Loading...
HomeMy WebLinkAboutM001.0Indiana 2aZ� PerFarmance Compliance Praperty �rganizatian fi978 MCGAIN WAY TSI Energy Solutions CARMEL, IN 46D33 Michael Hill Madel: 5�H❑ 317-84B-4fi55 Comrnunity: THE GRflVE AT LEGAC Builder THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC {AS DESIGNED) Ins ectian Status - ■���ner��S�l�atir�ns p Results are projected This report is based an a propos�d d�sign and does not confirm field enforcement of design �I�m�nts. Annual Energy Cast design Heati ng Cooling Water Heating Mechanical Ventilation SubTotal - lJsed to determine �ampliance Lights & Appliances wlout Ventilation �nsite generatian Total Indiana 2D20 PerFormance ��,�o� $1fi7 $331 $33 $1,fi35 $fi�1 $D $2,238 Requirements � � � � Q � � � 1145 1102.4.1.2 1102.5 1102.5 1104.1 Lighting Equipment E�oisncy Mandatory Checklist Mandatory cade requirements that are not checked by Ekatrope must be met. 1103.fi Mechanical Ventilation Rate 1103.6.1 Mechanical Ventilation Efficacy Design exceeds requirements for Indiana 2020 Perfarrnance campliance by 2.fi°Ia. Perfarmanr,e-based r,ompliance passes Gy 2,6°/0 Air Leakage Testing Area-weighted avarage fenestration SHGC Area-weighted a�erage fenes[ration U-Factor As ��signed ��,oss $1 fi0 $331 $1fi $1,593 $601 $0 $7,194 Air sealing is 4.56 AGH at 5� Pa. It must not exceed 5.00 ACH a[ 5a Pa. As a 3rd party extension of the oode jurisdiction utilizing these reports, I certify that this energy coda oompliance document has been created in accordance with the requirements of Ghapter 4 of the adopted International Energy GQnservation Gode basad on Glimate Zone 5. If rating is Projected, I certify that [he building dasign describad harain is consisten[ with the building plans, specifications, and other calculations submittad with the permit application. If rating is Confirmed, I certify that the address raferenced abo�e has been inspectedltested and that tha mandatory pro�isions of the IEGC have been installad to rneet or excead the intent of the IECC or will be verified as such by anothar party. Name Drganization Michael Hill T51 Energy Salutians Signature: Date: 6115f20 at 1 �:50 RM Ekotrope RATER - Version 3.2.3.2450 Indiana 2�20 Performance compliance results calculated using EkotrQpe RATEf2's energy and cQde compliance algQrithm, including appropriate amendments. Ekotrope R.4TER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered by Ekotrope users. Ekotrope disclaims all lia6ility forthe information shown on this report. �978 IVIC�AIN WAI� Ceiling Attic, R-38 Akaove Grade Walls R-15 Faundation Walls N!A Framed Flaar R-30 Slab R-10.D Perimeter, R-10.0 Under Infiltration �.5 ACH54 Window U-Value: D.3, SHGC: 0.28 6uil�ling Features duct Supply R-25.0, Return R-25.0 Duct Leakage ta Outside 5 CFM251 100 ft2 Total �uct Leakag� 8 CFM251 1D0 ft2 (Post-Canstruction} Heating Fumace • Natural Gas • 80 AFUE Coaling Air Canditioner • Electric • 13 SEER Water Heating Water Heater • Electric • 0.93 Energy Factor As a 3rd party extansion of the code jurisdi�tion utilizing these reports, I csrtify that this energy code compliance documant has been created in accordance with the requirements of Ghaptar4 of [hs adopted International Energy Ganservation Code based on Glima[e Zone 5. If rating is Projected, I certify that the building design describad hsrein is consistent with [he huilding plans, spacifications, and other calculations submitted with the permit application. If rating is Confirmed, I certify that the address refarenced ahove has bean inspectedltested and tha[ the manda[ory provisions of the IEGG ha�e bean installed to meat or axceed the in[ent of the IEGG or will be vsrifed as such by another party. Name: Michael Hill Signature: �rganizatian: TSI Energy Solutians Date: fif15120 at 10:50AM Ekotrape RATER - Version 3.2.3.246a Indiana �U�O Certificate compliance results calculated using Ekotrope RATER's energy and code compliance algorithm, including appropriate amendments. Ekotror�e RATER is a RESNCTAcceedited FiCRS Rating Tool. Alf results are based on data entered by Ekotrope users. �kctrope d scl�ims �II liab I ty fo� t�e in`o�iratio� shc�rrn cn [h s repo�t. CARMEL, IN 4G033 Builder: PYATT BUILOERS, LLC Model: SOHO Community: THE GROVE AT LEGACY 78 This repart is hased an a praposed design and daes not canfirm field enforcement nf design elements. Energy Cade Inspectivn Checklist Praperty �rganizatian fi978 MCGAIN WAY TSI Energy Solutions CARMEL, IN 46D33 Michael Hill Madel: 5�H❑ 317-84B-4fi55 Comrnunity: THE GRflVE AT LEGAC THE GROVE AT LEGACY 78 {AS DESIGNED) Gen�ral Building Information Conditioned Area �sq ft} Conditioned Volume (cubic ft) Insulated Shell Area (sq ft} Builder PYATT BUILDERS, LLC 2,279 20,511 5,7$8 Ins ectian Status - ■���ner��S�l�atir�ns p Results are projected The building energy rnodel in Ekotrope reflects the building assemblies and energy features I�sted below. Sometimes energy features will change in the �eld from what has been modeled. The inspection process should identify any changes and ensure that the home c�ntinues to meet the applicable energy code. 51ab � Name: SLAB(1,009 s.f., 1B4 ft_ exteriar perimeterj Fi-1D perimeter insulation, R-10 under slab insulatian. Framed Floor � Name: GARAGE (253 s.f.} R-0 continuous insulation, R-30 cavity insulation Insulatian Grade: I � Name: AMBIENT (1D9 s.f.} R-0 cantinuous insulation, R-30 cavity insulation Insulation Grade: I Foundation Wall None Present Ahave Grade Wall � Name: C�NDIAMB [2,414 s.f.} R-0 continuous insulation, R-15 cavity insulation Insulation Grade: I � Name: C�NDIGAFt [315 s.f.} R-0 continuous insulation, R-15 cavity insulation Insulation Grade: I Energy Cade Inspectivn Checklist Praperty �rganizatian fi978 MCGAIN WAY TSI Energy Solutions CARMEL, IN 46D33 Michael Hill Madel: 5�H❑ 317-84B-4fi55 Comrnunity: THE GRflVE AT LEGAC Builder THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC {AS DESIGNED) � Name: C�NDIATTIC [142 s.f.} R-0 continuous insulation, R-15 cavity insulation Insulation Grade: I Rim Joist � Name: C�NDIAMB [82 s.f.} R: 11.691 � Name: C�NDIATTIC [i3 s.f.} Fi: 11.fi91 Ceiling 1 Roof � Name: MAIN {1,371 s.f.} R-27.55 cantinuaus insulation, R-1fl.15 cavity insulation Insulation Grade: I �paque Doar � Name: FRQNT (2D s.f.} U: 0.182 � Name: GARAGE (18 s.f.} U: 0.182 Glazing Inspectian Status Results are projected � Name: FR�NT (78 s.f.}, U: �.300, SHGC: 0.2fi, �rientatian: S�UTH_EAST � Name: BACK (88 s.f.J, U: 0.300, SHGC: 0.2�, �rientatian: NOF�TH_WEST � Name: SLIaER �80 s.f.�, U: 0.30a, SHGC: 0.26, Orientation: N�RTH_WEST � Name: RIGHT 51DE {95 s.f.), U: D.30D, SHGC: 0.28, Orientation: N�RTH_EAST � Name: LEFT SIdE (104 s.f.j, U: 0.3�0, SHGC: 0.26, Orientation: 50UTH_WEST r TSICner�,�S�l�atir�ns 2 Energy Cade Inspectivn Checklist Praperty �rganizatian fi978 MCGAIN WAY TSI Energy Solutions CARMEL, IN 46D33 Michael Hill Madel: 5�H❑ 317-84B-4fi55 Comrnunity: THE GRflVE AT LEGAC THE GROVE AT LEGACY 78 {AS DESIGNED) 5kylight None Present Mechanical Ventilation Builder PYATT BUILDERS, LLC Inspectian Status Results are projected � Mechanical ventilation system rated for, and capable of, pra�iding cantinuous �entilation. System shall include autamatic timing controls. System type: Exhaust �nly, 24 hrslday, 18.48 Watts �Default) Mechanical Equipment !�! � � Fuel-fired air distribution {1 }• Natural Gas • 10fl°/o Heating Laad @ 8fl AFUE Air conditi�ner (2} • Electric • 100°I� Caoling Laad @ 13 SEER Water Heating [3j • Electric • 10D°Io Hot Water Load a� D.93 Energy Factar Air Leakage Cantrol � Test 5tatus: Blawer-door tested House is air-sealed as to achieve 1,538 CFMSa {4.5a ACHSa� or less at final hlower-door test. In�ltration Requirements for IECC in Climate Zone 5 2�D9 IECC Infiltratian limit for the design home is 7 ACH50. 2�12 IECC Infiltratian limit for the design home is 3 ACH50. 2�15 IECC Infiltratian limit for the design home is 3 ACH50. 2�18 IECC Infiltratian limit for the design home is 3 ACH50. Duct Leakage duct System 1 NOT entirely within conditioned space, testing required Leakage ta Dutside specified as: 5 CFM25 ! 1fl0 ft2 Total Leakage specified as: 8 CFM25 ! 100 ft� {Post-Canstructionj r TSICner�,�S�l�atir�ns 3 Energy Cade Inspectivn Checklist Praperty �rganizatian fi978 MCGAIN WAY TSI Energy Solutions CARMEL, IN 46D33 Michael Hill Madel: 5�H❑ 317-84B-4fi55 Comrnunity: THE GRflVE AT LEGAC Builder THE GROVE AT LEGACY 78 PYATT BUILDERS, LLC {AS DESIGNED) Duct Leakage Cade Requirements for IECC 2009 IECC: Ins ectian Status - ■���ner��S�l�atir�ns p Results are projected Postconstruction Leakage Test: ❑uct Leakage ta �utdaars �= 8 CFM251 100 sq ft CFA. Rough in Test with AHU: Total ❑uct Leakage �= fi CFM251 1 DD sq ft CFA. Rough in Test withoutAHll: Total Duct Leakage �= 4 CFM25 ! 10a sq ft CFA. 2012 IECC and 2015 IECC Prescripti�e Path: Postconstruction Leakage Test: Total Duct Leakage �= 4 CFM251 100 sq ft CFA. Rough in Test with AHU: Total ❑uct Leakage E= 4 CFM251 1 DD sq ft CFA. Rough in Test withoutAHll: Total Duct Leakage �= 3 CFM25 ! 10a sq ft CFA. 2015 Perfarmance Path (Cost Compliance}: Leakage testing is required UNLE55 all ducts and air handlers are located entirely within the therrnal envelape. There is no passlfail threshold for duct leakage on the performance path. Project Notes 4 Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] General Building Infarmation Numbar Of 6edrooms Number Qf Floors Conditioned Flaor Area [sq. ft.] Has Electric Vehicle Ready 5pace Unconditioned, atta�hed garage? Conditioned Volume [cu. ft.] Total Units in Building Residence Type Floor Number Madel Community Climate Zone Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Inspectian5tatus ' TS��ner�,�S�l�atir�ns Results are projected 3 2 2,279 No Yes 20, 511 1 5ingle family detached SaHa THE GROVE AT LEGACY 78 5A 'Foundation Wall None Present �Foundation Wall Library List None Present 51ab Name Liqrary Type Perimeter Flaor Grade SLAB R-10, 1'down, 2' in 1fi4 On Grade Garpet R Exposed Surtace Area Location Enclosing Masonry Area 1.23 0 1,009.0 R� Exposed Exterior Gonditioned Spac€ 51ab Library List Name Wall Construction Slab Completely� VJnderslah Perimeter Perimeter Thermal Bre�k Effecti�e R-��lue Type Insulated. Insulation Width [f[] Insulation Oepth [ft] Insulation R Value R-14, 1'down, 2' in Wood Frame 1 Other h!o 2 1 10 Yes 10.00 1 Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] �Framed Floor Name Library Type AMBIENT R-3fl, GR7 GARRGE R-30, GR7 Framed Floor Lihrary List Name R-30, GR1 Rim Joist Name GONDlAMB GONDlATTIC iRim Joist Library List Name G7 R-15, OSB �a�� Name GONDlAMB GONDlATTIC GO N DlGAR � Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Garpet R 723 123 Effecti�e R-value 27.493 Library Type G1 R-75, d5B G1 R-15. OSB Effective Insulatian R-value 71.697 � Library Type G1 R-15 BATT, fl5B G1 R-15 BATT, fl5B G7 R-15 Gar Walls Inspectian Status Results are projected Floar Grade Above Grade Abave Grada r TSICner�,�S�l�atir�ns Surtace Area Lacation 109.0 ft� Exposed Exterior 253.0 ft� Llneonditioned, a[[ached garage Surtaee Area 82.0 ft� 73.0 ft� Surface Colar Medium M�diurn Medium Laeation Exposed Exterior A[[ic � � Surface Area Laeation 2,414.0 R� Exposed Ex[erior 142.0 R� A[[ic 315.0 R� Unconditioned, attached garage � Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] Wall Lihrary List Name G7 R-15 BATT, OSB G7 R-15 Gar Walls Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Effecti�e R-�alue 13.423 11.972 Inspectian Status Results are projected Glazing Name LiGrary Type Wall Assignment Foundation Wall Overhang Oepth O�erhang Ft To �verhang F[ To Assignment iop 6ottom BAGK ll-.3fl, SHGC-.26 CON�IAMB 0 0 0 FRONT L1-.30, SHGC-.26 GON�IAMB 0 0 0 LEFTSI�E L1-.30, SHGC-.26 GON�IAMB 0 0 0 RIGHTSI�E L1-.30, SHGC-.26 CONDIAMB 0 0 0 SLIDER L1-.30, SHGC-.26 GON�fAMB 0 0 0 Glazing Library List Name Shgc lJ-facto r L1-.30, SHGG-.26 5kylight 5kylight Lihrary List 0.26 None Present None Present 0.3�0 r TSICner�,�S�l�atir�ns �rientation Surtace Area Northwas[ Southeast Southwest Nor[heast Northwest as.o n= �a.o n= 104.0 f[� 95.0 ft� 8a.0 f[� � Building Summary Property Organixatlon 6978 MGGAIN WAY TSI Energy Solutions CARMEL, IN 4fiQ33 Michael Hill Model: 50H0 317-846-4655 Community: THE GROVE AT LEGACY 78 6ullder THE GROVE RT LEGAGY 78 PYATT BLIILQERS, LLG [AS QESIGNEQ] Opaque Door Name LiqraryType WallAssignment FoundationWall Assignment FRdNT Fiberglassl5teel CON�IAMB Daor GARRGE FiberglasslSteel GON�IGAR Door Dpaque Doar Library List Name Effective IJ-factor FiberglasslStael Door 0.182 Inspectian5tatus ' TS��ner�,�S�l�atir�ns Results are projected Emittance Solar SurtaceCalor SurfaceArea Lacation Ahsorptance 0_9 Q.i5 Medium 20.d ft� Exposed Exterior 0_9 Q.75 Medium 18.0 ft� Expased Ex[erior Raof Insulatian Name Liprary Type Attic Exteriar Area [s.f.] Clay or Goncrete Roaf Tiles MAIN R-38 81own, GR7 7,377 No Roaf Insulation Library List Name Has Radiant Barrier R-38 Blown, GR1 No Whale Hause Infiltration Infiltra[ion Measurement Type 4.5 ACH at 50 Pa Blower-door tested SurFace Golar Medium Effective R-value 38.268 S h e Iter C las s 4 5 u rfa ee Area 1,377.0 ft� Laeation Attic 4 Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Mechanical Ventila#ion Ventilation Type Ventilatian Rate [f[' 1 Operational haurs per day Minute] Exhaust Only 52.8 CFM 2� Inspectian5tatus ' TS��ner�,�S�l�atir�ns Results are projected Fan Wat[s Runs once every three Energy Reco�ery Percent hours 18.48 Watts (Defaultj Yes Q Lighting °I Intcriar Fluorescent °I Interior LEO Lighting °I Exterior Fluorescent °! Exterior LE� Lighting °I Garage Fluorescent °I Garage LEO Lighting Lighting Lighting Lighting 90 Q 90 0 90 Q Onsite Generation None Present Onsite Generation Library List None Present 5alar Generatian None Present 5alar Generatian Lihrary List None Present � Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] Conditioning Equipment Name Library Type Air conditioner [2} Fuel-fred air distrihution {7] Water Heating [3] GA13NAfl3Q 310AAV04209Q RE350" Organixatlon Inspectian Status r TSICner�,�S�l�atir�ns TSI Energy Solutions Results are projected Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Hea[ing Percent Laad Cooling Percent Load Hot Water Percent Load Lacation 0 °% 1 QO°% 0% 100°I o�� Q �o 0°ti �°�o 100 % Conditioned Space Conditionad Space Conditioned Space Equipment Type: 31aAAV��2DS0 Fuel Type Natural Gas Distributian Type Farced Air MotorType PSC [Single Speed} Heating Effciency 80 AFUE Heating Capacity [kBtulh] 71 Use default EAE No EAE [kWh} 848 Equipment Type: CA13NA43� Fuel Type Electric Distributian Type Farced Air MotorType PSC (Single Speed} Cooling Efficiency 13 SEER Cooling Capa�ity [kBtulh] 27.4 Equipment Type: RE354* Fuel Type Distributian Type Hot Water E�cien�y Tank Capacity {gal.} Hot Water Capa�ity [kBtulh] Recovery Efficiency Ele�tric Hydranic Delivery [Radiant} ❑.93 Energy Factor 50 15.4 a.98 � Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] Distrihution System Distrihutian Type Heating Equipment Cooling Equipment 5q. Feet Served # Retum Grilles 5upply Duct R Value Return Duct R Value 5upply Duct Area [ft�] Return Duct ftrea [ft�] Leakage ta Outdaars Total Leakage Total Leakage Duct Test Conditions Use Default Flow Rate Duct 1 Duct Location Percent Supply Rrea Percent Return Rrea Duct 2 Duct Location Percent 5upply Area Percent Return Area Duct 3 Duct Location Percent 5upply Rrea Percent Return Rrea Duct 4 Duct Locatifln Percent 5upply Rrea Percent Return Area Duct 5 Duct Location Percent 5upply Rrea Percent Return Rrea Duct 6 Duct Location Percent 5upply Rrea Percent Return Rrea Ceiling Fan Has CeiVing Fan Cfm Per Watt Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Inspectian Status Results are projected Farced Air Fuel-firetl air distribukion {1} Air conditioner [2] 2279 2 25 25 615.33 2�7.9 5 CFM25 1 1 a0 ft2 182.32 CFM25 Post-Canstruction Yes Attic {well vented, under insulation} 50 50 Conditioned Space 50 50 Canditioned Space a 0 Conditioned Space a 0 Conditioned Space a 0 Conditioned Space 4 ❑ No 100 r TSICner�,�S�l�atir�ns 7 Building Summary Property 6978 MGGAIN WAY CARMEL, IN 4fiQ33 Model: 50H0 Community: THE GROVE AT LEGACY 78 THE GROVE RT LEGAGY 78 [AS QESIGNEQ] Water Distributian Organixatlon TSI Energy Solutions Michael Hill 317-846-4655 6ullder PYATT BLIILQERS, LLG Inspectian Status Results are projected Water Fixture Type 5tandard Use defau It Hot Water Pipe Length N❑ Hot Water Pipe Length [ft] 55 At Least R3 Pipe Insulatian? No Hot Water Recirculation 5ystem? N❑ Recirculaiion System Pipe Loop Length [ft] 20 Drain Water Heat Recavery? Na Clothes Oryer Fuel Type Cef Field Utilization Is Dutside Conditianed Space Clothes DryerAvailable Electric Timer Controls No Yes ClOtil@S WaSI1�P Label Energy Rating �lectric Rate Annual Gas Cost Gas Rate Capacity I mef Is Dutside Conditioned Space Clothes WasherAvaila6le 704 kWhlYear 0.08lkWh $23.00 $0.58lTherm 2.874 a.331 N❑ Yes Appliances and Contrals Programmable thermastat? Dishwasher Size Dishwasher Efficiency Dishwasher autside Canditioned 5pace? Rangefauen Fuel Convectian Oven? Induction Range? Rangefflven Outside Gonditioned 5pace? Refrigerator Consumption Refrigeratar autside Conditianed 5pace? Yes 270 kWh No Electric No N❑ No 709 kWhlYear No INotes r TSICner�,�S�l�atir�ns �