Loading...
HomeMy WebLinkAboutP001 - PLUMBING SYMBOLS, ABBREVIATIONS AND GENERAL NOTESVALVE AND FITTING SYMBOLS PLANVIEW �ETAILNEW � PIPINGREXIBLECONNECTION � � � PIPETURNEDUP(UNLESSNOTE�OTHERWISEJ � � � PIPETURNE��OWN � � �I� PIPEOUTTOP � � r, PIPEOUTBOTfOM � � THREA�E� NIPPLE WICAP �I PIPE WITH BLIND FLANGE �� CONCENTRIC REDUCER �� ECCENTRICRE�UCER � ISOLATIONVALVE �� �� CHECKVALVE � I � UNION � � �� GATE VALVE � q ��� BALLVALVE 0.A � � GLOBEVALVE � � �� BUTTERFLVVALVE �� TEMPERATURECONTROL-2-WAYMODULATINGVALVE � TEMPERATURE WNTROL 2-WAY, 2-POSITION ISOLATION VALVE �H TEMPERATURECONTROL3-WAYMODUTATINGVALVE NO � TEMPERATURECONTROL�3�WAV,2-POSITIONISOLATIONVALVE B� QfQ � CALIBRATEDBALANCEVALVE oQ� � SAFETYRELIEFVALVE � � � STRAWER � FLOW METER � a � FLOORDRAINBVPC � AUTOMATIC FLOW CONTROL VALVE � FLOW MEASURING �EVICE � MANUALAIRRELIEFVENT � AUTOMATICAIRRELIEFVENT �J— WBRICATE�PWGVALVE � PRESSURE RE�UCING VALVE(STEAM. GAS, COMPRESSE� AIR) � ANGLE VALVE �RY REFRIGERANTHOTGASBV-PASSVALVE � SHUT-0FFCOCK�HVDRONICS) � SOLENOIDVALVE REFRIGERANT EXPANSION VALVE � WATER PRESSURE REDUCINGIREGULATING VALVE O � —0— STEAM TRAP �� DIELECTRIC FITTING BETWEEN STEELAN� WPPER � � � STRAINER(STEAM) � PRESSUREAN�TEMPERATUREPWG � REFRIGERANTSIGHTGLASS g� THERMOMETER � P V T (P=PRESSV=VACT=TEMP�GAUGE � SENSOR(T-TEMP&HUMIDIiVJ @ B FS4 F�owswircH �CO 0.EAN OUT �� IN�ICATED EXPANSION LOOP (COLD SPRUNG) �� ANCHOR _ GUIOE —0'� REFRIGERANTSHUT-0FFVALVE $ EXPANSIONJOINT � �IFFERENTIAL SWITCH �rs.nq� � CtlJ�ttl REDUCEDPRESSUREBACKFLOWPREVENTER Hq �T-n � CtlJ�ttl DOUBLECHECKVALVEASSEMBLV V [] � �' FIRE�EPARTMENTCONNECTION r] � � FIREPROTECTIONCONTROLVALVE RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel `v�:����i 1�.rvalM�� . 06/29/20 GENERAL HVAC AND PLUMBING ABBREVIATIONS ABBREV DESCRIPTION ABBREV DESCRIPTION ABBREV DESCRIPTION NE ARCHITECTAN�ENGINEER GPM GALLONSPERMINUTE P� PRESSURE�ROP A� ACCESSDOOR 6V 6AS,NATURALVENT POC POINTOFCONNECTION ADJ ADJUSTABLEORADJACENT GW GLASSWAREWASHER PPH POUNDSPERHOUR AFF ABOVE FINISHE� FLOOR H HEIGHT PPM PARTS PER MILLION APPROX APPROXIMATE H� HEAD PREFAB PREFABRICATED ARCH ARCHITECT HGT HEIGHT PRES PRESSURE ATM ATMOSPHERE HOA HAN�-OFF-AUTOMATIC PRV PRESSURE REDUCING VALVE BHP BRAKEHORSEPOWER HORZ HORIZONTAL PSI POUNDSPERSpUAREINCH BLDG BUILDING HOSP HOSPITAL PSIG POUNDSPERS�UAREINCHGAUGE BOT BOTTOM HP HORSEPOWER PVC POLVVINVLCHLORI�E BTU BRITISHTHERMALUNIT HR HOUR REC RECENER BTUH BTUPERHOUR HZ HERTZ RECIRC RECIRCULATING CAP CAPAQTV I� INSI�EDIAMETEROR�IMENSION REF REFRIGERATOR CENTRIF CENTRIFUGAL IN WCHES RLA RVNNINGLOADAMPS CFH CUBICFEETPERHOUR INCL INCLUDE RM ROOM CFM CUBICFEETPERMINUTE INSUL INSULATE� RPM REVOLUTIONSPERMINUTE CPoI CONTRACTORFURNISHE�/OWNERINSTALLED INT IMERIOR SA SUPPLVAIRORSOUNDATfENUATOR Q CASTIRON INV WVERT SCFM STAN�AR�CUBICFEETPERMINUTE CO CLEANOUT I.P.S. IMERNATIONALPIPESRING SCH SCHE�ULE COL WLUMN JT JOINT SEC SECTION COMP COMPRESSOR KAIC SHORTCIRWITRATING SENS SENSIBLE WNC CONCRETE KEC KITCHENEpUIPMENTCONTRACTOR SF SpUAREF00T CONN CONNECTION KW KILOWATTS SHT SHEET CONST CONSTRUCTION L LENGTH SPEC SPECIFICATIONS CSP CEILINGSERVICEPANEL LBSORp POUN�S SQ SpUARE DEG DEGREE LF LINEARFOOT SdFT S�UAREFEET DEPT DEPARTMEM LFT LEAVINGFLUI�TEMPERATORE SRV SAFETYRELIEFVALVE �IA �IAMETER LOC LOCATION SS STAINLESSSTEEL DISC DISCONNECT LVG LEAVING STD STANDARD �ISCH �ISCHARGE LWT LEAVINGWATERTEMPERATURE STR STARTERORSTRUCTURE DN DOWN MAX MAXIMUM STRUC STRUCTURAL DWG DRAWING MBH 1000BTUIHR SW SWITCH EC ELECTRICALCONTRACTOR MC MECHANICALCONTRACTOR SVS SYSTEM ECC ENVIRONMENTALCONTROLCONTRACTOR MCA MINIMUMCIRCUITAMPACITY TCC TEMPERATURECONTROLCONTRACTOR EER ENERGVEFFlQENCYRATING MCC MOTORCONTROLCENTER TDH TOTALDVNAMICHEAD ELEC ELECTRIC MFR MANUFACTURER TEMP TEMPERATURE ELEV ELEVATION MIN MINIMUM TLL TEMPERATURELOWLIMIT EMER EMERGENCV MISC MISCELLANEOUS TMBH TOTALMBH ENCL ENCLOSURE MOCP MA%IMUM OVERCURRENT PROTECTIO TSP TOTAL STATIC PRESSURE ENTR EMERING MTO MOUMED TYP NPICAL EdUIP EQUIPMENT N NORTH UNO UNLESSNOTEDOTHERWISE ET E%PANSIONTANK NA NOTAPPLICABLE UVL ULTRAVIOLETLIGHT EIM1R ENTERINGWATERTEMPERATURE NC NORMALLVCLOSEDORNOISECRITERI VB VACUUMBREAKER E%OREXIST E%ISTING NIC NOTINCONTRACT VEL VELOCITV EM E%TERIOR NO NORMALLV OPEN OR NUMBER VFC VARIABLE FREQUENCV CONTROLLER F DEGREESFAHRENHBT NOM NOMINAL VSC VARIABLESPEEDCONTROLLER FC FLEXIBLECONNECTION NTS NOTTOSCALE VTR VENTTHROUGHROOF FH FUMEHOOD OC ONCENTER W WATTSORWIDTH RN RNISH OD OUTSIDEDIAMETER WI WITH FLA FULLLOADAMPS OFCI OWNERFURNISHED/CONTRACTORINS ALLE&10 WITHOOT FLR FLOOR OF01 OWNERFURNISHE�/OWNERWSTALLE WC WATERWLUMN FPC FlRE PROTECTION CONTRACTOR OPER OPERATOR WFMD WATER FLOW MEASURING DEVICE FT FEET OPNG OPENING WG WATERGAUGE G GAS,NATURAL ORIG ORIGINAL WGT WEIGHT GA GAUGE P PUMP.PNEVMATICORPRESSURE WM WATERMETER GAL GALLON PC PWMBINGCONTRACTOR WP WEATHERPROOF GALV GALVANRE� WPD WATERPRESSURE�ROP GC GENERALCONTRACTOR WTR WATER GH GRAVITVH00� PLUMBING ABBREVIATIONS ABBREV. DESCRIPTION ABBREV. DESCRIPTION ABBREV. �ESCRIPTION AI AIRINTAKE FOS FUELOILSUPPLV PIV POSTINDICATORVALVE AR AIRRECEIVER FOST FUELOILSTORAGETANK PPM PARTSPERMILLION AV ACI�VENT FOV FUELOILVENT PT PIASTERTRAP AW ACID WASTE PW PURE WATER GI GREASE INTERCEPTOR PWP PURE WATER PUMP BP BRINE PUMP GPH GALLONS PER HOUR PWR PURE WATER RETURN BST BULKSALTSTORAGE GT GREASETRAP PWS PUREWATERSUPPLY PWST PIIREWATERSTORAGETANK CA WMPRESSE�AIR HO HUBOUTLET W2 CARBON DIOXIDE HWC HOT WATER REqRC RB REFRIGERATOR BOX HWCP HOTWATERCIRCULATINGPUMP R� ROOFDRAIN �CVOR�CVA �OUBLECHECKVALVEASSEMBLY ROM REVERSEOSMOSISMACHINE DCW DOMESTICCOL�WATER IA INSTRUMENTAIR ROP REVERSEOSMOSISPUMP DCWBP DOMESTICCOL�WATERBOOSTERPUMP IAC INSTRUMENTAIRCOMPRESSOR ROST REVERSEOSMOSISSTORAGETANK DHWBP DOMESTIC HOT WATER BOOSTER PUMP IAD INSTRUMENTAIR �RVER RPZ RE�UCED PRESSURE BACKFLOW PREVEMER DHW DOMESTICHOTWATER �HWR �OMESTICHOTWATERRETURN JP JOCKEVPUMP SORSAN SANITARYORSEWER DI DEION2EDWATER JPC JOCKEVPUMP SCW SOFTCOL�WATER DS DOWNSPOUT SD SCUPPERDRAIN �SWBP �OMESTICSOFTWATERBOOSTERPUMP LA LABAIR SEP SEWAGEEJECTORPUMP DW DISTILLE�WATER LAC LABAIRCOMPRESSOR SK SINK DWBP DOMESTIC WATER BOOSTER PUMP lAD lAB AIR DRVER SP STORM PUMP OR SUMP PUMP �WH �OMESTIC WATER HFATER lAV LAVATORY ST STORM LV LABVACUUM STR STARTERORSTRUCTURE ECO E%TERIORCLEANOUT LVP LABVACUUMPUMP STRUC STRUCTURAL EpA EOUIPMENTAIR SV SPECIAWENT EpAC EQUIPMENTAIRCOMPRESSOR MA ME�ICALAIR SW SPECIALWASTE E�AI EQUIPMENTAIRINTAKE MAC ME�ICALAIRCOMPRESSOR EpV EOUIPMENTVACUUM MAD MEDICALAIR�RYER E�VP EQUIPMENTVACUVMPUMP MAI ME�ICALAIRINTAKE TMV THERMOSTATICMIXIN6VALVE EpVV EQUIPMENTVACUUMVENT MAM ME�ICALAIRMANIFOLD TW TEPIDORTEMPERE�WATER ES EMERGENCYSHOWER MB MOPBASIN ESP ELEVATORSUMPPUMP MH MANHOLE UR URINAL EW EMERGENCVEVEWASH MV MEDICALVACUUM EWC ELECTRICWATERCOOLER MVP MEDICALVACUUMPUMP V VENT VAC VACUUM FCO FLOORCLEANOUT N NITROGEN VV VACUUMVENT FD FLOOR�RAIN NM NITROGENMANIFOLD FDC FIREDEPARTMENTWNNECTION NOM NITROUSOXIDEMANIFOLD W WASTE FH FIREHOSE WAGD WASTEANESTHESIAGAS�ISPOSAL FHC RREHOSECABMET WB WALLBOX Po FUELOIL 0 OXYGEN WC WATERCLOSET FODT FIlEL01L�AYTANK ODOROR� OVERFLOW�RAIN WCO WALLCLEANOUT FOP FUELOILPUMP OM OXYGENMANIFOL� WH WALLHY�RANT FOR FUELOILRETURN OSD OPENSITEDRAIN WS WATERSOFTENERORWASTESTACK NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT BE USED ON THIS PROJECT PLUMBING PIPING SYMBOLS DCW DOMESTIC COL� WATER —�HW— DOMESTICHOTWATER —DHWR— �OMESTICHOTWATERCIRCULATION SCW SOFTCOL�WATER —TW— TEMPERED WATER —14��HW— 140�EGREE�OMESTICHOTWATERCIRWLATION —140DHWR— 140DEGREEDOMESTICHOTWATERSUPPLY S SANITARY SOIL, WASTE SEWER —SW— SPECIALWASTE V VENT —SV— SPECIALVENT —ST— STORMSEWER FP FIRE PROTECTION pW PURE WATER —NG— GAS.NATURAL �V GASVENT FO FUELOIL —PoV— FUELOILVENT LA LABORATORYAIR LV IABORATORYVACUUM —WA— E�UIPMENTAIR EQV EQUIPMENTVACUUM CA COMPRESSE�AIR MEDICAL GAS PIPING SYMBOLS MA ME�ICALAIR OXYGEN N20— NITROUS OXIDE MV MEDICALVACUUM N— NITROGEN —WAGD— WASTEANESTHESIAGAS�ISPOSAL �02 CARBON �IO%IDE IA INSTRUMENTAIR —VV— VACUUMVENT�MEDICALOREpUIPMENT) AI AIR INTAKE (ME�ICAL, EOUIPMENL OR INSTROMEN� LABORATORY GAS PIPING SYMBOLS AR ARGON —.^.02— CARBON DIOXI�E HE HELIUM MRV GASCVLIN�ERRELIEFVENT N— NITROGEN OXYGEN LA LABAIR —AI— AIR INTAKE(LAB) —LA-HP— LABAIR�HIGHPRESSURE) LA�P— LABAIR(LOWPRESSUR� —LV— LABVACUUM —SG— SPECIALGAS(NPE�ENOTEDBY-0,-2,ETG) LINE SYMBOLS LIGHTISCREENE� SOLI� OR �ASHE� LINES IN�ICATE EXISTING TO REMAIN ---- HEAVV OASHED LINES INDICATE EXISTING TO BE REMOVED HEAVV CONTINUOUS LINES INDICATE NEW WORK LIGHT DOT LINES IN�ICATE FOTURE WORK FLOOR PLAN SYMBOLS SECTION WITH TOP NUMBER IN�ICATING 1 TYP SECTION DESIGNATION AN� BOTTOM NUMBER A�p� INDICATINGDRAWINGTHATSECTIONISCUTON OR DRAWING THAT SECTION IS �RAWN ON � DETAIL WITH TOP NUMBER INDICATING DETAIL �ESIGNATION � TYP ANDBOTTOMNUMBERIN�ICATING�RAWINGTHAT�ETAIL A�p� ISREFERENCEDONORDRAWINGTHATDETAILISDRAWNON A. GENERALNOTE 1. PLANNOTELIST Oi PLAN NOTE OT THERMOSTAT OH HUMIDISTAT PM PRESSUREMONITOR�FLOORPLAN) �o Co2MONITOR(ROORPLAN) � coNNEcnoNOFNEwwoaKTOExisnNc PLUMBING DEMOLITION GENERAL NOTES A. MEXISTINGAREAS.EXISTINGSVSTEMSSHOWNAREBASEDONE%ISTINGDRAWINGS AND FIEL� VERIFIE� TO THE EXTENT POSSIBLE. CONTRACTOR SHALL VERIFY THAT SERVICES INDICATED PoR REMOVAL DO NOT SERVE SPACES OUTSI�E THE PROJECT AREA. CONTRACTOR SHALL FIELD VERIFV THAT E%ISTING SVSTEMS SHOWN ARE REPRESENTATIVE OF THE WSTALLE� SVSTEMS AN� REPORT MAJOR �ISCREPANCIES ID ENGMEER OF RECORD. B. FOR PHASED SCOPE OF WORK. REFERENCE ARCHITECTURAL PHASING PLANS FOR AREAS OF THE BUIL�ING INC W�E� IN THE SCOPE OF WORN AN� THE CONSTRUCTION PHASING. CONTRACTOR SHALL VERIFV THE FlXTURES, E�UIPMENT AND PIPING TO REMAIN ACTNE WHERE REpUIRE� BY THE PROJECT PHASING AS REQUIRED TO AVOID REMOVAL OF SVSTEMS TO REMAIN. C. INACTNE, ABANDONED SVSTEMS NOT SHOWN ARE TO BE REPORTE� TO THE ENGWEER OFRECOR� �. CONTRACTORISTOWOR�INATEALLSERVICEINTERRUPTIONSWITHONMER REPRESENTATIVES, MAIMENANCE STAFF, AND EN�-USERS. CONTRACTOR SHALL PROVIDE SUFFICIENT A�VANCE NOTICE TO ALL AFFECTE� PARTIES OF IMPENDING OUTAGE. E. SVSTEMS INDICATE� BY DASHED LWES OR RENDERED OBSOLETE BV CONSTRUCTION ARE TO BE REMOVE� IN THEIR ENTIRETY UNLE55 OTHERWISE �ESCRIBED BY PLAN NOTE(S�. THIS MCLUDES THE REMOVAL OF EXISTING HANGERS, INSULATION, AN� ASSOCIATED CONTROLS AN� ACCESSORIES. ALL PIPING TERMINATIONS NOT SHOWN ASBEINGREUSE�SHALLBECAPPE�. CONTRACTORSHALLPATCHINSULATION �AMAGED DURING �EMOLITION AN� WHERE PIPING IS SHOWN TO BE CAPPED. F. WHEN E�UIPMENT REQUIRING ELECTRICAL POWER IS REMOVED, CONTRACTOR SHALL ALSO�EMOLISHEXISTINGPOWERWIRINGAN�CON�UIT. ALICENSEDELECTRICIAN SHALL BE RESPONSIBLE FOR REMOVMG ALL POWER WIRING AND CONDUIT. G. WHERE MECHANICAL. ELECTRICAL. PLUMBING.OR FlRE PROTECTION WORK PENETRATES E%ISTING WALLS OR FLOORS TO REMAIN, THE OPENMG CREATE� MUST BE REPAIRED TO MATCH THE EXISTING W NSTRUCTION AND RRE RATING BV THE GENERAL CONSTRUCTION TRA�E SKILLED IN THE WORK TO BE PERFORMED. H. IF THE WORK OF OTHER TRA�E515 CURRENTLV SUPPORTED BY WORK TO BE DEMOLISHEQ CONTRACTOR SHALL FURNISH AND INSTALL NEW SUPPORTS. I. UNUSED HANGERS FOUN� WITHIN THE PROJECT SCOPE AREA SHALL BE REMOVE�. J. THEOWNERSHALLHAVEFIRSTRIGHTOFREFUSALFORANYITEMSREMOVE�FROM THE PROJECT SCOPE AREA. ALL ITEMS NOT CLAIMED BV OWNER SHALL BE REMOVED FROM PREMISES. A. NEWWORKSHOWNON�RAWINGSISCONCEPTUALINNATURE.CONTRACTORIS RESPONSIBLEFORTHECOOR�INATIONOFALLTRADES. CONTRACTORSHALL PERFORM FlNAL COORDINATION OF ALL TRADES AFTER CEILING REMOVAL ALLOWS FURTHER SITE INVESTIGATION ON E%ISTING BUILDMGS. B. UNLESSNOTE�OTHERWISEONTHEDRAWINGS.REFERTOSCHEDULESFORPIPE SIZES TO PLUMBING FlMTURES, DRAIN$ AND EQUIPMENT. C. WHEREEQUIPMENTREpUIRINGACCE55MU5T8EIN5TALLEDA80VEGYPSUMCEILING, CONTRACTOR SHALL WORDINATE A�EQUATE ACCESS WITH ALL TRADES AN� PROVIDE THE RE�UIRED ACCESS PANELS. �. WHEREEQOIPMENTREpUIRINGACCE551SIN5TALLE�BVPWMBINGCONTRACTOROR OTHER TRADES, ACCESS SHALL BE COORDINATED AN� SVSTEMS ROUTE� TO ALLOW ACCESS TO E�UIPMENT. E. FOR PHASE� SCOPE OF WORK. CONTRACTOR SHALL COORDINATE PHASING REDUIREMENTS WITH ARCHITECTURAL PHASING PLANS. F. CONTRACTORTOCOORDINATEWITHCONSTRUCTIONSCHEDULEFORALLWORK PERFORME�. G. ALL PIPE PENETRATIONS SHALL BE COOR�INATED WITH STRUCTURAL DRAWINGS AND EXISTING CONDITIONS. PIPE PENETRATIONS THROUGH CONCRETE BEAMS, JOISTS, OR COLUMNS ARE NOT ACCEPTABLE ONLESS SPECIFICALLV NOTED ON THE STRUCTURAL �RAWINGS OR APPROVE� 8Y THE STRUCTURAL ENGINEER. H. WHERE NEW PIPE PENETRATIONS THROUGH E%ISTING CONCRETE SLABS ARE TO OCCUR. CONTRACTOR SHALL LOCATE ANV EXISTING SVSTEMS OR REINFORQNG BV X- RAYiSCAN PRIOR TO CORE DRILLING TO AVOID �AMAGE TO SVSTEMS OR REWFORCMG. I. PROVI�EWATERHAMMERARRESTORSATALLFWSHVALVESANDWHEREIN�ICATE� ON PlANS AND DETAILS IN ACCORDNACE WITH P�I WH-201 GUIDELWES. J. NOPIPINGSHALLPASSTHROUGHORBELOCATE�INELECTRICALROOMS.TELECOM ROOMS ELEVATOR EpUIPMENT ROOMS, OR STAIR SHAFTS. FIRE PROTECTION DEMOLITION GENERAL NOTES A. EXISTINGSVSTEMSSHOWNAREBASEDONEXISTINGDRAWINGSAN�RELDVERIFIEDTO THEEXTENTPOSSIBLE. CONTRACTORSHALLVERIFYTHATSERVICESIN�ICATEDFOR REMOVAL�ONOTSERVESPACESOUTSIDETHEPROJECTAREA. CONTRACTORSHALL FIELD VERIFV THAT EXISTING SYSTEMS SHOWN ARE REPRESENTATNE OF THE INSTALLE� SYSTEMS AN� REPORT MAJOR DISCREPANQES TO ENGINEER OF RECOR�. B. FOR PHASED SCOPE OF WORN. REFERENCE ARCHITECTURAL PHASING PLANS PoR AREAS OF THE BUILDING INCLUDED IN THE SCOPE OF WORK AN� THE CONSTRUCTION PHASMG. C. IN AREAS OF RENOVATION, INACTIVE AN� ABANDONED SVSTEMS NOT SHOWN ARE TO BE REPORTE� TO THE ENGINEER OF RECORD. �. CONTRACTORISTOWOR�INATEALLSERVICEINTERRUPTIONSWITHOWNER REPRESENTATNES,MAIMENANCESTAFF,AN�EN�-0SERS. WNTRACTORSHALL PROVIDE SUFFICIENT ADVANCE NOTICE TO ALL AFFECTE� PARTIES OF IMPENDMG OUTAGE. E SVSTEMS INDICATE� BY DASHED LWES OR RENDERE� OBSOLETE BV CONSTRUCTION ARE TO BE REMOVED IN THEIR ENTIRETV UNLE55 OTHERWISE �ESCRIBED BY PLAN NOTE(5�. THIS MCW DES THE REMOVAL OF EXISTING HANGERS, INSULATION, AND ASSOCIATED CONTROLS AN� ACCESSORIES. ALL PIPING TERMINATIONS NOT SHOWN AS BEING REUSED SHALL BE CAPPE�. CONTRACTOR SHALL PATCH INSULATION DAMAGE� �URING �EMOLITION AN� WHERE PIPING IS SHOWN TO BE CAPPE�. F. WHENWUIPMENTRE�UIRINGELECTRICALPOWERISREMOVEO,CONTRACTORSHALL ALSO �EAIOLISH E%ISTING POWER WIRING AND CONDUIT. A LICENSE� ELECTRICIAN SHALL BE RESPONSIBLE FOR REMOVING ALL POWER WIRING AND CONDOIT. G. WHERE fnECHANICAL ELECTRICAL PLUMBING, OR FIRE PROTECTION WORK PENETRATES E%ISTING INALLS OR FLOORS TO REMAIN, THE OPENING CREATE� MOST BE REPAIRED TO MATCH THE EXISTING CONSTRUCTION AND RRE RATING BV THE GENERAL CONSTRUCTION TRAOE SKILLED IN THE WORK TO BE PERFORMED. H. IF THE WORK OF OTHER TRADES IS CORREMLV SUPPORTE� BV WORK TO BE �EMOLISHE�,CONTRACTORSHALLFORNISHAN�INSTALLNEWSUPPORTS. I. UNUSEOHANGERSFOUNOWITHINTHEPROJECTSCOPEFREASHALLBEREMOVED. FIRE PROTECTION GENERAL NOTES A. WHERERENOVATIONSOCCUR.MODIFVEXISTINGSPRINKLERCOVERAGETO ACCOMMODATE NEW LAYOUT. REFER TO ARCHITECTURAL PNNS FOR CHANGES TO THE AREA OF SCOPE. COOR�INATE SVSTEMS WITH EXISTINGAN� NEW SERNCES. B. WHEREE�UIPMENTREqUIRINGACCESSMUSTBEINSTALLE�ABOVEGYPSUMCEILING, CONTRACTOR SHALL COORDINATE ADE�UATE ACCESS WITH ALL TRADES AND PROVIDE THE RE(101RED ACCESS PANELS. C. WHERE EOUIPMENT REQUIRING ACCESS IS INSTALLE� BY FIRE PROTECTION CONTFACTOR OR OTHER TRADES, ACCESS SHALL BE COORDINATED AND SVSTEMS ROUTE� TO ALLOW ACCESS TO EQUIPMENT. �. WHEREPROJECTSCOPEISPHASED,WNTRACTORSHALLCOORDINATEPHASING REQUIREMENTS WITH ARCHITECTURAL PHASING PLANS. E. CONTRACTOR TO COORDINATE WITH CONSTRUCTION SCHEDULE FOR ALL WORK PERFORME�. E WHERENEWWORKISBEINGPERFORMEDONANEXISTINGBUILDING.CONTRACTOR SHALL SCHE�ULE SHUIDOWN OF E%ISTING FIRE SUPPRESSION SVSTEM WITH OWNER AND NOTIFV LOCAL FlRE �EPARTMENT OF SVSTEM AND AREAS OUT OF SERVICE. PROVI�E FIRE WATCH OF AREAS AND SYSTEMS AFFECTED. G. SPRINKLERPIPINGSERVINGELECTRICALROOMS,TELECOMROOMS,AN�OTHER SIMILAR SPACES SHALL BE MINIMIZED TO ONLV THE SPRMKLER PIPMG AND HEA� THAT SERVES THE SPACE. SPRINKLER PIPING SERVING THESE SPACES SHALL BE ROVTED IN SUCH A MANNER TO MINIMIZE PIPING WRHIN THE ROOM AN� SHALL NOT BE ROUTE� WER ELECTRICAL PANELS OR E�UIPMENT WITHIN THE ROOM. H. ALLPIPEPENETRATIONSSHALLBECOORDINATEDWITHSTRUCTURAL�RAWINGSAND EXISTING CON�ITIONS. PIPE PENETRATIONS THROUGH CONCRETE BEAMS, JOISTS.OR COLUMNSARENOTACCEPTABLEUNLESSSPEQFlCALLYNOTEDONTHESTRUCTURAL �RAWINGS OR APPROVED BY THE STRUCTURAL ENGINEER. I. FIREPROTECTIONCONTRACTORTOPROVIDEACOMPLETEAN�OPERABLESYSTEMIN ACCORDANCE WITH NFPA, STATE, AND LOCAL CODES. COORDINATE WIRING OF FlRE ALARM DEVICES WITH ELECTRICAL CONTRACTOR. � Q � e q m a Q a ' � c ry Q �, � vi a o C U � d 3 � ti (6 U � � N �4J�d� e � o _�S` `'f5"o< �soe�� sd���z No. " PE11800348 STATE OF O`+ e PE106061J1 i • . TTAIE OL . • REVISIONS Z 0 Q � Z WN I.f� � Z W � Q � d � O W = � _ U� W Z � J WCW G = W ? W � N � M t�0 � � �a �� = Q � ? Z W o � � � c 0 o �o Q � - a�d�` m '�m Z � pp m --o YL �_ � oxa W -� I� r � _ 4 Q PLUM G SYMBOLS, ABBREVIATIONS AND GENERAL NOTES P001