HomeMy WebLinkAboutElectrical_E20501
FIRST FLOOR POWER - AREA 3 ENLARGED PLAN
SCALE: 3/16" = 1'-0"
Plan Notes:
1O Reuse existing gontlola circuitsinihls area.
O2 Circuit �o exis�inq Panel "F2". lltilire exislinq 120 vol�, 20
amp circuit breakers abandoned irom demolition.
Provide antlinstail new circuitbreakers as required.
3� Gmuit�oexisNngPanel'F'L UNlrzeexisfing120vo1;20
amp circuit breakers abantloned �mm tlemoli�ion.
Provide antlinstail new circuitbreakers as required.
aO Connectto new equipmeN loca�ion as required. Reuse
exis6ng cimuit�s) whera eppliceble or new airwp �o
available space in exisling 120/208 volt panel.
OS Ceiling moun[etl �or access poin�.
O6 Provitle antlinstalla 3'plugsVip wi�h single-plex 6" o.c.
above coun[etlop.
O9 Cu[, pa[ch antl repair floor imkintl tor circuit routing
untlerslab.
10 Verily equipmen� elecVical connedion wi�h owner prior
m rough-in.
11 Connect to new equipmen� location as requiretl. Feuse
exis�ing circui��s)where applicable ornew circui��o
available space in exisling 12m208 volt panel. 120 volp
20 amp circui� breaker.
General Notes:
A. All 120 volt 20 amp circui�s over 60' in leng�h shall be
#10 AWG, over 95'shall be k8, over 145' shall be #6.
B. Conlrec�or shall coortlinate with all olher Vatles [o avoitl
conflicis of space.
G Conlrec�or shall coordina�e Ihe exac� loca�ion of all
tlevices with allo�herVatles prior[o rough-in. Exact
location to be determinetl in the fieb.
�. Conlrec�or shall coordina�e wi�h �he mechanical and
plumbing contraQors tor exact locations oi equipment
prior to rough�in.
E. Refer�o shee� E�01 for details antl symbols.
E Referto sheet E601 for iight fixture schedWe.
G. Refer�o shee� E901 for electrical specifiw�ions.
H. Sharetl neuVals shall not be permi�tetl.
J. No�e"H" clips are not acceptable�orlunc�ion box
suppotling.
K Swi[chesshallbeamaximum.48"A.F.F.tothetopof
�he tlevice unless o�herwise no�etl.
L Receptacles,telephone oulle�s.antl�elevision outlets
_._�� ._ a minimum of +18" A.F.F. �o ihe bo�tom of [he
nless o�herwise no�etl.
evices areinstalletlintire walls.[he boxes shall
antl sealetlforinstallationin atire wall.
HACR circuit breakers for all HVAC and
lion equipmen�.
ui� �o be supported irom �he roof deck.
e�e all �loor cu� means antl me�hods oi mu�ing
hmugh floor prior.
w �
L
��
U^1
� W
��
H�
U
U`
�
W °'
H�
�
U
2 �
�
U�
�
�` �^'
\ W
�
��
W a�
� �
�
- U
' /� L
V% �
PLAN REVIEW/PEFMIT SET
i�meam. t
�tlaneC P� tltl . SM1
3n
614ID20
ARCHITECT:
SITE ARCHITECTURE
atini�a��. ia�m�Pa atini�e��
PROJECTCONTHCT�.
BRA� SMITH, RA I LEE� AP
13140 EASTi06TH STREET
NOBLESVILLE,IN.06060
PH'.3P.3]4.BR0
EJr1AIL�.b�atlQsite-ercM1iteclure wm
MEP ENGINEER:
THE ENGINEERING
COLLABORATNE
PROJ W T CONTACT�.
SAM HURT. P.E.
2410 EXEIXITIVE DRIVE� SOITE 10�
INDIANAPOLI3, IN 4624
PH�.9� / 638 994�
6MAIC. sum@Ico-map.ao
H
W
�N
OC �
aw
��
w
2>�
W�w
�a�
���
� H
��/ N tG
L, f. Z �
�I.� L� �
�Qw
W
W Z �
�
Z H �
M
M
O
t0
�
Z
J
�
Q
V
FIRST FLOOR POWER -
AREA3ENLARGED
PLAN
RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 07�� 3�20
� KEY PLAN
E205
2020-007