HomeMy WebLinkAboutCOMcheck ETF West Carmel IND signedCOMcheck Software Version 4.1.1.0
Interior Lighting Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:Alteration
Construction Site:
10895 North Michigan Rd.
Zionsville, IN 46077
Owner/Agent:
CM FITNESS, LLC
2849 PYRENEAN PLACE
WESTFIELD, IN 46074
(317) 288-1741
RYANMURRAY@ETFFITNESS.COM
Designer/Contractor:
ERIC ENGELL
EMR ENGINEERING AND DESING
LLC
4236 HWY 3630
ANNVILLE, KY 40402
606-364-2886
CRAIG@EMRENGINEERS.COM
Project Information
Energy Code:
EAT THE FROG FITNESS
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Gymnasium/Exercise Center:Exercise Area 2953 0.90 2658
2658Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
Gymnasium/Exercise Center:Exercise Area (2953 sq.ft.)
LED 1: B: Linear Light: LED Linear 33W:1 1 50 50
LED 2: R1: Recessed Light: LED PAR 20W:1 9 20 180
LED 3: R2: Pendant Light: LED Other Fixture Unit 46W:1 11 46 506
LED 4: C1: Recessed Light: LED A Lamp 25W:1 28 9 252
Track lighting 2: TR: Track Light: Wattage based on current limiting device capacity 0 0 120 120
LED 5: R3: Recessed Light: LED Other Fixture Unit 46W:1 9 46 414
1522Total Proposed Watts =
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting
systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
81 ofPage
Eric Engell, P.E.6-2-2020
COMcheck Software Version 4.1.1.0
Mechanical Compliance Certificate
Project Title:
90.1 (2007) Standard
Project Type:Alteration
Location:Carmel, Indiana
Climate Zone:5a
Construction Site:
10895 North Michigan Rd.
Zionsville, IN 46077
Owner/Agent:
CM FITNESS, LLC
2849 PYRENEAN PLACE
WESTFIELD, IN 46074
(317) 288-1741
RYANMURRAY@ETFFITNESS.COM
Designer/Contractor:
ERIC ENGELL
EMR ENGINEERING AND DESING
LLC
4236 HWY 3630
ANNVILLE, KY 40402
606-364-2886
CRAIG@EMRENGINEERS.COM
Project Information
Energy Code:
EAT THE FROG FITNESS
Mechanical Systems List
Quantity System Type & Description
Electric Storage Water Heater, Capacity: 50 gallons w/ Circulation Pump
Proposed Efficiency: 0.93 EF, Required Efficiency: 0.86 EF
SWH COMPLIANCE REQUIRED.
1 Water Heater 1
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable
mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
82 ofPage
6-2-2020Eric Engell, P.E.
Inspection Checklist
Requirements: 100.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 90.1 (2007) Standard
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
4.2.2,
7.4.1
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
4.2.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the lighting and
electrical systems and equipment and
document where exceptions to the
standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.4.1.1,
8.4.1.2
[PR6]2
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the electrical systems
and equipment and document where
exceptions are claimed. Feeder
connectors sized in accordance with
approved plans and branch circuits
sized for maximum drop of 3%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
83 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
7.4.3
[PL1]2
Service hot-water piping systems
insulated. Where piping is installed in
or under a slab, verification may need
to occur during Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.1
[PL2]3
Temperature controls installed on
service water heating systems
(<=120ºF to maximum temperature
for intended use).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
84 ofPage
Section
#
& Req.ID
Mechanical Rough-In
Inspection
Plans Verified
Value
Field Verified
Value Complies?Comments/Assumptions
6.4.1.4,
6.4.1.5
[ME1]2
HVAC equipment efficiency
verified. Non-NAECA HVAC
equipment labeled as meeting
90.1.
Efficiency:_____Efficiency:_____Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list
for values.
6.4.4.1.1
[ME7]3
Insulation exposed to weather
protected from damage.
Insulation outside of the
conditioned space and associated
with cooling systems is vapor
retardant.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.6.1
[ME30]1
Exhaust air energy recovery on
systems >=5,000 cfm and 70%
of design supply air.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.5.8.1
[ME34]3
Unenclosed spaces that are
heated use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.2
[ME36]2
Service water heating equipment
meets efficiency requirements.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
85 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
9.4.1.1
[EL1]2
Automatic controls to shut off all
building lighting installed in buildings
>5,000 ft2.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.2
[EL2]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.1.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.2
[EL5]3
Ballasted one and three lamp fixtures
with >30 W/lamp have two lamp
tandem wired ballasts when >=2
fixtures in same space on same
control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.4.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.6.2
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
10.4.1
[EL9]2
Electric motors meet requirements
where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
86 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
6.4.3.1.1
[FI2]2
Heating and cooling to each zone is
controlled by a thermostat control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.2
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.3
[FI9]1
An air and/or hydronic system
balancing report is provided for HVAC
systems serving zones >5,000 ft2 of
conditioned area.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
6.7.2.4
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.3
[FI11]3
Public lavatory faucet water
temperature <=110°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
7.4.4.4
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.7.1
[FI16]3
Furnished as-built drawings for
electric power systems within 30 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
8.7.2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
9.2.2.3
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
6.4.3.3.1
[FI21]1
HVAC systems equipped with at least
one automatic shutdown control.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
87 ofPage
Project Title:
Data filename:
EAT THE FROG FITNESS
P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck
05/28/20Report date:
88 ofPage