Loading...
HomeMy WebLinkAboutPacket for BZA HO 07-27-20 Napleton Kia of Carmel Variance Request Docket Nos. PZ-2020-00107 V July 27, 2020 Hearing Officer Carmel Board of Zoning Appeals APPLICANT: Napleton Carmel Imports, LLC dba Napleton Kia of Carmel 1 Oakbrook Terrace, Suite 600 Oakbrook Terrace, IL 60191 ATTORNEY FOR APPLICANT: Nelson & Frankenberger, LLC Jim Shinaver, Attorney Jon Dobosiewicz, Land Use Professional TABLE OF CONTENTS 1. Explanation of Request 2. Site Location Aerial 3. Color Site Plan 4. King Of Glory Location Map and Plans 5. Findings of Fact and Ballot Sheet for Signage Variance 6. Findings of Fact and Ballot Sheet for Landscape Variance TAB 1 TAB 2 Napleton Kia Site Location Map NORTH SITE 96th StreetRandall Drive TAB 3 PLOT DATE (36"x24"): 7/3/2019 9:13 AM DRAWING FILE: P:\2018\00053\D. Drawings\Civil\Exhibits\2019-07-03 - Site Exhibit\2018.00053.CE.2019-07-03.Site Exhibit.dwg Site Exhibit July 3, 2019 0'30' NSCALE:1"=30' Site Exhibit Napleton KIA of Carmel 96th Street & Randall Drive 2018.00053 Carmel, Indiana TAB 4 0'80' NSCALE:1"=80' 40' PLOT DATE (11"x17"): 7/2/2020 4:39 PM DRAWING FILE: P:\2018\00053\D. Drawings\Civil\Exhibits\2020-07-02 - Exhibit\2018.00053.CE.Mitigation Exhibit.dwg Site Exhibit Carmel, IndianaJuly 2, 2020 2018.00053 (XS:W)773.8FT(XS:V)773.8FTFlood Fringe Zone AE BFE:774FTPLOT DATE: 6/2/2020 9:36 AMPLOT SCALE: 1:2.5849EDIT DATE: 6/2/2020EDITED BY: BSCHRAGEDRAWING FILE: P:\2018\00053\D. Drawings\Civil\Construction Documents\Compensatory Storage\2018.00053.CE.C300.GP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 09/25/2019 ADLS/DP 2018.00053 East Side of Brook Vista and Brook View Dr. Carmel, Indiana APPROVAL PENDINGNOT FOR CONSTRUCTIONNAPLETON KIA COMPENSATORY STORAGE EXISTING LEGEND GRADING LEGEND C300 GRADING PLAN PLOT DATE: 6/2/2020 9:37 AMPLOT SCALE: 1:2.5849EDIT DATE: 6/2/2020EDITED BY: BSCHRAGEDRAWING FILE: P:\2018\00053\D. Drawings\Civil\Construction Documents\Compensatory Storage\2018.00053.CE.C300.GP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 09/25/2019 ADLS/DP 2018.00053 East Side of Brook Vista and Brook View Dr. Carmel, Indiana APPROVAL PENDINGNOT FOR CONSTRUCTIONNAPLETON KIA COMPENSATORY STORAGE EXISTING LEGEND GRADING LEGEND C301 COMPENSATORY STORAGE CROSS SECTIONS PLOT DATE: 6/2/2020 9:37 AMPLOT SCALE: 1:2.5849EDIT DATE: 6/2/2020EDITED BY: BSCHRAGEDRAWING FILE: P:\2018\00053\D. Drawings\Civil\Construction Documents\Compensatory Storage\2018.00053.CE.C300.GP.dwg7260 Shadeland Station | Indianapolis, Indiana 46256 TEL 317.547.5580 | FAX 317.543.0270 www.structurepoint.com Project Number CERTIFIED BY ISSUANCE INDEX DATE: PROJECT PHASE: REVISION SCHEDULE NO.DESCRIPTION DATE 09/25/2019 ADLS/DP 2018.00053 East Side of Brook Vista and Brook View Dr. Carmel, Indiana APPROVAL PENDINGNOT FOR CONSTRUCTIONNAPLETON KIA COMPENSATORY STORAGE EXISTING LEGEND GRADING LEGEND C302 COMPENSATORY STORAGE CROSS SECTIONS TAB 5 CARMEL/CLAY BOARD OF ZONING APPEALS BALLOT SHEET for FINDINGS OF FACT – VARIANCE Docket No.: __________________________ Petitioner: Napleton Carmel Imports, LLC dba Napleton Kia of Carmel Request: Flood Hazard Ordinance, Chapter 10, Article 5, Chapter 5 (A) (11) pertaining to off-site mitigation. 1. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 2. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ 3. _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ DATED THIS 27th DAY OF JULY, 2020. __________________________________________________ Board Member TAB 6 CARMEL ADVISORY BOARD OF ZONING APPEALS CARMEL, INDIANA Docket No.: ______________ Petitioner: Napleton Carmel Imports, LLC dba Napleton Kia of Carmel Request: Flood Hazard Ordinance, Chapter 10, Article 5, Chapter 5 (A) (11) pertaining to off-site mitigation. FINDINGS OF FACT - DEVELOPMENT STANDARDS VARIANCE 1. The approval of the requested variances will not be injurious to the public health, safety, morals and general welfare of the community because: The approval of the requested variance will not be injurious to the public health, safety, morals and general welfare of the community because the Carmel Department of Engineering has reviewed and approved the off-site mitigation plan that is the subject of the requested variance. 2. The use and value of the area adjacent to the property included in the variance will not be affected in a substantially adverse manner because: The use and value of the area adjacent to the real estate that is the subject of the requested variance will not be affected in a substantially adverse manner because the off-site mitigation plan addresses all necessary engineering standards in a manner consistent with providing mitigation on-site. 3. The strict application of the terms of the Zoning Ordinance to the property will result in practical difficulties in the use of the property because: Strict application of the Zoning Ordinance results in practical difficulties in the use of the Applicant’s site because the Carmel Department of Engineering has approved the off-site mitigation plan that necessitates the requested variance and absent the variance, the Applicant will be unable to use the Real Estate for its intended purpose. DECISION IT IS THEREFORE the decision of the Carmel Board of Zoning Appeals that Development Standards Variance Docket No. _________ is granted, subject to any conditions stated in the minutes of this meeting, which are incorporated herein by reference and made a part hereof. Adopted this 27th day of July, 2020. _________________________________________ BOARD OF APPEALS HEARING OFFICER, Member of Carmel Board of Zoning Appeals _________________________________________ SECRETARY, Carmel Board of Zoning Appeals Conditions of the Board are listed on the back. (Petitioner or his representative to sign).