Loading...
HomeMy WebLinkAboutCD102 STORMWATER POLLUTION PREVENTION PLANCULVERT PROTECTION A INLET PROTECTION5 CD501 A STONE CHECK DAM TYP.2 CD502 SILT FENCE, TYP.1 CD501 1.SEE G001 - GENERAL NOTES FOR GENERAL AND SITE PREPARATION NOTES. 2.SEE SHEETS CD104-CD106 FOR SITE STABILIZATION PLAN. LIMITS OF CONSTRUCTION WETLAND MITIGATION SITE BOUNDARY EXISTING WETLAND 5 CD501 3 CD501 1 CD502 1 CD501 2 CD501 EDGE OF WATER INLET PROTECTION CULVERT AND SPILLLWAY PROTECTION STABILIZED CONSTRUCTION ENTRANCE TEMPORARY SEDIMENT FOREBAY TOPSOIL STOCK PILE STONE CHECK DAM SILT FENCE SEALS AND SIGNATURES KEY PLAN DRAWING TITLE PROJECT NUMBER SCALE DRAWING NUMBER DATEREVISSUED FOR 500 PARK BOULEVARD SUITE 800 ITASCA, IL 60143 630.221.1212 www.williams-architects.com WEST PARK: THE CORE 2700 W. 116TH STREET CARMEL, IN 46032 Owner: 44 EAST MIFFLIN STREET SUITE 500 MADISON, WI 53703 608.251.1177 www.smithgroup.com 65% REVIEW 04/20/2020 90% CONSTRUCTION DOCUMENTS 06/01/2020 100% REVIEW 06/19/2020 ISSUED FOR BID 07/14/2020 STORMWATER POLLUTION PREVENTION PLAN 11640 CD102 SHEET NOTES LEGEND N KEYED NOTES 0'80'40'20' SCALE: 1" = 40'MATCHLINE CD101MATCHLINE CD103INLET CONTROL MEASURES TO BE MAINTAINED UNTIL COVER CROP ESTABLISHMENT A CULVERT PROTECTION AND SPILLWAY PROTECTION SHALL CONSIST OF SILT FENCE, SEDIMENT LOG, ROCK OR OTHER BARRIER TO ALLOW WATER TO FLOW WHILE PREVENTING THE MIGRATION OF SEDIMENT INTO THE CULVERT OR SPILLWAY. B