Loading...
HomeMy WebLinkAboutI1-02 - FINISH SCHEDULE & DETAILS___________________________*_ __i�_ RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel `v�:����i 1�.rvalM�� DATE: 06�Z9�2O INTERIOR FINISH SELECTION SUMMARY NAME MANUFACTURER SNLE NUMBER COLOR SIZE COMMENTS �I E%^ ICI �52] BWEHERON i EP2 SHERWINWILLIAMS SW63]8 GRISPLMEN i EXISTINGTOREMAIN �i ETR EXISTINGFINISHTOREMHIN � INTERIORPAWT �i Pi SHERWINWILLIAMS SW63]8 CRISPLWEN �i P2 SHERWINWhLiAMS SW6206 OYSTERBAY EXAMAGGENTPAINT � WXURYVINYLTILE �I LVr1 GERFLOR CREHTIONCLIC30 W56 RHNCH 8.4'X48.8" �I PLASTICLAMINATE i PLi PiONITE WCa3t-5 MILLWORKCHERRY ___________________________________________________� PORCELAINTILEBASE � � PTB� CROSSVILLE EMPIRESERIES V581PALAISTAUPE 6%12COVEBASE RUBBER BHSE RB1 JOHNSONITE COVEBASE 29 MOONROCK 0" RB2 JOHNSONITE COVEBASE 29 MOONROCK 6" SHEETVINYLFLOORING SVt TEKNOFLOR 52202 NARVESiCHERRY SOLID SURFAGNG 551 CORIAN FOSSIL 550 CORIAN HN111RACRE _ _ ��i c�nsnc Hnrvoani�. iry srr�e AND FINISH TO MHTCH EXISTMG HANDRAIL 6RACKET PER MHNUF. STAN�HR�SVSTEM. - 2X FIRE TREATE� WOO� BLOCKMG BETW EEN STUD: OR 16GA_ 6" WIDE ANCHOR STRAPS CHERRY HHR�W OO� BOMP RAIL WITH QEAR FINISH 8 1/4" N. HOUNDED EDGES. ANCHOR AT 0' 0" OL. MHX. COIIMER5INK FASTENERS W ITH GLASTIC GLUGS TO MHTCH BUMP RAIL. BASE FlNISH FLOOR LME 6 BUMPRAI n.oz i vr� - i,a. _______�i- GVP. WALL SCHI WALL TILE ' 3 WALL I itaz s. = y�o. TILE DETAIL 1/2' HANDRAIL WALL PROTECTION WPt KOROGUARD Kd PORCELAW CAULKJOINTINMATCHMGCOLOR. w000woarc W�1 NRCHITECTURALGRA�ECHERRY, WSTOM,STAINTO �UARTER SLiCE� MATGH E%ISTMG SAMPLE CHERRV HAR�WOO� BUMP RAIL W ITH QEAR FlNISH AN� 1l4" R. ROVNDED EDGES HNCHOR HT 4' -�" O C. MAX. COUNTERSINKFASTENERS WITH PLASTIC PWGS TO MATCH BIIMP RHIL. 2X FIRE TREHTE� WOO� BLOCKING BETNEEN STUDS OR ifiGA., 6" W I�E ANCHOR STRAPS crvEaRr rvnaow000 auMa RAIL W ITH GLEAR FINISH 8 1l4" R. ROUNDED EDGES. HNCHOR HT 4'-0" O C. MAX. COUNTERSINKFASTENERS WITH PLASTIC PWGS TO MATCH Bl1MP RHIL. BASE FlNISH FLOOH LINE F. \ ��N 'rJ DOUBLE BUMPRAIL DET n.oz i vz� = i,o. i �tve COM AS N RESI FLO( DIVIDER STRIP TERRAZZO FLOOR Z TRANSITION DETAIL 11.02 6" = 1'�0' 'i SCHWTER SCHIENE ' LEVELING STRIP. LEG TO RUN I COMPOUND UNDERCARPET �i AS NEEDED TILE. i RESILIENT CARPET �i FLOORING TILE , 1 TRANSITION DETAIL ', n.az s. = i,o. GENERAL FINISH NOTES A. ALL WALLS ARE PAINT. U.N.O. B. LEVEL & FINISH OF GVP. B0. WALLS ANO SOFFITS TO BE LEVEL 4 FINISH, U.N.O. C. ALL GVP. BOARD CEILWGS TO BE PAINTED, U.N.O. D. CARPETSEAMSTOBELOCATE�ATCENTERLWEOFDOORIN CLOSED POSITION. E. ALIGN FLOORINGTRANSITIONS WITH FlNISH BASE EXCEPTAT DOORS, U.N.O. F. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO BE LOCATED AT CENTEFLME OF DOOR WHEN IN CLOSED POSITION G. ALL REQUIRED FLOORING PREPERATIONS SHALL BE BV ROORING CONTRACTOR. H. PAINT ALL HOLLOW METAL DOOR FRAMES, U.N.O. I. SEALAROUNDALLDOORFRAMESANDCASEWORKWITHWLOR TO MATCH WALL. J. ALL PL4STIC LAMINATE ON VERTICAL SURFACES TO RUN VERTICALLV. K. PAINT WALLS: EGG-SHELL PAINTCEILINGS FLAT PAINT DOOR FRAMES/rRIM: SATIN L. ALL FlNISH MATERIAL SAMPLES AND PRODUCT DATA ARE TO BE SUBMITTED TO ARCHITECT FOR APPROVAL PRIOF TO INSTALL4TION. M. EVERY EFFORT HAS BEEN TAKEN TO NOTE WHERE HANDRAILS MAV BE NEW OR PATCHED IN. CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL LOCATIONS ARE ACCOUNTED FOR CONTACT INTERIOFS FOR ANV GOORDINATION QUESTIONS AS TO WHERE HAN�RAIL IS REQUIRED. TYPICAL FINISHES (U.N.O. FINISH REMARKS A. TERRAZZO FLOOR IS EXISTING AND TO REMAIN. REPLACE EXISTING CARPET WITH LVT. B. INSTALL WALL PROTECTION T04' 4" AFF ON ALL WALLS. PAINT FlNISH ABOVE. C. INSTALL WALL PROTECTION UP TO 18" BELOW CEILING. PAINT FlNISH ABOVE. D. PATCH AND REPAIR WITH E%ISTING FINISHES ONLV. E. SEE FLOOR PLAN FOF FINISH/PATTEFN. R EXISTING TERRAZZO IS TO REMAIN. REMOVE EXISTING TERRAZZO BASE AND REPLACE WITH RB1 IN OFDER TO HAVE CONSISTENT RB1 IN ENTIRE CORRIDOR. TERRAZZO BASE IS TO BE SALVAGED FOR REUSE AS NEEDED IN OTHER AREAS. G. PATCH EXISTING FLOORING WITH MATCHING, AS NEEDED. H. SEECASEWORKELEVATIONSAN�SECTIONSFORADDITIONAL BASE AND FINISH INFORMATOIN FOR THE RECEPTION DESK. I. SEE ALTEFNTE #4. INSTEAD OF LVT, PFOVIDE PRICE TO COMPLETE WAITING ROOM WITH TERRAZZO FLOOR, TZ3 (IN LIEU OF LVT). FINISH LEGEND BLOCK OFFICE� ROOM NAME 123 NUMBER FLOOR CPT-1 ense i --- WALL IPT4 FINISH REMARKS 1,2.3 NOTE: FINISHES INDICATED M FINISH LEGEND BLOCKS ARE GENERAL OVERALL FlNISHES FOR ROOM UNLESS OTHERWISE INDICATEO BV NOTE, REMARK, �ETAILAND/OR ELEVATION. : a � a Q a � �a a� N a o UJ � V N �-3 a� (6 C@j i � N �4J�d� e � o _=S` s£zQo6 0 cae�.�'�� `�-'-� sao��y o �...,�o OO� No.10500156 STATE OF 6I312020 9:4fi:52 AM REVISIONS z O a O Z W � � Z WcC W � Q � F N d N W � � � 0 = � R a ���� C7 O Z � Q Z W W W o � = r W ? � U � 0 o �o Q � ��e �ay� � =-m Z � -"A m `--o YL �_ ro oxa W -� I� r � _ 4 Q � FINISH SCHEDULE & DETAILS 11.02 S CHHIR RHIL CRt SEE6/11.02 MATCNIUHEALTNSTANDAR�. COOR�INNIE WITH EHISTING INSTALL 4 WALL BASE DETAIL n.oz s. = i,o.