HomeMy WebLinkAboutA009 First Floor I-Joistrequired for cantilever. BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity. See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever. BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature) Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OC Web-Filler Connection Double BCI Joist®F58 Start Framing Here 16" O.C Spacing BM-30 BM-31 BM-32 BM-33BM-34BM-35BM-49Ca1Ca1Ca1Ca1 Ca1Ca1Ca1Ca1Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 FJ8-1 FJ2-1 FJ2-1 FJ1-1 FJ5-1 FJ6-1 FJ3-1 FJ4-1 FJ7-1 Bk1 1X1X 1X1X 1X1X 8"1' 4"1' 4"8"Products PlotID Net Qty Product Length Plies FJ1-1 8 11-7/8" BCI® 5000s-1.8 38' 0" 1 FJ2-1 16 11-7/8" BCI® 5000s-1.8 36' 0" 1 FJ3-1 21 11-7/8" BCI® 5000s-1.8 30' 0" 1 FJ4-1 5 11-7/8" BCI® 5000s-1.8 28' 0" 1 FJ5-1 2 11-7/8" BCI® 5000s-1.8 24' 0" 1 FJ6-1 5 11-7/8" BCI® 5000s-1.8 22' 0" 1 FJ7-1 2 11-7/8" BCI® 5000s-1.8 20' 0" 1 FJ8-1 3 11-7/8" BCI® 5000s-1.8 18' 0" 1 BM-35 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 36' 0" 2 BM-31 3 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 32' 0" 3 BM-34 3 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 30' 0" 3 BM-32 3 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 28' 0" 3 BM-30 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 26' 0" 2 BM-33 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 22' 0" 2 BM-49 2 1-3/4" x 18" VERSA-LAM® 2.0 3100 SP 40' 0" 2 Ca1 23 1" x 11-7/8" BC RIM BOARD OSB 12' 0" 1 Bk1 2 11-7/8" BCI® 5000s-1.8 2' 0" 1 By: Date: Scale:3/16"=1' BC FRAMER RIMBOARD IS NOTTO BE CUT. IF A PIECE OF RIMBOARD ENDS BETWEEN TWO JOISTS, BUTT THE NEXTPIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTEN ALL 2-PLYLVL'S UP TO 11-7/8" WITH 2ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16D SINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 20"-24" WITH 2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLYLVL'S UP TO 11-7/8" WITH 2ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16D SINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 20"-24" WITH 2 ROWS OF 16D SINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLYLVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGERED THROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLYLVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGERED THROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACED WITH SDW22634 SCREWS UNLESS OTHERWISE NOTED ON THE LAYOUTFOR ALL CONNECTION DETAILS Revision Date: Revision Date:1STFLR FRAMINGCarter Lumber, Noblesville INSnellenbergerCarter Noblesville07/21/20 Mike Sheeks