Loading...
HomeMy WebLinkAboutTraffic Analysis 07-06-20TRAFFIC OPERATIONS ANALYSIS PROPOSED RESIDENTIAL DEVELOPMENT AMBLESIDE POINT 146TH STREET CARMEL, INDIANA ________________________________________________ PREPARED FOR PLATINUM PROPERTIES MANAGEMENT _______________________________________________ JUNE 2020 8365 Keystone Crossing, Suite 201 Indianapolis, IN 46240 Phone: (317) 202-0864 Fax: (317) 202-0908 AMBLESIDE POINT CARMEL, INDIANA COPYRIGHT This analysis and the ideas, designs, concepts and data contained herein are the exclusive intellectual property of A&F Engineering Co., LLC and are not to be used or reproduced in whole or in part, without the written consent of A&F Engineering Co., LLC. 2020, A&F Engineering Co., LLC AMBLESIDE POINT CARMEL, INDIANA I TABLE OF CONTENTS TABLE OF CONTENTS ...................................................................................................................................................... I LIST OF FIGURES ............................................................................................................................................................. I LIST OF TABLES .............................................................................................................................................................. I CERTIFICATION .............................................................................................................................................................. II INTRODUCTION .............................................................................................................................................................. 1 PURPOSE ........................................................................................................................................................................ 1 SCOPE OF WORK ............................................................................................................................................................ 1 DESCRIPTION OF THE PROPOSED DEVELOPMENT ........................................................................................................... 2 STUDY AREA .................................................................................................................................................................. 2 DESCRIPTION OF ABUTTING STREET SYSTEM ................................................................................................................ 2 EXISTING TRAFFIC VOLUMES & PEAK HOURS ............................................................................................................... 4 GENERATED TRIPS FOR PROPOSED DEVELOPMENT ........................................................................................................ 4 PASS-BY & INTERNAL TRIPS .......................................................................................................................................... 4 ASSIGNMENT AND DISTRIBUTION OF GENERATED TRIPS ............................................................................................... 5 GENERATED TRIPS ADDED TO THE STREET SYSTEM ...................................................................................................... 5 CONCLUSIONS & RECOMMENDATIONS .......................................................................................................................... 5 LIST OF FIGURES FIGURE 1: AREA MAP .................................................................................................................................................... 3 FIGURE 2: EXISTING TRAFFIC VOLUMES ........................................................................................................................ 6 FIGURE 3: ASSIGNMENT AND DISTRIBUTION OF GENERATED TRAFFIC VOLUMES FROM PROPOSED DEVELOPMENT ..... 7 FIGURE 4: GENERATED TRAFFIC VOLUMES FROM PROPOSED DEVELOPMENT ............................................................... 8 FIGURE 5: SUM OF EXISTING TRAFFIC VOLUMES & GENERATED TRAFFIC VOLUMES FROM PROPOSED DEVELOPMENT 9 LIST OF TABLES TABLE 1 – TOTAL GENERATED TRIPS FOR PROPOSED DEVELOPMENT ........................................................................... 4 AMBLESIDE POINT CARMEL, INDIANA II CERTIFICATION I certify that this TRAFFIC OPERATIONS ANALYSIS has been prepared by me and under my immediate supervision and that I have experience and training in the field of traffic and transportation engineering. A&F ENGINEERING CO., LLC R. Matt Brown, P.E. Indiana Registration 10200056 Sai Sharanya Velpula, Traffic Engineer Trevor Reich, E.I Traffic Engineer AMBLESIDE POINT CARMEL, INDIANA 1 INTRODUCTION This TRAFFIC OPERATIONS ANALYSIS, prepared at the request of the City of Carmel on behalf of Platinum Properties Management is for a proposed residential development known as Ambleside Point that will be located south of the 146th Street Frontage Road and north of 141st Street east of Towne Road in Carmel, Indiana. PURPOSE The purpose of this analysis is to determine what impact the traffic generated by the proposed development will have on the existing adjacent roadway system. This analysis will identify any existing roadway deficiencies or ones that may occur when this site is developed. Conclusions will be reached that will determine if the roadway system can accommodate the anticipated traffic volumes or will determine the modifications that will be required to the system if there are identified deficiencies. Recommendations will be made that will address the conclusions resulting from this analysis. These recommendations will address feasible roadway system improvements to provide safe ingress and egress, to and from the proposed development, with minimal interference to traffic on the public street system. SCOPE OF WORK The scope of work for this analysis is as follows: First, conduct traffic volume counts at the intersections of 141st Street & Beaument Boulevard and 141st Street & Autumn Woods Drive during peak hour periods. Second, estimate the number of peak hour trips that will be generated by the proposed development. Third, assign and distribute the generated traffic volumes from the proposed development to the study intersections. Fourth, prepare recommendations for the roadway geometrics that will be needed to accommodate the total traffic volumes once the proposed development is constructed. Finally, prepare a TRAFFIC OPERATIONS ANALYSIS report documenting all data, analyses, conclusions and recommendations to provide for the safe and efficient movement of traffic through the study area. AMBLESIDE POINT CARMEL, INDIANA 2 DESCRIPTION OF THE PROPOSED DEVELOPMENT The subject site is located south of the 146th Street east of Towne Road in Carmel, Indiana. The proposed development will consist of approximately 50 town homes and 215 single-family homes. As proposed, the site will be served by access drives along the 146th Street Frontage Road and two access drives connecting to the existing Saddle Creek subdivision on Megan Drive and Beaument Boulevard. Figure 1 is an area map showing the location and general layout of the proposed site. STUDY AREA The study area for this analysis has been defined to include the following intersections: • 146th Street Frontage Road & Megan Drive • 146th Street Frontage Road & Beaument Boulevard • 141st Street & Autumn Woods Drive • 141st Street & Beaument Boulevard DESCRIPTION OF ABUTTING STREET SYSTEM The proposed development will be primarily served by the public roadway system that includes the following roadways: 146TH STREET FRONTAGE ROAD – is an east/west, two-lane undivided roadway with a posted speed limit of 35 mph in the study area. According to the Carmel Thoroughfare Plan, 146th Street is classified as a Local Street. 146TH STREET – is an east/west, four-lane divided roadway with a posted speed limit of 45 mph in the study area. According to the Carmel Thoroughfare Plan, 146th Street is classified as a Primary Arterial Street. 141ST STREET – is an east/west, two-lane undivided roadway with a posted speed limit of 40 mph in the study area. According to the Carmel Thoroughfare Plan, 141st Street is classified as a Parkway Collector Street. TOWNE ROAD – is a north/south, four-lane divided roadway with a posted speed limit of 45 mph in the study area. According to the Carmel Thoroughfare Plan, Towne Road is classified as a Parkway Arterial Street. DITCH ROAD – is a north/south, four-lane divided roadway with a posted speed limit of 45 mph in the study area. According to the Carmel Thoroughfare Plan, Ditch Road is classified as a Parkway Arterial Street. 3 CARMEL, INDIANA AMBLESIDE POINT TRAFFIC OPERATIONS ANALYSIS AREA MAP FIGURE 1 AMBLESIDE POINT CARMEL, INDIANA 4 EXISTING TRAFFIC VOLUMES & PEAK HOURS A&F Engineering conducted traffic counts at the intersections of Beaument Boulevard & 141st Street and at Autumn Woods Drive & 141st Street between the hours of 7:00 AM to 9:00 AM and 4:00 PM to 6:00 PM during a typical weekday in June 2020. According to the traffic counts, the AM peak hours for the intersections occur from 7:45 AM to 8:45 AM. The PM peak hours for the intersections occur from 5:00 PM to 6 PM and from 4:45 PM to 5:45 PM respectively. Figure 2 summarizes the peak hour traffic volumes for these intersections. The intersection count output summary sheets for these counts are included in the Appendix. GENERATED TRIPS FOR PROPOSED DEVELOPMENT The estimate of newly generated traffic is a function of the development size and of the character of the land use. The ITE Trip Generation Manual 1 was used to calculate the number of trips that will be generated by the site. This report is a compilation of trip data for various land uses as collected by transportation professionals throughout the United States in order to establish the average number of trips generated by those land uses. Table 1 summarizes the total trips that will be generated by the site. TABLE 1 – TOTAL GENERATED TRIPS FOR PROPOSED DEVELOPMENT DEVELOPMENT INFORMATION GENERATED TRIPS LAND USE ITE CODE SIZE AM ENTER AM EXIT PM ENTER PM EXIT Multifamily Housing 220 50 DU 6 19 20 12 Single-Family Housing 210 215 DU 39 118 134 78 PASS-BY & INTERNAL TRIPS Pass-by trips are trips that are already in the existing traffic stream along the adjacent public roadway system that enter a site, utilize the site, and then return to the existing traffic stream. Residential developments do not typically attract a significant number of pass-by trips. Therefore, pass-by trip reductions are not included in this study. An internal trip results when a trip is made between two or more land uses without traversing the external public roadway system. The proposed development is a single land use only. Hence, internal trip reductions are not considered in this study. 1 Trip Generation Manual, Institute of Transportation Engineers, Tenth Edition, 2017. AMBLESIDE POINT CARMEL, INDIANA 5 ASSIGNMENT AND DISTRIBUTION OF GENERATED TRIPS The study methodology used to determine the traffic volumes from the site that will be added to the street system is defined as follows: 1. The volume of traffic that will enter and exit the site must be assigned to the access points and to the public street system. Using the traffic volume data collected for this analysis, traffic to and from the site has been assigned to the proposed driveways and to the public street system that will be serving the site. 2. To determine the volumes of traffic that will be added to the public roadway system, the generated traffic must be distributed by direction to the public roadways at their intersection with the driveways. For the site, the trip distribution was based on the location of the development, the existing traffic patterns, and the assignment of generated traffic. Figure 3 illustrates the assignment and distribution of generated traffic volumes for the proposed development. GENERATED TRIPS ADDED TO THE STREET SYSTEM The total generated traffic volumes that can be expected from the proposed development have been assigned to each of the study intersections. These volumes were determined based on the previously discussed trip generation data, assignment of generated traffic and distribution of generated traffic. Figure 4 displays the peak hour traffic volumes for the proposed development. In addition, Figure 5 shows the sum the existing traffic volumes and the volumes generated by the proposed development. CONCLUSIONS & RECOMMENDATIONS Based on the previously mentioned assignment and distribution of generated traffic volumes, and the resulting traffic volumes; the generated traffic from the proposed development will have minimal impact on the adjacent roadway system. CARMEL, INDIANA AMBLESIDE POINT TRAFFIC OPERATIONS ANALYSIS 6 EXISTING TRAFFIC VOLUMES FIGURE 2XX = A.M. PEAK HOUR (XX) = P.M. PEAK HOUR * = NEGLIGIBLE(3) 0(7) 4(0) 3 (9) 0 (127) 117 0 (3)7 (16)19 (9)(14) 88 (15) 10 (16) 74 (153)(1) 0(0) 2(1) 1 (24) 5 (125) 81 0 (1)12 (20)25 (25)(14) 71 (18) 7 (34) 78 (164) CARMEL, INDIANA AMBLESIDE POINT TRAFFIC OPERATIONS ANALYSIS XX = INBOUND TRAFFIC XX = OUTBOUND TRAFFIC * = NEGLIGIBLE 14% 7%14%13%13% 7%5%5% 3%11%11% 3%3%21%21% 11% 7% 13%7%26%26% 13% 3% 11% FROM PROPOSED DEVELOPMENT OF GENERATED TRAFFIC VOLUMES ASSIGNMENT & DISTRIBUTION FIGURE 3 7 CARMEL, INDIANA AMBLESIDE POINT TRAFFIC OPERATIONS ANALYSIS 8(*)(21) 6 (11) 3 (*)19 (13)18 (12)6 (20) 9 (6) (8) 2 (5) 1 5 (17) 4 (3)(3) 4(19) 2910 (32) 5 (17)(*)(11) 3 (12) 18 (*)9 (6)36 (23)12 (40) 6 (20) (5) 1 (10) 15 (4) 7(10) 15PROPOSED DEVELOPMENT TRAFFIC VOLUMES FROM TOTAL GENERATED FIGURE 4XX = A.M. PEAK HOUR (XX) = P.M. PEAK HOUR * = NEGLIGIBLE CARMEL, INDIANA AMBLESIDE POINT TRAFFIC OPERATIONS ANALYSIS 9 XX = A.M. PEAK HOUR (XX) = P.M. PEAK HOUR * = NEGLIGIBLE(3) 0(7) 4(0) 3 (30) 6 (138) 20 0 (3)26 (29)37 (21)(14) 88 (15) 16 (36) 83 (159)(1) 0(0) 2(1) 1 (35) 8 (137) 99 0 (1)21 (26)61 (48)(14) 71 (18) 19 (74) 84 (184) PROPOSED DEVELOPMENT GENERATED TRAFFIC VOLUMES FROM EXISTING TRAFFIC VOLUMES & SUM OF FIGURE 5 TRAFFIC IMPACT STUDY APPENDIX 8365 Keystone Crossing Boulevard, Suite 201 Indianapolis, IN 46240 Phone: (317) 202-0864 Fax: (317) 202-0908 AMBLESIDE POINT CARMEL, INDIANA ADDITIONAL FIGURES L T R TOTAL L T R TOTAL L T R TOTAL 2 0 7 9 0 0 1 14 15 25 0 12 37 0 25 1 20 46 5 81 1 87 0 24 125 1 150 1 78 7 86 0 18 164 34 216 L T R TOTAL L T R TOTAL L T R TOTAL 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% NB SB NB+SB EB WB EB+WB TOTAL TO 10 33 43 66 52 118 161 TO 14 29 43 82 81 163 206 TO 15 23 38 101 158 259 297 TO 13 43 56 154 208 362 418 52 128 180 403 499 902 1082 4.8%11.8%16.6%37.2%46.1%83.4%100.0% COUNTED BY :TR OFF PEAK HOUR VOLUMES BEGINS 7:30 AM BEGINSBEGINS4:45 PM HOURLY SUMMARY HOUR 9:00 AM 8:00 AM 5:00 PM 6:00 PM 4:00 PM 5:00 PM TOTAL VOLUME PERCENTAGE 6/25/2020 TOTAL VEHICLES (PASSENGER CARS + TRUCKS) 7:00 AM 8:00 AM OFF PEAK HOUR FACTOR APPROACH INTERSECTION WESTBOUND SOUTHBOUND TRUCK PERCENTAGE PEAK HOUR FACTOR 0.84 0.78 0.74 0.75 PM PEAK HOUR PERCENTAGE EASTBOUND INTERSECTION 0.84 EASTBOUND NORTHBOUND SOUTHBOUND AM PEAK HOUR PERCENTAGE NORTHBOUND #DIV/0! #DIV/0! OFF PEAK HOUR PERCENTAGE 0.92 0.75 0.77 0.80#DIV/0!#DIV/0! A & F ENGINEERING CO., LLC TRAFFIC VOLUME SUMMARY WESTBOUND AM PEAK HOUR FACTOR PM PEAK HOUR FACTOR APPROACH APPROACHINTERSECTION PM PEAK HOUR VOLUMES NORTHBOUND SOUTHBOUND 4:45 PM 0.90 #DIV/0! EASTBOUND WESTBOUND AM PEAK HOUR VOLUMES CLIENT : INTERSECTION : DATE : Platinum Properties Autumn Woods Dr & 141st Street Release 11-18-04 L T R TOTAL L T R TOTAL L T R TOTAL 4 0 8 12 0 5 3 11 19 19 0 7 26 0 9 1 16 26 0 98 0 98 0 11 139 3 153 8 74 10 92 0 12 161 18 191 L T R TOTAL L T R TOTAL L T R TOTAL 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% 0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0% NB SB NB+SB EB WB EB+WB TOTAL TO 7 20 27 62 62 124 151 TO 15 26 41 93 84 177 218 TO 25 18 43 107 130 237 280 TO 19 26 45 153 191 344 389 66 90 156 415 467 882 1038 6.4%8.7%15.0%40.0%45.0%85.0%100.0% COUNTED BY :AN OFF PEAK HOUR VOLUMES BEGINS 7:45 AM BEGINSBEGINS4:45 PM HOURLY SUMMARY HOUR 9:00 AM 8:00 AM 5:00 PM 6:00 PM 4:00 PM 5:00 PM TOTAL VOLUME PERCENTAGE 6/25/2020 TOTAL VEHICLES (PASSENGER CARS + TRUCKS) 7:00 AM 8:00 AM OFF PEAK HOUR FACTOR APPROACH INTERSECTION WESTBOUND SOUTHBOUND TRUCK PERCENTAGE PEAK HOUR FACTOR 0.54 0.91 0.85 0.53 PM PEAK HOUR PERCENTAGE EASTBOUND INTERSECTION 0.92 EASTBOUND NORTHBOUND SOUTHBOUND AM PEAK HOUR PERCENTAGE NORTHBOUND #DIV/0! #DIV/0! OFF PEAK HOUR PERCENTAGE 0.93 0.60 0.72 0.93#DIV/0!#DIV/0! A & F ENGINEERING CO., LLC TRAFFIC VOLUME SUMMARY WESTBOUND AM PEAK HOUR FACTOR PM PEAK HOUR FACTOR APPROACH APPROACHINTERSECTION PM PEAK HOUR VOLUMES NORTHBOUND SOUTHBOUND 5:00 PM 0.87 #DIV/0! EASTBOUND WESTBOUND AM PEAK HOUR VOLUMES CLIENT : INTERSECTION : DATE : Platinum Properties Beaument Blvd & 141st St Release 11-18-04