Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P-501 - PLUMBING SCHEDULES AND-DETAILS
RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel � �{�n„� i,.�a�i_ � HANGER LOCKING �OOBLESUPPORT PIPE HANGER 14GAl1GEZMCCOATED � SHEET STEELSA��LE ATLEASTI2"LONG , O PREPoRMEO PIPE SUPPORT INSERT, SAME THICKNE55 AS INSULATION MANUFACTURED FOR THIS PURPOSE � PIPE HANGER DETAIL ~ NOT TO SCALE NEOPRENEISOLATOR OR CUSHION STRIP THREADED SYSTEM PIPE (REFER TO STEELHANGER � DRAWINGSFORTVPEOF R0� /f� / SYSTEMANDPIPESIZE) SiEELROD � � � �o�P��N� ii � TRIM ALL THREAD - R0� BELOW TRAPEZE SUPPORT TO NO MORE THAN ll2' BLOCNING Roo � � PIPE INSULHTION MATERIAL (REFER TO SPEqRCATI0N5) STRUT PIPE CLAMP UNI STRUT TRAPEZE SUPPORT B TRAPEZE DETAIL SURE SEAL WATER CUT-0FF MASTIC PROVIDE STAINLESS STEEL CLAMPING BAN� PENETRATION BOOT 8 FLASHING TO MEMBRANE ROOFING BYROOFING CONTRACTOR INCREASER AS REQUIRED PIPE SIZE PER �RAWINGS SEE �RAW INGS FOR SIZE �' ROOF DECK -SEE ARCHITECTURAL DRAWINGS FOR CONSTRUCTION OPENING IN DECK BY PLUMBING CONTRACTOR � VENT THRU ROOF DETAIL NOT TO SCALE PLUMBING FIXTURE ROUGH-IN SCHEDULE SPECIFlCATION SECTION 22A000 ROUGH-IN SIZES MARK FIXTURETYPE WqSTE VENT CW HW FIXTUREMOUNTINGHEIGHT NOTES SIZE SIZE SIZE SIZE WPi WATERCLOSET 4" 2" �" - 1YTORIM 1,2 WG2 WATERCLOSET,A�ACOMPLIANT 4" Y 1" - 1]'TORIM 1,2,3 UR4 URINAL 2' 11p' 314" - 24"TOLIP 1.4 UR-2 URINAL,A�AWMPLIANT 2" 1112' 314" - iT'TOLIP 1,4 La SINGLEUSERLAVATORV,ADACOMPLIANT 1112' 1112' 92" 92" 3a'TORIM 1,5,8,] L2 THREEPERSONUSERIAVATORY,A�ACOMPLIANT 1V2' 1V2' V2' V2' 34'TORIM 1,5.6.] L� PoURPERSONl1SERLAVATORV,ADACOMPLIANT 1�/2" 1�/2" 1l2" 1l2" 34'TORIM 1,5,8,] PERMANUFACTURERSREDUIREMENTS EWC4 BI-LEVELELECTRICWATERCOOLERW/BOTTLEFILLER 11p' 11p' 112" - 1,] ANDA�ACOMPLIANT M&1 MOPBASIN 3' 2' 112" 112" 36"TOFAUCET 1 NOTES �- MOUNTINGHEIGHTISFROMFlNISHEOFLOOR. 2. WALLMOONTEDWATERCLOSETWITHELECTRONICSENSOROPERATE�FLUSHVALVE. 3. I�STALL FLUSH HANDLE AT WIDE SIDE OF COMPARTMENT. 4. VVALLMOIINTEDURINALVVITHELECTRONICSEN50ROPERATE�FWSHVALVE. 5. LAVATORV/SINKWITHELECTRONICSENSOROPERATE�FAUCET.WITHLEAD-FREEI�IOTHERMOSTATICMIXINGVALVE. 6. INSULATE DRAIN AND WATER SUPPLIES WITH INSULATION KIT. 1. 2]" MINIMIIM KNEE 0.EARANCE WITH MINIMUM 9" IDE 0.EARANCE. 8. REFERTOiHEARCHITECTURALDRAWINGFORMOUNTINGHEIGHT. ELECTRIC WATER HEATER SCHEDULE SPECIFlCATION SECTION P2330� ELECTRICALOATA RECOVERV NOMINAL UNIT MARN LOCATION STORAGE EFF % WEIGHT MANUFACTURER4VITH NOiES HP KW VOLTS PHASE GPH RISE°F CAPACITV (LBS.) MO�ELNUMBER (GAL) �WH-0 JAN.102 - 2.5 120 1 10 1�0 20 - - LOCHINVARWTCO2�FS 1.2 NOTES: 1. INSTALL �RAIN PAN UN�ER WATER HEATER, PIPE �RAIN PAN AN� WATER HEATER T8P VALVE TO FLOOR �RAIN. 2. WATERHEATERTOBELOWBOVTVPE PLUMBING EQUIPMENT SCHEDULE MARK LOCAiION MAKEANDMODELNO. DESCRIPTION CAPACITV ELECTRICAL NOTES CHARACTERISTICS ET4 JAN. W2 A.O. SMITH PMG2 THERMAL E%PANSION TANK Z,� GAL. TOTAL VOLUME 103 GAL MA%. ACCEPT NOTES: 1. - PUMP SCHEDULE SPECIFlCATION SECTION 232123 DESIGN DESIGN PUMP MOTOR �ATA MIN MANUFACTURER WITH MARK LOCATION SVSTEM NPE CAPACIiY CAPACIN SUCT. �ISCH HP NOTES (GPM) (FT.H�) EFfi RPM VOLTS PH MODELNUMBER (INJ QN) WATTS HWRP-1 JpN.102 �OMESTICHOT WLINE 2 12 - - - (125) 2950 115 1 BELLBGOSSETfNBF25 1,2,3 WATERRETURN NOTES 1. POMPCONTROLLE�BYASTRAPONApUASTATAN�BVTHEB0IL�INGAUTOMATIONSYSTEM. 2 LFA��FREEINAGCOR�ANCEWITHSTATEANDFEDERALREGULATIONS. 3. WETROTOR. GATE VALVE (TYP) 4"CWT03"CW REDUCER PRESSUREGAUGE ro eui�oiNc �REDUCE�PRESSUREZONE TVPE BACKFLOW PREVEMER TVPICAL�RAINFUNNELWITH gFp.� AIRGAP.TERMINATEDRAINLINE — OVERNEARESTFLOORDRAIN � � �c��o ��o� nErEa i '� o ~ > _—. � ��=m iFINISHE� FLOOR WUPLING A�APTOR(iYP�� �SEESPEGRCATIONSFORPIPE FLOORSLEEVE SUPPORTREQUIREMENTS 7"CW INCOMING SERVICE 1. ENTIRE INSTALU+TION SHALL BE IN ACCORDANCE WITH UTILITY COMPANY'S REQUIREMENTS. WATER METER FURNISHED BY LOCAL UTILITK CONTRACTOR INSTALLE�. � SINGLE WATER METER PIPING DETAIL V NOTTOSCALE THERMOMETER UNION (TVPICAL) ALL-THREAO SUPPORTRO�S SUPPORT PLATFORM ASSEMBLV WITH DRAIN PAN AND SUPPORT BRACKETS EQUAL TO HOL�RITE p50 SWHP-M. INSTALL PER MANUFACTURER'S RE�UIREMENTS SUPPORTFROM SiRUCTURE VACUUM RELIEF VALVE HW /H I\ I HWR �W \ STRAPONApUASTAT BALL VALVE QIPICAL) � BALLVALVE \HWRECIRCULATINGPUMP CHECKVALVE UNION�TVPICAL) J THERMAL EXPANSION TANK (ET�2J ASMEAPPROVE�TEMP.B PRESSURE RELIEF VALVE. TERMINATE RELIEF DRAIN LME OVER MOP BASIN OR NEAREST FLOOR DRAIN WITH MINIMUM A" AIR GAP PAN ASSEMBLY ORAIN, TERMINATE OVER MOP BASIN OR NEAREST FLOOR DRAIN WITH MINIMUM d' AIR GAP � SUSPENDED WATER HEATER DETAIL L NOTTOSCALE ELECTRIC WATER HEATER �own-i� TANK DRAIN WATER HAMMER ARRESTOR SCHEDULE SPECIFICATION SECTION 221116 TVPE FlXTUREUNITRATING I.P.S. ZURNNUMBER NOTES W�A.A ,.,, �a�� ,�ox�.a ,,� WHA-B 1232 1" 12fi0XL-B 1,2 WHhC 3380 1' 1260%LC 1,2 WHA-0 61�113 1' 1260XL-D 1,2 WH&E 114154 1" 12fi0XL-E 1,2 WHA-F 165330 1' 1260%LF 1,2 NOTES: 1. WATERHAMMERARRESTORSSHALLBESIZEDANDINSTALLE�PERTHEPLUMBINGDRAINAGE INSTITUTE �STANDAR� P�I-WH 201) REpUIREMENTS IN ACCESSIBLE LOCATIONS ON THE WLD WATER AN� HOT WATER PIPING WHERE FW SH VALVES AN� ANY OTHER QVICK CLOSING VALVES ARE USE�. 2. CERTIFIEDTONSF/AN513126YIAPMO. BACKFLOW PREVENTER SCHEDULE SPECIFlCATION SECTION 221116 �ESIGN PRE55. S2E MANOFACTURERWITH MARK LOCATION SVSTEM TYPE CAPACITY DROP (IN) MO�ELNUMBER NOTES (GPM) (PSIG) BW-1 STORAGE108 MAINCWSYSTEM RE�OCEDPRESSURE 80 10 2" WATTSLF909 3.4.S.fi ZONE ASSEMBLY NOTES: 1. USCAPPROVEqF�ASTRAMER,].SFPSFLOW. 2 I&LINE, IN�EPEN�ENT CHECK VALVES WRH AN INTERME�WTE RELIEF VALVE. NON-RISING STEM RESILIENT SEATE� GATE VALVES. �. PROVIDEUNITWRHAIRGAPDRAINASSEMBLY,PIPEDRAINTONEARESTFLOORDRAINORSWK. 4. MAXIMUMMOUNTINGHEIGHTOFS'0"ABOVEFLOOR. 5. I&LINE IN�EPEN�ENT CHECK VALVES W ITH INTERMEDIATE RELIEF VALVE, FULL PORT QUARTER�TURN RESILIENT SEATE� BALL VALVE. BRONZE STRAWER. 6. ASSELEADFREEANDCERTIFIED. � CIRCLE DESIGN GROUP Engineer: Y ���T � ti+e �a9� � " �( :'.^^•0118 [ . 1 3113 »�i t �:'`b BTAIECG �[Cqu� , i��p,A,�L�9IANP'� 'My�'�Wa�fi� \��.w�� JF— —. _ By: Developer: P E D C O R �� �� DEVELOPMENT CO. Project �/ I ` � OW O � � � � � U � — I � Z �U �; J � U w5 � L J � m U � � CONSTRUCTION DOCUMENTS Sellssue Dale Sheetlssue Date WI�3120 �3I�3120 Drawn By Checked By MM GR Last Revision Date: 1 O6/24/20 ADDENDUM#3 CDG Numbec 19212 SheetTitle: PLUMBING SCHEDULES AND DETAILS Sheel Number: P-501 DATE: 0��06 2O