HomeMy WebLinkAboutM1.01-Mechanical PlanPLAN NOTES:
1. �-DAYPROGRAMMABLETHERMOSTATSFORALLUNITS,COORDINATEWITHOWNER
FOR ACTUAL LOCATIONS PRIOR TO COMMENCMG WORK.
2. PROVIDE WALL CAP WITH BACNDRAFT DAMPER FOR DRYER EXHAUST. SIZE DRYER
DUCT PER MANUFACTURER'S RE�UIREMENTS.
3. DUCIWORKUPTHROUGHROOFTORTU.
4. DUCTWORKUPTHROUGHROOFTOEXHAUSTFAN.IMERLOCKMOTORIZEDDAMPER
WITH FAN CONTROL WHEN A MOTORIZED DAMPER IS NOTED ON THE PLANS.
5. DUCTWORKUPTHROUGHROOFTOGOOSENECK.
6. ROUTE 314" CONDENSATE TO FLOOR DRAIN IN 131 STORAGE.
Z RETURN AIR �UCTWORKTHAT DROPS �IRECTLY FROM THE ROOFTOP INTO THE OPEN
SPACE IT IS SERVING SHALL BE FULL SIZE OF E�UIPMENT OPENING CONTRACTOR
SHALL TURN DUCTWORK UP TOWARDS ROOF, TO MINIM2E NOISE, AND LEAVE END OF
RETURN DUCIWORK OPEN. LINE DUCTWORK WITH MINIMUM 1"THICK ACOUSTICAL
LINER. DUCT SIZES SHOWN ON PLAN. REFER TO DETAIL 9/M501.
e. UNDERCUTDOOR3/4".
9. RELOCATE EXISTING GAS FlRED 11NIT HEATER FROM SOUTH EAST CORRIDOR TO THE
LOCATION SHOWN, PROVIDE NEW FLUE VENT THRU ROOF PER MANUFACTURER'S
WRITTEN INSTRUCTIONS. COOR�INATE ROOF PATCH AND REMOVAL OF EXISTING FLUE
WITH GENERAL CONTRACTOR AN� ROOF CONTRACTOR.
10. CONNECT4"EXHAUST�UCTTOMANICURETABLEE%HAUSTREGISTER.REFERTO
DETAIL S/M5.�1.
11. DROP68"X20"RETURNDUCTAND62"X26"SUPPLYDUCTDOWNTHROUGHROOFFROM
RTU. ROUTE RETURN DUCT MAIN BELOW SUPPLY DUCT MAIN.
12. PLACE SOURCE CAPTURE SYSTEM WITH TWO INLET DUCTS IN BETWEEN PEDICURE
CHAIRS. EACH INLET Ml1ST EXHAUST 50 CFM MIN. SOURCE CAPTURE SYSTEM TO BE
PROVI�ED BY OTHERS E�UIVALENT TO HEALTHYAIR HA-SCP-G4-D-OV. CONNECT4'
OUTLET TO EXHAUST CONNECTION IN WALL 6" AFF.
13. ROUTEVENTANDFLUEUPTHROUGHROOFTOMANUFNCTURER'SRECOMMENDED
VENT KIT.
14. ROUTEIO"X10"RETURNDUCTDOWNTOPLENUMBOkCONNECTE�TORETURN
GRILLE.
15. ROUTE 10"Xe" RETURN DUCT DOWN TO PLENUM BOX CONNECTED TO RETURN GRILLE.
i6. HORIZONTAL �UCT RUN MUST BE ROUTED IN TOP 72" OF HALFWALL AND TOP 3' OF
LARGER WALL.
77. ROUTE26"X18"RETURNDUCTBELOW36"X14"SUPPLYDl1CT
scs �2 a m m
� 4 EA4"m 1a
�
SA
34008 x. m 505612/eEA4"9 SBi6B SB1616 SBi6/6
EF-02 � 34� 50 355 355 355
PEoi X
'T- �� S612/8 248
SA �Q -�.�. 340 m� SB i616 SB i6/6 SB i6/6
34n �nrn =, �"�+ �� � 355 355 355
SB i6/6
355
SB i6/6
355
i
��
EA 12112 EA 12112 Q RA �� SA SA em= r: ,..,
� 15010x10� 100 � ,,.FR ��i.,rnse �70 SA �200�I ;-�..
8x8 _ EF-01 � i�, ` �� 95 RA
�IDU-01 �� 6x6 10x� sB 200 m
,F.; Bx8 �
SB 16/6 SB i616 �e o-,:4 <
355 355 �� 8e mV ^"��� � 9
m �� E'
240 EA 12I12 � °j " � SA ....-- SA 60 qq
85 ,i�rcrre
SB 16I6 SB 16I6 100 SA
355 355 � FA12H2 200� 80 Y N8H ��� � 10x6 �
5616/6 150 a<=F�o..v� =o o _
�' 60., SA � � 64/
355 A 5 C a�i �
_ N
m RTU-05 6q 100 88 f 8� SA ` 95 �Zp�
�8��� 20� � SOx20 SA � = eN, SA� � �110. 10x8 � � � 60
IJ� � v v� �� O ROTU-05 �'�- �,,,.. 200 x- ,�-� - SA RTUOFO � RA „
SB 12/4 a 250 � 18x14 18x14 T;' ' �.
285 ��
15 R7U-01 T � I RETURN 14 � 16 RA ��� BA ��
, ��S , �F.�,� Rruoa o � '� R^ aoo ae 2zo so � sm eo �
- , I_ ��� 12B � 7� SB i6/6 SB 1616 SB i616 SB 1616 8000 .� SB�1�O13 �, �5 a RT
355 355 355 355 ���'��' RTU-07� 18x14 O
��
GENERALNOTES'.
A. ALLMECHANICALWORKSHALLBEDONEPERTHESTATEMECHANICALCODEANDLOCAL
MECHANICAL CODES.
B. MECHANICALCONTRACTORSHALLHOLDALLDUCTWORKASTIGHTASPOSSIBLETO
UNDERSIDE OF STRUCTURE.
C. MECHANICALCONTRACTORSHALLCOORDINATEDUCTROUTINGWITHLIGHTINGNO
�UCTWORK SHALL BE ROUTE� OVER OR UNDER ANV LIGHT FIXTURES.
D. ALLROOFTOPEQUIPMENTSHALLBEINSTALLEDAMINIMUMOF10'-0"FROMEDGEOF
ROOF.
E. TAB-TVPEFITTINGSWITHAIRSCOOPSSHALLBEPROVIDEDFORALLROUNDBRANCH
TAPS.
F. FLE%CONNECTIONSTODIFFUSERSARETOBEINSULATE�FLEXWITHAMAXIMUM
LENGTH OF 5 FEET.
G. MECHANICALCONTRACTORSHALLBERESPONSIBLEFORALLCONTROLWIRMG.
H. MECHANICALGONTRAGTORSHALLBERESPONSIBLEFORWORDINATIONWITH
ELECTRICAL WNTRACTOR REGARDING THE WIRING OF ALL MECHANICAL EQUIPMENT.
I. PROVIDEBALANCEDAMPERSATALLBRANCH�UCTSSERVINGDIFFUSERS.
J. �OORSSHALLNOTBEUNDERCUTINEXCESSOFTHECLEARANCEPERMITTEDIN
ACWRDANCE WITH NFPA-8�.
K. PIPEANDDl1CTSPASSINGTHROUGHHORIZONTALASSEMBLIESSHALLBEPROTECTE�
WITH AN APPROVED NON-COMBUSTIBLE MATERIAL TO RESIST THE FREE PASSAGE OF
FLAME AND THE PRODUCTS OF COMBUSTION.
L. HEATING EQUIPMENT SHALL BE WSTALLE� IN ACGORDANCE WITH UNDERWRITER'S
APPROVAL, MANUFACTURER'S RECOMMENDATIONS, G00� ENGINEERMG PRACTICE
AND THE STATE MECHANICAL CODE AND THE INTERNATIONAL FUEL GAS CODE.
M. CONTRACTORSHALLCOORDINATELOCATIONOFAIRDEVICESWITHREFLECTE�
CEILING PLAN AN� LIGHTING LAVOUT.
N. ALLEXPOSEDDUCTWORKTOHAVEMILLPHOSPHATIZEDFINISHTOBEPAINTEDBLACK
BV OTHERS.
�
� - 7// I _ _ 7//L _ /// _ /L _ _ 7/L _ ///L _ /// _ /L _ _ %/L _ ///L _ /// -_ �/L _ _ /// - //L _ _ /L _ _ %L - - .I_�
� �A
i ,v ,-,,.. a � A
�� 60 SA SA
50 6� 6� Sp \
SA 6m EH-02
� /�
�� ='100 310 / \
� �rx�
SA �_ � ��� EH-04 _
50
0 10fb
� SA
310
6� SA SA
�155 �155
- . SA �.. �,
sg 50
"' 0 O 80 80
� RTU-08 SA
n` so � �ax�z RAO� e.�����Ciss
S61214 � SA ° 400� 200 120 O . 32x14
_ TB 24116
200 430 SB i616 SB i616 SB i6/6 SB i6/6 12W . ... -- �J 8H 80
128 12m 356 355 355 355 RTU-o6�� RBo•�� 1� 0 � .y9.�� a�+� 32x14 `� n� 20x14 � \ p �� 930 gq ,�1 5
R��m�o � � � s�ti,� 0 � zox�s — 3zx�a � � s� � ies
300 �q 100 SA �; �� SA - ,: � `v pg � SA 60 �
vrs�ie.�e �- gq 430 �� 430 < < SA� r' � 2x14 r SA� �gq 1700 75
�� `� `10a 250 120 �� 12� SB " 425 �
x 346 100 = Ri - _ �'S ' � ' 42b . � � ' i �.c :_
� � RA RA RA 1214 '10�SA SA 12q 1� q2� SA 120 - �2p .
� '� -.�i6• . , 350 250 � 346 425 425 .. .
400 — .. 100 ,.� c�,�sRo.,�
SC10/W C SA I I� � SA � � k � o RA osrevsnur � - tt�
I
�� 300 10� " 430 � � m 430 T�. � `� 18x10 200 � �' ..
, SA �n 20 I I �' 12fd RTU-04 .._- �- . � �o
1 100 100 120 � 20 120 � 28
10� 250 f — 12x10 SA
o m SA � SA � � �
SA voo ° SA SA gq 200 8� � Fr.n+ ac 34 °- 345 cn - � ce gq ' ' gq /
_ x
� SA - , �� 430 35010p 250 . � �i' � m-0 � �
10� 250 �� SA � � � SA i:�, mrvr r�- ` g SO6P1EF�6
430 120 � � 12H 430 . � � V8 A i
16ID EF-0q 10ID 8� SA qp/
� � ,o= -'nse�w z0o
+�M EO � F e iii SA � � N�6Uv
38x14 �I I�� �'� EA�I " 0 2W �ry,� � SA
- 710 �:�250 �200
� x SB1214 RTU-02 � � �� ��F�'o"u SA �16x10 8�
� SBSp�4 � 130 iri :� r a o� � ix' m RTU-04 �� .10x8
RTU-03 m ��'�
a
�`1 � 250 w �� 0 16x14 ftA �
. � � � � � 14x10 �
a zoo
��� ......._ 200 EA 24112 Sx6 � 10x8 � RA SA �
� �120 300 I :,,`�"ci I ��}�� r^nN2 I _acwcz I o n� 350175
� SA o �., 340 I r.. 3 0 �3 0 I �„ 340 �..: 340 2 0 � a RT � T �� O II m� 3 0 @�3 0 �5 0 II � 40 8� TA 241� C
SA RA SA � o
aoo � m m � � m m ���o,.—
� r �.a � i � — izoo 2
SA , � � , �.. � �q �
120 400 _ _ _ _-" a£k14 - _.. � _ _ _-. �_ - - -]6x14 - - � n Il,1 n ' RC _ 36k94_ _ _ _ ...._ - �_ }8x}4- ' - �
, dLJ 3375 12/24 � - -�
9 QQ , m � " �o«�z �" iox�2 " „ �o.�z � �ox�z '" � sn ae sn � ��� �
� .KF�r EF=07 � � -. � -, .. _ 6x � 8x18 625 � � � 60 60 � 175 �ID
uUeoor, � ID � 8 `. � io x EF-03 � m i 6t � � 6� g
EA'12124 w ���.
120 S �3 0� ��I � 40 625 � 3 0 I �� 340 �� 3 0 � 50 � �340 I�� 340 �� 3 0 � �3 0 I� ��3 0 � � 50 4� mA
400 I I °s�T"�^r I I `� � 4H u
� I I �� I I SA EH-03--'E-�60_ __
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�`� �,�:;vaYa/„1��.
DATE: O��0��20
425 425
�
NOT IN
SCOPE
OF
WORK
GFUH-EX
X\
0
MECHANICAL PLAN � 1
„g.-„a. M 1.01
NORTH
1.G. D��ISS
A�C�iITfCTS, „�
a�• WALHALLA tOAD
COLUMEUS, OHIO �s�oi
(bl�l ]064]]0
1p010] •
TATEOF ;'�
�
�
F;�.NpIANP.� a
s a
S�ONA� E
�o� ��,.. ��Q� ,�
�
U N U7 m
"� � � N O
� �
O N in V
� } C � 6
� �� �
Q � C
_ O p
� w �
N �
N � o
N �
•L �NU
�a
�
^l C
i �
�..L i
�n� �
W
Q
PREPARED FOR
Aveda Institute
16281 Tri Ridge Blvd
Suife 140
Loveland, Ohio 45140
SHEET WFORMATION
Project #: 20013
luoed Por. BID / PERMIT
Dbfe: 5/29/20
Revisions'.
�
�
PEServices
ENGINEERING FOH YDUR 5l1CCE55
7-573-836-3810
www.pe-services.�om
SHEET TITLE
CONTRAGTOR NOTE
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY
THE ARCHITECT, LANDLORD AND TENANT OF ANV
oiscRePnNcieseNcouNreReooNTHea�nNsoaiN MECHANICAL PLAN
EXISTING SITE CONDITIONS PRIOR TO SUBMISSION OF BID.
BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE
THEMSELVES WITH EXISTING CONDITIONS AND SATISFY
THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK.
THE BASE BID SHALL REFLECT MODIFICATIONS TO SYSTEMS
ANDDEVICESASREQUIREDBVSTATE,LOCALAN�FEDERAL SHEETNUMBER
CO�ES WHETHER IN�ICATED OR NOT ON CONTRACT
DOCUMENTS. THE SUBMISSIONS OF A BID WILL BE EVIDENCE
THAT SUCH AN EXAMINATION AN� COMPLIANGE WITH
GOVERNING CODESIREQUIREMENTS HAS BEEN MADE LATER M 1 • O 1
CLAIMS FOR LABOR, EQUIPMENT, OR MATERIALS REQUIRED,
OR FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE
BEEN FORESEEN HA� AN EXAMINATION AND
GO�E/REQUIREMENTS REVIEW BEEN MADE, WILL NOT BE
ALLOWED. .