HomeMy WebLinkAboutElectrical_E204w^'�
L
Ii �
U
� �
.�
��
U
U`
�
w�
�
H�
U
2 �
�
�
U�
�+
Q�
�
�
w�
��
�
- U
' /� L
V% �
General Notes:
A- All 120 vol; 20 emp oircw�s over 60' in leng�h shell be
#10 AWG, over 95 shall be N8, over 145'shall be #6.
B. Conlrac[or shall coortlinate wi�h all other Vatles to avoitl
conflic�s of space.
G Conlrector shall coordina�e �he exac� loca�ion of all
tlevices with all o�her [ratles prior to rough-in. Exact
loca�ion �o be de�ermined in �he fieb.
D. Con�ractor shall coortlina�e wi�h �he mechanical antl
plumbing contractorsforexactlocations otequipment
prior�o mugh-in.
E Fe�er �o shee� E]01 for tle�ails and symbols.
F. Re�e��oshee�E601foNighlfixWreschetlule.
G. Re�er�o shee�E901forelecVicalspeci�ica�ions.
H. Sharetl neuVals shall not be permitletl.
J. Note "H" clips are notacceptable forlunclion box
supporting.
K. Switches shall be a maximum t48" AFF. to Ne �op o!
Ne tlevice unless otherwise notetl.
L Fecep[acles,�elephone outlels, antltelevision outlets
shall be a minimum o! +18" AFF. to [he boVom ol ihe
tlevice unless o�herwise notetl.
M. Where tlevices areinstalled intire walls.the boxes shall
be raletl antl sealetlforins[alla�ion in afire wall.
N. Provitle HACF circuitbreakersfor all HVAC and
reGigeration equipmen�.
P. No contlui� to be supporled from �he roof tleck.
Q Coortlina�e all �loor cm means and me�hods oi roming
condui��hroughtloorpnor.
Plan Notes:
1O Reuse existing gondola circuitsinthis area.
O2 Circuit�o exis�ing Panel'F2". Utilize existing 120 volt 20
amp circui� breakers abandonetl from demolition.
Pmvitle antl ins�all new cirwi� breakers as requiretl.
�3 Girouit�o exis�ing Panel "F'L U91rze exis�ing 120 vol�, 20
amp circui� breakers abantlonetl Gom tlemolition.
Pmvitle antl ins�all new cirwi� breakers as requiretl.
O4 Connect to new equipment location as required. Feuse
exiating circult(s) whera appliceble or new clrcWtto
available space in existing 120/208 vol[ panel.
O5 Ceilinq mountedforaccess point.
O6 Provitle antlinslalla 3'plugsVip wi�h single-plex 6"o.c.
above coun�erlop.
O9 Cu�, pa�ch antl repair floor in-hintl for circui� rou�inq
underslab.
ID Verify equipment electrical connection with owner prior
�o rough-in.
11 Conned to new equipment loca�ion as required. Reuse
exisfing cimuit(s) where applicable or new cirouitm
availabla space in existing 120/208 volt peneL 120 volt,
20 amp circui� breaker.
12 ProvideshunC�ripcircuitbreaker.
PLAN REVIEW/PEFMIT SET
i�meam. t
�tlaneC P� tltl . SM1
3n
614ID20
ARCHITECT:
SITE ARCHITECTURE
atini�a��. ia�m�Pa atini�e��
PROJECTCONTHCT�.
BRA� SMITH, RA I LEE� AP
13144 EASTi06TH STREET
NOBLESVILLE,IN.06060
PH'. 3P.3]6.8]20
EJr1AIL�.b�atlQsite-ercM1iteclure wm
MEP ENGINEER:
THE ENGINEERING
COLLABORATNE
PROJ W T CONTACT:
SAM HURT. P.E.
2410 EXEIXITIVE DRIVE SUITEIO�
INDIANAPOLIS,IN.4624�
PH�.911638 994�
6MAIC. sum@Ico-map.aom
�
W
� y/
� �
Q �
` �
W
2>�
W�W
�a�
� � V!
� r/A
��/ � W
L, f. Z �
�I.� L� �
� � �
W
WZ�n
W�
Z��
FIRST FLOOR POWER -
AREA2ENLARGED
PLAN
RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 07�� 3�20
� KEY PLAN
E204
M
M
0
t0
�
Z
J
C
/a\
V
2020-007