HomeMy WebLinkAboutCD103 STORMWATER POLLUTION PREVENTION PLANTEMPORARY SEDIMENT
FOREBAY
SILT FENCE, TYP.
INLET PROTECTION, TYP.5
CD501
1
CD502
1
CD501
CULVERT
PROTECTION
A TYP.
TOPSOIL STOCKPILE
SPILLWAY
PROTECTION
1.SEE G001 - GENERAL NOTES FOR GENERAL AND SITE PREPARATION
NOTES.
2.SEE SHEETS CD104-CD106 FOR SITE STABILIZATION PLAN.
JANUARY 2, 2020
LIMITS OF CONSTRUCTION
WETLAND MITIGATION SITE BOUNDARY
EXISTING WETLAND
5
CD501
3
CD501
1
CD502
1
CD501
2
CD501
EDGE OF WATER
INLET PROTECTION
CULVERT AND SPILLLWAY PROTECTION
STABILIZED CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT FOREBAY
TOPSOIL STOCK PILE
STONE CHECK DAM
SILT FENCE
STORMWATER POLLUTION
PREVENTION PLAN
11640
CD103
SHEET NOTES
LEGEND
N
KEYED NOTES
SEALS AND SIGNATURES
KEY PLAN
DRAWING TITLE
PROJECT NUMBER
SCALE
DRAWING NUMBER
DATEREVISSUED FOR
500 PARK BOULEVARD
SUITE 800
ITASCA, IL 60143
630.221.1212
www.williams-architects.com
WEST PARK:
THE CORE
2700 W. 116TH STREET
CARMEL, IN 46032
Owner:
44 EAST MIFFLIN STREET
SUITE 500
MADISON, WI 53703
608.251.1177
www.smithgroup.com
65% REVIEW 04/20/2020
90% CONSTRUCTION DOCUMENTS 06/01/2020
100% REVIEW 06/19/2020
ISSUED FOR BID 07/14/2020
0'80'40'20'
SCALE: 1" = 40'MATCHLINE CD102MATCHLINE CD101
INLET CONTROL MEASURES TO BE MAINTAINED UNTIL COVER CROP
ESTABLISHMENT
A
CULVERT PROTECTION AND SPILLWAY PROTECTION SHALL CONSIST
OF SILT FENCE, SEDIMENT LOG, ROCK OR OTHER BARRIER TO
ALLOW WATER TO FLOW WHILE PREVENTING THE MIGRATION OF
SEDIMENT INTO THE CULVERT OR SPILLWAY.
B