Loading...
HomeMy WebLinkAboutElectrical_E20501 FIRST FLOOR POWER - AREA 3 ENLARGED PLAN SCALE: 3/16" = 1'-0" Plan Notes: 1O Reuse existing gontlola circuitsinihls area. O2 Circuit �o exis�inq Panel "F2". lltilire exislinq 120 vol�, 20 amp circuit breakers abandoned irom demolition. Provide antlinstail new circuitbreakers as required. 3� Gmuit�oexisNngPanel'F'L UNlrzeexisfing120vo1;20 amp circuit breakers abantloned �mm tlemoli�ion. Provide antlinstail new circuitbreakers as required. aO Connectto new equipmeN loca�ion as required. Reuse exis6ng cimuit�s) whera eppliceble or new airwp �o available space in exisling 120/208 volt panel. OS Ceiling moun[etl �or access poin�. O6 Provitle antlinstalla 3'plugsVip wi�h single-plex 6" o.c. above coun[etlop. O9 Cu[, pa[ch antl repair floor imkintl tor circuit routing untlerslab. 10 Verily equipmen� elecVical connedion wi�h owner prior m rough-in. 11 Connect to new equipmen� location as requiretl. Feuse exis�ing circui��s)where applicable ornew circui��o available space in exisling 12m208 volt panel. 120 volp 20 amp circui� breaker. General Notes: A. All 120 volt 20 amp circui�s over 60' in leng�h shall be #10 AWG, over 95'shall be k8, over 145' shall be #6. B. Conlrec�or shall coortlinate with all olher Vatles [o avoitl conflicis of space. G Conlrec�or shall coordina�e Ihe exac� loca�ion of all tlevices with allo�herVatles prior[o rough-in. Exact location to be determinetl in the fieb. �. Conlrec�or shall coordina�e wi�h �he mechanical and plumbing contraQors tor exact locations oi equipment prior to rough�in. E. Refer�o shee� E�01 for details antl symbols. E Referto sheet E601 for iight fixture schedWe. G. Refer�o shee� E901 for electrical specifiw�ions. H. Sharetl neuVals shall not be permi�tetl. J. No�e"H" clips are not acceptable�orlunc�ion box suppotling. K Swi[chesshallbeamaximum.48"A.F.F.tothetopof �he tlevice unless o�herwise no�etl. L Receptacles,telephone oulle�s.antl�elevision outlets _._�� ._ a minimum of +18" A.F.F. �o ihe bo�tom of [he nless o�herwise no�etl. evices areinstalletlintire walls.[he boxes shall antl sealetlforinstallationin atire wall. HACR circuit breakers for all HVAC and lion equipmen�. ui� �o be supported irom �he roof deck. e�e all �loor cu� means antl me�hods oi mu�ing hmugh floor prior. w � L �� U^1 � W �� H� U U` � W °' H� � U 2 � � U� � �` �^' \ W � �� W a� � � � - U ' /� L V% � PLAN REVIEW/PEFMIT SET i�meam. t �tlaneC P� tltl . SM1 3n 614ID20 ARCHITECT: SITE ARCHITECTURE atini�a��. ia�m�Pa atini�e�� PROJECTCONTHCT�. BRA� SMITH, RA I LEE� AP 13140 EASTi06TH STREET NOBLESVILLE,IN.06060 PH'.3P.3]4.BR0 EJr1AIL�.b�atlQsite-ercM1iteclure wm MEP ENGINEER: THE ENGINEERING COLLABORATNE PROJ W T CONTACT�. SAM HURT. P.E. 2410 EXEIXITIVE DRIVE� SOITE 10� INDIANAPOLI3, IN 4624 PH�.9� / 638 994� 6MAIC. sum@Ico-map.ao H W �N OC � aw �� w 2>� W�w �a� ��� � H ��/ N tG L, f. Z � �I.� L� � �Qw W W Z � � Z H � M M O t0 � Z J � Q V FIRST FLOOR POWER - AREA3ENLARGED PLAN RELEA5E0 FOR CONSTRIlCTION Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��. DATE: 07�� 3�20 � KEY PLAN E205 2020-007