No preview available
HomeMy WebLinkAboutA011 Roof Stick Frame Detailrequired for cantilever. BCI joist blocking 23/32" min. plywood/OSB into each flange. Nail with 8d nails or rimboard closure. ® F05 See Boise literature for Nail Boise Rimboard nail into each flange. to BCI joist with 8d Bo ise R i mboa r d vertical load capacity. ® F07 vertical load capacity. See Boise literature forF07-A of Boise joist & rimboard for total vertical load capacity. Sum vertical load capacities F07-C (stacked over wall below) Load bearing wall above See Boise literature for vertical load capacity. BCI Joist Blocking® F06 above to bearing below. Solid block all posts from F08 required for cantilever. BCI / AJS joist blocking LVL Rim 8d nails @ 6" o.c. ® Inverted hanger F05-A against top flange with 1/8" Boise Rim Board Web Stiffener for 14" & 16" joists. 5 - 3" (10d) nails gap between bottom flange 1/8" Stiffeners are required on both sides - Hangers with side nailing. - Any hanger with sides not containing the top flange with 3 - 3" (10d) - Web stiffener nailed of the joist. 11 7/8" joists, and nails for 9 1/2" and of the web when : Point Load from above > 1500 lbs. (Factored) Install web stiffeners tight For Point Load from above: F16-E 2x block (stacked over wall below) 1/16" Load bearing wall aboveF09 10-10d nails. Nail with Filler block. Install tight to top flange. mount hanger load exceeds 250 lbs. Backer block required where top Backer block (12" wide min.) Nail with 10- 10d nails. Install tight to top flange. Joist hanger F10 (see literature) Filler Block Contact Boise EWP Engineering for specific conditions. Connection valid for all applications. Nailing 12" OC Web-Filler Connection Double BCI Joist®F58 VERIFYBEAMWILL BE PROPERTYBRACEDTO AVOID MOMENT ISSUES. PLEASE VERIFY VERIFYBEAMWILL BE PROPERTYBRACEDTO AVOID MOMENT ISSUES. PLEASE VERIFY BM-46BM-47Products PlotID Net QtyProduct LengthPlies BM-46 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 36' 0" 2 BM-47 2 1-3/4" x 9-1/4" VERSA-LAM® 2.0 3100 SP 28' 0" 2 By: Date: Scale:1/4"=1' BC FRAMER RIMBOARDIS NOT TO BE CUT. IF A PIECE OF RIMBOARDENDS BETWEEN TWO JOISTS, BUTT THE NEXT PIECE UP TO IT. Boise I-Joist can be offset up to 3" to avoid vertical plumbing. Joist 3" max C L Joist 3" max C L OJ-AFASTENALL2-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 2-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED FASTEN ALL 3-PLY LVL'S UP TO 11-7/8" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLYLVL'S 14"-18" 3 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 3-PLY LVL'S 20"-24" WITH 2 ROWS OF 16DSINKER NAILS @12" OC STAGGERED, FROM BOTH SIDES FASTEN ALL 4-PLY LVL'S UP TO 18" WITH 2 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED FASTEN ALL 4-PLYLVL'S 20"-24" WITH 3 ROWS OF 1/2" STAGGEREDTHROUGH BOLTS @12" OC STAGGERED ALL 1/2" BOLTS , CAN BE REPLACEDWITH SDW22634 SCREWS UNLESS OTHERWISE NOTEDON THE LAYOUT FOR ALL CONNECTION DETAILS Revision Date: Revision Date:ROOFCarter Lumber, Noblesville INSnellenbergerCarter NoblesvilleASSUMES RAFTERS WILL BE COLLAR TIEDANDRIDGE WILL NOT POST DOWN FEATHEREDLINES INDICATE CEILING JOIST BEARING DIRECTION DOUBLE ARROWS INDICATE CEILING JOIST DIRECTIONS PINK DIAMONDINDICATE ROOF POST DOWNS REDBOXES INDICATE RAFTER BEARING NO OTHER ROOF WEIGHT MAY BEAR ON EWP PRODUCTS GRAYAREAS INDICATE OVERFRAMING 07/21/20 Mike Sheeks