Loading...
HomeMy WebLinkAboutSite Plan Stamped ApprovedPRELIMINARY PENDING AGENCY APPROVAL NOT FOR CONSTRUCTION MKLITZING@CARMELCLAYPARKS.COM DISTURBED AREA: 4.00 ACRES PROJECT START DATE: 5/2020 PROJECT COMPLETE DATE: 12/2020 PRELIMINARY PENDING AGENCY APPROVAL NOT FOR CONSTRUCTION PE880303 STATE OF -oNREGIS TER E D INDI A N APRO F E SSION A L E N G INEERRICH A R D R.HO O VER06/29/20 PRELIMINARY PENDING AGENCY APPROVAL NOT FOR CONSTRUCTION All paving within the existing and proposed city right -of-way shall conform to the requirements of the Department of Engineering. The contractor shall contact the department of Engineering to schedule a pre-construction meeting to review the department's construction requirements, staff notification requirements, required inspections for certain stages of the work and to review the authority of the department as it relates to work within the existing and proposed right-of-way. Damage to the exisitng right-of-way shall be restored/repaired to the satisfaction of the City at the completion of the project. The contractor is encouraged to inspect the right-of-way with the city prior to the start of construction to document the existing condition of the right-of-way. All existing perimeter road drainage structures and bridges across the frontage of this development are indicated on the plans. Provisions have been made to pmprove or replace any drainage structures and bridges as necessary or as request by the City ot accommodate the pavement widening, auxiliary lanes, multi-use path, and any other required improvements to the property or the roadway. The cost to improve or replace any draiange structures and bridges will be borne by the developer. 06/29/20