HomeMy WebLinkAboutP102.0�
�
�_
`, :
,
10 y�5 �
s���n��g AAV o-
a, 1
10 y$�� �
�I�
II�
i, 3�4.
f�
�I�
II�
li
1-1/2"
II I � 3�4�
I � I�,^
I�
-� I��� --a..-.n�:
II�
I III
� II�
� �II�
II�
��
���
� � II� �
_, / II�
� I�� � � � ,
I II�
.�� ��� . � aP.
14 HS4� 3 4• I II�
/ �1� i�L
�1 �l _______
p ��1����
� AAV AAV
,� - �- -, �
,. �
� � ,I �;
� a
�
� \/ �
� �,
MSB1 �8
� _� �p^ ....�
3/4°� I
ie�h
WS
1
1-1/2"
1°
_ — �--
' �___
� 3 q ��. ooc oriice
HB1 �7 i
4°FS1 �
/ I V_ \ Pli imhinn Flnnr PIQn
RELEA5E0 FOR CONSTRIICTI�N
Su6ject�o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
��n„� i�•va,2,a!
DATE: 07�� 4�20
PLUMBING NOTES
1❑ SEE DETAIL D/P2.1.
Q POINT OF CONNECTION TO EXISTING 1-1/2" DOMESTIC WATER PIPING.
CON7RACTOR TO FIELD �ERIFY SIZE AND LOCATION OF EXISIING PIPING
PRIOR TO CONSiRUC710N FOR CONNEC710N POINT.
�3 1/2° HOT AND WLD WAIER DOWN IN WALL TO LAVATIX2Y. CONNECT TO
LAVATORY A1IXING VALVE AS REQUIRED PER DETAIL B/P2.1. PRONDE 2"
WAS1E DONN IN WALL, 2" VENT UP IN WALL.
�4 3/4° COLD WATER DONTJ IN WALL TO WAIER CLOSET W11H 4" WAS7E
DOWN AND 2" VENT UP IN WALL.
�5 2" FLOOR DRAIN W1TH COMMON 2' WASTE DOWN, COMMON 2'
VENT UP IN WALL.
�6 4" FLOOR SINK WITH 4" WASTE DONM, 2" VENT UP TO AIR
ADMITTANCE VALVE INSTALLED PER MANUFACTURER'S INSIRUCTIONS.
�7 3/4" COLD WATER DONTJ IN WALL W1TH SHUT-OFF VALVE TO HOSE
BIBB. CONNECT WAIER FROM HOSE BIBB TO VACUUMI PUM1P AND DRAIN
TO FLOOR SINK WITH AIR GAP, AS REWIRED PER MANUFACIURER'S
INSTALLATION INSIRUC710NS.
�8 3/4' HOT AND COLD WAIER DOWN IN WALL TO MOP SERVICE BASIN
W1TH 3" WAS1E DONN IN WALL, 2" �ENT UP TO AIR ADMITTANCE VALVE
INSTALLED PER AIANUFACTURER'S INSTRUCTIONS.
�9 ROUIE 3/4" HOT AND COLD WAIER DO'hN IN WALL TO SINK. PROVIDE 2"
WASTE W1TH 2" VENT UP TO AIR ADAIITTANCE VAL4E INSTALLED PER
MANUFAC7URER'S INSIRUC710NS. EX7END 1/2° COLD WATER IN WALL TO
EAIERGENCY EYEWASH AND CONNECT AS REQUIRED.
10 3/4' HOT AND COLD WAIER UP IN WALL FROM BELOW GRADE TO SINK.
CONNECT TO SINK MIXING VALVE AS RE�UIRED PER DETAIL B/P2.1.
PRONDE 2° WASTE DOWN WITH 2" VENT UP TO AIR ADMIITTANCE VAL�E
INSTALLED PER AIANUFACNRER'S INSTRUCTIONS.
11 3/4' HOT AND COLD DOWN IN WALL TO BREAKROOM SINK N17H 2°
WASTE DONN N1TH 2' �ENT UP TO AIR ADMITTANCE VALVE INSTALLED
PER MANUFACTURER'$ INS7RUC710NS. EXTEND HOT WAIER AND DRAIN
PIPING AND CONNECT TO DISHWASHER (PROVIDED BY O1HER5) AS
REOUIRED PER MANUFACIDRER'S INSTALLATION INSTRUC110NS.
12 1/2° COLD WATER DOWN IN WALL TO WALL BOX. EXIEND PIPING W1TH
SHUT-OFF VALVE TO APPLIANCE (PROVIDED BY O7HERS) AND INSTALL
PER MANUFAC7URER'S INSTALLAlION INS7RUC710NS.
13 PRONDE 1-1/4" HOT AND COLD WATER PIPING DOWN IN WALL
TO BELOW FLOOR WITH 3/4" HOT WA7ER RECIRCULATION PIPING
UP FROM BELOW GRADE.
14 3/4° HOT AND COLD UP UNDERCOUNTER FROM BELOW GRADE AND
CONNECT TO SINK INTH �IIXING VALVE AS REQUIRED PER DETAIL B/P2.1.
PRONDE 2" WASTE DOWN, 2' �ENT UP TO AIR ADMITTANCE VALVE
INSTALLED PER MIANUFACNRER'S INS7RUC710NS.
IS ROUIE 3/4" HOT AND COLD WAIER DONN IN WALL TO $INK. CONNECT
TO SINK. PROVIDE 2" WAS7E DOWN TO PLASTER 1RAP (PRONDED BY
OIHERS) W17H 2" VENT UP TO AIR ADMITfANCE VAL�E INSTALLED PER
MANUFACIDRER'S MSTRUCTIONS. SEE DETAIL F/P2.1.
16 SET BALANCING VALVE TO 0.5 GPM. (TYP. 5).
17 POINT OF CONNEC710N TO EXISTING 4° WASTE MAIN. CON7RACTIX2 TO
FlELD �ERIFY EXACT SIZE, LOCATION AN� INVERT PRIOR TO
CONSIRUC110N FOR CONNECTION.
18 CONNECT COLD WAIER AND DRAIN PIPING FROM VISTAPURE WATER
� SYSTEM (PRO`ADED BY OTHERS) TO SINK AS REWIRED PER DENTAL
EQUIPMENT INSTALLA710N INSTRUCTIONS.
19 3' VENT THROUGH ROOF. CONTRACTOR TO FIELD COORDINAIE LOCATION
AND ROU7ING FOR CON7INUOUS RUN 1HROUGH ROOF DECK, MAINTAINING
10' CLEAR FROM BUILDING OPENINGS AND MECHANICAL IXITSIDE AIR
INTAKES.
DEDUCT/ALTERNATES
• REFER TO ARCHITECTURAL SPECIFICATIONS FOR COMPLETE
LIST OF ALTERNATES
• WHERE NOT REQUIRED BY LOCALLY ADOPTED CODES,
CONTRACTOR TO PROVIDE BREAKOUT DEDUCT PRICING TO
NOTINSTALL HOT WATER RECIRCULATION PUMP/SYSTEM.
THIS INCLUDES BUT IS NOT LIMITED TO PIPING, HANGERS,
INSULATION, VALVES, CONTROLS, POWER ETC. ASSOCIATED
WITH THIS SYSTEM.
C�
JOE
C�
N
U
�
C
0
�
O
�
U
�
N
>�
>
C�
C�
C�
0
��
N O
`mP
� o
�
N O
� �
m -
� �
v �
0
c� U
C�
2020-03-31
� �
REVISIONS
k Da�e Descrip�lon
� �
DAiE: 31 MAR 2020
PROJECiNO: 19082
DkA W N BY: 3CE
ISSUED FOR: Consfvcfion
� �
Plumbing
Floor Plan
, P1.1
I
iais aan n.e. w., oe��e�. co sozos
p30335].1998 �
3consultlngenglnears-wm �
�
C�