(1) 11-3-10 to 11-8-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1 except(jt=lb) 7=165, 10=143, 8=166. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V16 TrussType GABLE Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:252018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-I?weLPnpkBYIYe2z7ZkihOYbS4sOr7rG?252a_yv3Ue Scale=1:22.5 0-1-13T1 T2 T3 W2 B1 ST1 W1 1 2 3 4 7 6 5 8 9 10 11 12 2x4 4x4 4x4 1.5x4 1.5x41.5x4 1.5x4 9-10-10 9-10-10 4-11-2 4-11-2 7-3-10 2-4-8 9-10-10 2-7-0 0-0-41-6-103-3-71-6-108.0012 PlateOffsets(X,Y)-- [3:0-2-0,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.33 0.13 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 29 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud OTHERS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.All bearings 9-10-10. (lb)-Max Horz1=92(LC 13) Max UpliftAll uplift 100 lb orless at joint(s) 1, 5, 7, 6 MaxGravAllreactions 250 lb orless at joint(s) 1, 5, 6 except 7=318(LC 29) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 3-5-12,Interior(1) 3-5-12 to 4-11-2,Exterior(2) 4-11-2 to 7-3-10 zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 5, 7, 6. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V17 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:262018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-mBU1YloRVUg99od9hHFxDb5hgUC_aaAQEirc6Qyv3Ud Scale=1:15.1 0-1-13T1 T2 W1 B1 W1 1 2 3 5 4 6 7 8 2x4 4x4 1.5x4 1.5x41.5x4 0-0-6 0-0-6 2-6-10 2-6-4 7-10-10 5-4-0 2-6-10 2-6-10 7-10-10 5-4-0 0-0-41-6-101-8-71-6-108.0012 PlateOffsets(X,Y)-- [2:0-2-0,0-1-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.68 0.18 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 20 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=67/7-10-4(min. 0-1-8), 4=199/7-10-4(min. 0-1-8), 5=300/7-10-4(min. 0-1-8) Max Horz1=49(LC 13) Max Uplift1=-26(LC 16), 4=-50(LC 12), 5=-32(LC 13) MaxGrav1=108(LC 35), 4=282(LC 34), 5=357(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. WEBS 2-5=-255/139 NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2) 0-5-12 to 6-9-9,Interior(1) 6-9-9 to 7-8-14zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 5. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V18 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:272018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-EN2Pm5p3Goo0nyCLF_nAmpezOuZrJ1ZZSMa9esyv3Uc Scale:1"=1'0-1-13T1 T2 W2 B1 W1 1 2 3 5 4 2x4 4x4 1.5x4 1.5x41.5x4 0-0-6 0-0-6 2-6-10 2-6-4 5-10-10 3-4-0 2-6-10 2-6-10 5-10-10 3-4-0 0-0-41-6-101-8-71-6-108.0012 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-P 0.24 0.07 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 5-10-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 6-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=50/5-10-4(min. 0-1-8), 4=124/5-10-4(min. 0-1-8), 5=231/5-10-4(min. 0-1-8) Max Horz1=49(LC 13) Max Uplift1=-12(LC 16), 4=-30(LC 12), 5=-36(LC 13) MaxGrav1=94(LC 35), 4=175(LC 34), 5=262(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4, 5. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard DE Job# 60084-W1 Dansco Engineering, LLC Date: 7/24/18 WARNING – VERIFY DESIGN PARAMETERS AND READ NOTES BEFORE FABRICATION AND INSTALLATION!!! This truss design is adequate for the design parameters shown. Review and approval of design parameters is the responsibility of the building designer, not the truss designer or truss engineer. Permanent bracing requirements against out-of-plane buckling are noted/shown for individual truss members (and for the truss as a whole) subjected to gravity and wind loads. Additional permanent bracing design shall be the responsibility of the design professional of record. Temporary and erection bracing shall be the responsibility of the contractor. Reference ANSI/TPI-1, “National Design Standard for Metal Plate Connected Wood Truss Construction” and TPI/WTCA BCSI-06, “Building Component Safety Information Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses” for additional information. Job 1802419-12T Truss V19 TrussType Valley Qty 1 Ply 1 1802419-12TDWH Jackson'sGrantlot169 Job Reference (optional) Run:8.200 s Apr72018 Print:8.200 s Apr72018MiTekIndustries,Inc.Mon Jul2322:09:282018 Page1 ID:wjHjEqZJY8QEP_FF_QAE9JzaK_D-iacnzRqh16xtP6mYpiIPJ0A9ZIvr2UXjh0KiAJyv3Ub Scale=1:11.3 0-1-13T1 T2 W1 B1 1 2 3 4 2x4 3x4 2x4 1.5x4 3-10-10 3-10-10 2-6-10 2-6-10 3-10-10 1-4-0 0-0-41-6-101-8-71-6-108.0012 PlateOffsets(X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- PlateGrip DOL Lumber DOL RepStressIncr Code 2-0-0 1.15 1.15 YES IBC2012/TPI2007 CSI. TC BC WB Matrix-R 0.15 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT= 14% GRIP 197/144 LUMBER- TOP CHORD2x4SPF No.2 BOT CHORD2x4SPF No.2 WEBS 2x4SPFStud BRACING- TOP CHORD Structuralwoodsheathing directly applied or 3-10-10 oc purlins, except end verticals. BOT CHORD Rigidceiling directly applied or 10-0-0 oc bracing. MiTekrecommends that Stabilizers and requiredcross bracing beinstalled during truss erection,in accordancewithStabilizer Installation guide. REACTIONS.(lb/size)1=117/3-10-4(min. 0-1-8), 4=125/3-10-4(min. 0-1-8) Max Horz1=49(LC 13) Max Uplift1=-18(LC 16), 4=-25(LC 13) MaxGrav1=170(LC 35), 4=142(LC 34) FORCES.(lb)-Max. Comp./Max.Ten.-All forces 250 (lb) orless exceptwhenshown. NOTES- 1) Unbalancedroofliveloads have been considered for this design. 2)Wind:ASCE 7-10;Vult=115mph(3-second gust)Vasd=91mph;TCDL=6.0psf;BCDL=6.0psf; h=25ft; Cat. II;Exp C; enclosed; MWFRS(envelope) gable end zone and C-CExterior(2)zone;cantileverleft and right exposed ; end verticalleft and right exposed;C-C formembers and forces&MWFRS forreactionsshown; Lumber DOL=1.60 plate grip DOL=1.60 3)TCLL:ASCE 7-10;Pr=20.0 psf(roofliveload: Lumber DOL=1.15Plate DOL=1.15);Pg=20.0 psf(groundsnow);Pf=20.4 psf(flat roofsnow: Lumber DOL=1.15Plate DOL=1.15); CategoryII;Exp C; PartiallyExp.; Ct=1.1, Lu=50-0-0;Min. flatroofsnowload governs. Rainsurcharge applied to all exposedsurfaceswithslopesless than 0.500/12 in accordancewithIBC 1608.3.4. 4) Unbalancedsnowloads have been considered for this design. 5)Provide adequate drainage to preventwater ponding. 6)Gablerequirescontinuous bottomchord bearing. 7)This truss has been designed for a 10.0 psf bottomchordliveload nonconcurrentwith any otherliveloads. 8)Providemechanicalconnection(by others) of truss to bearing platecapable of withstanding 100 lb uplift at joint(s) 1, 4. 9)This trussis designedin accordancewith the 2012 InternationalBuilding Code section 2306.1 and referencedstandardANSI/TPI 1. LOADCASE(S)Standard