Loading...
HomeMy WebLinkAboutP000.1RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel �u't1�\i �J•tv:�lRA�� WATER HEATER SCHEDULE MHNOFACTOFER AOSMITH MO�EL �EN52 STATUS NEW aunNnry i GAPAGITY SOGALLONS FUEL ELECTFIC KW 9(45SIMULTANEOUS� AHPICEPTIFlCATENO. ]056811 STANOBVLO55 0.8%/HR FEGOVEFY 61 GPH` VOLTAOE 208/ll60 AMPERAGE 432 WBGHT�EMPN� 1311B5. * �a 60" F TEMPERATUFE RISE SCOPE OF WORK PHOVIDE ALL PLUMBING FOR NEW HEALTH CLUB INCWDING ALL WATER AND SANITARV LWES AND CONNECT TO EXISTWG UTILITIES. PROVIDE A NEW TANK WATER HEATER COORDINATE WITH GC AND MECH CONTRACTOR FOR ANV FEQUIRED CONDENSATE LINES AND GAS FLUE FOR WATER HEATER. PLUMBING NOTES 1. ALLWORKMANSHIPaNDMATERIAL55MALLBEINSTRIQACCORDFNCEWITH 3. ALLEQUIPMENTWHICHISTOREMAINMUSTBEREFURBISHEDTOALIKENEW CONDITION 6. PWMBIN6CONTRAQORSHFLLVISITTHEJOBSITEANDTHOROUGHLV FAMILIAR¢E HIMSELF WITH ALL EXISTING CONDITIONS. 5. ALLMATERIALSSHALLBENEW. 6. ALLWORKSHALLeEPERFORMEDBVALICENSEDPLUMBINGCONTRACTORINA FIRST QASS W ORKMANLIKE MANNER. THE COMPLETED SYAEM SHALL BE FULLY OPERATNE ALLEXCAVFTIONFNDBAIXRLLASREQUIREDFORTHISPHASEOF CONSTRUQION SHALL BE A PART OF TH IS CONTRACT ]. REQUIREDINSURANCESHALLBEPROVIDEDBVTHEPWMBINGCONTRAQORFOR PROTEQION AGAINST PUBLIC LIABILITV AN D PROPERTV DAMAGE FOR THE �URATION OFTHE WORK. 8. PWMeIN6CONTRAQORSHALLSECUREFNDPAVFORFLLPERMITS,FEES, INSPEQION AN� TESTS. P W MeIN6 CONTRAQOR TO OBTAIN PERMIT AND APPROVE� SUeMITTALS PRIOR TO BE6INNIN6 WORK OR OR�ERING EQUIPMENT. P W MeING CONTRAQOR M UA BE PRESENT FOR ALL INSPEQIONS OF HIS W ORK BV REGUTATORV AUTHORITIES 9. DRAWIN6SFRE�IFGRAMMATIC DONOTSCALEFORTHEEXNQLOCFTIONOF FlXTURFS, PIPING, EQUIPMENT, ETC. 10. ALL W ORK SHALL BE COORDINATED W ITH OTHER TRADES TO AVOID 11. 12EXPOSEDWATERPIPINGSHALLBETVPE"L"COPPERFOR2"ANDUNDER WATER PIPINGINWFLLSHNDUNDERGROUNDSHNLLBE'PEX TYPEPIPINGTHATMEETS FNSI/NSF STANOARO 61. 13. SOIL, WAAE, VENT AND RAIN WATER PIPING SHALL BE PVC BUT MAV NOT RUN THRU RNTED ASSEMBLIES OR IN PLENUMS. 14. ALL RNTURES MUST BE PROVIDED W ITH READILV ACCESSIBLE STOPS AND FPPROPRIFTELV MFRKED FCCE4 PANELS COOROINFTE LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO INSTALLATION. 15. FURN ISH ANO INSTALL APPROVEO AIR CHAMBERS AT EACH PLUMBING FlXTURE GROUP AS PER CODE AN� WITH GOOD ENGMEERIN6 PRAQICE. 16. �I ELEQRIC COUPLIN65 ARE REQUIRE� BETW EEN NLL DISSIMILAR METAL IN PIPING NND EQUIPMENT CONNECTIONS; EXCEPT AT WATER HEATER AS PER CODE. ll.60LATE COPPER PIPE FROM HANGER OR SUPPORTS WITH ISOLATOR PAD. 18. ALL FlRE RATEO FLOOR AN D WALL PEN ETRATIONS SHALL BE PROPERLY PROTEQED FROM FlRE, SMOKE ANO WATER PENETRATION BV RLLING VOIDS BETW EEN PIPE AN D WALL/FLOOR SLEEVES W ITH RRE RATED FOAM, TO NCHIEVE THE SAME RFTING AS WALLS OR FLOORS AS PART OF THE P W MBER'S WORK. 19. P W MB W 6 CONTRAQOR SHFLL GUARANTEE ALL MATERIALS NN� WORKMANSHIP FREE FROM DEFEQS FOR H PERIOD OF NOT LESSTHFN ONE (l) VEAR FROM DATE OF CERTIRCATE OF OCNPFNCY. CORREQION OF HNV DEFEQS SHFLL BE COMPLETED W ITHOUT ADDITIONAL CHFlRGE W ITHIN ]2 HOU RS OF NOTIRCNTION AN D SHALL MCW DE REPLFlCEMENT OR REPAIR OF ANY OTHER PHNSE OF THE INSTNLL4TION WHICH MAV HAVE BEEN DAMAGED. 20. STU�O0. MINI/MANI AIR A�MITTANCE VALVES MAV NOT BE USED AS AN ALTERNATE TO VENT PIPING THRU ROOF 21. PROVI�E CH0.0ME PLATED COMBINATION COVER PLATE AN� CLEAN OUT P WG OR AQESS PANEL FO0. ALLCLEANOUTS. 22. NO COMBUSTIeLE MATERIAL TO 9E USED IN MECHFNICAL ROOMS OR IN CEILIN6 SPACES WHERE USEO AS RETURN FIR PLENUM$ 23.NO WATER, SANITARV OR DRAINAGE PIPING PERMITfED W ELEQRICFL OR ELEVATOR EQUIPMENT ROOMS 24. WATER PIPING INSULATION SHALL BE 1"THIIX ARMAFLEH INSTALLED IN ACCOR�ANCE WITH MANUFACTURER'S INSTRUCTIONS FORALL HOT WATER PIPIN6. WHERE DOMESTIC WATER TEMPERATURES CAN CAUSE SWEATING, ALL COL� WATER PIPING SHALL eE INSULqTED W ITH 1/2"THICK ARMAFLEX MSULATION. �S CONDENSATE oRAIN uNES TO eE RUN UNDER SLAB IN PVC SCH40 PIPE NND 26. PROV IOE AN6LE STOPS ON ALL WATER SERVICE LW ES TO FlXTURES FOR irvoivioun�sHur-oFF. D.NOl01NT5UNDERGROUN�FORCOPPER. 28. PLUMBING RXTURES SHALL COMPLV W ITH IPG2006. 29. WATER HAMMER ARRESTORS AS PER IPC-2006. 30. P W MBING CONTRAQOR TO PROVIDE ANTI-SCALDING VALVE FOR TU85 AND SHOWERS. 31. P W MBING CONTRAQOR SHALL REVI E W ALL BI� �ONMENTATION. 32.PWMeIN6 CONTRAQORSHFLL REVIEW WALL FlNISHES @ LOCATION REQUIRING BARRIE&FREE COMPLIANCE �EXAMPLP CENTER LINE TO TOILET�. 33.CONSTRUQION ASBUILT DRAWINGSAND�OCUMENTSSHALLBEPROVIDEDTO THE OW NER WITHIN 30 �AVS AFTER THE DATE OF AGCEPTFNCE. 34.OPERATION MAN UALS AND MAINTENFNCE MANUALS SHALL BE PROVIDED TO rnE auaoin� owNER. PLUMBING LEGEND �� SANITARVSEWERPIPING � - - - � VENT PIPING � � - � - � � oOMESTIC COLD WATER PIPING � - - � HOT WATER PIPING (110°) � - - � HOT WATER PIPING (140°) � - - - co � CONDENSATE PIPING �--- aa. � TEMPERATURE&PRESSURERELIEF � STORM DRAIN PIPING � �.. - � � GAS PIPING �O� PIPE RISE OR DROP ��� PIPE FISER UP ��'^°�"a� HOTWATERRETURN ��`�'�'^5� HOTWATERSUPPLV C- CAPPED END OF PIPE �CO CLEANOUT o-jp P-TFAP S.O.V. SHUT-0FFVALVE COTC CLFANOUTTOGRADE C�f�l DOMESTIC COLD WATEF h'NI DOMESTIC HOT WATEF HWR �OMESTICHOTWATERRETURN °��'B HOSEBIBB VTR VENTTHRUROOF DQ GATEVALVE � GLOBE VALVE N CHECKVALVE � BALANCING VALVE � GAS COCK WATER HAMMER ARRESTER O FD FLOOR �RAIN F,W, FlLTERE�WATER � BACKFLOW PREVENTOR I.W. INDIRECT WASTE � FLOORSWK ��. AIRADMITTANCEVALVE HDO HUBDRAIN �� �� THERMOSTATIGMI%INGVALVE PLUMBING SCHEDULE WATER wnsTe I[em No. ��Y- Description Re�erence Motlel Hot Coltl Direct J 1 CONTROLVALVE AMERICANSTANDARD R111 1/2' V2'• K 1 SHOWERHEAD KHOLER AWAKENB1101.]5 1/2•' 1@'• R 1 DRINKING FOUNTAM ELKAY EZH2O 1/2' 11/6" S 1 MOP SINK FIAT MS&2424 p^ 51 1 MOPSINKFAUCET MUSTEE 63.600A 1/2' 1/2'• T 1 WATER HEATEfl SEE SCHEDULE SEE SCHE�ULE 3/4" 3/4" 1 HOT WATER RECIRCULATOR TACO OO6e3 FLOOR DRAINS ZURN Z5415 W/ TVPE BS STRAMER p^ 'PROVIDE TRAP PRIMERS FOR ALL FLOOR DRAINS RESTROOM FIXTURE SCHEDULE wnrea WASTE Item No. �1Y� Description Manufacturer Model Hot Cold Wasle Usage Spec P 2 WATERCLOSET KHOLER HIGHLINECL4SSIC(K3493-0) 1/2" 3" 1.6 GPF O 2 LAVATORV KOHLER GREENWICHK42643-0 1 V4" V 2 LAVATORY FAUCEf DELTA 559LF-BLLPU (MATTE BL4CI� 1/2" 1/2" 0.5 GPM p THERMOSTATICMIXINGVALVE WATTS LFMMV 1/2" 1/2" 2 MSUL4TED PLUMBING COVERS PLUMBERE% X4446 NOTE: -GC TO FURNISH AN� INSTALL ALL FI%TURES, ACCESSORIES AND FINISHES � IF APPROVED BY OWNER, G.Q TO SALVAGE EXISTING LAVATORY AND WATER CLOSET FOR REUSE. 0 � HOT WNTER HEATEF SEE PLUMBING 3/4" FT. PLYW00� DECK W/ FRP MTL. PAN W/ 2' HIGH MIN. SIDES 6" 20 GA. MTL STU� FRNMING @ 12" O.C. PROVIDE 2X6 FT. WOOD BLOCKING TO HANG MOP Bl1CKET P!/c11�AP111JIq�1�4P19:L[N:� WALL MOUNTED ECO-LAB CLEANSING PRODUCTS FFP TO COVER ALL SURFACES OVEF °/a" DUROCK, TVPICnL 3�5�8' 18 GA. MTL STII� @ 12 O.C. W/ 5I8" MA. GVP. BOARD'� EA FACE ANCHOR WALL TO SOLID WOOD BLOCKING IN WALL BEVOND 3b/8' 20 GA. MTL. STU� @ 16' O.C. MOP SWK. SEE PLUMBING ANCHOR TRACK TO (E) SLAB W/ MLTI .ta5 SHOT PMS �OR E�L) @ 12" OA. PIPE MAY E%TEN� AS WHSTE PFOVIDE CLEANOUT TEE W ITH SGFEN/ED COUNTEF-SUNK HBS PlASTIC PLUG: TAPARED-THREHD WITH TFE JOINT COMPOUND W HERE QEANOUT TEE IS CONCEALED IN A CHASE OR A PARTITION, PROVIDE H ROUN� 19 GAUGE STAINLESS STEEL COVER WITH BEVELED EDGES AN� FLATHEAD MACH WE SCREW. [�P[d:lil�fSI]:l RISER LENGTH AS WALL CLEANOUT NOT TO SCHLE N OR ON AS ION PLAN REFER TO PLUMBING FlXTURESCHEDULE FOR FURTHER INFORMATION. �IPECTION � OF FLOW ALL CLEANOUT DETAIL NOTES 1) PROVI�E WCO WHERE SHOWN ON PLANE, AN� ON SANITARY WASTE BRANCHES NOT SEavEo wirry n F�ooa c�EnNour 2) LOCNTE AeOVE RXTIIFE FLOOF RIM WITHIN C' OF FLOOF. 37 CONSULT LOCAL CO�ES FOR OTHER WCO FE�UIqEMENTS. 4) LONG SW EEP NT EN� OF L W E OF COMBINHTION W VE NNO EIGHT BEN� IN PUN OF LINE 57 QENN OUT FACC SHALL BE WITHIN 4" OF WALL SURFACC PFOVI�E A PIPE EXTENSION IF FE�UIqED )REFERTOPWMBINGFlXTURESCHEDULEFORFUTHERWFOFMATIONFOq WCO MEMBRHNE CIAMP FC� FLOORSLABONGFA�E SAMESREASSEWERUPTO ASREOUIRE� 4"MHXIMUM FOR �EPTH QFSEWER LONGSWEEPELBOWAT �� EN� OR TURN OR RUN HUB AND SPIGOT CAST IRON PIPE BELOW FLOOF COMBINATION WYEAN� EIGHT BEND IN RUN EMER SANITqRY TOPOFPIPE SEWER LINE A �oIRECT10N V� THE FLOW FLOOR CLEANOUT NOT TO SCALE LOOR CLEANOUT DETAIL NOTES 1) LOCATE CLEANOUT AT THIS LOCHTIONS'. H) BUILDING EXIT B) AT TURNS OF PIPES GFEATER THHN 95 DEGREES C) HT 90' INTEPVHLS ON STRAIGHT RUNS D) W HERE IS SHOWN ON PLANS E) WHEFE IS 18" CLEAF AROUND � Z � I-� 12" MIN - EHCH SIDE PflOVI�E WEATHER ROOF CHPFOFFUTUFETENqNT NREN$ fURN HEAD PIPE �OWN METALFLASHING ROOF VENT THRU ROOF DETAIL ns VENT THRU ROOF DETAIL NOTE ANY VENT FIqE WITHIN 10'-0' OF ANY �OOF. W IN�OW, OR E%HqUST OPENING SHALL E%TEND NOT LE55 THqN 3'-0" HBOVE SUCH SLIP JOINT NUT 12 �38� NPT WNN. FLOOR �Po �ESCl1TCHEON �NISH FLC 55 BRAIDED PRIMER HOSE TRAP PRM FITf `-I CLEANOUT 2 �13� FIP COMPRESSION FITfING FLOOR DRAIN TRAP RESEAL DETAIL NOT TO SCALE Eo Cd s�a d�i N3xo� �<a`�LL�3 � � � � � v � � w w PIt01F4i V'^1 V1 � � h""'1 W � � � � � O � � w 'x w �~~ � I-1 � lr) � � ^~ � � �~z W � � � RPVISIONS DATES: raoe�ss+oaw�, ssa� ,�`�:c�'�'e<�'%� : ,` �>_ , � .�q�OnC . ST��� <` * `�4 , �y�i1 rZQ� ¢aic erveeu eeemzowm amisrraro ervarvrert SiBtt�OFIFDIANA ISSUE DATE: 08.19.19 PROJECTk: 307E.1292E DRA�b'N BY: HMiNV CHECKEDBY: AK PLUMBING DETAILS & NOTES P-1 DATE: 07�06�20