HomeMy WebLinkAbout83-99 Utility PlanG" GATE VALVE
CUR �I�:L,ET_
rT. A44.SR
20' 40'
T.0E � 2
. IAAhnCIANHUF
NV. E. - 83b.26
NV. W. - 838.36
/I A"
35 (OR EQUAL)
844.52
44.42
/EXTING
FIRE
HYDRANT
"DON'T DIG BLIND"
1-800-382-5544
CALL BEFORE YOU DIG
LEGEND
EXISTING PROPOSED
STORM SEWER
UNDERDRAIN _ _ _ _ _ _ -
- - - - - - - - - - SANITARY SEWER
SANITARY SEWER
LATERAL
CLEANOUT
•++.��,SANITARY MANHOLE
STORM MANHOLE
INLET
END SECTION
STRUCTURE NO.
G
•
El
(STORM)
W -
WATER LINE
W
T -
TELEPHONE LINE
T
GAS LINE
G
E -
ELECTRIC LINE
E
GAS METERO
W
4
WATER VALVE
►�
FIRE HYDRANT
WM )
WATER METER
v0
POWER POLE
LIGHT POLE
E--
GUY ANCHOR
0
AREA LIGHT
MAILBOX
OTELEPHONE MANHOLE
C�
+ DECIDUOUS TREE
TY PLAN
AL NOTES:
HE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE
ENGINEER IMMEDIATELY.
HE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVERAGE REQUIREMENTS BY UTILITY CONTRACTORS AND/OR
UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE.
HE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE
CONSTRUCTION IS TO START. TO VERIFY ALL UTILITIES ARE PRESENT ON SITE.
ALL VERIFICATIONS (location. size, and depth) SHALL BE MADE BY THE APPROPRIATE
UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING
UTILITIES. THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A
REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT
AND OBSERVE DURING CONSTRUCTION.
4. LENGTHS OF PIPES INDICATED ARE FROM CENTER TO CENTER OF STRUCTURE
AND DO NOT REPRESENT ACTUAL PIPE LENGTHS.
5. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COMPLETELY WITH
ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT.
6. DO NOT SCALE FROM THESE PLANS FOR SURVEY LOCATIONS.
REFER TO ARCHITECTURAL PLANS FOR ALL UTILITY BUILDING CONNECTIONS
it AND INTERIOR ROUTING.
r�
8. REFER TO LIGHTING PLANS FOR SITE LIGHTING.
it 9. FOR SITE PLAN. SEE SHEET C103.
tt
ti 10. FOR GRADING PLAN, SEE SHEET C104.
�t
tk 11. FOR CONSTRUCTION DETAILS, SEE SHEETS C109 - C111.
it
I(
�i 12. CONTRACTOR TO INSTALL A KNOX BOX ON THE BUILDING AT A LOCATION
APPROVED BY THE CARMEL FIRE DEPARTMENT.
13. DAYLIGHT ROOF DRAINS IN REAR OF BUILDINGS INTO SWALE.
-No.
* 19800417
';Pt STATE OF w
rr k,
i
G
�JJgJt! tltOkkii
� T �
m aa)) a
0 o v
U)
w
Q
0
Z
Q
Z
O
w
m
VJ
U
LL
Q
O
z
Q
Q
T
z
O
w
�.
Q
M
U
0
0
M
w
�
C
LEI
O
r
v CL LL
V)
} ? A
CL 'IT
w (0 �
~_��
O
'cy)n
Lj
C ch co
a W
O1?
Uri C
Q
n. 1 In
Yw
i� C-
EO1
m
�
�ZQ
C)
Lin
LLI
0
00Q�
p
oni
ff)
W��
d
JO)O
tr
Cr
(Z
d-
DATE: AUGUST
19, 1999
SCALE: 1" =
20'
PROJECT NO.111-1194
IISHEET
C105
1194U.DGN
I