Loading...
HomeMy WebLinkAbout83-99 Utility PlanG" GATE VALVE CUR �I�:L,ET_ rT. A44.SR 20' 40' T.0E � 2 . IAAhnCIANHUF NV. E. - 83b.26 NV. W. - 838.36 /I A" 35 (OR EQUAL) 844.52 44.42 /EXTING FIRE HYDRANT "DON'T DIG BLIND" 1-800-382-5544 CALL BEFORE YOU DIG LEGEND EXISTING PROPOSED STORM SEWER UNDERDRAIN _ _ _ _ _ _ - - - - - - - - - - - SANITARY SEWER SANITARY SEWER LATERAL CLEANOUT •++.��,SANITARY MANHOLE STORM MANHOLE INLET END SECTION STRUCTURE NO. G • El (STORM) W - WATER LINE W T - TELEPHONE LINE T GAS LINE G E - ELECTRIC LINE E GAS METERO W 4 WATER VALVE ►� FIRE HYDRANT WM ) WATER METER v0 POWER POLE LIGHT POLE E-- GUY ANCHOR 0 AREA LIGHT MAILBOX OTELEPHONE MANHOLE C� + DECIDUOUS TREE TY PLAN AL NOTES: HE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. HE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVERAGE REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. HE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START. TO VERIFY ALL UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (location. size, and depth) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES. THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY SO A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO INSTRUCT AND OBSERVE DURING CONSTRUCTION. 4. LENGTHS OF PIPES INDICATED ARE FROM CENTER TO CENTER OF STRUCTURE AND DO NOT REPRESENT ACTUAL PIPE LENGTHS. 5. TRENCHES FOR ALL UTILITIES SHALL BE BACKFILLED COMPLETELY WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 5 FEET OF PAVEMENT. 6. DO NOT SCALE FROM THESE PLANS FOR SURVEY LOCATIONS. REFER TO ARCHITECTURAL PLANS FOR ALL UTILITY BUILDING CONNECTIONS it AND INTERIOR ROUTING. r� 8. REFER TO LIGHTING PLANS FOR SITE LIGHTING. it 9. FOR SITE PLAN. SEE SHEET C103. tt ti 10. FOR GRADING PLAN, SEE SHEET C104. �t tk 11. FOR CONSTRUCTION DETAILS, SEE SHEETS C109 - C111. it I( �i 12. CONTRACTOR TO INSTALL A KNOX BOX ON THE BUILDING AT A LOCATION APPROVED BY THE CARMEL FIRE DEPARTMENT. 13. DAYLIGHT ROOF DRAINS IN REAR OF BUILDINGS INTO SWALE. -No. * 19800417 ';Pt STATE OF w rr k, i G �JJgJt! tltOkkii � T � m aa)) a 0 o v U) w Q 0 Z Q Z O w m VJ U LL Q O z Q Q T z O w �. Q M U 0 0 M w � C LEI O r v CL LL V) } ? A CL 'IT w (0 � ~_�� O 'cy)n Lj C ch co a W O1? Uri C Q n. 1 In Yw i� C- EO1 m � �ZQ C) Lin LLI 0 00Q� p oni ff) W�� d JO)O tr Cr (Z d- DATE: AUGUST 19, 1999 SCALE: 1" = 20' PROJECT NO.111-1194 IISHEET C105 1194U.DGN I