HomeMy WebLinkAboutMech_M7013tlji
Return Grille with Sound Baffle
Cooling cail
� tlrain pan
1"grea�erthan
ha0 oifan
static pressure
D 9 Pipe Curb
M]0� Scaie: None
Uni� manufacWrers [hreadetl
drain pipe connec�ion (typ)
Routefullsize condensa�e drain pipe�o
�Fullsize neareslfloo�drain.Refertoplumbing
drawingsioriloordreinlocations
��CleanoutPlug Jr
� � �"greaterthanfan
I I s�a�ic pressure
� � Drain line (bo�tom
I a� conneQion only) Full size �
r
\\ T � Cleanou�plug
�L__________
Cooling coil
tlrein pan Blow Throuqh Coil
rUni� manufacWrers [hreatletl
/ tlrein plps connec�lon (ryp)
�� Fullsize
� �Cleanoutplug
Rou�e tull size condensa�e drein pipe to
neares� floor drain. Re�er to plumbing
1"greaterihan tlrawingsforfloortlrainlocations.,
I I fan s�atic pressure
I I
� �
� �� raln lina (bo�Nm
connection only)
\ T________
��L________
PoII size �
Draw Throuah Coil
1"grea[erthan halfaf
fan s�a�ic pressure
Cleanout plug
Roa�
RD�# 12'0 AFF� �
FD-# J
Floor
Duc�as High as
possible (unless
specifietl o[herwise�.
See plans �or sizes.
/i1 Round Diffuser Duct Connection
RELEA5E0 FOR CONSTRUCTION S°a1e "�
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 07�� 3�20
Maximum sag shall be No�es:
� V2" pertoo� ot suppoN �, MetalGc �lexlble tluciwork ahell ba aVechetl using a minlmum of three (3) k8 ahee�
spacing. me�al screws equalty spacetl amuntl �he tluc�work circumference. Duc�work larger
Nan 12" shall have a minimum of �ive (5) #8 sheet metal crews. Screws shall be
� Suppotl sountl batYle Yrom s�mcture
Extentllined sheeMetalto prevent
line of siqht through tluct opening
and eggcrete 9rille
�W
— Cover dum �
opaning wl�h 1/2" \ I \
hartlware clo�h ,'
I �
�SVap braang shall be located at leas[ 1!2" imm the tluctwork entl.
pmvitletl a[ a maximum
a! 3'-0" on centers 2, Non-me�allic ilexible duc�work shall be securetl �o �he sleeve or collar using a
tlraw bantl. If �he duc�work collar exceetls 12", ihe draw bantl mus� be positionetl
Maximumilexible behind a bead onihe metalcollar.
duc� leng�h shall be 3. Insulation antl vapor barriers presen[ on fac[ory-(abriwtetl tlucWork shall be fiVetl
5'-0". over ihe core connection and shall be supplementally secured with a draw band.
4. Flexible duc�work sealing shall be a class "B" seal tor low p�essu�e duc�work.
Detail 1 i Suppotlsystemshallno�tlamageorcauseoubo4rountlshape.
6 Flexible tluc�work shall be a maximum o� 5'-0" in leng�h antl shall NOT be usetl as
an elbow.
. Wiresuppor[.
i+:^.. � U�J
w
�Minimum 1"wide clamp.
� 1" Band clamp with
wire.(Op6onap
Detail 2 Detail 3
D 5 Insulated Flexible Ductwork
M�01 Scale: None
Low pressure
supply branch tluct
Pmvitle shoe � 8" Min.
[ap fining
�—
Collar wi�h manual �
volume tlamper & lock
Insula�edilexible duc[
�o suppty tlifluser
Note'. TiWs "FlexaBooC is an
accep[able al[ema�ive to[his
tle�ail
Sheet metal Vansfer duct as required to
� Iit reWrn air grille with acouslical liner
Line sountl baHle imemalry wi�h
non-�ibmus acous�ic tlucNiner
� � \ \ — W\ \ — � Reinforcing angles as requiredto
receive screws for supporl and
anchorege ol reWrn air grille antl
baFlle where required
Eqqcrate grille J � Acoustical�ile ceiling
(see sohedule) (iteppllcebla -�ieltl
vetly ceiling rype)
Factory ex�ended
panel �o fit ceiling grid
� Insulated il ble
duct to supply
diHuser
No�e=
Provide a a5 degree en�ry square-�o-round fiVing from low pressure
supply branch dmt when the supply diituser branch size equals or
exceeds ihe depih of ihe supply branch ducL Widih shall equal round
difluser brench size, depth shall equal suppty b�anch tluc� depth.
Refer �o supply diifuser plenum conneQion de�ail ii guidelines oi this
de�ailcan no�be me�dueto physicallimita�ions.
A maximum leng�h of 5'�0" oiilexible ductis allowetlin a single mn.
Shee� me�al box � Secure �lexible tlud to
supply tlifWserelbow
fitling with drawband
1-1 �2" i uct wraP �
?� / \ m
Lay-in panelJ m\ `Ceilin
where requiretl `��" *��" supply d'dWser 9
��
24" x 24" supply di1fu52� J
Supply Diffuser and Flexible Duct Connection
� Ceiling
More ihen 30°
Ductotiset
Use radius for more �han 30°
Turning vanex
�
� H H�
90° Sauare Elbow 90' Ratliusetl Elbow
V.D.
�46° Boottap fitOng
Branch offmain
o, Low Velocity Sheet Metal Fittings
M]o� Scale: None
J ��
Supply tliftuser J
Application NOT Acceptable
Secureilexible tluc�to
supply tlifluser elbow
fifling wi�h drewbantl
Sheet metal elbow�
1-V2" tluc� wrep �
Np0,012f12 WBd�hplSBdl
Insulatetl Curb bY RTU �
MFR unless specifietl
o[herwlse �
Coun�erflashing�
Trea�etl 2x4 shimming
toleveltop oicurb
Roopop Uni� 4" flexible tluct connection be[ween roo�
insula�ion and boVom of r00%op onit
— — �Wootlnailer
_ _ � Ficltl applictl can�strip
Supply and
�ew�� a�as
� Rootconstmc�ion. Refer�o
amhi�ecWral drawings for type
Foof strucWre. Reler �o
simcWral tlrawings !or type
Provitle square 90` elbow 1````�
wi�h Wrninq vanes �o 1`�
Vansi�ion �o horizon�al. Do 1`
no� provitle a duq plenum `�
and horizontal tap. If a
square 90� elbowis
impraaical, coordinate�
altema�ive wi�h Engineer
Notes:
t Root curbs shall be provided with pwpedy designed fabricated leveling devices
so equipmen� is level antl �he roof curb is ins�alled �o ma�ch �he roof slope.
2. Provide perimeter angle supporl at all sides between simcWral steel. Slze of
angle basetl on load oi equipment. Minimum size shall be 3" x 3" x V4".
3. Roof cu�bs shall no� be supported by �he moi insula�ion.
4. Coortlina[e loca�ion o� mof curb antl mo� opening wi[h s�mc[ure.
5. Roofinginsulationshallbecontinuousuntler�hemo�[opequipment.
Alternate position o(bolt� �
�
�___J
0 3 Roof Equipment Support Curb Section
M]01 Scale: None
� 1" Flange antl hem
�1-1/2" Pocket slip
1� /`Bo114" on centers
I{. / 1"x 1/B" Band Iron � Flexible material �
V � es specified
f d � Duciwork
I� n--n �— i�a �� —� .
Flangeticonnectlon / NrasherJ / � �Sheetmetalasspea(iedforduciwork
on�an sitle J �
Sheet metal as s ecified for tludwork � ��-����� Mlnimum to 3" maximum
P Ins�alletl.6"nominalwith matenal�aut
Rectanpular Flexible Connection
Flangetl connec�ion
on fan side
� 916" Flange
Bolt a" on centers
///1"x 1!8" Band iron Flexible material as specifietl
� �1"x 1/8"Draw ban� �1"x 1B"Drew bantl
� Rivet 4" on cenlers
O O p
�V2'�1/2'� �.��. m\
` DucMark
14/2" Minimum�o 3" mexlmum
installetl.6" nominal wi�h material taut
Round Flexible Connection
o z Flexible Connection
M]01 Scale: None
30`orless
Duc[oflset
Use mileretl tor 30° or less
w^'�
L
Ii �
U^1
� W
��
H�
U
U`
�
W °'
H�
�
U
2 �
�
U�
�
�` �^'
\ W
�
��
W a�
� U
' /� L
V% �
PLAN REVIEW/PEFMIT SET
m�aa. �
�aa�a.c Po aa '. Sn
a,
s ismeo
ARCHITECT:
SITE ARCHITECTURE
amni�eaure � ienmcepe emnitecmre
PROJECTCONTHCT�.
BRA� SMITH, RA I LEE� AP
13144 EASTi06TH STREET
NOBLESVILLE IN.06060
PH' 311.3]6 BRO
EJr1AIL�.b�atlQsite-ercM1iteclure wm
MEP ENGINEER:
THE ENGINEERING
COLLABORATNE
PROJ W T CONTACT:
SAMHURT P.E.
24ID EXECIITIVE DRIVE,SUITEIO�
INDIANAPOLIS IN.46241
PR 91l 648 994�
6MAIC. sum@Ico-map.aom
W
� y/
� �
Q �
f� G
W
2>�
W�W
�a�
� � N M
� N � �
� Z � �
LLI LL � Z
J F. cn �
W a W �
W Z � �
ZH� V
M701
2020-007
Heavy gauge gaNanizetl steelwi�h J fiberglassinsula�ion
continuous weltled corner seams