Loading...
HomeMy WebLinkAboutA010 Bonus Room and atic I-Joistrequired for cantilever. BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity. See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever. BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature) Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OC Web-Filler Connection Double BCI Joist®F58 Start Framing Here 16" O.C SpacingSTART FRAMING HERE 16" O.C SPACING Connector Summary PlotIDQty Manuf Product Flange H1 1 Simpson HUS1.81/10 Reverse H2 54 IHF20112 None Products PlotID Net Qty Product Length Plies FJ1-1 4 11-7/8" BCI® 5000s-1.8 36' 0" 1 FJ2-1 8 11-7/8" BCI® 5000s-1.8 32' 0" 1 FJ3-1 6 11-7/8" BCI® 5000s-1.8 28' 0" 1 FJ4-1 1 11-7/8" BCI® 5000s-1.8 24' 0" 1 FJ5-1 25 11-7/8" BCI® 5000s-1.8 20' 0" 1 FJ6-1 6 11-7/8" BCI® 5000s-1.8 16' 0" 1 FJ7-1 1 11-7/8" BCI® 5000s-1.8 14' 0" 1 FJ8-1 13 11-7/8" BCI® 5000s-1.8 12' 0" 1 FJ9-1 4 11-7/8" BCI® 5000s-1.8 4' 0" 1 FJ10-1 30 16" AJS® 24 26' 0" 1 BM-43 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 20' 0" 2 BM-44 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 20' 0" 2 BM-38 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 14' 0" 2 BM-39 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 14' 0" 2 BM-45 2 1-3/4" x 11-1/4" VERSA-LAM® 2.0 3100 SP 34' 0" 2 BM-22 3 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 28' 0" 3 BM-25 1 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 16' 0" 1 BM-26 1 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 16' 0" 1 BM-37 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 14' 0" 2 BM-23 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 12' 0" 2 BM-29 2 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 12' 0" 2 BM-27 1 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 4' 0" 1 BM-48 1 1-3/4" x 11-7/8" VERSA-LAM® 2.0 3100 SP 4' 0" 1 2x by other 1 3 1/2" x 1' 0" Generic Material 40' 0" 1 BBO7 1 3 1/2" x 1' 0" Generic Material 40' 0" 1 STEEL BEAM BY OTHERS 1 3 1/2" x 1' 0" Generic Material 22' 0" 1 2x by other 2 3 1/2" x 1' 0" Generic Material 12' 0" 1 2x by other 1 3 1/2" x 1' 0" Generic Material 10' 0" 1 Ca1 15 1" x 11-7/8" BC RIM BOARD OSB 12' 0" 1 Ca2 9 1" x 16" BC RIM BOARD OSB 12' 0" 1 assumes 2x ceiling framing byother verifyrooflayout withbuilder prior to shipment BBO7BM-22BM-23 STEEL BEAM BY OTHERS H2 BM-25BM-26BM-27 H2 BM-29BM-37 2x by other BM-38BM-392x by other BM-43BM-442x by other 2x by other BM-45 BM-48 Ca2 Ca2Ca2FJ10-1Ca1Ca1 Ca1Ca1 Ca1Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 Ca1 FJ9-1FJ4-1FJ7-1 H2 H2 H2 FJ9-1 FJ5-1 FJ5-1 FJ8-1 FJ2-1 FJ6-1 FJ1-1 FJ3-1 H2H2 H1H2 H2H2 1X1X1' 7"1' 4" By: Date: Scale:1/4"=1' BC FRAMER RIMBOARDIS NOT TO BE CUT. IF A PIECE OF RIMBOARDENDSBETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLY LVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLY LVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLY LVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACEDWITH SDW22634 SCREWS UNLESS OTHERWISE NOTEDON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:2NDFLR FRAMINGCarter Lumber, Noblesville INSnellenbergerCarter Noblesville07/21/20 Mike Sheeks