Loading...
HomeMy WebLinkAboutCOMcheck ETF West Carmel IND signedCOMcheck Software Version 4.1.1.0 Interior Lighting Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:Alteration Construction Site: 10895 North Michigan Rd. Zionsville, IN 46077 Owner/Agent: CM FITNESS, LLC 2849 PYRENEAN PLACE WESTFIELD, IN 46074 (317) 288-1741 RYANMURRAY@ETFFITNESS.COM Designer/Contractor: ERIC ENGELL EMR ENGINEERING AND DESING LLC 4236 HWY 3630 ANNVILLE, KY 40402 606-364-2886 CRAIG@EMRENGINEERS.COM Project Information Energy Code: EAT THE FROG FITNESS Allowed Interior Lighting Power A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B X C) 1-Gymnasium/Exercise Center:Exercise Area 2953 0.90 2658 2658Total Allowed Watts = Proposed Interior Lighting Power E (C X D) D Fixture Watt. A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures Gymnasium/Exercise Center:Exercise Area (2953 sq.ft.) LED 1: B: Linear Light: LED Linear 33W:1 1 50 50 LED 2: R1: Recessed Light: LED PAR 20W:1 9 20 180 LED 3: R2: Pendant Light: LED Other Fixture Unit 46W:1 11 46 506 LED 4: C1: Recessed Light: LED A Lamp 25W:1 28 9 252 Track lighting 2: TR: Track Light: Wattage based on current limiting device capacity 0 0 120 120 LED 5: R3: Recessed Light: LED Other Fixture Unit 46W:1 9 46 414 1522Total Proposed Watts = Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Interior Lighting PASSES Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 81 ofPage Eric Engell, P.E.6-2-2020 COMcheck Software Version 4.1.1.0 Mechanical Compliance Certificate Project Title: 90.1 (2007) Standard Project Type:Alteration Location:Carmel, Indiana Climate Zone:5a Construction Site: 10895 North Michigan Rd. Zionsville, IN 46077 Owner/Agent: CM FITNESS, LLC 2849 PYRENEAN PLACE WESTFIELD, IN 46074 (317) 288-1741 RYANMURRAY@ETFFITNESS.COM Designer/Contractor: ERIC ENGELL EMR ENGINEERING AND DESING LLC 4236 HWY 3630 ANNVILLE, KY 40402 606-364-2886 CRAIG@EMRENGINEERS.COM Project Information Energy Code: EAT THE FROG FITNESS Mechanical Systems List Quantity System Type & Description Electric Storage Water Heater, Capacity: 50 gallons w/ Circulation Pump Proposed Efficiency: 0.93 EF, Required Efficiency: 0.86 EF SWH COMPLIANCE REQUIRED. 1 Water Heater 1 Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 90.1 (2007) Standard requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 82 ofPage 6-2-2020Eric Engell, P.E. Inspection Checklist Requirements: 100.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 90.1 (2007) Standard Section # & Req.ID Plan Review Complies?Comments/Assumptions 4.2.2, 7.4.1 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable Requirement will be met. 4.2.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.4.1.1, 8.4.1.2 [PR6]2 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the electrical systems and equipment and document where exceptions are claimed. Feeder connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 83 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions 7.4.3 [PL1]2 Service hot-water piping systems insulated. Where piping is installed in or under a slab, verification may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.1 [PL2]3 Temperature controls installed on service water heating systems (<=120ºF to maximum temperature for intended use). Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 84 ofPage Section # & Req.ID Mechanical Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 6.4.1.4, 6.4.1.5 [ME1]2 HVAC equipment efficiency verified. Non-NAECA HVAC equipment labeled as meeting 90.1. Efficiency:_____Efficiency:_____Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. 6.4.4.1.1 [ME7]3 Insulation exposed to weather protected from damage. Insulation outside of the conditioned space and associated with cooling systems is vapor retardant. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.6.1 [ME30]1 Exhaust air energy recovery on systems >=5,000 cfm and 70% of design supply air. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.5.8.1 [ME34]3 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.2 [ME36]2 Service water heating equipment meets efficiency requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 85 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions 9.4.1.1 [EL1]2 Automatic controls to shut off all building lighting installed in buildings >5,000 ft2. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.2 [EL2]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.1.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.2 [EL5]3 Ballasted one and three lamp fixtures with >30 W/lamp have two lamp tandem wired ballasts when >=2 fixtures in same space on same control. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.4.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.6.2 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable Requirement will be met. 10.4.1 [EL9]2 Electric motors meet requirements where applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 86 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions 6.4.3.1.1 [FI2]2 Heating and cooling to each zone is controlled by a thermostat control. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.2 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.3 [FI9]1 An air and/or hydronic system balancing report is provided for HVAC systems serving zones >5,000 ft2 of conditioned area. Complies Does Not Not Observable Not Applicable Requirement will be met. 6.7.2.4 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.3 [FI11]3 Public lavatory faucet water temperature <=110°F. Complies Does Not Not Observable Not Applicable Requirement will be met. 7.4.4.4 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.1 [FI16]3 Furnished as-built drawings for electric power systems within 30 days of system acceptance. Complies Does Not Not Observable Not Applicable Requirement will be met. 8.7.2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable Requirement will be met. 9.2.2.3 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. 6.4.3.3.1 [FI21]1 HVAC systems equipped with at least one automatic shutdown control. Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 87 ofPage Project Title: Data filename: EAT THE FROG FITNESS P:\1 ENGINEERING\Energy Calcs\ComCheck\Eat The Frog\Eat the Frog - Carmel IN 90.1 (2007).cck 05/28/20Report date: 88 ofPage