Loading...
HomeMy WebLinkAboutM2.01-Mechanical Roof PlanPLANNOTES: GENERALNOTES: 1. ROUTECONDENSATETOSPLASHBLOCK. A. ALLMECHANICALWORKSHALLBEDONEPERTHESTATEMEGHANIGALGODENNDLOGAL MECHANICALCODES. 2 HVAC CONTRACTOR TO INSTALL SMOKE DETECTOR IN RBl1RN AIR DUCT. B. MECHANICALCONTRACTORSHALLHOLDALLDUCTWORNASTIGHTASPOSSIBLETO 3. TERMINATEEXHAUSTATGOOSENECKWITHBIRDSCREEN. UNDERSIDEOFSTRUCTURE. 4. ROUTEMANUFACTURER'SREGOMMEN�EDFWEKITFORGASFIREDUNITHEATER C. MECHANICALCONTRACTORSHALLCOORDINATEDUCTROUTINGWITHLIGHTING.NO THROUGH ROOF. PATCH ROOFAT E%ISTING FLUE PENETRATION TO BE PERFORME� DUCTWORK SHALL BE ROUTED OVER OR UNDER ANY LIGHT FIkTURES. BY ROOFING CONTRACTOR. D. ALLROOFTOPEQUIPMENTSHALLBEINSTALLEDAMINIMUMOFIO'-0"FROMEDGEOF 5. ROUTEVENTAN�FWEUPTHROUGHROOFTOMANUFACTURER'SRECOMMENDED ROOF. VENT KIT. E. TAB-TYPEFITfINGSWITHAIRSC00PS5HALLBEPROVIDE�FORALLROUN�BRANCH 6. EITHERPROVIDEADAPTINGCURBTOMATCHEXISTINGSIZEOFPENETRATIONOR TAPS. REMOVE C11R6 AND PROVIDE NEW Cl1RB IF EXISTING 512E OF PENETRATION IS NOT OF ADEQUATES¢E. F. FLEXCONNECTIONSTODIFFUSERSARETOBEINSULATEDFLEHWITHAMAXIMUM LENGTH OF 5 FEET. ]. FlLL M EXISTING ROOF CURB. IT WILL NOT BE USED FORANV NEW E�l11PMENT. G. MECHANICALCONTRACTORSHALLBERESPONSIBLEFORALLCONTROLWIRING. H. MECHANICALCONTRACTORSHALLBERESPONSIBLEFORCOORDINATIONWITH ELECTRICAL CONTRACTOR REGARDING THE WIRING OF ALL MECHANICAL EQUIPMENT. I. PROVIDEBALANCEDAMPERSATALLBRANCH�UCTSSERVINGDIFFl1SERS. J. DOORS SHALL NOT BE UNDERCUT IN EXCESS OF THE CLEARANCE PERMITTED IN ACCORDANCE WITH NFPA-80. K. PIPEANDDUCTSPASSINGTHRUHORIZONTALASSEMBLIESSHALLBEPROTECTEDWITH AN APPROVED NON-COMBUSTIBLE MATERIAL TO RESIST THE FREE PASSAGE OF FLAME AND THE PRO�UCTS OF COMBUSTION. L HEATING E�IIIPMENT SHALL BE INSTALLED IN ACCOR�ANCE WITH UNDERWRRER'S APPROVAL, MANUFACTURER'S RECOMMENDATIONS, GOOD ENGINEERING PRACTICE AND THE STATE MECHANICAL CODE AND THE INTERNATIONAL FUEL GAS CODE. M. CONTRACTOR SHALL COOR�INATE LOCATION OFAIR �EVICES WITH REFLECTED CEILING PLAN AND LIGHTING LAYOUT. N. ALLEXPOSEDDUCTWORKTOHAVEMILLPHOSPHATIZEDFINISHTOBEPAINTEDBLAGK BY OTHERS. 1.G. D��ISS A�C�iITfCTS, „� a�• WALHALLA tOAD COLUMEUS, OHIO �saoi (bl�l ]064]]0 � � A NP.G� NAL E� ,o� ��,.. ...Q� ,�� � i si s� si � � U � U7 c+� u' � � N O � � O N � � � } C � � � �� � Q � C _ O p � w � N � N � o N � •L �NU a � � ^ N � � 1�1 � 1� U V L �^ � � Q PREPARED FOR Aveda Institute 16281 Tri Ridge Blvd Suife 140 Loveland, Ohio 45140 SHEET WFORMATION Prolec� N: 20013 luoed Por. BID / PERMIT Date: 5/29/20 Revisions'. — � PEServices ENGINEERING FOH YDUR 5l1CCE55 7-573-836-3810 www.pe-services.�om 6Y71qi�111�7 RELEA5E0 FOR CONSTRUCTION Suhjec� �o compliance with all regula�ions 04 S�a�e antl Local Codes City of Carmel `�y,:a���'.�`� �,�:;vaYa/„1��. DATE: O��0��20 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ARCHITECT, LANDLORD AND TENANT OF ANY �ISCREPANGES ENCOUMERED ON THE PLANS OR IN EXISTING SITE CONDITIONS PRIOR TO SUBMISSION OF BID. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK. THE BASE BID SHALL REFLECT MODIFIGATIONS TO SYSTEMS AND DEVICES AS REQUIRED BV STATE, LOCAL AN� FEDERAL CO�ES WHETHER IN�ICATED OR NOT ON CONTRACT DOCUMENTS. THE SUBMISSIONS OF A BID WILL BE EVIDENCE THAT SUCH AN EXAMINATION AND COMPLIANGE WITH GOVERNING CODESIREQUIREMENTS HAS BEEN MADE LATER CLAIMS FOR LABOR, EQUIPMENT, OR MATERIALS REQUIRED, OR FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HA� AN EXAMINATION AND CO�E/REQUIREMENTS REVIEW BEEN MADE, WILL NOT BE ALLOWED. MECHANICAL ROOF PLAN tiy:i�anomaaa M2.01