HomeMy WebLinkAboutVESPA (1ST FLR LAYOUT)required for cantilever.
BCI joist blocking
23/32" min. plywood/OSB
into each flange.
Nail with 8d nails
or rimboard closure.
®
F05
See Boise literature for
Nail Boise Rimboard
nail into each flange.
to BCI joist with 8d
Bo ise R
i
mboa
r
d
vertical load capacity.
®
F07
vertical load capacity.
See Boise literature forF07-A
of Boise joist & rimboard for
total vertical load capacity.
Sum vertical load capacities
F07-C
(stacked over wall below)
Load bearing wall above
See Boise literature for
vertical load capacity.
BCI Joist Blocking®
F06
above to bearing below.
Solid block all posts from
F08
required for cantilever.
BCI / AJS joist blocking
LVL Rim
8d nails @ 6" o.c.
®
Inverted hanger
F05-A
against top flange with 1/8"
Boise Rim Board
Web Stiffener for 14" & 16" joists.
5 - 3" (10d) nails
gap between bottom flange
1/8"
Stiffeners are required on both sides
- Hangers with side nailing.
- Any hanger with sides not
containing the top flange
with 3 - 3" (10d)
- Web stiffener nailed
of the joist.
11 7/8" joists, and
nails for 9 1/2" and
of the web when :
Point Load from above > 1500 lbs. (Factored)
Install web stiffeners tight
For Point Load from above:
F16-E
2x block
(stacked over wall below)
1/16"
Load bearing wall aboveF09
10-10d nails.
Nail with
Filler block.
Install tight to top flange.
mount hanger load exceeds 250 lbs.
Backer block required where top
Backer block (12" wide min.)
Nail with 10- 10d nails.
Install tight to top flange.
Joist hanger
F10
(see literature)
Filler Block
Contact Boise EWP Engineering for specific conditions.
Connection valid for all applications.
Nailing 12" OC
Web-Filler
Connection
Double BCI Joist®F58 START FRAMING HERE 16" OCConnector Summary
PlotIDQty ManufProduct Flange
H1 10 IHF17140 None
Products
PlotID Net Qty Product Length Plies
FJ1-1 4 14" BCI® 4500s-1.8 32' 0" 1
FJ2-1 16 14" BCI® 4500s-1.8 28' 0" 1
FJ3-1 3 14" BCI® 4500s-1.8 22' 0" 1
FJ4-1 12 14" BCI® 4500s-1.8 18' 0" 1
FJ5-2 4 14" BCI® 4500s-1.8 18' 0" 2
FJ6-1 3 14" BCI® 4500s-1.8 16' 0" 1
FJ7-1 4 14" BCI® 4500s-1.8 14' 0" 1
FJ8-1 3 14" BCI® 4500s-1.8 10' 0" 1
FJ9-1 2 14" BCI® 4500s-1.8 6' 0" 1
FJ10-1 13 14" AJS® 24 32' 0" 1
FJ11-1 12 14" AJS® 24 24' 0" 1
BM-31 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 14' 0" 2
BM-1 3 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 34' 0" 3
BM-6 1 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 6' 0" 1
BM-32 2 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 28' 0" 2
Ca1 22 1" x 14" BC RIM BOARD OSB 12' 0" 1
Bk1 19 14" BCI® 4500s-1.8 2' 0" 1
Bk2 1 14" BCI® 4500s-1.8 2' 0" 1
steel beams and 2x by otherBM-1STEEL BM-6
BM-31
BM-32 Ca1
Ca1 Ca1 Ca1Ca1Ca1 Ca1
Ca1
Ca1
Ca1
Ca1
Ca1
Ca1Ca1 Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1Bk1Bk1 Bk1Bk1Bk1Bk2FJ5-2
FJ1-1
FJ6-1
FJ5-2
FJ6-1
FJ6-1
H1H1H1
H1
FJ2-1FJ1-1FJ11-1FJ2-1FJ7-1FJ8-1FJ4-1FJ10-1FJ3-1 FJ9-1 Bk1Bk1Bk1 Bk1 Bk11' 4"
1' 4"1' 7"1' 3 3/8"
1' 1 5/8"
1' 4"
By:
Date: 5/13/20
Scale:3/16"=1'
BC FRAMER
RIMBOARDIS NOT TO BE CUT. IF A PIECE OF
RIMBOARDENDSBETWEEN TWO JOISTS, BUTT
THE NEXT PIECE UP TO IT.
Boise I-Joist can be offset up to 3" to avoid vertical plumbing.
Joist
3" max
C L Joist
3" max
C L
OJ-AFASTENALL2-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED
FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED
FASTEN ALL 2-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED
FASTEN ALL 3-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES
FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES
FASTEN ALL 3-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES
FASTEN ALL 4-PLYLVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED
FASTEN ALL 4-PLYLVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED
ALL 1/2" BOLTS , CAN BE REPLACEDWITH SDW22634 SCREWS
UNLESS OTHERWISE NOTEDON THE LAYOUT FOR ALL CONNECTION DETAILS
Revision Date:
Revision Date:1ST FLR FRAMINGCarter Lumber, Franklin INVespa residenceCarter Franklin07/15/20
Mike Sheeks