DISTURBED AREA: 4.00 ACRES
PROJECT START DATE: 5/2020
PROJECT COMPLETE DATE: 12/2020
PRELIMINARY
PENDING AGENCY
APPROVAL
NOT FOR
CONSTRUCTION
PE880303
STATE OF
-oNREGIS TER
E
D
INDI A N APRO
F
E
SSION A L E N G INEERRICH A R D R.HO
O
VER06/29/20
PRELIMINARY
PENDING AGENCY
APPROVAL
NOT FOR
CONSTRUCTION
All paving within the existing and proposed city right -of-way shall conform to the
requirements of the Department of Engineering. The contractor shall contact the
department of Engineering to schedule a pre-construction meeting to review the
department's construction requirements, staff notification requirements, required
inspections for certain stages of the work and to review the authority of the
department as it relates to work within the existing and proposed right-of-way.
Damage to the exisitng right-of-way shall be restored/repaired to the satisfaction of
the City at the completion of the project. The contractor is encouraged to inspect the
right-of-way with the city prior to the start of construction to document the existing
condition of the right-of-way.
All existing perimeter road drainage structures and bridges across the frontage of
this development are indicated on the plans. Provisions have been made to pmprove
or replace any drainage structures and bridges as necessary or as request by the
City ot accommodate the pavement widening, auxiliary lanes, multi-use path, and
any other required improvements to the property or the roadway. The cost to improve
or replace any draiange structures and bridges will be borne by the developer.
06/29/20