Loading...
HomeMy WebLinkAboutVESPA (1ST FLR LAYOUT)required for cantilever. BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity. See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever. BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature) Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OC Web-Filler Connection Double BCI Joist®F58 START FRAMING HERE 16" OCConnector Summary PlotIDQty ManufProduct Flange H1 10 IHF17140 None Products PlotID Net Qty Product Length Plies FJ1-1 4 14" BCI® 4500s-1.8 32' 0" 1 FJ2-1 16 14" BCI® 4500s-1.8 28' 0" 1 FJ3-1 3 14" BCI® 4500s-1.8 22' 0" 1 FJ4-1 12 14" BCI® 4500s-1.8 18' 0" 1 FJ5-2 4 14" BCI® 4500s-1.8 18' 0" 2 FJ6-1 3 14" BCI® 4500s-1.8 16' 0" 1 FJ7-1 4 14" BCI® 4500s-1.8 14' 0" 1 FJ8-1 3 14" BCI® 4500s-1.8 10' 0" 1 FJ9-1 2 14" BCI® 4500s-1.8 6' 0" 1 FJ10-1 13 14" AJS® 24 32' 0" 1 FJ11-1 12 14" AJS® 24 24' 0" 1 BM-31 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 14' 0" 2 BM-1 3 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 34' 0" 3 BM-6 1 1-3/4" x 14" VERSA-LAM® 2.0 3100 SP 6' 0" 1 BM-32 2 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 28' 0" 2 Ca1 22 1" x 14" BC RIM BOARD OSB 12' 0" 1 Bk1 19 14" BCI® 4500s-1.8 2' 0" 1 Bk2 1 14" BCI® 4500s-1.8 2' 0" 1 steel beams and 2x by otherBM-1STEEL BM-6 BM-31 BM-32 Ca1 Ca1 Ca1 Ca1Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1Ca1 Ca1 Ca1Ca1Ca1Ca1 Ca1Ca1Ca1Bk1Bk1 Bk1Bk1Bk1Bk2FJ5-2 FJ1-1 FJ6-1 FJ5-2 FJ6-1 FJ6-1 H1H1H1 H1 FJ2-1FJ1-1FJ11-1FJ2-1FJ7-1FJ8-1FJ4-1FJ10-1FJ3-1 FJ9-1 Bk1Bk1Bk1 Bk1 Bk11' 4" 1' 4"1' 7"1' 3 3/8" 1' 1 5/8" 1' 4" By: Date: 5/13/20 Scale:3/16"=1' BC FRAMER RIMBOARDIS NOT TO BE CUT. IF A PIECE OF RIMBOARDENDSBETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLYLVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLYLVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLYLVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACEDWITH SDW22634 SCREWS UNLESS OTHERWISE NOTEDON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:1ST FLR FRAMINGCarter Lumber, Franklin INVespa residenceCarter Franklin07/15/20 Mike Sheeks