HomeMy WebLinkAboutElectrical_E206w^'�
L
Ii �
U
� �
.�
��
U
U`
�
w�
�
H�
U
2 �
�
�
U�
�+
Q�
�
�
w�
��
�
- U
' /� L
V% �
General Notes:
A. All 120 volt, 20 amp circui�s over 60' in leng�h shall be
#10 AWG, over 95 shall be N8, over 145'shall be #6.
B. Gonlrac�or shall coortlinate wi�h all olher Vatles to avoitl
confliqs of space.
G Conlrector shall coortlinate Ihe exac� location of all
tlevices with allo�her[ratles priorto rough-in. Exact
loca�ion �o be de�ermined in �he field.
�. Coniractor shall coordinate with the mechanicai antl
plumbing contractorsforexactlocations otequipment
priorto mugh-in.
E. Refer to sheet E��� for tletails and symbois.
F. Refe��oshee�E601bNighlfixWreschedule.
G- Re�er�o shae�E901forelacVioalspeai�ications-
H. Sharetl neuVals shall not be permitletl.
J. Note"H"dips are no�accep�ableforlunction box
supporting.
K. Swi[ches shall be a maximum t48" AFF. to Ne �op o!
the tlevice unless a�herwise notetl.
L Fecep�acles,�elephone ou�lets, antl�elevision ou�le�s
shall be a minimum o! +18" AFF. to �he boVom ol Ihe
tlevice unless o�herwise no�etl.
M. Where tlevices areins�alletlinfire walls.[he boxes shall
be ratetl antl sealetlforins[alla�ion in afire wall.
N. Provitle HACF circuitbreakersfor all HVAC antl
reGigeration equipment.
P. Nocontluittobesupporledfmm�heroottleck.
Q Coortlinate aililoorcutmeans antl methods ofmuting
conduitihroughfloorpnor.
Plan Notes:
1O Reuse existing gondola circuitsinthis area.
O2 Circuitto existing Panel'F2'. Utilize existing 120 volt 20
amp circuit breakers abandonetl from demoiition.
Pmvide antl install new cirwi� breakers as required.
�3 Cirouit�o exisfing Panel "F'L UNlrze exis�ing 120 vol�, 20
amp circuit breakers abantlonetl Gom tlemolition.
Pmvide antl install new cirwi� breakers as required.
O4 Conneclto new equipmen�location asrequired. Feuse
exiating circult(s) whera eppliceble ar new circWtto
available space in exis[ing 120/208 vol[ panel.
OS Ceilingmountedforaccesspoin�.
O6 Provitle antlinstalla 3'plugsVip with single-plex 6"o.c.
above coun�erlop.
O9 Cup patch antlrepairfloorin-hintltorcircuitrou�inq
underslab.
ID Verify equipment electrical connection with owner prior
�o rough-in.
t 1 Conned to new equipment location as required. Reuse
existing oiwult(s) where applicable or new ciroult to
available space in existing 120'208 volt panel. 120 vop,
20 amp circui� breaker.
12 Provideshunbinpcircuitbreaker_
PLAN REVIEW/PEFMIT SET
i�meam. t
�tlaneC P� tltl . SM1
3n
614ID20
ARCHITECT:
SITE ARCHITECTURE
atini�a��. ia�m�Pa atini�e��
PROJECTCONTHCT�.
BRA� SMITH, RA I LEE� AP
13144 EASTi06TH STREET
NOBLESVILLE,IN.06060
PH'.3P.3]6.BR0
EJr1AIL�.b�atlQsite-ercM1iteclure wm
MEP ENGINEER:
THE ENGINEERING
COLLABORATNE
PROJ W T CONTACT:
SAM HURT. P.E.
24ID EXEIXITIVE DRIVE SUITEIO�
INDIANAPOLIS,IN.4624�
PH�.911638 994�
6MAIC. sum@Ico-map.aom
1
W
� y/
� �
Q �
` �
W
2>�
W�W
�a�
� � V!
� r
��/ � �
L, f. Z �
�I.� L� �
� � W
W
WZ�n
W�
Z��
FIRST FLOOR POWER -
AREA4ENLARGED
PLAN
RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 07�� 3�20
� KEY PLAN
E206
M
M
0
t0
�
Z
J
C
/a\
V
2020-007
// �`\ � I 1 1 1 \ V I I L V V I \ 1 V V V L I \—%l l\ L%l T L 1 Y L%l l\ V L V I L%l1 Y
� SCALE: 3/16" = 1'-0"