HomeMy WebLinkAboutI1-02 - FINISH SCHEDULE & DETAILS___________________________*_
__i�_
RELEA5E0 FOR CONSTRIICTI�N
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
`v�:����i 1�.rvalM��
DATE: 06�Z9�2O
INTERIOR FINISH SELECTION SUMMARY
NAME MANUFACTURER SNLE NUMBER COLOR SIZE COMMENTS
�I E%^ ICI �52] BWEHERON
i EP2 SHERWINWILLIAMS SW63]8 GRISPLMEN
i EXISTINGTOREMAIN
�i ETR EXISTINGFINISHTOREMHIN
� INTERIORPAWT
�i Pi SHERWINWILLIAMS SW63]8 CRISPLWEN
�i P2 SHERWINWhLiAMS SW6206 OYSTERBAY EXAMAGGENTPAINT
� WXURYVINYLTILE
�I LVr1 GERFLOR CREHTIONCLIC30 W56 RHNCH 8.4'X48.8"
�I PLASTICLAMINATE
i PLi PiONITE WCa3t-5 MILLWORKCHERRY
___________________________________________________�
PORCELAINTILEBASE � �
PTB� CROSSVILLE EMPIRESERIES V581PALAISTAUPE 6%12COVEBASE
RUBBER BHSE
RB1 JOHNSONITE COVEBASE 29 MOONROCK 0"
RB2 JOHNSONITE COVEBASE 29 MOONROCK 6"
SHEETVINYLFLOORING
SVt TEKNOFLOR 52202 NARVESiCHERRY
SOLID SURFAGNG
551 CORIAN FOSSIL
550 CORIAN HN111RACRE
_ _ ��i
c�nsnc Hnrvoani�. iry srr�e
AND FINISH TO MHTCH
EXISTMG HANDRAIL
6RACKET PER MHNUF.
STAN�HR�SVSTEM. -
2X FIRE TREATE� WOO�
BLOCKMG BETW EEN STUD:
OR 16GA_ 6" WIDE ANCHOR
STRAPS
CHERRY HHR�W OO� BOMP
RAIL WITH QEAR FINISH 8
1/4" N. HOUNDED EDGES.
ANCHOR AT 0' 0" OL. MHX.
COIIMER5INK FASTENERS
W ITH GLASTIC GLUGS TO
MHTCH BUMP RAIL.
BASE
FlNISH FLOOR LME
6 BUMPRAI
n.oz i vr� - i,a.
_______�i-
GVP.
WALL
SCHI
WALL
TILE
' 3 WALL
I itaz s. = y�o.
TILE DETAIL
1/2'
HANDRAIL
WALL PROTECTION
WPt KOROGUARD Kd PORCELAW CAULKJOINTINMATCHMGCOLOR.
w000woarc
W�1 NRCHITECTURALGRA�ECHERRY, WSTOM,STAINTO
�UARTER SLiCE� MATGH E%ISTMG SAMPLE
CHERRV HAR�WOO� BUMP
RAIL W ITH QEAR FlNISH AN�
1l4" R. ROVNDED EDGES
HNCHOR HT 4' -�" O C. MAX.
COUNTERSINKFASTENERS
WITH PLASTIC PWGS TO
MATCH BIIMP RHIL.
2X FIRE TREHTE� WOO�
BLOCKING BETNEEN STUDS
OR ifiGA., 6" W I�E ANCHOR
STRAPS
crvEaRr rvnaow000 auMa
RAIL W ITH GLEAR FINISH 8
1l4" R. ROUNDED EDGES.
HNCHOR HT 4'-0" O C. MAX.
COUNTERSINKFASTENERS
WITH PLASTIC PWGS TO
MATCH Bl1MP RHIL.
BASE
FlNISH FLOOH LINE
F. \
��N
'rJ DOUBLE BUMPRAIL DET
n.oz i vz� = i,o.
i
�tve
COM
AS N
RESI
FLO(
DIVIDER STRIP
TERRAZZO
FLOOR
Z TRANSITION DETAIL
11.02 6" = 1'�0'
'i SCHWTER SCHIENE
' LEVELING STRIP. LEG TO RUN
I COMPOUND UNDERCARPET
�i AS NEEDED TILE.
i RESILIENT CARPET
�i FLOORING TILE
, 1 TRANSITION DETAIL
', n.az s. = i,o.
GENERAL FINISH NOTES
A. ALL WALLS ARE PAINT. U.N.O.
B. LEVEL & FINISH OF GVP. B0. WALLS ANO SOFFITS TO BE LEVEL 4
FINISH, U.N.O.
C. ALL GVP. BOARD CEILWGS TO BE PAINTED, U.N.O.
D. CARPETSEAMSTOBELOCATE�ATCENTERLWEOFDOORIN
CLOSED POSITION.
E. ALIGN FLOORINGTRANSITIONS WITH FlNISH BASE EXCEPTAT
DOORS, U.N.O.
F. ALL TRANSITION/REDUCER STRIPS AND OTHER THRESHOLDS TO
BE LOCATED AT CENTEFLME OF DOOR WHEN IN CLOSED
POSITION
G. ALL REQUIRED FLOORING PREPERATIONS SHALL BE BV ROORING
CONTRACTOR.
H. PAINT ALL HOLLOW METAL DOOR FRAMES, U.N.O.
I. SEALAROUNDALLDOORFRAMESANDCASEWORKWITHWLOR
TO MATCH WALL.
J. ALL PL4STIC LAMINATE ON VERTICAL SURFACES TO RUN
VERTICALLV.
K. PAINT WALLS: EGG-SHELL
PAINTCEILINGS FLAT
PAINT DOOR FRAMES/rRIM: SATIN
L. ALL FlNISH MATERIAL SAMPLES AND PRODUCT DATA ARE TO BE
SUBMITTED TO ARCHITECT FOR APPROVAL PRIOF TO
INSTALL4TION.
M. EVERY EFFORT HAS BEEN TAKEN TO NOTE WHERE HANDRAILS
MAV BE NEW OR PATCHED IN. CONTRACTOR IS RESPONSIBLE FOR
CONFIRMING ALL LOCATIONS ARE ACCOUNTED FOR CONTACT
INTERIOFS FOR ANV GOORDINATION QUESTIONS AS TO WHERE
HAN�RAIL IS REQUIRED.
TYPICAL FINISHES (U.N.O.
FINISH REMARKS
A. TERRAZZO FLOOR IS EXISTING AND TO REMAIN. REPLACE
EXISTING CARPET WITH LVT.
B. INSTALL WALL PROTECTION T04' 4" AFF ON ALL WALLS. PAINT
FlNISH ABOVE.
C. INSTALL WALL PROTECTION UP TO 18" BELOW CEILING. PAINT
FlNISH ABOVE.
D. PATCH AND REPAIR WITH E%ISTING FINISHES ONLV.
E. SEE FLOOR PLAN FOF FINISH/PATTEFN.
R EXISTING TERRAZZO IS TO REMAIN. REMOVE EXISTING TERRAZZO
BASE AND REPLACE WITH RB1 IN OFDER TO HAVE CONSISTENT
RB1 IN ENTIRE CORRIDOR. TERRAZZO BASE IS TO BE SALVAGED
FOR REUSE AS NEEDED IN OTHER AREAS.
G. PATCH EXISTING FLOORING WITH MATCHING, AS NEEDED.
H. SEECASEWORKELEVATIONSAN�SECTIONSFORADDITIONAL
BASE AND FINISH INFORMATOIN FOR THE RECEPTION DESK.
I. SEE ALTEFNTE #4. INSTEAD OF LVT, PFOVIDE PRICE TO
COMPLETE WAITING ROOM WITH TERRAZZO FLOOR, TZ3 (IN LIEU
OF LVT).
FINISH LEGEND BLOCK
OFFICE� ROOM NAME
123 NUMBER
FLOOR CPT-1
ense i
--- WALL IPT4
FINISH REMARKS 1,2.3
NOTE: FINISHES INDICATED M FINISH LEGEND BLOCKS ARE
GENERAL OVERALL FlNISHES FOR ROOM UNLESS
OTHERWISE INDICATEO BV NOTE, REMARK, �ETAILAND/OR
ELEVATION.
: a �
a
Q a �
�a
a� N
a o
UJ � V N
�-3 a�
(6 C@j i � N
�4J�d�
e
� o
_=S`
s£zQo6 0
cae�.�'�� `�-'-�
sao��y o
�...,�o OO�
No.10500156
STATE OF
6I312020 9:4fi:52 AM
REVISIONS
z
O
a
O
Z
W
�
�
Z
WcC W
� Q �
F N
d N
W � � �
0 = � R
a
����
C7 O Z
� Q Z W
W W o �
= r
W ? � U
�
0
o �o
Q � ��e
�ay�
� =-m
Z � -"A
m `--o
YL �_
ro oxa
W -�
I� r � _
4
Q
�
FINISH
SCHEDULE &
DETAILS
11.02
S
CHHIR RHIL
CRt SEE6/11.02 MATCNIUHEALTNSTANDAR�.
COOR�INNIE WITH EHISTING INSTALL
4 WALL BASE DETAIL
n.oz s. = i,o.