HomeMy WebLinkAboutM001.0Indiana 2aZ� PerFarmance Compliance
Praperty �rganizatian
fi978 MCGAIN WAY TSI Energy Solutions
CARMEL, IN 46D33 Michael Hill
Madel: 5�H❑ 317-84B-4fi55
Comrnunity: THE GRflVE AT LEGAC
Builder
THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC
{AS DESIGNED)
Ins ectian Status - ■���ner��S�l�atir�ns
p
Results are projected
This report is based an a propos�d d�sign and does not confirm field enforcement of design �I�m�nts.
Annual Energy Cast
design
Heati ng
Cooling
Water Heating
Mechanical Ventilation
SubTotal - lJsed to determine �ampliance
Lights & Appliances wlout Ventilation
�nsite generatian
Total
Indiana 2D20 PerFormance
��,�o�
$1fi7
$331
$33
$1,fi35
$fi�1
$D
$2,238
Requirements
�
�
�
�
Q
�
�
�
1145
1102.4.1.2
1102.5
1102.5
1104.1 Lighting Equipment E�oisncy
Mandatory Checklist Mandatory cade requirements that are not
checked by Ekatrope must be met.
1103.fi Mechanical Ventilation Rate
1103.6.1 Mechanical Ventilation Efficacy
Design exceeds requirements for Indiana 2020 Perfarrnance campliance by 2.fi°Ia.
Perfarmanr,e-based r,ompliance passes Gy 2,6°/0
Air Leakage Testing
Area-weighted avarage fenestration SHGC
Area-weighted a�erage fenes[ration U-Factor
As ��signed
��,oss
$1 fi0
$331
$1fi
$1,593
$601
$0
$7,194
Air sealing is 4.56 AGH at 5� Pa. It must not exceed 5.00 ACH a[ 5a Pa.
As a 3rd party extension of the oode jurisdiction utilizing these reports, I certify that this energy coda oompliance document has been created in accordance with the requirements of
Ghapter 4 of the adopted International Energy GQnservation Gode basad on Glimate Zone 5. If rating is Projected, I certify that [he building dasign describad harain is consisten[ with
the building plans, specifications, and other calculations submittad with the permit application. If rating is Confirmed, I certify that the address raferenced abo�e has been
inspectedltested and that tha mandatory pro�isions of the IEGC have been installad to rneet or excead the intent of the IECC or will be verified as such by anothar party.
Name
Drganization
Michael Hill
T51 Energy Salutians
Signature:
Date: 6115f20 at 1 �:50 RM
Ekotrope RATER - Version 3.2.3.2450
Indiana 2�20 Performance compliance results calculated using EkotrQpe RATEf2's energy and cQde compliance algQrithm, including appropriate amendments.
Ekotrope R.4TER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered by Ekotrope users.
Ekotrope disclaims all lia6ility forthe information shown on this report.
�978 IVIC�AIN WAI�
Ceiling Attic, R-38
Akaove Grade Walls R-15
Faundation Walls N!A
Framed Flaar R-30
Slab R-10.D Perimeter, R-10.0
Under
Infiltration �.5 ACH54
Window U-Value: D.3, SHGC: 0.28
6uil�ling Features
duct Supply R-25.0, Return R-25.0
Duct Leakage ta Outside 5 CFM251 100 ft2
Total �uct Leakag� 8 CFM251 1D0 ft2 (Post-Canstruction}
Heating Fumace • Natural Gas • 80 AFUE
Coaling Air Canditioner • Electric • 13 SEER
Water Heating Water Heater • Electric • 0.93 Energy Factor
As a 3rd party extansion of the code jurisdi�tion utilizing these reports, I csrtify that this energy code compliance documant has been created in accordance with the requirements of
Ghaptar4 of [hs adopted International Energy Ganservation Code based on Glima[e Zone 5. If rating is Projected, I certify that the building design describad hsrein is consistent with [he
huilding plans, spacifications, and other calculations submitted with the permit application. If rating is Confirmed, I certify that the address refarenced ahove has bean inspectedltested and
tha[ the manda[ory provisions of the IEGG ha�e bean installed to meat or axceed the in[ent of the IEGG or will be vsrifed as such by another party.
Name:
Michael Hill
Signature:
�rganizatian: TSI Energy Solutians Date: fif15120 at 10:50AM
Ekotrape RATER - Version 3.2.3.246a
Indiana �U�O Certificate compliance results calculated using Ekotrope RATER's energy and code compliance algorithm, including appropriate amendments.
Ekotror�e RATER is a RESNCTAcceedited FiCRS Rating Tool. Alf results are based on data entered by Ekotrope users.
�kctrope d scl�ims �II liab I ty fo� t�e in`o�iratio� shc�rrn cn [h s repo�t.
CARMEL, IN 4G033
Builder: PYATT BUILOERS, LLC
Model: SOHO Community: THE GROVE AT LEGACY 78
This repart is hased an a praposed design and daes not canfirm field enforcement nf design elements.
Energy Cade Inspectivn Checklist
Praperty �rganizatian
fi978 MCGAIN WAY TSI Energy Solutions
CARMEL, IN 46D33 Michael Hill
Madel: 5�H❑ 317-84B-4fi55
Comrnunity: THE GRflVE AT LEGAC
THE GROVE AT LEGACY 78
{AS DESIGNED)
Gen�ral Building Information
Conditioned Area �sq ft}
Conditioned Volume (cubic ft)
Insulated Shell Area (sq ft}
Builder
PYATT BUILDERS, LLC
2,279
20,511
5,7$8
Ins ectian Status - ■���ner��S�l�atir�ns
p
Results are projected
The building energy rnodel in Ekotrope reflects the building assemblies and energy features I�sted below. Sometimes energy
features will change in the �eld from what has been modeled. The inspection process should identify any changes and ensure
that the home c�ntinues to meet the applicable energy code.
51ab
� Name: SLAB(1,009 s.f., 1B4 ft_ exteriar perimeterj
Fi-1D perimeter insulation, R-10 under slab insulatian.
Framed Floor
� Name: GARAGE (253 s.f.}
R-0 continuous insulation, R-30 cavity insulation
Insulatian Grade: I
� Name: AMBIENT (1D9 s.f.}
R-0 cantinuous insulation, R-30 cavity insulation
Insulation Grade: I
Foundation Wall
None Present
Ahave Grade Wall
� Name: C�NDIAMB [2,414 s.f.}
R-0 continuous insulation, R-15 cavity insulation
Insulation Grade: I
� Name: C�NDIGAFt [315 s.f.}
R-0 continuous insulation, R-15 cavity insulation
Insulation Grade: I
Energy Cade Inspectivn Checklist
Praperty �rganizatian
fi978 MCGAIN WAY TSI Energy Solutions
CARMEL, IN 46D33 Michael Hill
Madel: 5�H❑ 317-84B-4fi55
Comrnunity: THE GRflVE AT LEGAC
Builder
THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC
{AS DESIGNED)
� Name: C�NDIATTIC [142 s.f.}
R-0 continuous insulation, R-15 cavity insulation
Insulation Grade: I
Rim Joist
� Name: C�NDIAMB [82 s.f.}
R: 11.691
� Name: C�NDIATTIC [i3 s.f.}
Fi: 11.fi91
Ceiling 1 Roof
� Name: MAIN {1,371 s.f.}
R-27.55 cantinuaus insulation, R-1fl.15 cavity insulation
Insulation Grade: I
�paque Doar
� Name: FRQNT (2D s.f.}
U: 0.182
� Name: GARAGE (18 s.f.}
U: 0.182
Glazing
Inspectian Status
Results are projected
� Name: FR�NT (78 s.f.}, U: �.300, SHGC: 0.2fi, �rientatian: S�UTH_EAST
� Name: BACK (88 s.f.J, U: 0.300, SHGC: 0.2�, �rientatian: NOF�TH_WEST
� Name: SLIaER �80 s.f.�, U: 0.30a, SHGC: 0.26, Orientation: N�RTH_WEST
� Name: RIGHT 51DE {95 s.f.), U: D.30D, SHGC: 0.28, Orientation: N�RTH_EAST
� Name: LEFT SIdE (104 s.f.j, U: 0.3�0, SHGC: 0.26, Orientation: 50UTH_WEST
r TSICner�,�S�l�atir�ns
2
Energy Cade Inspectivn Checklist
Praperty �rganizatian
fi978 MCGAIN WAY TSI Energy Solutions
CARMEL, IN 46D33 Michael Hill
Madel: 5�H❑ 317-84B-4fi55
Comrnunity: THE GRflVE AT LEGAC
THE GROVE AT LEGACY 78
{AS DESIGNED)
5kylight
None Present
Mechanical Ventilation
Builder
PYATT BUILDERS, LLC
Inspectian Status
Results are projected
� Mechanical ventilation system rated for, and capable of, pra�iding cantinuous �entilation.
System shall include autamatic timing controls.
System type: Exhaust �nly, 24 hrslday, 18.48 Watts �Default)
Mechanical Equipment
!�!
�
�
Fuel-fired air distribution {1 }• Natural Gas • 10fl°/o Heating Laad @ 8fl AFUE
Air conditi�ner (2} • Electric • 100°I� Caoling Laad @ 13 SEER
Water Heating [3j • Electric • 10D°Io Hot Water Load a� D.93 Energy Factar
Air Leakage Cantrol
� Test 5tatus: Blawer-door tested
House is air-sealed as to achieve 1,538 CFMSa {4.5a ACHSa� or less at final hlower-door test.
In�ltration Requirements for IECC in Climate Zone 5
2�D9 IECC Infiltratian limit for the design home is 7 ACH50.
2�12 IECC Infiltratian limit for the design home is 3 ACH50.
2�15 IECC Infiltratian limit for the design home is 3 ACH50.
2�18 IECC Infiltratian limit for the design home is 3 ACH50.
Duct Leakage
duct System 1
NOT entirely within conditioned space, testing required
Leakage ta Dutside specified as: 5 CFM25 ! 1fl0 ft2
Total Leakage specified as: 8 CFM25 ! 100 ft� {Post-Canstructionj
r TSICner�,�S�l�atir�ns
3
Energy Cade Inspectivn Checklist
Praperty �rganizatian
fi978 MCGAIN WAY TSI Energy Solutions
CARMEL, IN 46D33 Michael Hill
Madel: 5�H❑ 317-84B-4fi55
Comrnunity: THE GRflVE AT LEGAC
Builder
THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC
{AS DESIGNED)
Duct Leakage Cade Requirements for IECC
2009 IECC:
Ins ectian Status - ■���ner��S�l�atir�ns
p
Results are projected
Postconstruction Leakage Test: ❑uct Leakage ta �utdaars �= 8 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total ❑uct Leakage �= fi CFM251 1 DD sq ft CFA.
Rough in Test withoutAHll: Total Duct Leakage �= 4 CFM25 ! 10a sq ft CFA.
2012 IECC and 2015 IECC Prescripti�e Path:
Postconstruction Leakage Test: Total Duct Leakage �= 4 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total ❑uct Leakage E= 4 CFM251 1 DD sq ft CFA.
Rough in Test withoutAHll: Total Duct Leakage �= 3 CFM25 ! 10a sq ft CFA.
2015 Perfarmance Path (Cost Compliance}:
Leakage testing is required UNLE55 all ducts and air handlers are located entirely within the therrnal envelape.
There is no passlfail threshold for duct leakage on the performance path.
Project Notes
4
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
General Building Infarmation
Numbar Of 6edrooms
Number Qf Floors
Conditioned Flaor Area [sq. ft.]
Has Electric Vehicle Ready 5pace
Unconditioned, atta�hed garage?
Conditioned Volume [cu. ft.]
Total Units in Building
Residence Type
Floor Number
Madel
Community
Climate Zone
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Inspectian5tatus ' TS��ner�,�S�l�atir�ns
Results are projected
3
2
2,279
No
Yes
20, 511
1
5ingle family detached
SaHa
THE GROVE AT LEGACY 78
5A
'Foundation Wall
None Present
�Foundation Wall Library List
None Present
51ab
Name Liqrary Type Perimeter Flaor Grade
SLAB R-10, 1'down, 2' in 1fi4 On Grade
Garpet R Exposed Surtace Area Location Enclosing
Masonry Area
1.23 0 1,009.0 R� Exposed Exterior Gonditioned
Spac€
51ab Library List
Name Wall Construction Slab Completely� VJnderslah Perimeter Perimeter Thermal Bre�k Effecti�e R-��lue
Type Insulated. Insulation Width [f[] Insulation Oepth [ft] Insulation R Value
R-14, 1'down, 2' in Wood Frame 1 Other h!o 2 1 10 Yes 10.00
1
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
�Framed Floor
Name Library Type
AMBIENT R-3fl, GR7
GARRGE R-30, GR7
Framed Floor Lihrary List
Name
R-30, GR1
Rim Joist
Name
GONDlAMB
GONDlATTIC
iRim Joist Library List
Name
G7 R-15, OSB
�a��
Name
GONDlAMB
GONDlATTIC
GO N DlGAR
�
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Garpet R
723
123
Effecti�e R-value
27.493
Library Type
G1 R-75, d5B
G1 R-15. OSB
Effective Insulatian R-value
71.697
�
Library Type
G1 R-15 BATT, fl5B
G1 R-15 BATT, fl5B
G7 R-15 Gar Walls
Inspectian Status
Results are projected
Floar Grade
Above Grade
Abave Grada
r TSICner�,�S�l�atir�ns
Surtace Area Lacation
109.0 ft� Exposed Exterior
253.0 ft� Llneonditioned, a[[ached
garage
Surtaee Area
82.0 ft�
73.0 ft�
Surface Colar
Medium
M�diurn
Medium
Laeation
Exposed Exterior
A[[ic
� �
Surface Area Laeation
2,414.0 R� Exposed Ex[erior
142.0 R� A[[ic
315.0 R� Unconditioned, attached garage
�
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
Wall Lihrary List
Name
G7 R-15 BATT, OSB
G7 R-15 Gar Walls
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Effecti�e R-�alue
13.423
11.972
Inspectian Status
Results are projected
Glazing
Name LiGrary Type Wall Assignment Foundation Wall Overhang Oepth O�erhang Ft To �verhang F[ To
Assignment iop 6ottom
BAGK ll-.3fl, SHGC-.26 CON�IAMB 0 0 0
FRONT L1-.30, SHGC-.26 GON�IAMB 0 0 0
LEFTSI�E L1-.30, SHGC-.26 GON�IAMB 0 0 0
RIGHTSI�E L1-.30, SHGC-.26 CONDIAMB 0 0 0
SLIDER L1-.30, SHGC-.26 GON�fAMB 0 0 0
Glazing Library List
Name
Shgc
lJ-facto r
L1-.30, SHGG-.26
5kylight
5kylight Lihrary List
0.26
None Present
None Present
0.3�0
r TSICner�,�S�l�atir�ns
�rientation Surtace Area
Northwas[
Southeast
Southwest
Nor[heast
Northwest
as.o n=
�a.o n=
104.0 f[�
95.0 ft�
8a.0 f[�
�
Building Summary
Property Organixatlon
6978 MGGAIN WAY TSI Energy Solutions
CARMEL, IN 4fiQ33 Michael Hill
Model: 50H0 317-846-4655
Community: THE GROVE AT LEGACY 78
6ullder
THE GROVE RT LEGAGY 78 PYATT BLIILQERS, LLG
[AS QESIGNEQ]
Opaque Door
Name LiqraryType WallAssignment FoundationWall
Assignment
FRdNT Fiberglassl5teel CON�IAMB
Daor
GARRGE FiberglasslSteel GON�IGAR
Door
Dpaque Doar Library List
Name Effective IJ-factor
FiberglasslStael Door 0.182
Inspectian5tatus ' TS��ner�,�S�l�atir�ns
Results are projected
Emittance Solar SurtaceCalor SurfaceArea Lacation
Ahsorptance
0_9 Q.i5 Medium 20.d ft� Exposed Exterior
0_9 Q.75 Medium 18.0 ft� Expased Ex[erior
Raof Insulatian
Name Liprary Type Attic Exteriar Area [s.f.] Clay or Goncrete Roaf
Tiles
MAIN R-38 81own, GR7 7,377 No
Roaf Insulation Library List
Name Has Radiant Barrier
R-38 Blown, GR1 No
Whale Hause Infiltration
Infiltra[ion Measurement Type
4.5 ACH at 50 Pa Blower-door tested
SurFace Golar
Medium
Effective R-value
38.268
S h e Iter C las s
4
5 u rfa ee Area
1,377.0 ft�
Laeation
Attic
4
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Mechanical Ventila#ion
Ventilation Type Ventilatian Rate [f[' 1 Operational haurs per day
Minute]
Exhaust Only 52.8 CFM 2�
Inspectian5tatus ' TS��ner�,�S�l�atir�ns
Results are projected
Fan Wat[s Runs once every three Energy Reco�ery Percent
hours
18.48 Watts (Defaultj Yes Q
Lighting
°I Intcriar Fluorescent °I Interior LEO Lighting °I Exterior Fluorescent °! Exterior LE� Lighting °I Garage Fluorescent °I Garage LEO Lighting
Lighting Lighting Lighting
90 Q 90 0 90 Q
Onsite Generation
None Present
Onsite Generation Library List
None Present
5alar Generatian
None Present
5alar Generatian Lihrary List
None Present
�
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
Conditioning Equipment
Name Library Type
Air conditioner [2}
Fuel-fred air
distrihution {7]
Water Heating [3]
GA13NAfl3Q
310AAV04209Q
RE350"
Organixatlon Inspectian Status
r TSICner�,�S�l�atir�ns
TSI Energy Solutions Results are projected
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Hea[ing Percent Laad Cooling Percent Load Hot Water Percent Load Lacation
0 °%
1 QO°%
0%
100°I
o��
Q �o
0°ti
�°�o
100 %
Conditioned Space
Conditionad Space
Conditioned Space
Equipment Type: 31aAAV��2DS0
Fuel Type Natural Gas
Distributian Type Farced Air
MotorType PSC [Single Speed}
Heating Effciency 80 AFUE
Heating Capacity [kBtulh] 71
Use default EAE No
EAE [kWh} 848
Equipment Type: CA13NA43�
Fuel Type Electric
Distributian Type Farced Air
MotorType PSC (Single Speed}
Cooling Efficiency 13 SEER
Cooling Capa�ity [kBtulh] 27.4
Equipment Type: RE354*
Fuel Type
Distributian Type
Hot Water E�cien�y
Tank Capacity {gal.}
Hot Water Capa�ity [kBtulh]
Recovery Efficiency
Ele�tric
Hydranic Delivery [Radiant}
❑.93 Energy Factor
50
15.4
a.98
�
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
Distrihution System
Distrihutian Type
Heating Equipment
Cooling Equipment
5q. Feet Served
# Retum Grilles
5upply Duct R Value
Return Duct R Value
5upply Duct Area [ft�]
Return Duct ftrea [ft�]
Leakage ta Outdaars
Total Leakage
Total Leakage Duct Test Conditions
Use Default Flow Rate
Duct 1
Duct Location
Percent Supply Rrea
Percent Return Rrea
Duct 2
Duct Location
Percent 5upply Area
Percent Return Area
Duct 3
Duct Location
Percent 5upply Rrea
Percent Return Rrea
Duct 4
Duct Locatifln
Percent 5upply Rrea
Percent Return Area
Duct 5
Duct Location
Percent 5upply Rrea
Percent Return Rrea
Duct 6
Duct Location
Percent 5upply Rrea
Percent Return Rrea
Ceiling Fan
Has CeiVing Fan
Cfm Per Watt
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Inspectian Status
Results are projected
Farced Air
Fuel-firetl air distribukion {1}
Air conditioner [2]
2279
2
25
25
615.33
2�7.9
5 CFM25 1 1 a0 ft2
182.32 CFM25
Post-Canstruction
Yes
Attic {well vented, under insulation}
50
50
Conditioned Space
50
50
Canditioned Space
a
0
Conditioned Space
a
0
Conditioned Space
a
0
Conditioned Space
4
❑
No
100
r TSICner�,�S�l�atir�ns
7
Building Summary
Property
6978 MGGAIN WAY
CARMEL, IN 4fiQ33
Model: 50H0
Community: THE GROVE AT LEGACY 78
THE GROVE RT LEGAGY 78
[AS QESIGNEQ]
Water Distributian
Organixatlon
TSI Energy Solutions
Michael Hill
317-846-4655
6ullder
PYATT BLIILQERS, LLG
Inspectian Status
Results are projected
Water Fixture Type 5tandard
Use defau It Hot Water Pipe Length N❑
Hot Water Pipe Length [ft] 55
At Least R3 Pipe Insulatian? No
Hot Water Recirculation 5ystem? N❑
Recirculaiion System Pipe Loop Length [ft] 20
Drain Water Heat Recavery? Na
Clothes Oryer
Fuel Type
Cef
Field Utilization
Is Dutside Conditianed Space
Clothes DryerAvailable
Electric
Timer Controls
No
Yes
ClOtil@S WaSI1�P
Label Energy Rating
�lectric Rate
Annual Gas Cost
Gas Rate
Capacity
I mef
Is Dutside Conditioned Space
Clothes WasherAvaila6le
704 kWhlYear
0.08lkWh
$23.00
$0.58lTherm
2.874
a.331
N❑
Yes
Appliances and Contrals
Programmable thermastat?
Dishwasher Size
Dishwasher Efficiency
Dishwasher autside Canditioned 5pace?
Rangefauen Fuel
Convectian Oven?
Induction Range?
Rangefflven Outside Gonditioned 5pace?
Refrigerator Consumption
Refrigeratar autside Conditianed 5pace?
Yes
270 kWh
No
Electric
No
N❑
No
709 kWhlYear
No
INotes
r TSICner�,�S�l�atir�ns
�