Loading...
HomeMy WebLinkAboutS300.1 APP B-2020.00426 (ROOF LAYOUT)required for cantilever. BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity. See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever. BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature) Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OC Web-Filler Connection Double BCI Joist®F58 Products PlotID Net Qty Product Length Plies BM-342 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 16' 0" 2 BM-252 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 14' 0" 2 BM-26 2 1-3/4" x 11-1/4" VERSA-LAM® 2.0 3100 SP 18' 0" 2 BM-33 2 1-3/4" x 11-1/4" VERSA-LAM® 2.0 3100 SP 18' 0" 2 BM-35 4 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 46' 0" 4 BM-24 2 1-3/4" x 16" VERSA-LAM® 2.0 3100 SP 18' 0" 2 VERIFYWITHBUILDER PRIOR TO SHIPMENT SOLID BLOCKBM-35DOWN THROUGH1ST FLOOR FOR BEARING BM-24 BM-25BBO4 BM-26BM-33BM-34BM-35 By: Date: 5/13/20 Scale:3/16"=1' BC FRAMER RIMBOARD IS NOT TO BE CUT. IF A PIECE OF RIMBOARD ENDS BETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLY LVL'S UP TO 11-7/8" WITH2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16D SINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 20"-24" WITH2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLY LVL'S UP TO 11-7/8" WITH2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED, FROM BOTHSIDES FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16D SINKER NAILS @12" OC STAGGERED, FROM BOTHSIDES FASTEN ALL 3-PLY LVL'S 20"-24" WITH2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED, FROM BOTHSIDES FASTEN ALL 4-PLY LVL'S UP TO 18" WITH2 ROWS OF 1/2" STAGGERED THROUGHBOLTS @12" OC STAGGERED FASTEN ALL 4-PLYLVL'S 20"-24" WITH3 ROWS OF 1/2" STAGGERED THROUGHBOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACED WITHSDW22634SCREWS UNLESS OTHERWISE NOTED ON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:ROOFCarter Lumber, Franklin INVespa residenceCarter FranklinASSUMES RAFTERS WILL BE COLLAR TIED AND RIDGE WILL NOT POST DOWN FEATHERED LINES INDICATE CEILING JOIST BEARING DIRECTION DOUBLE ARROWS INDICATE CEILING JOIST DIRECTIONS PINKDIAMOND INDICATE ROOF POST DOWNS RED BOXES INDICATE RAFTER BEARING NO OTHER ROOF WEIGHT MAY BEAR ON EWP PRODUCTS GRAY AREAS INDICATE OVERFRAMING 07/15/20 Mike Sheeks