Loading...
HomeMy WebLinkAboutTLR 2 EnergyIndiana 2�2� Perfarman�e �ompliance Praperty 14433 TALLYN WAY CARMEL, IN 46074 Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E5IGEND� Performance-based compliance passes by 4.3°�6 Air Leakage Testing Area-weighted average fenestration SHGC Area-weighted a�erage fenestration Ll-Factor Annual Energy Cost Design Heating Cooling Water Heating Mechanical Ventilatian 5ubTotal - Used to determine �omplian�e Lights & Appliances wlout Ventilation �nsite generation Total Ins e�tion 5tatus _ T���nergyS�lutir�ns p Results are projected This report is based an a proposed design and does not confirm field enforcement of design elements. Requirements � � � � � � � � 11D5 11 D2.4.12 11 D2.5 11 D2.5 11D4.1 Lighting Equipment Efficiency f�landatory Checklist �'�andatory code requirements that are not checked by Ekotrope must be met. 11D3.6 Mechanical Ventilation Rate 1103.6.1 hlechanical Ventilation Efficacy Indiana 2020 Performance $1,649 $2�5 $467 $21 $2,412 $1,111 $0 $3,523 As aesigned $1,633 $259 $467 $46 $2,4�6 $1,111 $0 $3,516 Air sealing is 4.00 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa. Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy 0.3°Io. As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party. Name ❑rganizatian ❑rganixatian TSI Energy Solutions ❑evin Sielschott 6uilder FISCHER HDMES ❑evin 5ielschott TSI Energy 5olutions Signature: Date: 5f18J2D at 3:18 PI�1 Ekotrope RATER - Vers�on 3.2.3.2440 Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users. Ekotrope disclaims all lia6ility for the information shown on this report. 'I 4433 TAL LYl11 INAY Ceiling Attic, R-�9 Abawe Grade Walls R-15 Foundation Walls R-11 Framed Floor R-3� Slab R-�.� Perimeter, R-0.0 Under Ilnfiltration 4 ACH50 Window U-Value: fl.31, SHGC: 0.29 Building Features Duct 5upply R-25.�, Return R-25.Q Duct Leakage ta Outside 4 CFM251 10� ft2 Tatal auct Leakage 8 CFM251 100 ft2 (Past-Canstructiony Heating Furnace • IVatural Gas • 92.1 AFllE Cooling Air Conditianer • Electri� • 13 SEER Water Heating Water Heater • Electric • 0.93 Energy Factor As a 3ro party ext�r7sion of tne code junsd�ci�on ut�lizir7g these reports, I cert�fy that ihis energy code can7pliar7ce documeryt has been created in accoraance �aith the requiren�er7ts of Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consistent �tiith the building plans. specifications, and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent ofthe IEGC or vrill be verifed as such by another party. Name: Davin Sielschatt Signature: Organization: TSI Energy Solutions Date: 5118120 at 3:18 PM o rope - Version 3.2.3.2440 Irdiara 2C2ii Certiicate camr wnce r�s.alts calculated usina Fko=rope �.ATER's energy and code complia�c� �Inari:lim. including ao��opriate ainerdme�ts E4::�tr:��� P..=.TER is a RESNETHcc-edited HFRS R?trg Tool. =.1 resul°s are based on d.=.:._. �n � a: :�: EF:otr�pe �sers. -E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �. CARM E L, 1 N 4G�74 Builder: F15CHER HOMES IVlodel: ALLERT�N �ER) Camrnunity: TALLYNS RIDGE 2 This repart is based an a propased design and does nat confirm field enfar�ement �f design elements. Energy �ode Inspectian Checklist Praperty 14433 TALLYN WAY CARMEL, IN 46074 Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 ❑rganixatian TSI Energy Solutions ❑evin Sielschott 6uilder FISCHER HDMES TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E5IGEND� �eneral Building Infvrmatian Canditioned Area �sq ft} Canditioned Valume (�ubic ft) Insulated Shell Area (sq ft� 5,912 52,�35 1 a,87� Ins e�tion 5tatus _ T���nergyS�lutir�ns p Results are projected The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure that the home cantinues to meet the applicable energy code. 51ab � Name: BSMT�1,97i s.f., 220 ft. exterior perimetery R-0 perimeter insulation, R-� under slab insulatian. Framed Flvar � Name: DUER GARAGE (261 s.f.} R-0 continuous insulation, R-30 cavity insulation Insulatian Grade: I � Name: DUERAMBIENT (18 s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I Fvundatian Wall � Name: C�NDlAM6 �Exterior Perimeter [ft]: 192, HeightAbave Grade [ft]: 1, aepth Below Grade [ft]: 8} R-11 continuous insulation, R-0 cavity insulation Insulation Grade: I Feet from top af wall to tap of insulation: 0, Feet from top of wall to bottam of insulation: 4 � Name: C�NDlGAR �Exterior Perimeter [ft]: 59, Height Above Grade [ft]: 1, Depth 6elow Grade [ft]: 8} R-11 cantinuous insulation, R-0 cavity insulation Insulation Grade: I Feet from tap af wall to tap of insulatian: 0, Feet from top of wall to bottom of insulatian: 4 Above �rade Wall Energy �ode Inspectian Checklist Property ❑rganixatian 14433 TALLYN WAY TSI Energy Solutions CARMEL, IN 46074 ❑evin Sielschott Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 6uilder FISCHER HDMES TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E5IGEND� � Name: C�NDlAM6 �2,939 s.f.} R-0.2a5 continuaus insulation, R-15 cavity insulation Insulation Grade: I � Name: CaN DlGAR �504 s.f. � R-a continuous insulation, R-15 cavity insulatian Insulation Grade: I � Name: C�NDlATTIC �233 s.f.} R-0.2a5 continuaus insulation, R-15 cavity insulation Insulation Grade: I Rim Jaist � Name: C4N DfAM 6�285 s.f. y R: 15.�14 � Name: C�NDlGAR �59 s.f.y R: 15.�14 � Name: C�NDlATTIC �79 s.f.y R: 15.�14 Ceiling 1 Ravf � Name: SEGONa (2,256 s.f.} R-38.57 eontinuaus insulati�n, R-1 D.15 �avity insulatian Insulati�n Grade: I ❑paque Daar � Name: FR�NT (48 s.f.} U: 0.476 � Name: GARAGE (18 s.f.} U: 0.182 Ins e�tion 5tatus _ T���nergyS�lutir�ns p Results are projected �lazing 2 Energy �ode Inspectian Checklist Property ❑rganixatian Inspe�tion 5tatus 14433 TALLYN WAY TSI Energy Solutions Results are projected CARMEL, IN 46074 ❑evin Sielschott Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 6uilder FISCHER HDMES TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E5IGEND� � Name: FR�NT (93 s.f.}, U: D.310, SHGC: 0.26, �rientation: S�UTH_EAST � Name: BACK (298 s.f.}, Ll: D.31 D, SHGC: 0.29, Drientation: NORTH_WEST � Name: RIGHT SI�E �121 s.f.}, U: 0.310, SHGC: a.29, Drientatian: hIDRTH_EAST � Name: RIGHT Ga (24 s.f.}, U: 0.310, SHGC: 0.29, flrientation: NORTH_EAST � Name: LEFT SIaE �76 s.f.y, Ll: 0.31D, SHGC: D.29, Drientation: SDLITH_1NE5T � Name: BAGK BSMT (40 s.f.}, lJ: 0.310, SHGC: �.29, Drientatian: NDRTH_UVEST � Name: RIGHT 6SMT �6 s.f.}, U: D.310, SHGC: 0.29, �rientation: NORTH_EAST Skylight None Present Mechanical Ventilation � Mechanical ventilation system rated for, and capable of, praviding cantinuous ventilation. System shall include automatic timing controls. System type: Air Cycler, 8 hrsJday, 25D Watts Mechanical Equiprnent � Fuel-fired air distribution {1} • Natural Gas • 67°Io Heating Load a� 92.1 AFIJE � Fuel-fired air distribution {2} • Natural Gas • 33°Io Heating Load a� 92.1 AFIJE � Air conditianer (3} • Electric • fi2°/o Coaling Laad [�7a 13 SEER � Air conditioner (4} • Electric • 38°/o Coaling Load �a 13 SEER � Water Heating �5} • Electric • 100°Io Hot UVater Load a� 0.93 Energy Factor + TS��nergyS�lutir�ns 3 Energy �ode Inspectian Checklist Praperty 14433 TALLYN WAY CARMEL, IN 46074 Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 ❑rganixatian TSI Energy Solutions ❑evin Sielschott 6uilder FISCHER HDMES Inspe�tion 5tatus Results are projected TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E51GEN�} Air Leakage Cvntrvl � Test Status: 6lower-door tested House is air-sealed as to achieve 3,496 CFM�O �4.00 AGH50] or less at final blower-door test. Infiltration Requirements for IECC in Climate Zone 5 2a09 IECC Infiltration limit for the design hame is 7 ACHS�. 2a12 IECC Infiltration limit for the design hame is 3 ACHS�. 2a15 IECC Infiltration limit for the design hame is 3 ACHS�. 2�18 IECC Infiltration limit for the design home is 3 ACH��. Duct Leakage Duct 5ystem 1 All ducts and equipment within conditianed space Leakage to ❑utside specified as: � CFM251 1 DD ftz Total Leakage spe�ified as: 8 CFM251 1D� ft2 �Post-Constru�tion} Duct 5ystem 2 NOT entirely within �onditioned spa�e, testing required Leakage to ❑utside spe�ified as: 4 CFM25 ! 1 Da ftZ Total Leakage spe�ified as: 8 CFM251 1D� ft2 �Post-Constru�tion} + TS��nergyS�lutir�ns 4 Energy �ode Inspectian Checklist Praperty 14433 TALLYN WAY CARMEL, IN 46074 Madel: ALLERT�N �ER) Community: TALLYNS RIaGE 2 ❑rganixatian TSI Energy Solutions ❑evin Sielschott 6uilder FISCHER HDMES TRLLYNS RIQGE 2 TLRDQ2 �A5 ❑E5IGEND� Duct Leakage Cvde Requirements fvr IECC 20fl9 IECC: Ins e�tion 5tatus _ T���nergyS�lutir�ns p Results are projected Postconstruction Leakage Test: auct Leakage to Dutdoors �= 8 CFM251 100 sq ft CFR. Rough in Test with AHU: Tatal auct Leakage �= 6 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 4 CFM251 1 a0 sq ft CFA. 2a12 IECC and 2015 IECC Prescripti�e Path: PQstconstruction Leakage Test: Tatal au�t Leaka�e �= 4 CFM25 ! 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA. Raugh in Test without AHU: Total Duct Leakage �= 3 CFM25 1 100 sq ft CFA. 2015 Performance Path �Cost Campliance}: Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope. There is no passlfail threshold for duct leakage on the performance path. Praject Nates 5 Building 5ummary Propert.y Qrganixation Inspectian Status 14433 TALLYN VJAY TSI Energy Solutions Results are proje�ted CARI,�EL. IN 4S07d �evin Sielschatt P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 Builder FISCHER Haf�1E5 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] General Building Informatian Number Of Bedrooms 5 Number Df Floors 2 Conditioned FlaorArea [sq. ft.] 5,912 Has Ele�tric VehiGe Ready 5pa�e No Unconditioned; atta�hed garage7 Yes Canditioned Volume [�u. ft.] 52;435 Total Units in Building 1 Residence Type 5ingle family detached Flaar Number - �vladel ALLERTON {ER} Cammunity TALLYNS RIDGE 2 Climate Zone 5A Foundatian Wall Name CaND.�Ah46 C�M D.'GAR Liqrary Type Height Aba�e Grade Depth Below Grade R-11 Drapetl, 4f[ 1 8 R-11 Draped, 4f[ 1 8 Perimeter 192 59 Foundatian Wall Lihrary List Name Feet From Wall Top To Feat From Wall Top To Is Fully Insulated Continuous R-value Cantinuauslnsulation Continuauslnsulation Top Battam R-11 Draped, 4R p 4 No 11.0� Slab Name Library Type BSh�1T Llninsulated + TS��nergyS�lutir�ns Locatian Enclosing Exposed Exterior Conditioned Space Exposed Exterior Conditioned Space Ca�ity R-value Effective Insulation R• value N.'A N.+A Perimeter FloorGrade CarpetR Exposed SurtaceArea Location Enclosing Masonry Area 220 Below Grade D � 1,977.D f[� Exposed Exterior Conditioned Space Slab Lihrary List Name Wall Construction Slah Completel�r UnderslaG Perimeter Perimeter Thermal Break Effective R-value rype Insulated. Insulation Width [Yt] Insulation Depth [fi] �nsu�ation R Value Uninsulated �,Nood Frame ? Dther fVo 0 0 D No 6.00 � Building 5ummary Property Qrgan ixation 14433 TALLYN VJAY TSI Energy Solutians CARI,�EL. IN 4S07d �evin Sielschatt P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 Builder FISCHER Haf�1E5 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Framed Flvar Name Liqrary Type Carpet R OUERAh�61ENT R-30. GRi 1.23 DVER GARAGE R-3�. GR1 1.23 Framed Flvar Library List Name R-3�. GR1 Rim Joist Name CaN D.`Af•;16 CD N D.� ATTI C C�M D'GAR Rim J�ist Library List Name G1 R-19. DS6 Effective R•value 27.493 Lihrary rype Gi R-19. dS6 G1 R-19. DS6 G1 R-19. �S6 Effective Insulation R-value 15.414 ���� Name C�M D.'Ah16 CD N D'ATTI C CaN D.'GAR Liqrary rype G1 R-15 6AT7. T-PLY G1 R-15 6AT7. T-PLY G1 R-15Gar4^Jalls Inspectian Status Results are proje�ted Floor Grade Above Grade Above Grade SurtaceArea 285. � ft� 79. � ft� 59.0 ft� Surtace Colar f�ledium h�ledium F�ledium + TS��nergyS�lutir�ns Surface Area Location 18.D ft� Exposed Exterior 261.D f[� Llnconditioned, attached garage Locatian Exposed Exterior AttIC Unconditioned. atta�hed garage SurfaceArea Location 2,939.D f[� Exposed Exterior 233.D ft� Atti� 504.D f[� Unconditioned. attached garage � Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Wall Library List Name Effective R-value G1 R-15 BATT, T-PLY 12.842 G1 R-15 GarVdalls 11.972 Qrgan ixation TSI Energy Solutians �evin Sielschatt Builder FISCHER Haf�1E5 Inspectian Status Results are proje�ted Glazing Name Lihrary Type Wall Assignment Foundation Wall averhang Depth Overhang Ft To Ouerhang Ft To Assignment Tap Bottom BRCK LI-.31. SHGC-.29 COND.+AP;1B D � 0 BACK BSF�1T 11-.31. SHGC-.29 CDNa+AI�1B D � 0 FRDNT 11-.31. SHGC-.26 COND.+AP;1B D � 0 LEFT SI�E lJ-.31. SHGC-.29 COND.+AP;1B D 0 0 RIGHT BSh�1T lJ-.31. SHGC-.29 CDNa+AMB D � 0 RIGHT GD lJ-.31. SHGC-.29 COND.+AP;1B D � 0 RIGHT SI�E lJ-.31. SHGC-.29 GOND.+AI;1B D 0 0 Glazing Library List Name Shgc U-factor 11-.31. SHGC-.26 11-.31. SHGC-.29 Skylight D.26 D.29 None Present �.310 �.310 + TS��nergyS�lutir�ns Orientatian 5urfaceArea Narthwest Narthwest Southeast Southwest Nor[heast Nor[heast Mor[heast 298.� ft� aa.o n= 93.� ft� 76.0 ft� 6.0 ft� 24.� ft� 121.0 ft� � Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Skylight Library List Qrgan ixation TSI Energy Solutians �evin Sielschatt Builder FISCHER Haf�1E5 None Present ❑paque Davr Name Library Type Wall Assignment Foundation Wall Assignment FRDNT 4"Joad Door COND.+AP;1B GARAGE Fiberglass+'Steel COND.+GAR Door ❑paque Davr Library List Name Fiberglass.+Steel Door 4^Joad Door Ravf Insulation Name SECOND Effective L!-factar 0.182 �.d76 Inspectian Status ' TS��nergyS�lutir�ns Results are proje�ted Emittance Solar SurtaceColor SurtaceArea Lacation Aqsorptance 0.9 0.75 P;ledium 48.6 ft� Exposed Exterior 0.9 0.75 1;ledium 18.6 ft� Exposed Exterior Surtace Calor f•;ledium Library Type Attie ExteriarArea [s.f.] Clay or Concrete Roaf Tiles R-49 Blo�tin. GR1 2,256 No R�of Insulation Lihrary List Name Has Radiant Barrier R-d9 Blown. GR1 INo Effective R-�alue 49.312 Surtace Area 2.256. � f[� � Location Atti� � Building 5ummary Property Qrgan ixation 14433 TALLYN VJAY TSI Energy Solutians CARI,�EL. IN 4S07d �evin Sielschatt P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 Builder FISCHER Haf�1E5 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Whale House Infiltrativn Infiltration Measurement Type 4 ACH at 50 Pa Blower-door tested Inspectian Status Results are proje�ted Shelter Class 4 + TS��nergyS�lutir�ns Mechanical Ventifation * Ventilation Type Ventilatian Rate [ft� f Dperational hours per day Fan Watts Runs once every three Energy Recovery Percent Minute] hours Air Cycler 312.36 CFI,� {unmeasured} 8 25D U"Jatts Yes 0 Lighting °4 Interior Fluorescent =5 Interior LED Lighting i Exterior Fluorescent l Exterior LEO Lighting °� Garage Fluorescent =�� Garage LED Lighting Lighting Lighting Lighting 90 Q 9D � 90 0 ❑nsite Generation None Present ❑nsite Generation Library List None Present Solar Generativn None Present Solar Generativn Library List None Present � Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] I C�nditivning Equipment Name Liqrary Type Air conditioner (31 Air conditioner [41 Fuel-fired air distribution [11 Fuel-fired air distribution [21 �^later Heating [51 GSX 13 D421 A GSX13D421A Gh15592�803BNAR Gf•;155920803BNAP, ENT 50 1 D� Qrganixation Inspectian Status + TS��nergyS�lutir�ns TSI Energy Solutions Results are proje�ted �evin Sielschatt Builder FISCHER Haf�1E5 Heating Percent Load Cooling Percent Load Hot Water Percent Load Location 04n 04n 67°a 334a 0°n fi2°I 38°I 0% �°Io 01 �°o �91� �°io �°io 1�D°o Conditioned Space Conditioned Space Conditioned Space Conditioned Space Conditioned Space Equiprnent Type: ENT 5a 10� Fuel Tyae Electric Distri�utian Type Hydranic Delivery {Radiant} Hot Water Efficien�y 0.93 Energy Factor Tank Capacity {gal.} 5� Hot Water Capa�ity [kBtu,'h] 15.4 Recavery Efficiency 0.98 IEquiprnent Type: GM559208036NAA Fuel Ty;�e Matural Gas Disiri�utian Type Farced Air MatorType PSG {Single Speed} Heating Efficiency 92.1 AFUE Heating Capaciry [kBtu.�h] 74 Use default EAE No EAE [kWh] �76 �Equiprnent Type: G5?C130421A Fuel Ty;�e Electri� Distri�utian Type Farced Air MatorType PSG {Single Speed} Caaling Efficien�y 13 SEER Cooling Capa�ity [kBtu.�h] 4� � Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Distributian 5ystem Distri�utian Type Heating Equipment Caaling Equipment Sq. Feet Served # Return Grilles Supply Duct R Value Return Duct R Value Supply DuctArea [ftz] Return �uct Area [ftZ] Leakage ta Outdaars TotalLeakage Total Leakage Duct Test Conditions Use Default Flaw Rate Duct 1 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 2 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 3 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 4 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 5 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 6 Duct Lacation Percent 5upply Rrea Percent ReturnArea Qrganixation Inspectian Status TSI Energy Solutions Results are proje�ted �evin Sielschatt Builder FISCHER Haf�1E5 Farced Air Fuel-fired air distributian [1] Air canditioner {3j 395� 3 25 25 535.8 297.7 4 CFIv125 � 10� ftZ 316.32 CFf4125 Post-Canstruction Yes Conditianed 5pace 144 �oo Conditianed 5pace 0 0 Conditianed Space 0 ❑ Conditianed 5pace 0 4 Conditianed 5pace 0 ❑ Conditianed 5pace 4 0 + TS��nergyS�lutir�ns Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Distributian 5ystem Distri�utian Type Heating Equipment Caaling Equipment Sq. Feet Served # Return Grilles Supply Duct R Value Return Duct R Value Supply DuctArea [ftz] Return �uct Area [ftZ] Leakage ta Outdaars TotalLeakage Total Leakage Duct Test Conditions Use Default Flaw Rate Duct 1 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 2 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 3 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 4 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 5 Duct Lacation Percent 5upply Rrea Percent ReturnArea Duct 6 Duct Lacation Percent 5upply Rrea Percent ReturnArea Ceiling Fan Has Ceiling Fan Cfm Per Wari Qrganixation Inspectian Status TSI Energy Solutions Results are proje�ted �evin Sielschatt Builder FISCHER Haf�1E5 Farced Air Fuel-fired air distributian [2] Air canditioner {4j 1958 3 25 25 131.2 72.9 4 CFIv125 � 10� ftZ 156.�i4 CFf4125 Post-Canstruction Yes Conditianed 5pace 14 16 Attic {well vented; under insulation} 90 30 Conditianed Space 0 ❑ Conditianed 5pace 0 4 Conditianed 5pace 0 ❑ Conditianed 5pace 4 0 No �oo + TS��nergyS�lutir�ns Building 5ummary Property 14433 TALLYN VJAY CARI,�EL. IN 4S07d P•,9odel: ALLERTDM {ER} Communitv: TALLYNS RI�GE 2 TALLYNS RIDGE 2 TLR002 [AS DESIGEND] Water ❑istrihutivn Water Fixture Type Use Default Hot Water Pipe Length Hot Water Pipe Length [ft] At Least R3 Pipe Insulatian? Hot Water Recirculation System7 Recirculation System Pipe Loop Length [ft] Drain Water Heat Recovery7 Clvthes Dryer Fuel Ty;�e Cef Field Utilization Is Outside Conditianed 5pace Clvthes Washer Label Energy Rating Electric Rate Annual Gas Gost Gas Rate Capacity Y mef Is Outside Conditioned 5pace Appliances and Cantrals Programria�le thermastat? Dishwasher Size Dishwasher Efficiency Dishwasher Outside Canditioned 5pa�e7 Range'Duen Fuel Canvectian Dven7 Inductian Range7 Range?Duen flutside Conditioned Space7 Refrigeratar Gonsumption Refrigeratar Outside Conditianed 5pace7 Nates Qrganixation Inspectian Status TSI Energy Solutions Results are proje�ted �evin Sielschatt Builder FISCHER Haf�1E5 5tandard No 129 ND No 20 No Electric Timer Contrals No 7�4 kWhr'Year 5�.68�kWh 523.00 Sa.58rTherm 2.874 4.33452632 N❑ Yes 5tandard 27� kWh ND Electri� ND No No 7�9 kWhlYear ND + TS��nergyS�lutir�ns