HomeMy WebLinkAboutPlumb_P104General Notes:
A. All fiVings. piping, �ixWres, ma�erials, etc. to meet the
current Safe Drinking Water Actwith allo�its
amendmen�s and the Reduction oi Lead in Drinking
water Act.
B- HII wolk shell oomply wph all na6onal, s19�e, locel oodes
and ordinances pertainingtothe workinihis proled.
C. All plumbing �ixWres shall be supplied wi�h intlivitlual
water supply stops antl cotle app�oved traps. Exposed
piping shallbe chmme pla[etl.
�. AIIplumbing�ixWresshallbeins�alletlwi�happmvetl
backflow prevention tlevices.
E No piping shall pass tlirec�ty over elec[rical pawer
tlisVibution cabine�s, panelboartls, e[n ConVactor [o
coartllneta panallocetlons priorto plping Instellatlon.
F. All plumbing ven�s lo be a minimum of 10'-0" Irom any air
Intake. Coordina�e loca�ions wilh HVAC plans.
G. Single mnouts ro plumbing flxWres shall be ihe same
size as on the plumbing fixWre schedule unless
mherwise noted.
H. Concealed gas piping shall be cons�mmed in accordance
wi�h cotle without unions, Wbing titlings or mnning
�hreatls.
I. Gas lines run on mof to be suppor[etl by Roof Top Blox
or similar antl equal. DO NOT USE WMBER FOR GAS
PIPING SUPPOFT.
J. Dry-pipefire pro�ec�ion system shall be usetlin allareas
subleM to�reezing.
K_ HII was�e, wa�er, ven�, gas and condensate lines shown
�o be connected �o �heir associated firture/equipment
unless no�etl otherwise. All equipment and systems
shown mus� be comple�e antl usable upon comple�ion oi
pmleq.
Plan Notes:
1OExtentl case tlrain to nearest hub tlrain.
OConnect new fixture to nearest existing water, waste and
ven� pipes serving removed fixWre. AtljusVex�end
exis�ing u�ilpies as required �o sui� new IixWre
�ype/looa�ioa Repairiloo�/wallin kind, ready M�finish-
�S a"CW &'�"HW down along wall to serve iwo (2) sinks.
Holtl pipes es tlgh��o wall es practicel.
O4 '�"CW 8}"HW down along walL Hold pipes as �ight �o
wall as practical. Ex[entl�'CW &�'HW to serve sink.
Extentl ?"CW�o below slab
OAtljusl exis�ing waste s[ub imm below slab to serve new
floorsink. Repairslabinkindreatlyforfinish.
OConnec� new (ixWre m exis�inq wa�er pipes, servinq
removed flxWre. Atl�usVextentl exisOng utllitiea ea
requiretl b sui� new flxWre �ype'loca�ion.
OConnect new was�e piping to neares� active was�e pipe
oiequalorlargersize. Fleldverityexactsize,bcation,
elavation, materialand contlition ofexistin8 waste pipe;
prior�o statl oiwork.
OConneot new water pipa(s) �o neeras� ective water
plpe(aJ o! aquel or lerger slze. Fieltl verity axacl slza,
loca[ion, eleva[ion, materialantl contlition ofexis[ing
weterpipe(s);prior�o e�etl a�work
ONea�ly saw-cu� existing slab alonq entire path of new
utllity, vetlfy peth prior to statl of work. Repair slab In
kintl, reatly for finish.
10 Provide 1"G line connectetl ro existing hoo8s fire
suppression sys�em �o serve Kitchen Equipment Field
verity exact size, bcatioq material and condltion oi
existing gas pipe;priorto startofwork.
11 Provide 1';'G line conneqed to exis�ing hood's fire
suppression sys�em �o serve Kitchen Equipment Field
verify exacisize,iocation, materiaiantl condition of
exis�ing gas pipe;prior�o statl oiwork.
t2 Provide a"G line to serve Kitchen Equipment. Pwvitle
48" exVa, (lexible gas line in a loop behintl equipment.
Te�her loop to ifs respeqive piece of equipmenL See
Ki�chen Equipmen�5uppller's plansiormorelnforma�ion.
13 This was�e piping mus� be Cas� Imn.
14 Repipe existing floor tlrain �o tlischarge in�o Sanitary
Grease Was�e pipe.
15 Pmvide 1 j"G line �o serve Ki�chen Equipment Pmvide
a8" extra, ilexible gas Ilne in a loop behintl equipment.
Tether loop to ifs respective piece oi equipmenl See
Kitchen EquipmeN Suppliefs plans b� more in�orma�ion.
w^'
Ii
�
�
U
w
H
2
U
�`
\
W
�
V J
�
L
�
U
N
.�
�
U
L
�
�
�
�
U
�
�
�
�
+
W
L
�
�
U^'
W
�
�
U
L
�
PLAN REVIEW/PEFMIT SET
m�aa. �
�aa�a.c Po aa '. Sn
a,
s ismzo
ARCHITECT:
SITE ARCHITECTURE
atini�a�re. ia�m�pa atini�e�re
PROJECTCONTHCT�.
BRA� SMITH, RA I LEE� AP
13144 EASTi06TH STREET
NOBLESVILLE,IN.06060
PH'. 3P.3]6.8]20
EJr1AIL�.b�atlQsite-ercM1iteclure wm
MEP ENGINEER:
THE ENGINEERING
COLLABORATNE
PROJ W T CONTACT:
SAM HURT. P.E.
2410 EXEIXITIVE DRIVE SUITEIO�
INDIANAPOLIS,IN.4624�
PH�.911648 994�
6MAIC. sum@Ico-map.aom
�
1�
�I
i
2w
_ /
W
�
�
�
�
W
J
�
W
Z
M
M
O
m
�
Z
J
C
Q
v
FIRST FLOOR
PLUMBING -AREA 2
ENLARGEDPLAN
RELEA5E0 FOR CONSTRIlCTION
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
DATE: 07�� 3�20
� KEY PLAN
P104
NL
r
Z
WC
C
W
ONw
I.L �
a�
G '�^
� V!
2
N
Z
�
F-
Q
W
�
2
H
m
N
r
r
�
Q
Y/
�
�
�
2020-007