HomeMy WebLinkAboutP0.02-Plumbing SpecificationsPLUMBING SPECIFICATIONS
REFER TO ARCHITECTURAL DRAWINGS, GENERAL NOTES, INSTRUCTIONS
TO BIDDERS, GENERAL WNDITIONS, SUPPLEMENTARY GENERAL
CON�ITIONS, BASE BUILDING SPECIFICATIONS AN� DRAWWGS, SHOP
DRAWING MANUALS AND AS-BUILT PLANS, EXCEPT AS NOTED HEREIN,
WHICH APPLV IN ALL RESPECTS TO THIS $ECTION. THE CONTRACTOR
SHALL VISIT THE SITE AND FAMILIARIZE HIMSELFIHERSELF WITH ALL
EXISTING CONDITIONS, PRIOR TO 81DDING THE WORK.
THE IMENT OF THE SPECIFICATIONS AND DRAWINGS IS TO PROVIDE A
COMPLETE AN� FULLY OPERATIONAL PLUMBWG SYSTEM. THE PLUMBING
WMRACTOR SHALL FURNISH AND INSTALL ALL LABOR, MATERIAL AND
EQUIPMENT NECESSARY TO COMPLETE THE PLUMBING WORK.
THE PLUMBMG CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS
OF WORK WHERE EQUIPMENT, DUCTWORK, ELECTRICAL PANELS AND
PIPMG WILL BE INSTALLE� AN� SHALL REPORT ANY WN�ITION THAT
PREVENTS THE PROPER INSTALLATION OF THE PLUMBING WORK, PRIOR
TO BID. HE/SHE SHALL ALSO EXAMINE THE DRAWINGS AND
SPECIFICATIONS OF OTHER BRANCHES OF WORK, MAKING REFERENCE
TO THEM FOR DETAILS OF NEW OR EXISTING BUILDING CONDITIONS. NO
EXTRAS WILL BE ALLOWED TO 8E INCLUDED FOR ALL REQUIRED WORK
IN BID. ALL WORK SHALL BE DONE AT TIMES CONVENIENT TO THE
OWNER AND ONLV DURING NORMAL WORKMG HOURS, UNLESS
SPEGFIED OTHERWISE. PLUMBWG CONTRACTOR SHALL TAKE HISMER
OWN MEASUREMENTSAND BE RESPONSIBLE FOR THEM. CONTRACTOR
SHALL ARRANGE FOR HISIHER OWN PARKING AND TELEPHONE.
EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE
PROVISIONS OF OHFA FORM 001 - CONTRACTOR / ARCHITECT
CERTIFICATION, GREEN COMMUNITIES CRITERIA 20�8, AGA, ARI, ASME,
ASTM, GSPI, UL, NEMA, ANSI, SMACNA, ASHRAE, NFPA, NEC, AS
APPLICABLE TO EACH INDNIDUAL UNIT OR ASSEMBLV. ALL EQUIPMENT
MUST BEAR UL LABEL.
ALL WORK SHALL BE PERFORMED IN STRICT ACCOR�ANCE WITH ALL
APPLICABLE STATE AND LOCAL CODES AND ORDINANCES. M CASE OF
WNFLICT BETWEEN THE DRAWMGS/SPECIRCATIONS AND THE CODES
AN� ORDINANCES, THE HIGHEST STAN�ARO SHALL APPLY. THE PWMBWG
CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM
STANDARD WITHOUT ANY EXTRA COST TO THE OWNER.
PERMITS AND FEES
THE PLUMBING CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS,
FEES, TAXES AND INSPECTIONS NECESSARY TO COMPLETE THE PWMBING
WORK. FURNISH CERTIFICATE OF APPROVAL, FOR WORK FROM INSPECTION
AUTHORITY, TO OWNER BEFORE FINAL ACCEPTANCE FOR WORK.
CERTIFICATE OF FINAL WSPECTION AND APPROVAL SHALL BE SUBMITTED
WITH THE CONTRACTOR'S RE�UEST FOR PAYMENT. NO FINAL PAYMENT
WILL BE APPROVED WITHOUT THIS CERTIFICATE.
WNTRACT DRAWINGS
THE WNTRACT DRAWINGS ARE INTENDED TO BE DIAGR4MMATIC ONLY,
INTEN�ING TO SHOW GENERAL RUNS AN� LOCATIONS OF E�UIPMENT,
FIXTURES, DUCTS AND PIPING. THE DRAWINGS DO NOT NECESSARILY
SHOWING ALL OFFSETS, DETAILS, ACCESSORIES AN� EQUIPMENT TO BE
CONNECTED, AS MAY BE REQUIRED DURING CONSTRUCTION.
ALL WORK SHALL BE ACCURATELY LAI�-OUT WITH OTHER TRADES, PRIOR
TO INSTALLATION & FABRICATION, TO AVOID ALL CONFLICTS AND OBTAIN A
NEATAN� WORKMANLIKE INSTALLATION, WHICH WILLAFFORD MAXIMUM
ACCESSIBILITV FOR EQUIPMENT OPERATION, MAWTENANCE CLEARANCES
AND HEADROOM. PLUMBING CONTRACTOR SHALL PROVI�E 1/4 SCALE
COORDINATION SHOP DRAWINGS FOR FIXTURES, EQUIPMENT, PIPING,
VALVES,ETC.
SUBMIT (4) COPIES OF COMPLETE & CERTIFIED SHOP DRAWINGS,
DESCRIPTNE DATA, PERFORMANCE DATAAND RATINGS, DIAGRAMS AND
SPECIFICATIONS ON ALL SPECIFIED E�UIPMENT, WCLUDING
ACCESSORIES, AND MATERIALS FOR REVIEW, TO THE ENGINEER. THE
MAKE, MODEL NUMBER, TYPE, FINISH AND ACCESSORIES OF ALL
EQUIPMENT AND MATERIALS SHALL BE REVIEWED AND APPROVED BY THE
PLUMBING CONTRACTOR AND GENERAL CONTRACTOR, PRIOR TO
SUBMITTING TO THE ENGINEER FOR THEIR REVIEW AND APPROVAL.
APPROVAL OF SHOP DRAWINGS DOES NOT RELIEVE THE PLUMBING
CONTRACTOR AND VENDOR FROM COMPLIANCE WITH THE
REQUIREMENTS OF THE CONTRACT DRAWINGS, SPECIFlCATIONS AND
APPLICABLE CODES,
AS-BUILT DRAWWGS
THE PLUMBING CONTRACTOR $HALL KEEP AT LEAST ONE $ET OF
COLORED PENCIL CORRECTED SHOP AND DESIGN DRAWINGS AT THE
SITE. �RAWINGS SHALL BE CURRENT, DENOTING APPROVED
MODIFICATIONS AND ACTUAL WSTALLED DEPARTURE. SUBMIT ONE
SET OF AUTOCAD AS-BUILT DRAWINGS TO THE OWNER, PRIOR TO
PROJECT CLOSE OUT AND BEFORE FINAL PAYMENT.
ACCESSPANELS
FURNISH & INSTALL ALL CEILING AND WALL ACCESS PANELS TO ACCESS
CONCEALED PLUMBING E�UIPMENT. VALVES. ETC, PRIORTO BIDDING.
THERE SHALL BE NO EXTRAS FOR HAVMG TO ADD ACCESS PANELS,
AFTER BIDS ARE AWARDED.
CUTTING AND PATCHING
NEATLY CONDUCT ALL FLOOR CUTTING AND PATCH ALL CUT SURFACES,
AS REQUIRED, TO MATCH BUILDMG CONSTRUCTION. HOWEVER, THE
CONTRACTOR SHALL EMPLOY AND PAY A TRADE TRAINED AND QUALIFIED
PERSON TO PERFORM THE REQUIRED PATCHING WORK. ALL SURFACES
DISTURBED SHALL BE RESTORED WITH SIMILAR MATERIALS, TO THE
SATISFACTION OF THE ENGMEER. ALL PENETRATIONS THROUGH ROOF
SHALL BE MADE 8Y BON�ED ROOFER. PLUMBMG CONTRACTOR SHALL PAY
ALL FEES.
EXCAVATION, TRENCHING AND BACKRLL
CONDUCT ALL EXCAVATION, TRENCHING AND BACKFILL, REQUIRED FOR
THE INSTALLATION OR SETTING OF PWMBING WORK. ALL BACKFILL $HALL
BE COMPACTE� & BROUGHT TO FINISHED GRADE AND SHALL MATCH
SURROUNDING CONDITIONS. RESTORE ALL DISTURBED FLOORING TO IT'S
ORIGINAL CONDITION.
RIGGING
CONDUCT ALL RIGGWG, AS RE�UIRED.
SCAFFOLDING
FURNISH AND INSTALL ALL NECESSARY SCAFFOLDING OR STAGING. AS
RE�UIRED FOR COMPLETION OF WORK.
FLASHING AND COUNTER-FLASHING
ROOF FLASHING SHALL BE FURNISHED AND INSTALLED BY THE ROOFING
CONTRACTOR. ROOF COUNTERfLASHMG SHALL BE FURNISHED AND
WSTALLED BY THE PLUMBING CONTRACTOR. COORDINATE WORK WITH
ROORNG CONTRACTOR AND PAY ALL FEES.
CONCRETE
ALL CONCRETE SHALL BE IN ACCORDANCE WITH ACI-317-77 AND BUILDING
CO�E REQUIREMENTS, FOR REINFORCE� CONCRETE. ALL WNCRETE
SHALL BE 3000 PSI CONCRETE MINIMUM. COORDINATE WITH GENERAL
CONTRACTOR, PRIOR T0 BEGINNING WORK.
WARRANTY
THE PLUMBING CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL
WORK TO BE FREE OF �EFECTS W EQUIPMENT, MATERIAL AN�
WORKMANSHIP, FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL
ACCEPTANCE BY THE ENGINEER. THE PWMBING CONTRACTOR WILL
REPAIR OR REPLACE ANY DEFECTIVE WORK, PROMPTLY AND WITHOUT
CHARGE TO THE OWNER. CONTRACTOR SHALL RESTORE ANY OTHER
EXISTING WORK DAMAGED IN THE COURSE OF REPAIRING �EFECTNE
EQUIPMENT. MATERIALS AND WORKMANSHIP.
OWNERS INSTRUCTIONS
INSTRUCT THE OWNERS' PERSONNEL IN THE OPERATION OF THE
PLUMBING SYSTEMS. WORK SHALL BE CONSI�ERED ACCEPTABLE BY THE
ENGWEER FOR REGULAR INTENDED USE. PROVIDE TWO SETS OF
COMPLETE OPERATMG AND MAINTENANCE PROCEDURES WITH
DRAWINGS, TYPEWRITTEN INSTRUCTIONSAND OPERATING SEQUENCES
AND DESCRIPTNE DATA SHEETS. ASSEMBLE EACH SET IN A HARD BOUND
COVER,
FINALE
PUT ALL EQUIPMENT AND FIXTURES M SERVICE AND DEMONSTRATE THAT
ALL CONDITIONS OF THE CONTRACT HAVE BEEN FULFlLLED. REMOVE ALL
TOOLS, �EBRIS, ETCACCASIONED BY WORK, UNDER THIS CONTRACT.
SUBMIT ALL WARRANTIES, BALANCING REPORTS, TEST REPORTS,
OPERATMG AND MAINTENANCE PROCEDURES, LOG SHEETS AN� CHARTS,
AND GUARANTEES AS PREVIOUSLY SPEGFIED. PROVIDE ALL REPORTS,
FORMS, ETC, REQUIRED BY INSPECTORS, TO THE SATISFACTION OF THE
OWNER.
PLUMBMG WORK
THE PLUMBING CONTRACTOR SHALL PROVIDE NEW PLUMBING FIXTURES,
EQUIPMENT, PIPING AND VALVES, AS INDICATED ON DRAWMGS AND AS
SPECIFIED. FIXTURES SHALL BE SECURELY FASTENED, TO PREVENT ANY
MOVEMENT OF FIXTURE DURING NORMAL USE. SEAL TO WALL, FLOOR OR
COUNTERTOP WITH SILICONE ACRYLIGLATEX CAULK. STARTUP AND iST
YEAR PARTS AND LABOR WARRANTY SHALL BE INCLUDED, AS WELL AS
MANUFACTURER'S EXTENDED WARRANTIES.
SHOP DRAWINGS
SHOP DR4WINGS SHALL BE REQUIRED ON THE FOLLOWING:
1. PIPMG - SUBMIT COORDINATED PIPING DRAWINGS TO THE ENGINEER,
PRIOR TO FABRICATION, INDICATING SIZES, LOCATIONS, OFFSETS AND
ELEVATIONS. FULLY COORDINATE WITH ALL PROJECT DISCIPLINES.
2. PLUMBING FIXTURES AND EQl11PMENT- REFER TO DRAWING SCHEDULES
FORMANUFACTURERSAN�MODELNUMBERS.
3. PLUMBMG PIPMG, VALVES AN�ACCESSORIES.
SANITARY WASTE AND VENT PIPING
GENERAL: PROVIDE PIPING AN� FITTINGS IN ACCORDANCE WITH THE
FOLLOWING LISTING:
1. BELOWGRADEPIPING:
a. SCHEDULE 40 POLYVINYL CHLORIDE (PVC) PIPE
CONFORMING TO ASTM D2665 OR ASTM D2949. FITTINGS SHALL BE
PVQ SOLVENT CEMENT TYPE CONFORMING TO ASTM D2665. ASTM
D3311 OR ASTM F1866.
2. ABOVE GRADE PIPWG
a. SCHEDULE 40 POLYVINYL CHLORIDE (PVC) PIPE
WNFORMING TO ASTM D2665 OR ASTM D2949. FlTTINGS SHALL PVC,
SOLVENT CEMENT TYPE CONFORMING TO ASTM D2665, ASTM D3311
OR ASTM F1866.
b. SERVICEWEIGHTCASTIRONPIPECONFORMINGTOASTM
A74, ASTM A888 OR GSPI 301. PIPING SHALL BE MARKE� WITH THE
COLLECTNE TRA�EMARK OF THE CAST IRON SOIL PIPE INSTITUTE
AND BE LISTED BY NSF INTERNATIONAL FITTINGS SHALL BE CAST
IRON CONFORMING TO ASME Bi6.4, ASME 816.12, ASTM A74, ASTM
A888 OR CISPI 301 ( AND BE LISTE� BY NSF INTERNATIONAL ).
SCHEDULE 40 PVC PIPE IS NOT PERMITTED IN RETURN AIR
PLENUMS. HORRONTAL PIPING SMALLER THAN 3", SHALL �RAIN AT
A SLOPE OF 114" PER FOOT. HORIZONTAL PIPING 3" AND LARGER,
SHALL DRAIN AT A SLOPE OF 1/8" PER FOOT. COORDINATE WITH
LOCAL AUTHORITIES FOR DRAINAGE REQUIREMENTS FOR E�UIPMENT
DESIGNATED WITH INDIRECT WASTE TO ROOR/HUB DRAINS.
3. PUMPED DISCHARGE PIPMG,
a. SCHE�ULE 40 CAST IRON PIPE CONFORMING TO ASTM A74
OR ASTM A888. FLANGED FITTINGS SHALL BE CAST I RON
CONFORMING TO ASTM A126; ANSI / AWWA C110I A21.10 OR ASME
Bi6.1.
b. SCHEDULE SO POLYVINYL CHLORIDE (PVC) PIPE AND
FLANGE� FITINGS CONFORMING TO ASTM D1784. FLANGES SHALL
BE 150 PSI, PER ANSI / ASME 616.5.
VENT PIPE THROUGH ROOF
FURNISH & INSTALL VENT PIPE THRU ROOF PER CODE & ROOFING
CONTRACTOR'S REQUIREMENTS TO MAINTAIN ROOF WARRANTY.
COORDINATE WORK WITH ROOFWG WNTRACTOR PRIOR TO BEGINNING
ANY ROOF WORK.
PW MBMG WNTRACTOR SHALL PAY ALL FEES.
DOMESTIC WA7ER PIPING
GENERAL PROVI�E PIPING AND FITTINGS IN ACCORDANCE WITH THE
FOLLOWING LISTING:
1. WATERSERVICEPIPING:
a. SCHEDULE SO CHLORINATED POLYVINYL CHLORIDE (CPVC)
PIPE CONFORMING TO ASTM F441. FITTINGS SHALL BE CPVC,
SOLVENT CEMENT TYPE CONFORMING TO ASTM F439.
6. DUCTILE IRON WATER PIPE, CLASS 53 ( OR AS RE�UIRED BY
THE AHJ), AND RESTRAINED-JOINT FITTMGS CONFORMING TO
AWWA C151 OR AWWA C115.
2. WATERDISTIBUTIONPIPING:
a. COPPER OR COPPER-ALLOY PIPE OR TUBING, TYPE "L",
CONFORMING TO ASTM B75, ASTM 888, ASTM B251 OR ASTM
B447. FITTINGS SHALL 8E COPPER OR COPPER-ALLOY
CONFORMING TO ASME B16.15, ASME B16.18, ASME Bi 622, ASME
B1623, ASME 61626 OR ASME B1629.
b. CHLORINATEDPOLYVINYLCHLORIDE(CPVC�PLASTICPIPE
OR
TUBING, WNFORMING TO ASTM D2486, ASTM F441 OR ASTM F442.
FITTINGS SHALL BE CPVC CONFORMING TO ASTM F437, ASTM F438
OR ASTM F439.
a COPPER AND COPPER-ALLOY PRESS FITTINGS SHALL
CONFORM TO MATERIAL REQUIREMENTS OF ASME Bi 6. i 8
OR ASME 81622 AND PERFORMANCE CRITERIA OF IAPMO
PS 117. SEALING ELEMENTS FOR PRES$ FITTINGS $HALL
BE EPDM. PRESS END SHALL HAVE SMART CONNECT
FEATURE DESIGN IN il2" T04" PIPE SIZES.
d. MANUFACTURERS: VIEGA, PROPRESS, OR APPROVED EQUAL.
ESCUTCHEON PLATES
INSTALL ONE PIECE CHROME PLATE� BRASS WALL PLATE EQUIPPED WITH
SET SCREW AROUND ALL EXPOSED PIPE PASSING THROUGH WALLS.
NATURAL GAS PIPING
REFER TO PLANS FOR NATURAL GAS PIPING LAYOUT AND MATERIALS
SPECIFICATIONS.
NATURAL GAS PIPE MATERIAL STEEL PIPE, ASTM A531A53M, BLACK STEEL,
SCHEDULE40.
NATURAL GAS PIPE FITTINGS�MALLEABLE IRON, THREADED FITTINGS, 2"
AND SMALLER. ASTM B16.3. CLASS 150, STANDARD PATTERN.
NATURAL GAS PIPE HANGERS�, SHALL CONFORM TO RE�UIREMENTS OF
MSS SP-58 AND SHALL BE SPACED IN ACCORDANCE WITH IFGC SECTION
415.
NATURAL GAS PIPING SHALL BE PAINTED WITH EPDXY YELLOW PAINT,
WHEREEXPOSE�TOTHETHEELEMENTS,OUT�OORS.
CONNECTIONS
INSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL CONNECTION TO
EACH PIECE OF E�UIPMENT. INSTALL �IELECTRIC COUPLINGS TO CONNECT
PIPING MATERIALS OF DISSIMILAR METALS. PROVIDE THREADED STEEL
PIPING UP TO AND INCWDING 1-1/2".
HANGERS&SUPPORTS
THE PWMBING CONTRACTOR SHALL FURNISH ALL PIPE SUPPORTS
REQUIRED FOR HIS/HER EQUIPMENT AND MATERIAL. ALL HORIZONTAL
RUNS OF PIPING SHALL BE SUPPORTED BY PIPE HANGERS SPACED NOT
MORE THAN 10 FEET O.C. FOR PIPES 1-114" AND LARGER, AND 8 FEET O.C.
FOR PIPES SMALLER THAN 1-114" AND AT EACH JOINT FOR SOIL OR WASTE
PIPE. ADDITIONAL SUPPORTS SHALL BE PROVIDED WHERE REQUIRE� TO
PREVENT SAGGMG OR AS REQUIRED BY MANUFACTURER'S SPEGFICATION
AND CO�E RE�U IREMENTS. HANGERS AND PIPE ATTACHMENT$ TO BE
FACTORY FABRICATED WITH GALVANRED COATINGS.
CLEANOUTS
PROVIDE ZURN OR EQUIVALENT FLOOR AND WALL CLEAN OUTS, AS
INDICATED ON THE DRAWINGS OR WHERE REQUIRED IN ALL DRAIN LWES.
IN AREAS WITH CERAMIC TILE OR CARPETED FLOORING, PROVI�E CLEAN
OUTS WITH SQUARE ADJUSTABLE, NICKEL BRONZE TOPS. IN AREAS WITH
RESILIENT ROORING, PROVIDE CLEAN OUTS WITH S�UARE, ADJUSTABLE,
NICKEL BRONZE TOPS WITH TILE RECESS. CLEAN OUTS SHALL BE SAME
SIZE AS PIPE, EXCEPT CLEAN OUTS LARGER THAN 4" WILL NOT BE
REQUIRED. WHERE CLEAN OUTS OCCUR IN WALLS OF FINISHE� AREAS,
THEY SHALL BE CONCEALED BEHIND CHROME PLATED ACCESS COVERS.
INSTALLATION
INSTALL PIPING FREE OF SAGS AND BENDS. INSTALL FlTTINGS FOR
CHANGES IN �IRECTION AN� BRANCH CONNECTIONS. INSTALL SLEEVES
FOR PIPES PASSING THROUGH CONCRETE AND MASONRY WALLS,
GYPSUM-BOARD PARTITIONS, CONCRETE FLOOR AN� ROOF SLABS.
CAULK AND SEAL PIPE PENETRATIONS, THROUGH RATED CONSTRUCTION,
WITH FlRE STOPPING SEALANT MATERIAL UNDERGROUND WATER AND
SEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUM
HORRONTAL SPACING, AS REQUIRED BY CODE. EXCAVATED TO THE
PROPER DEPTH AND GRADED TO PRODUCE THE RE�UIRED FALL.
TESTING
DOMESTIC WATER, DRAIN, WASTE & VENT PIPING SHALL BE TESTED &
APPROVED BY INSPECTOR PRIOR TO BEMG BACKFILLED, CONCEALED &
PUT INTO SERVICE AFfER TESTING IS COMPLETE 8 APPROVED, THE
PLUMBING CONTRACTOR SHALL �ISINFECT THE POTABLE WATER SYSTEM
AS REQUIRED BY LOCAL AUTHORITY. TEST WATER PURITY ACCORDING TO
LOCAL RE�UIREMENTS AND SUBMIT CERTIFIE� TEST RESULTS TO
ENGINEER FOR REVIEW AND APPROVAL.
VALVES-GENERAL
PLUMBING CONTRACTOR SHALL PROVIDE VALVES WHERE INDICATED ON
PLANSAND AS NECESSARY FOR PROPER SYSTEM OPERATION AND
COMPONENT ISOLATION. INSTALL VALVES FOR EACH RXTURE AN� ITEM OF
EQUIPMENT. PROVIDE BRAIDED STAINLESS STEEL HOSE (UNLESS
OTHERWISE NOTED) BETWEEN VALVE AND EQUIPMENT/FIXTURE, IN
ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. LOCATE
SHUT-OFF VALVES ADJACENT TO EQUIPMENT FOR EASY ACCESS, SUCH
THAT VALVES CAN BE REACHED WITHOUT MOV WG EQUIPMENT.
VALVES
PROVIDE VALVES FOR WORKING PRESSURE IN WATER PIPING OF 125 PSI
OR GREATER. UNLESS NOTED OTHERWISE, VALVES SHALL BE AS
FOLLOWS
VALVETYPE MANUFACTURER
BALLVAWE APOLLO,NIBCOOREQUIVALENT
BUTTERFLYVAWE APOLLO,NIBCOOREQUIVALENT
CHECKVAWE APOLLO,NIBCOORE�UNALENT
GLOBEVALVE APOLLO,NIBCOOREaUNALENT
GATE�ALVE APOLLO,NIBCOORE�UNALENT
TEMP.BPRESSURERELIEF WATfSOREQUNALENT
BACKFLOWPREVENTOR WATf50RE�UNALENT
VACWMRELIEFVALVE WATfSORE�UNALENT
PRESSUREREDUCINGVAWE WATTSORE�UNALENT
TRAPSEALPRIMER J.R.SMITHOREQUIVALENT
THERMOSTATIC69XWGVALVE WATTS.POWERS,NWLER,OREQUNALENT
WATER PIPING MSULATION
PROVIDE THERMAL INSULATION ON ALL COLD & HOT WATER PIPMG WITH
SELF-SEALING CLOSED CELL ELASTOMERIC FOAM OR PREMOLDED
FIBERGLASS PIPE COVERING, WITH ALL-SERVICE JACKET. PROVIDE A
CONTINUOUS VAPOR TIGHT SEAL. INSULATION SHALL BE CONTINUOUS
THROUGH ALL WALLS AND FLOORS. NFPA FlRE HAZARD RATING FOR
WSULATION, ADHESIVES, SEALERS, AND COATINGS SHALL NOT EXCEED 25
FOR FLAME SPREAD AND 50 FOR SMOKE DEVELOPED, UNLESS OTHERWISE
REQUIRED BY THE LOCAL AUTHORITY OR ENERGY CODES. THE MINIMUM
INSULATION THICKNESS SHALL BE AS FOLLOWS:
PIPESIZE INSULATIONTHICKNESS
1"DIA.ORLESS 314'
1"�2'DIA. 1"
r�oinoece�,r� ��v2•
DOMESTIC WATER HEATERS
PROVIDE DOMESTIC WATER HEATERS, AS REQUIRED. REFER TO WATER
HEATER SCHE�ULE, ON PLUMBING DRAWINGS, FOR EQUIPMENT
DESCRIPTIONS, FUEL TYPE, MANUFACTURERS AND MODEL NUMBERS.
ANCILLARY RELATED PWMBING COMPONENTS MAY BE FOUND ON THE
PLUMBING SCHEDULES DRAWING(5�.
WLINE DOMESTIC WATER PUMPS
PROVIDE INLINE DOMESTIC WATER PUMP, IN DOMESTIC HOT WATER
RECIRCULATION SYSTEM(S), AS REQUIRED. REFERTO RECIRCULATING
PUMP SCHE�ULE. ON PW MBING DRAW WGS, FOR EQUIPMENT
DESCRIPTIONS, MANUFACTURERS AND MODEL NUMBERS.
1.G. D��ISS
ARC�iITfCTS, «<
a�� WALHALLA tOAD
COLUMlUS, OHIO �s�oo
la�l �os.n�o
� R
_
] 2W
4TEOF ;'�
�;
��ANP.G?\
� �p
NAL E_.�P��
� ,�,...� .. � _�,�,u�.E3..w���,��.�
U Q�
w }
o ��
d }
�
N
�
N
�L
�^l
W
L
�..L
�
�
�
t'
N N �.�j
� � �
� in V
U L �
� � C
C � p
a� a
Q � C
p � _
L w �
N �
N O
�`+ o
6N U
N
�
C
�
L
U
N
�
PREPARED FOR
Aveda Institute
16281 Tri Ridge Blvd
Suite 140
Loveland, Ohio 45140
SHEET WFORMATION
Prolect p: 20013
luoed Por. BID / PERMIT
Da�e: 5/29/20
Revlsions'.
�
PEServices
ENGINEERIN6 FOR VOUR 5U[[E55
1-513-636-3810
vwvw.pe-servi�es.com
�.y:ieamne
RELEA5E0 FOR CONSTRUCTION
Suhjec� �o compliance with all regula�ions
04 S�a�e antl Local Codes
City of Carmel
`�y,:a���'.�'� �,�:;vaYa/„1��.
DATE: O��0��20
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY
THE ARCHITECT, LAN�LORD AND TENANT OF ANY
DISCREPANCIES ENCOUMERED ON THE PLANS OR IN
EXISTING SITE CONDITIONS PRIOR TO SUBMISSION OF BID.
BIDDERS ARE TO VISIT THE SITE AND FAMILIARRE
THEMSELVES WITH EXISTING CONDITIONS AND SATISFY
THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK.
THE BASE BID SHALL REFLECT MODIFICATIONS TO SYSTEMS
AND DEVICES AS REQUIRED BV STATE, LOCAL AN� FEDERAL
CODES WHETHER INDICATED OR NOT ON CONTRACT
DOCUMENTS. THE SUBMISSIONS OF A BID WILL BE EVIDENCE
THAT SUCH AN EXAMINATION AN� COMPLIANCE WITH
GOVERNING CODESIREQUIREMENTS HAS BEEN MADE LATER
CLAIMS FOR LABOR, E�UIPMENT, OR MATERIALS RE�UIRED,
OR FOR DIFFICULTIES ENCOUNTERED WHICH COULD HAVE
BEEN FORESEEN HAD AN E%AMINATION AND
CO�E/REpUIREMENTS REVIEW BEEN MADE, WILL NOT BE
ALLOWED.
PLUMBING
SPECIFICATIONS
FYiIqi�RqJil:7q 7
P0.02