Loading...
HomeMy WebLinkAbout83-99 Grading PlanFA 114 "� i !! J !, J:7Elj7 1 i i i i CA 90' RIGHT-OFD E WAY V - -_41b—wo J no fft ,III, 4ft Y r +r,r-sue - _ _ - Vic, _ _y-.y�-•� AN, 95 45 f852.20 L85170 1 - _ _ 85.96 85 _ "DON'T DIG BLIND" Z7 w 1-800-382-5544 CALL BEFORE YOU DIG `. LEGEND EXISTING PROPOSED M.E._ _ _ _ = STORM SEWER 848.04 aa7.sa SANITARY SEWER O MANHOLE 0 } U INLET ■ 1 END SECTION 4 STORM STR. NO. M.E. x aas.5s SURFACE WATER 848.03 3 848.FLOW DIRECTION � " 1 a4a.2s GROUND aa7.7s CONTOUR 1 1 SPOT ELEVATION aso.00 DECIDUOUS M.E. TREE 846.67 i 846.17 EVERGREEN TREE ' FM SANITARY FORCE MAIN GRADING PLAN GENERAL NOTES: `j 1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO ` STARTING CONTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD LOCATIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS 12 FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 2. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EOUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND/OR UTILITY J COMPANIES SO AS NOT TO CAUSE DAMAGE. 3. PROVIDE POSTIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS AFTER INSTALLATION. CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY, PONDING CONDITIONS THAT EXIST. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START. TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location, size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER i EXISTING UTILITIES. THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 5. ALL PROPOSED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL GRADE ELEVATIONS. U- = = G: _ =TRENCHES FOR ALL STORM AND SANITARY PIPES ARE TO BE BACKF I LLED " COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF 11 PAVEMENT. � 11 7. SEE APPROPRIATE DETAILS TO DETERMINE SUBGRADE ELEVATIONS BELOW FINISH GRADE ELEVATIONS INDICATED. � 11 S. FLOW LINE ELEVATIONS ARE GIVEN FOR ALL CONCRETE END SECTIONS. � 11 l 1� 9. SEE SHEET C103 FOR SITE PLAN. 10. SEE SHEET C105 FOR UTILITY PLAN. 11. DAYLIGHT ROOF DRAINS IN REAR OF BUILDING INTO SWALE. CIO w Q 0 0 Z Q U) Z O CO W cr SNF��%,, No. `t *1 19800417 AUS ?I a. W � z u- z Q O Q �J Q r Ise Z O-- 0 2 C1 co -, Q U M I �r � o 0 CO '.. o' W U) �o c W ON 0 c �c v d 11 V) aa) .o c> o' W (0 IT ITQ � O 0(0 �,—y W LL. l c� c c� r� a W OZ C a=V) 4 F-J YIt a won_ QOQ tl 0K)Q 0 w Q w Z ►() a- cc QPf)� a- J�Z ccCi- DATE: AUGUST 19, 1999 SCALE: 1" = 20' PROJECT NO.111-1194 SHEET NO. C104 1194G. DGN r