Loading...
HomeMy WebLinkAboutMech_M901REQUIFEMENTS OF REGl1LFTORv AGENGIES All ma�erials antl workmanship shall comply with all applicable codes. specifiwtions, local ordinances, indusiry stantlartls, and utiiiry company regWations. In case ofa tliHerence between builtling codes,specifications.statelaws,local ordinances, industry standards. u�iliTy company regula�ions antl Conlrac� Documents, the mos� stringen� shall govem. The Cont�ac�or shall pwmptly no�ity the Owne� in writing o� any such diHerence. Non-Compliance: Should the Con�rac�or perform any work tha� does no� compty wi�h requiremems of applicable building codes, sta�e laws, local ortlinances, indus�ry s�andartls and u�iliTy company regulations. he shail bear alicosis arising in correctingthe deficiencies. qpplicable codes and standards shall include all sta�e laws, local ortlinances, Wili�y company regula�ions and applicablerequiremen�s o�s�a�e plumbing antl mechanicalcotles. Permi�s: ConVactor shall pay �or all building permi�s requiretl by work and permi�s Por opening s�ree�s andior connection�o various Nilities,including�ees fo�wa�e�me�erins�alla�ion and any o�her requiremems necessary m carry om his work. Where stree�s or sitlewalks are wt, same mus� be repairetl to at least as gootl a contlition as they were before, all at the expense oi ihis Con[racmr. Permits shall be pos[ed in a pmminem place auhe building si�e pmperly pm�ec�etl imm the wea�he� and physical damage. GUHRHMEE Contrac�o� shall. by accep�ing �hese Drawings and Specifiw�ions, gua�an�ee: Contractor shall Wmish all material antl equipment as specifietl except where specifietl approval is given by Engineeriorsubs[iW[ion. All ma�erial and equipment shall be ins�alled substantially as shown on drawings antl as requiretl within ihe intent oi ihese Specifications. qll equipmen�. piping, ek., shall be driptigh�. aihight free of vibra�ion. pountling. and o�he� objemionable noises. Con[racmr shall guaran[ee all equipmem, accessories, and ma�erial Wmishetl by him, including ins�allationfora periotl ofone year�rom tla�e offinalacceptance againstalltle�ec�sin ma�erialand workmanship. If any equipmen�, ma[erial, antl/or pipeloin�s,connec�ions.e�c.,fail or do noropera�e satisiac�orily or show undue wear, he will, upon being notified, immediatety remedy defect a� his own expense. WORK AND WORKMHNSHIP Provide all required labor, ma�erials. equipmem antl Contramor's services necessary �or complete ins�allation ofsystems required iniullcon�ormiry wi�h requiremen�s ofaNhori�ies having junstliction, an as indicated on Drawings and herein specified. Finished lob shall be functional antl complete in every detail, including any and all such i�ems required for a comple�e sys�em whe�her or no� these i�ems be specified or shown on �he Drawings. qil such accessories and appunenances shali be providetl antl installetl at no atltlitionai cost to the owner. Special a��ention shall be given �o accessibility oi working patls antl con�mlling patls. Atljus�able pahs shall be within easy �each. Removable patls shall have space for removal. Each ConVactor shall acquaint himseli wi�h details of all work �o be pedormed by o�her trades and �ake necessary steps �o integra�e antl coordinate his work wi�h other hatles. It is assumetl �ha� the Con�rac[or is �amiliarwi�h standard Firs� Class ins�allation pmcetlures. Therebre, these Specifica�ions tlo no� a�temp� to inclutle every detail or ope�ation necessary b� �he complete ins�alla�ion. It should be particularly no�etl tha� the �erms "fumish" antl "provitle" are in�erchangeable and �ha[ each o� �hese means �o pmvide, install antl connect, unless othervuise sta�ed. Whenever �ables or schedules show quaNiry of matenalA they shall no� be used as a guide �o �he Con[rac�or. Each ConVac�or shall be responsible for fumishing all ma[erial no�ed on the Drawings and as speci�ietl. Contractor shan be responsibie for the protection, safekeeping, antl cleanliness of all existing equipmen�. ma[eriaL e[c., located in spaces �o be remotleletl in which he is working. As parl of his responsibiliTy, he shall provide �he necessary covers, s�mctures, etc., as required �o keep all tlitl. wa�er, moisWre and dus� imm equipment The me�hod �he Contrac�or pmposes �o use in pmtecting equipment shali be coortlinated with the Engineer and Owner's representative for appmvai bebre any work is s�ahetl. Any tlamage sustained tluring cons�mdion shall be correc[ed or replaced by �he Con[racmr. ASSIGNMENT OF MISGELLANEOUS WORK Pain[ing: Mechanical Conhac�or will pmvitle prime pain[ing on all fermus me�als such as suppotl s�eel or hangers for mechanical equipmenL Any finish paiming o� mechanical work requireQ inclutling painting steel exposetl to ou[sitle envimnment shall be pain[etl by ihe Mechanical co�o-amo�. PlaHorms and suppotling stantls for mechanical equipment shall be �umished by �he Mechanical Con[ractor unless notetl otherwise. Owner shall give approval prior �o any cutling. All larger holes shall be provitled by o�hers, as tle�ailed in �he s�mctural drawings. Ceiling antl Wall Access Panels: Mechanical ConVactor shall cm antl patch finishetl areas �or panels as requiretl by Ne Mechanical ConVactor. Pmvitle access panels as specitieQ where show¢ or required for access m coils, valves, e[c. A. Acoustical tile Wall or Ceiling: 24" x tt" unless o�herwise no�ed Constmmetl to receive tile ta ma�ch ceiling. Milcor Sryle A. B. Plas�eretl Wall or Ceiling: 24" x 12" unless o�herwise no�etl. Cons[mc�etl to receive plaster �o match adlacent finish. Milcor Sryle B. Cutling and Patching: Mechanical Conhac�or shall wt and pa�ch finished areas as requiretl by the Mechanical ConVacroc Cu� stmcWral ma�erials onty where requiretl a�[er appmval �mm [he Amhitect and Engineer. Disposi�ion oi existing equipmen� which is �o be removed and salvagetl shall remain �he pmpetly of �he Owner antl be sroretl by �he Canhac�or as tlirectetl by �he Owner. Temporery petllllons or bartlere reqNretl to pmtect exls[ing bulltling ar ladlltles shell be pmNtletl by the Mechanical ConVactoc Mechanical ConVac�or shall coordinate necessiry and loca�ion of such pm�ec�ion wi[h Owner. Roof openings antl Oashing requiretl by Mechaniwl ConVaclor shall be by Mechanical Gonlractor. Mechanical ConVac[or is responsible forthe correc[ size antl loca�ion oi same. Coun�etllashing by �he Mechanical Con[rac�or. All oulsitle tlownspou[s shall be by the General ConVactac Downspou[ shoe shall be by Ihe Mechanical ConVacmr. Sani�ary ven� pans antl flashing by the Mechanical ConVactor. Louvers shall be fumished by �he Mechanical Conhac�or. Size and loca�ion shall be verified by �he Mechanical ConVactor. Roof curbs and bases for ventilators, moi intakes and reliei antl fans shali be fumished by ihe Mechanical ConVacmr. DRAW WGS Mechanical Drawings show general arrangemen[ oi all equipmen� antl appur[enances. They shall be followetl as closely as actual building cons�mc�ion antl work o� o�he� Vades will pe�mi�. Mechanical woB shall con�orm to requiremen�s shown on all Drawings. General and ShucWral Drewings shan take precedence over Mechanical Drawings. Because of ihe smail scale of Mechanical Drawings. it is no� possible to intlica�e all o��se�s, �i�[ings and accessories which may be requi�eQ Contrac�o� shall imestiga�e s�mcWral and finish condi�ions aHec�ing work and shall arrange his work accordingly, pmviding such �iflings. valves and accessories as may be required �o meet such conditions without additional cost m the Owner. COORDINATION BETWEEN CONTRACTOFS Each ConVaRor antl SubconVacror shall sWtly all tlrawings applicable �o �his work so comple�e coortlina�ion belween Vades will be aHec�ed. Special aflen�ion shall be given �o poiNs where duc�s cross other duc�s or piping, where lights fi� in�o ceilings and where duc�s, and conduit pass �hm waus ana columns. It is �he responsibili�y of each Comractor and Subcomractor �o leave necessary room br o�her tratles. No ex�ra compensa�ion will be allowed �o cover �he cos� of removing condui�. tlucts, or equipment found encmaching on space required by others. MINOR DEVIATIONS Forthe purpose ofciariry antliegibilitg Drawings are essentiaily diagrammatic atlhough size and loca�ion of equipmen� are tlrawn nearto scale wherever possible. Verify Conhac� Dowment iniorma�ion a� si�e. Drawingsintlicate requiretl sizes antl points oitermination ofducis antl suggested routes.ltis not �heinten�ion ofDrawings�oindica�e allnecessary o�ise�s.lns[allworkin a manner�o coniormto s�mcture, avoid obstmc�ions, p�eserve heatlroom and keep openings and passageways clear. Do not scale from Drawings. ATTACHING TO BUILDING CONSTRUCTION Equipmen� and piping suppotls shell be ettechatl to s�mcWral mambers (beams, ]ois�s, e�o J Rather ihan to iloor or roof slabs. Do not aflach hangars to boflom chord oi slmcWra� members. BHLANCING Work shali be pmvided by the Mechanicai Contractor. Generel: Balance and adlust air and hydwnic sys�ems to achieve comiotl antl pmper opera�ion oi systems and �o capacities intlica�etl on �he tlrawings. A. Use pmcedures as ou�lined in the Na�ional S[antlards for Fieltl Measurements and Instmmemation, currem volume, as published by �he Associa�ed Air Balance Council. Ceni7y balance o� sys�em m be comple�e antl accura�e as shown antl submi� repon m Engineerfor review antl approval. B. I� a piece oi equipment is not opera�ing in a satisiac�ory manne�, coortlina�e wi�h manufacturer �o repair or adNs� as necessary. G Report ro Engineer ii sys�em or piece o� equipmen[ canno[ be atljus�etl to opera�e sa�isfactorily. D. Test antl Balance shail be provitletl by a NEBB, AABC or TABB cerlified Balance ConVador. INSULATION Duc�work Insula�ion A. Service: Air condrtioning and hea�ing supply, iresh (ou�sitle) air in contli[ioned spaces - insula�e en�irely. Ma�erial: 0]S lb/cu fl. Flexible fiberglass 1Y" �hick wi�h flame resis�an� aluminum krafl �oJ jacke�. B. Service: Air conditioning and heating suppty antl return. iresh (outside) air in uncondi�ionetl spaces � insula�e en�irely. Ma[erial: 0]S lb/cu ri Flexible fiberglass 2" �hlck wi�h fleme resis�en� eluminum krett foil lacket (R6 Minlmum) NOTE: All insula�io¢ ra�ing no� �o exceed 25 �lame, 50 smoke and ra�ed for use in reWm air plenum. REFRIGERATION PIPING SVSTEM Service: Refrigerant requiretl by selec�etl equipmen[. Maeimum tlesign: Pressure 525 psig temperaWre 300°F. Piping (above gmuntl): So�t seamless copper linesets as recommentletl by air contli�ioner ManufacWrer, cleaneQ dehytlrated and sealed according �o manufacNrer's recommendations. Conceal all reirigeran� piping unless o�herwise no�ed Con�ac� Engineer for altema�ives ii concealmen[ is not possible. Pertorm an initial tes� af Ihe reGigeration system as follows'. A. Holtl pressure �or 12 hours antl check �or loss o� pressure. Certity reatlings. No�ity equipmen�manufacWrero��es�and allowobservance. B. Draw antl holtl 500 micmn vawum. Holtl for 12 hours antl check for loss of vacuum. No�ity equipmen� manu�acW�er o� �es� and allow observance. Q I� leak(sJ is tle�ec�eQ entire rafrigaren� sys�em shell be aheckatl wph leek detedor. Cau�ian: Any heon [hat might be presen� in area can in�erlere wiN tletectors. Area must be thomughty ventilated. D. Repair any leaks antl repea� above pmcetlure. Repairing leaks untler pressure shall not be tlone. Brazetl loin�s shall be repairetl by using new ma�erial. E Insulate all in�erior refrigeran� suc�ion piping wi�h 2' ilexible elas�omeric insulation. E Insulate all ex�erior reirigeran� piping wi�h 1"ilexible elas�omeric insulation and pmvide a.020" aluminum jacke� sealetl wea[her tigh�. "LOW PFESSURE" DUCTWORK AND ACCESSORIES Cons�mct rec[angular duc� of first qualiry materials in accortlance wi[h SMAGNA-HVAG DUR Gons�mction Stantlartls, Metal antl Rexible. Cmssbreak excep� where rigitl insula�ion is speci�ietl. Cons�mclmunddmtacwrding�orecommenda�ionso�ASHRAEGuitle. Roundtluctshouldbe galvanized spiral unless noted o�herwise. Longitutlinal lock-seam duR is not acceptable. Keep all ductwork, duct system and equipment openings covered with adhesive duct proteetive wrap Iike VenWreTape 1512, until systam s�ah�up. This is �o preventinfrusion otaonsfrm6on tlitl and debris into the duM system, and HVAC equipment. Phenolic tlum by PabDuc� or KoobDuc� is an accep�able atlema�ive �o shee�metal dum and insula�ion in concealetl spaces. Use flanged joints. Submi� detailetl tluc� drawings �or engineer review. Support horizontal tluc� in wall wi�h bank imn sVap hanger if width is under 18" antl wi�h shelf �ype bracke�ifoverl8". Support tlucis suspentled from woi slmcWre with band-type hangers ii maximum is inside 48" and wi[h Vapeze�rype hangers i� over 48". Fitlings: fl Elbows pess ihan 24" witle): Use stantlartl ratlius elbow. Radius sha�l be i5limes witl�h of fittings. C. Elbows (2a" wide and over): Shall be square elbows with Nming vanes. Elbows less �han 36" wide shall have single�bladed vanea Elbows 36" witle and over shall have double-bladed vanes in aiAoil pattem. D. Main �ee connec�ions shall be radius o� square depentling on �he size tluc� reducetl to. Adjus�able spli�ter damper shall be provitled ahead of tee. E Branch �ee connec�ions shall be 45` branch �ake-o�fs. Pmvitle balancing tlampers in branches unless o�he�wise di�ec�etl�o tlelete�hem. E Transitions, raises and dmps shall be buil� so �ha� change in direction oi side oi dmt does not exceetl 30` angle to pwjectetl same side. Provide �lexible connec�ions (FC) a� each inle� antl outle� dmt connec�ion �o every piece o� fan equipmenL Fabric fas[enetl to me[al wi�h tlouble lock seam. Fabric for ortlinary HVAC uses �o be wa�erpmof, fire re�ardan� and sui�able �or �emperatures o� 200°E Manufadurers: Dum�Dyne, Ven�fabrics orequal. Runs oi ilexible duct shall not exceed 5'-0". Flexible dum shall no� be used as an elbow. Pmvide sheet metal elbow a� dii�user neck where �ap is no� out o� �he botlom of the supply main. Fumish antl ins�all balancing tlampers (BD) �or each supply air mnou� antl a[ atltli�ional loca�ions, as shown on �he drawings. Constmc�ion �o be galvanized s�eel, two gauges heavie� �han tluc�. Shatt shall be s�eel wi[h brass bearings. Blatles shall no� exceetl 12" witle antl 48" lang Frames o� same gauge me�al are required where two blatles or more are used. Balancing dampers ro have lock-rype tlamper opera�or and linkage as bes� suits cons[mc�ion and access condi�ions. Dampere wi�h accessible ope�ators to be providetl wi�h locking damper quadrams complete with locking nu�s antl gratlua�ed scale. Dampers wi�h nomaccessible operators providetl with Voung Series 300 concealetl regWator and cover piate compiete with work gear or linkage as required for smoo�h tlamper opera�ion. Dampers in untlerslab duc�s provided with Voung Series 335 atljus�able cover �egulators. Duc� Sealing: Comply wi�h SMACNA s�antlard dmt sealing requiremems �or class "A" dums for all O/A, supply, re[um antl exhaus� tluctwork. H. WaterBasetlJoin�andSeamSealan�: 1. Applica�ion Me�hod: Brush on. 2. Solids ComenC Minimum 65 percem. 3. Shore A Hardness: Minimum 20. 4. Wa�erresistan�. S Moltl antl mildew resis�am. 6. VOC: Maximum 15 g'L (less wa�er�. ]. Maximum S�a�icPressu�e qass: 10-inch wg (2500 Pa�, posi�ive and nega�ive. 8. Service: Intloor orou�door. 9. SubsVa�e: Compa�ible wi�h galvanizetl shee� steel (both PVC coa�etl antl bare), s�ainless steel, or aluminum shee�s. 10. Tape shall no� be accep�able. 1 L Total dm� leekaga re�as shell no� axaeetl 10%- Fire Dempere (FD): A� each peneVation [hmugh fire-re�atl parlitiona pmvltle fire tlampare where indica�ed on drawings �o mee� or exceetl bartier ra�ing. Fire tlampers shall be type "B", UL classified and mee� all NFPA cri�eria �or primary fire dampers. Rame shall be 20 gauge minimum. Blatles shall be 24 gauge minimum. Blatles shall not inlringe on tluc� free area for aidlow. Fusible link shall be ra�ed a� 165°E Closure springs shall be 301 s�ainless s[eeL Finish shall be mill. SMOKEDAMPER A Fabrica�e in acmrtlance wi�h NFPA 90A antl UL SSSS, and as indica[ed. B. Normally Close Smoke Ven� Dampers: Cutlain �ype, opening by graviry upon acWa�ion r i� i i i , o�eemm�harmel mk laxibas�emlasss�aelbedeed aseas�o mvdeconstant 9 P sealing pressure. C. Normally Open Smoke Vent Damper Cutlain �ype, dosing upon ac[uation of elec�m �hermal link, flexible stainless s�eel blade edge seals to pmvide cons�an� sealing pressure, stainless s�eel springs with locking tlevices ensure positive closure tor uni�s mountetl horizon�ally. HVAC WUIPMENT Refer ro Plans antl Schetlule shee[s. If equipment other �han basis of tlesign (schetluletl ManufacWrer) is being considereQ notify �he Engineer and sentl specs for review. w^'� L Ii � U � � .� �� U U` � W °' �� � U 2 � � � U� �` �^' \ W � � W a� � �i � - U ' /� L V% � PLAN REVIEW/PEFMIT SET m�aa. � �aa�a.c Po aa '. Sn a, s is.xaeo ARCHITECT: SITE ARCHITECTURE amni�eaure � ienmcepe emnitecmre PROJECTCONTHCT�. BRA� SMITH, RA I LEE� AP 13144 EASTi06TH STREET NOBLESVILLE IN.06060 PH'.3P.3]6.BR0 EJr1AIL�.b�atlQsite-ercM1iteclure wm MEP ENGINEER: THE ENGINEERING COLLABORATNE PROJ W T CONTACT: SAMHURT P.E. 24ID EXECIITIVE DRIVE, SUITE 10� INDIANAPOLIS IN.46241 PH�.911648 994� 6MAIC. sum@Ico-map.aom � W � v/ Yr � Q � ` ` W 2>� � O � �a� � � N M � N � � p�ZN � LLI LL � Z J F. cn � � Q W � W Z � � WW�Q ZH� V I HVAC SPEpFICATIONS RELEA5E0 FOR CONSTRIlCTION Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��. DATE: 07�� 3�20 M901 2020-007I